Confirmation/backflushing of finished goods

Hello all,
We sometimes produce finished goods using other finished goods.  We have them added to BOMs accordingly, however, during Production Order confirmation CO15 they do not show up in the list of other components. Backflush indicator etc is set.
What's the setting to allow us to confirm them? I poked around in Material Type setup but nothing caught my eye.
Many thanks...

Thank you for your replies! I apologize, I just realized I asked the wrong question. The finished goods components do show up in the confirmation.
The problem is that these finished goods components don't create any demand in MRP. That's because we are on gross requirements planning.
I guess this goes back to my needs to have both independent (PIRs) and dependent (OrdRes) requirements active in MRP, and SAP for some reason doesn't do that.

Similar Messages

  • Material backflush in production order after finished goods GR

    Dear all,
    I once started similiar topic several months ago, but didn't recieved any response. I'm gonna give it another try, so maybe you'll be able to support me after all.
    So, the situation is like this. We have a production order, in which MC team maintained the materials to consume. The problem is, that very often it comes that we have to use same material part, but under 2-3 different partnumbers. E.G.:
    Production order target: 1000 finished goods
    Required materials: Part A 1000 pcs, Part B1 700 pcs, Part B2 300 pcs, Part C 1000 pcs, Part D1 150 pcs, Part D2 450 pcs, Part D3 400 pcs.
    So yes, in case when it is Part B1, B2 and etc. it means that we're using physically the same part, but under different partnumbers. The problem is, that those material are all coming in pieces, not in meters or anything, and we can't allow to have, for example, 0.7 pcs of any of those materials (cause obviously you can't have 0.7 pcs of LCD panels stored in the warehouse).
    It wouldn't be a problem if we could just confirm all operations in production order in 1 batch, but production order is being confirmed partially, every time the pallet with finished goods is being released from production line (we have integrated system, that sends requests to SAP to confirm specific quantity of finished goods in production order). So, as an example, if 1 pallet contains 15 pcs of finished goods, you have 67 confirmations for production order [(66*15)+(1*10)]. And, since all those materials come in PCS, SAP is rounding up consumption if it has decimal, which leads to wrong materials consumption.
    Initially, I had an idea of adding 1 more operation in production order, which was supposed to be a manual use only, after finished goods GR, and MC team supposed to assign those B1\B2 and etc. material to this operation  E.G.:
    Operation 0010 - consume material from work center A
    Operation 0020 - consume material from work center B
    Operation 0030 - finished goods GR (milestone)
    Operation 0040 - consume material from work center C
    My idead was rejected, since I was told that after GR for finished goods is done and you continue consuming materials in production order - it will not be shown in financial reporting (don't know the details, it was quite a straight reject, without much explanation).
    So, question is - is there a way to consume materials after finished goods GR without creating mess in financial reporting, or if not - what other options do I have?
    thank you in advance

    Hi Valentin,
    After GR also you can do goods issue. Till the order status is CLSD (Closed) you can book cost on to the order.
    Two ways to consume materials on order.
    In order component overview maintain the required part number with quantity. GI as can done with reference to order MB1A 261 movement type.
    Directly do GI with MB1A -261 movement type - Input the order number, material number and qty.
    Refer to the below discussion on unplanned GI which was discussed yesterday,
    http://scn.sap.com/message/14850196#14850196
    Thank & Regards,
    Ramagiri

  • Confirmation of Finish Goods Non Valuated for MTO

    Hello SAPper Friends,
    I was doing a Make to Order production with Strategy 20. When I was doing the confirmation with at least four operations, in the first operation was fine, movement type 261 was posted for the components and also in the last operation I have successfully confirmed the production order for the Finish Goods. However when I checked in CO03 - Display Production  Order > Goto > Documented Goods Movements, the Finish Goods has a goods movement = 4 - Goods REceipt for Production, Movement Type = 101 with D/C indicator = S with the Amount in LC = 0.00.
    It was only now that I have taken notice of this. How can I check cost of the production order if these is no cost provided by te confirmation? Please assist me to have this validated.
    Many Thanks,
    Nap

    Hello Mario,
    Thank you very much for your assistance. Btw, I have informed already the client of the strategy 20 that will answer their problem regarding the MTO, i was not aware of the product costing. I have checked that there is a strategy group 25 that might be resulting with a cost for the production of the Finish Goods.
    I need to check on this, again.
    Many Thanks,
    Nap

  • Auto GR but no finish good in component overview in CO11N

    Dear SAPper,
    I use auto gr with control key PP03 standard SAP.
    But when i do confirmation of the operation with PP03 control key, no finish good in
    component overview in CO11N.
    i ever asked about raw mat component always shown in component overview when CO11N although
    i don;t user backflush. I got solution that in OPK4 i should untick "All Component" in good movement box.
    is this the root cause my finish good doesn't shown either in component overview although i used auto gr.
    The condition i need is :
    1. i don't use backflush so no component shown in component overview in CO11N and it should save in screen of confirmation and not save in component overview screen
    2. because auto GR is used so finish good should shown in component overview.
    Please kindly help.
    Thank.
    Best regards,
    Freddy Ha

    Hi Freddy,
    It will not show the GR Quantity in th Component details of the CO11n.
    The confirmed quantity will be the GR Quantity.
    After posting the Confirmation, check the 101 movement for the Assembly with MB51..
    Regards,
    Siva

  • Actual Cost of finished goods in MIGO

    Hi,
    The value of Finished material in FI Document generated in MIGO takes the (Goods Receipt Quantity) X (Planned/Moving average Price from material master), Where as it should take the Total Actual Price calculated after Order Confirmation Based on Actual Material Purchase Price & Actual Activity Posting Value.
    For example:
    Present scenario
    Material-> MIGO QTY>Moving Avg Price -->MIGO FI Document Value
    Finished> 1000  EA> Rs. 10/ EA--
    >Rs. 10,000=00
    Required Scenario:
    MIGO FI Document value= (Purchase Value of Raw Material)+ ((Activity Posted while Confirmation)X(Activity price))
    Thanks.

    Hi,
    What u said is right Mr Kapil.. See when u do GR From Production Order System Calculate Moving Price or Planned Price from
    material Matser .
    As per ur Reuirement u told it should calculate (Raw Material Price + activity+OVHD).
    it is possible only when order quantity is less , suppose say your order qty is 150 mt per day and your Plant capacity is 500mt
    per day production will be done in a half day, sale can be done on same day after Production with the formula what u told.
    If suppose say , Your order is 2000 ton of Oil , it will take u to complete 4 days for your Total production as you told, GR should
    be done on (Raw Material Price + activity+OVHD) formula, you dont know exact activity price for 2000 ton until u finish your total
    production, at the same time until u do GR sales cannot be done. So in SAP Gr is intially done on Moving Average Or Planned
    (Standard Price) , After totla Prodcution GR is Compared with Actual Cost(Raw Material Price + activity+OVHD)= :"Variance".
    Plus are MInus is Reduced or added to Finished Goods Account or PP account during Settlement.
    If any wrong Pls Correct me Experts,
    Pavan

  • Salvage of Finished goods

    Dear Friend ,
    I want to salvage the finished goods and take back raw material in the store .
    Provide me solution for configuration and process .
    Thanks & Regards
    Rajan Keshri

    Hi,
    Is the meaning of "salvage" to utilize the damaged FG? To disassemble it and use the components that are not damaged?
    The most primitive and simple way may be to scrap the FG (MB1A + 551) and "create" the components by MB1A + 552.
    (MB1A + 201 / 202 can also be used)
    You can create BOM for it (where component is the FG, BOM header one of the component, and by-products / co-products the other components) > you can create a disassemble production order based on the BOM > when you carry out the confirmation the components will be created by mvt 101 /531, the FG will be consumed by mvt 261.
    You should decide which scenario to use based on the real situation and business process.
    Regards,
    Csaba

  • How to including the finished goods as raw material to the other FG?

    Hi Gurus,
    Have a nice day!
    We would like to create production order for our semi finished goods and then we will doing confirmation. After we have produced our semi finished goods, we would like to include it in the bom as raw materials for our final FG. But how to handle this situation? Any suggestion on how the procedure to do it that the cost will not be double..when confirming the semi FG production it will generate cost for the usages of it raw materials. The semi FG is valuated then when i included it as raw material into Final FG it will generate cost for consumption in doing confirmation. I dont know the correct term for this scenario. In other word or semi FG will be part as a raw material to the next production.
    Please advise if you have been encountered the same scenario with me.
    Thanks ,
    Weldin

    Hello Gurus,
    Thanks julian for contributing your idea. I really appreciated it.
    Right now all activity in manufacturing FG is combine in one production order. Let say we have two activity one is the extrusion and the other one is bagging and printing. From our current set up, we would like to separate the activity. The idea is one production order for extrusion serve as semi-finished good. Then this semi-FG will be added in the component of our final FG which is the bagging and printing because in actual transaction that would be the procedure. Theoritically, we would like to separate the cost of extrusion activity to bagging activity. That is why we will be trying to figure out how to do it right for the analysis purposes.
    Other of my idea is when  i will set the semi FG to non valuated material. So that when i add  the semi FG as component to our Final FG no double costing happen. But when we will run the costing run it will compute low cost in terms of standard price for our final product.
    Thanks and best regards,
    Weldin angelo

  • Finished Goods BOM Semi finished goods costs

    Dears
    We have Product Costing by order where we have multi level BOM with Phantom Assembly. When we run the costing CK11N we unable to see the cost break at semi finished goods level rather we can only see the cost details by raw material level. We think something wrong with the BOM but unable to find out the reason. Can some one help us in this regard
    Thanks
    Farhan Qaiser

    Hi Ajay,
    I need your help, in the CO03 the production order the GR shows (finished goods) negative value? will it be correct or anything else , i want to confirm to my client.
    one more year end activity,while KKAO we run successfully, but the accounting entry is not generated?will generate accounting entry or not .please explain us. I have posted in forum but not got the correct answer.
    Edited by: arjooo on Apr 11, 2011 6:23 AM

  • Finished Goods valuation at Moving average price.

    Dear Experts,
    My client needs all finished goods are to be valuated at Price Control of <b>V</b> and it has to update the price in the material master when the production order is confirmed for finished goods on a real time basis.
    Is there any configuration for this upart from changing the valuation type from S to V in the Material Master.
    Please help on this.   It is very urgent and I will be grateful for all of you.
    Thanks and Regards
    Sivakumar Subramanian

    The valuation of material happens based on price control in the material master.
    thanks
    Ashok

  • Planning without considering inventory of finished goods.

    Hi
    My users for asking for this, which don't make much sense to me, but I am a beginner in PP module. We are implementing MRP now. They want to input actual Production quantity in MD61 as PIR for the finished good and want MRP to generate Planned orders for whatever the quantity's entered in MD61, regardless of inventory, receipts for the MPS item. They want MRP to only look at component inventory and accordingly create Planned orders for dependant requirements. Is this possible in SAP & how do I do it?
    Thanks
    Suri

    Hi Prasobh
    Users want to continue to use their spreadsheet in arriving at the production plan & input that quantity in MD61 & have MRP create Planned orders for them, so that they can backflush against those planned orders, regardless of inventory situation for those finished goods. I am still not convinced about their decision on that. They want MRP to throw planned orders only when there is shortage of components, so that they can convert those to Purchase req. in order to buy them.
    Appreciate your help..
    regards
    Suri

  • Finished Goods Rework - incorrect inventory after GR

    Dear All,
    What is the normal steps to setup in SAP for Rework of Finished Goods.
    As this moment, we have a wrong inventory for those Rework FG.
    The case is :
    1. Goods return from Customer at Zero value, as we have to help customer to repair and ship back to them
    2. We will create Return Sales Order, and perform goods receive from Customer
    3. We will create Production Order and issue original FG to production line with extra materials + extra labour cost
    4. When Production order complete and confirm, GR to stock, at this moment, the inventory will be at originally cost + extra materials + labour
    As we just want to capture the rework FG cost at extra materials + labour cost.
    How can we do it ?
    Thanks a lot !

    Goods return from Customer at Zero value, as we have to help customer to repair and ship back to them
    Consider you have MTO scenario
    We will create Production Order and issue original FG to production line with extra materials + extra labour cost
    When Production order complete and confirm, GR to stock, at this moment, the inventory will be at originally cost + extra materials + labour
    If you create a production order with out sale order in CO01, system will take a price from material master, , then you will get price as originally cost + extra materials + labour
    If you don't want the price for FG, then follow this process
    send the material into blocked stock
    create a production order in Co07
    enter the extra material in component overview.and  tick the back flush indicator
    confirm the operation in co15 & post the GI
    After confirmation
    move the fg from blocked to unrestricted
    abd do the sale process

  • Production date of finished goods

    Dear Experts,
    How to check production date of finished goods products.
    wilson

    Hi..
    what I would say that production date would be the confirmed finish date.. if you open any production order..there is a field for this confirmed finish date.. it is the field which gets updated when u do the GR of finished product...
    Let me know if u have different requirement.
    I think Prasobh seems to be more accurate to ur requirement...
    Neeraj
    Edited by: NEERAJ BHARDWAJ on Mar 27, 2009 8:12 AM

  • Consumption of finished goods

    Hi All,
    I notice the posting of co11n is dr consumption finished goods cr finished goods account.
    May I know why there is such an accounting posting?
    Thanks

    Unlike many other systems, SAP moves all production activity through the P&L during the month - WIP is only moved back to the balance sheet during month-end processing.
    So, the production value flow (items before the slash are FI accounts, items after the slash are cost objects)
    1. Consume materials
    Dr  consumption  /  order
    Cr  Inventory       /  -
    2. Absorb costs (activity confirmations)
    Dr  -                   /  Order
    Cr  -                   /  CCtr
    ( no postings in FI, secondary cost postings in CO only )
    3. Place finished items in inventory
    Dr  Inv                  /  -
    Cr  Prod. clearing / order
    4. Month-end (settlement):
    If the order is complete, then:
    Dr Variances            / -
    Cr Variances offset / order
    If the order isn't complete, then:
    ( also, the prior month's WIP settlement posting is reversed )
    Dr WIP                     / -
    Cr WIP clearing       / order
    ...at the end of each month, all orders should have a zero balance.  This is the basic value flow for production, very grossly oversimplified.
    The orders pool up costs, and the confirmation clears them back to the balance sheet as inventory.  That's why the credit booked to the order.

  • External Btach Number for Finished Goods

    Hi All....
    We have a  repetitive mfg scenario, where finished goods are managed with external batch numnber. Client has 20+ plants and each plant follows its own number ranges...
    In each plant,each product shud have continuous batch numbers, eg., Product A - Batch number : MA040801 & Product B : MA040801 & respective 2nd batch produced will have ; product A : MA040802 & product B: MA040802 & so on...
    These batch numbers will be entered  in Backflush activity. ( ie., with GR or in Quality management after final GR to quality stock)
    In SAP Batch Management for external Number assignment... what are the settings to be done for the above scenario..?
    looking forward to early reply,
    With regards,
    LN

    To be able to enter external numbers for the no. range object BATCH_CLT the external number check box is to be selected. Tranx OMAD
    If you want to automatically assign an external number as per your criteria you can use the following user exit:
    Set Up Customer Exits for External Batch Number Assignment
         As part of the external batch number assignment, the following two
         function module exits are available in the SAP enhancement SAPLV1ZE for
         checking a new batch number that has been entered.
         o   EXIT_SAPLV01Z_003. Using this exit, you can replace the proposed
             number range object BATCH_CLT and/or external interval 02 with a
             number range object and/or external interval you have defined
             yourself.
             You also have the option of suppressing the batch number check, for
             example, based on the material or plant.
         o   EXIT_SAPLV01Z_004. Using this exit, you can define your own checking
             rule.
         Further notes
         In both exits, a communication structure with the application data for
         each business transaction (for example, plant or material type ) is
         available. To obtain more information such as the time, user name, or
         the date, you must use one of the exits.
         Example
         In the function module exit EXIT_SAPLV01Z_003, an external number range
         XY is determined, against which the batch numbers are checked.
         In the function module exit EXIT_SAPLV01Z_004, the batch number entered
         is checked against your own rules.
    Ram

  • Kanban for finished goods (discrete manufacturing)

    Hi gurus,
    I am using kanban for finished goods(with MRP) to triggers production order(discrete manufacturing). If i set the status "empty" system is creating a planned order directly. It is not coming for MRP run. I suppose, that planned order should be created through MRP run(since i am using kanban with MRP). Can you please tell what settings i need to be checked?
    Regards
    Rajib Pathak

    Hi,
    Pls. find details about settings for KANBAN With MRP:
    KANBAN With MRP
    Prerequisites
    In this process, the storage location assigned to the supply area is not excluded from MRP.
    If a material is planned and procured with MRP, you must make the following settings:
    You must maintain a valid MRP type for the material. This means, the setting "ND" (No planning) is not allowed.
    You must maintain all other control parameters required for MRP for the material.
    You must maintain a repetitive manufacturing profile (in the MRP data screen) for replenishment strategies with a cost collector (in-house production with run schedule quantities, manual KANBAN). In the SAP standard system, a profile is available that is specially intended for KANBAN, that is, using this profile, the system creates a cost collector without a run schedule header.
    Features
    Here, the total production quantity or the procurement quantities of a certain period are planned in the planning run and the replenishment elements are also created in the planning run. For in-house production, you can use either Repetitive Manufacturing or production orders to plan the production quantities per period. For external procurement, all the standard replenishment elements are available. The replenishment elements created in the planning run, however, are not intended to trigger production or replenishment directly. Instead, they exist to provide the supply source with a preview. Actual production and material flow are controlled and triggered by setting the kanban to FULL and EMPTY. Backflushes and goods receipts are posted with no reference to the kanban. This means that you can backflush daily quantities, for example.
    In this procedure, the following is valid for materials with BOMs:
    Components that are used in KANBAN materials can be planned using any one of the MRP procedures. However, the system has to be organized so that the supply source does not produce the material for the replenishment element created in MRP immediately but awaits the kanban request.
    As the system creates preview data in the procedure with MRP, it is particularly useful for replenishment with run schedule quantities (Repetitive Manufacturing) and scheduling agreement releases.
    HOpe this helps.
    Regards,
    Tejas