Material backflush in production order after finished goods GR

Dear all,
I once started similiar topic several months ago, but didn't recieved any response. I'm gonna give it another try, so maybe you'll be able to support me after all.
So, the situation is like this. We have a production order, in which MC team maintained the materials to consume. The problem is, that very often it comes that we have to use same material part, but under 2-3 different partnumbers. E.G.:
Production order target: 1000 finished goods
Required materials: Part A 1000 pcs, Part B1 700 pcs, Part B2 300 pcs, Part C 1000 pcs, Part D1 150 pcs, Part D2 450 pcs, Part D3 400 pcs.
So yes, in case when it is Part B1, B2 and etc. it means that we're using physically the same part, but under different partnumbers. The problem is, that those material are all coming in pieces, not in meters or anything, and we can't allow to have, for example, 0.7 pcs of any of those materials (cause obviously you can't have 0.7 pcs of LCD panels stored in the warehouse).
It wouldn't be a problem if we could just confirm all operations in production order in 1 batch, but production order is being confirmed partially, every time the pallet with finished goods is being released from production line (we have integrated system, that sends requests to SAP to confirm specific quantity of finished goods in production order). So, as an example, if 1 pallet contains 15 pcs of finished goods, you have 67 confirmations for production order [(66*15)+(1*10)]. And, since all those materials come in PCS, SAP is rounding up consumption if it has decimal, which leads to wrong materials consumption.
Initially, I had an idea of adding 1 more operation in production order, which was supposed to be a manual use only, after finished goods GR, and MC team supposed to assign those B1\B2 and etc. material to this operation  E.G.:
Operation 0010 - consume material from work center A
Operation 0020 - consume material from work center B
Operation 0030 - finished goods GR (milestone)
Operation 0040 - consume material from work center C
My idead was rejected, since I was told that after GR for finished goods is done and you continue consuming materials in production order - it will not be shown in financial reporting (don't know the details, it was quite a straight reject, without much explanation).
So, question is - is there a way to consume materials after finished goods GR without creating mess in financial reporting, or if not - what other options do I have?
thank you in advance

Hi Valentin,
After GR also you can do goods issue. Till the order status is CLSD (Closed) you can book cost on to the order.
Two ways to consume materials on order.
In order component overview maintain the required part number with quantity. GI as can done with reference to order MB1A 261 movement type.
Directly do GI with MB1A -261 movement type - Input the order number, material number and qty.
Refer to the below discussion on unplanned GI which was discussed yesterday,
http://scn.sap.com/message/14850196#14850196
Thank & Regards,
Ramagiri

Similar Messages

  • Costing Report summarized production cost by Finished Goods Material

    Dear Expert,
    I am looking for a report that can summarized the production cost in production order by Finished Goods Material Number.
    or a report that can show me the cost components incurred related to a Finished Goods Material.
    Can any expert enlighten me? please help.
    Thanks a lot.

    Hi
    I would recommend the product drilldown reports in KKO0...
    For this you will have to do settings in OKN0 (Asisgn a Cost Comp Structure and specify the Product Group)
    After this, execute KKRV to collect the summarized data and then you can use KKO0 reports
    It gives cost of production as per the Cost Comp Str and also the product no, product group, Prod Order etc
    Regards
    Ajay M

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • To book a production-order as finish

    Hi,
    I have the problem that that our (obsolete)production-orders still appears
    in the dispo-list!
    Now I read, that the Controlling have to "book" the production order as
    finished (or similar else).
    In which transaction-code(CO) can I book orders as "finished"!

    Hello
    Check
    Scheduling margin key
    The float before production, float after production and the relea se period are defined in the scheduling margin key (Customizing for Shop Floor Control, by choosing Operations ® Scheduling ® Define Scheduling Margin Key) . The scheduling margin key is assigned to the material ( MRP area in the material master) and is transferred when the production order is created. These values can be changed in the production order.
    When is an order scheduled?
    When you create a production order it is always automatically scheduled. In the scheduling parameters (Customizing for Shop Floor Control by choosing Operations ® Scheduling ® Define Scheduling Parameters) you can define that, after every change relevant to scheduling, the production order is also automatically rescheduled before saving ( Automatic scheduling indicator) .
    reg

  • Production Order Cost Analysis - Goods Receipt

    I have been assigned to create analysis of production orders.  I need to show the volume variance as well as the cost variance using both the initial planned costs as well as the actual costs when the production order is completed.  All this information is available in COR3 on cost analysis, but I need to allow for display of multiple orders based on plant and date information.
    I have found that the ingredients are in the table RESB with most of the information that I need, I have not had luck in finding what table has the goods receipt information (produced product).  SAP help says that the fields are in KKBCS_OUT, which is a structure that I can't find where populated from.
    I would appreciate any assistance in this endeavor.
    Thanks
    Steven M Engel

    Thanks for the suggestions, but they have not provided me with what I think I need to give a solution to my superiors.
    I will attempt to clarify what I need to do.  We are a manufacturing facility.  We have a BOM that says to make 10 E, I need 3 A, 2 B, 3 C, and 4 D.  Each of the components (A to D) have a set cost at the time the production order is created, this looks to be saved as part of the planned cost in RESB.  Produced product E also has a planned cost at time production order created (as seen by COR3) but that is not stored in RESB.
    At production time we actually use 2.5 A, 2.5 B, 3 C, and 5 D to make the 10 E.  COR3 cost analysis is showing me the cost variance.  This cost variance has two parts, part 1 is because the quantities of the inputs are different.  Part 2 is because between the time the production order was created, and the production order was finished, the costs of A to E may have changed.
    I need to breakout the different components to show management how much of the total cost variance is attributed to each part.  I need a report that management can run (or have run) that will allow them choose by plant, date, end product, etc.  so they can direct what changes need to be made to costing, pricing, and BOMs.
    I hope that I have laid out what I am trying to do in a coherent manner.  Also I am new to the SAP system with less than 1 year using the system.
    Thanks for your time.
    Steven M Engel

  • Material requisition against production order

    Dear all,
    How do i put material requisition against production order. Kindly give me the t-code and total path till material issue from a particular storage location. i.e
    --> requisition against Production order for a storage location
    --> Transfer posting by movement type
    Thanks

    Hi,
    Procurement of RM: -
    1. MM01 - First of all create materials (RM, SF, FG)
    2. CS01 - Create BOM (FG > SF > RM)
    3. MD61 - Planned Independent Requirement for FG
    4. MD02 - MRP Run for FG (System will create Planned orders and PRs automatically as per procurement key - E, F and X in Material Master)
    5. MD04 - Stock / Requirement List OR ME5A - PR List
    6. ME21N - Create PR w.r.t. PO
    7. MIGO - GR w.r.t. PO (Movement Type - 101, Capture Excise invoice here)
    8. J1IEX - Post Excise Invoice
    9. MIRO - LIV for PO
    Goods Issue of RM: -
    1. CO40 - Convert Planned Order to Production Order (Schedule, Release Order)
    2. MIGO - Goods Issue > w.r.t. Production Order (Movement Type - 261) - You can also use MB1A for GI against Order
    3. CO11N - Confirm Production Order
    4 MIGO - Goods Receipt > Order (Movement Type - 101)
    5. KO88 - Order Settlement

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • Stop excess raw material consumption against production order

    Hello
    Please Guide
    Is there any  control to Stop the excess or less consumption of raw material against the Production Order confirmation.
    Eg
    Prod order Qty - 10
    Ram material reqd A- 10 piece & B- 10 Piece
    So now Order confirmation Qty - 10
    raw material consumption A - 10 & B- 10
    so for A or B if i want to issue (261) excess or Less qty than system should not allow this. System response to be as an error message in case I increase or decrease the Qty of A or B other than 10 against the prod order confirmation of qty 10.

    Hi,
    You have to use user exit only to avoid it.
    1.CONFPP02 - for checking good issue during confirmation
    2.MBCF0002 - for Checking Confirmations during the Goods receipt.
    For this you need to Use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Sep 9, 2008 12:41 PM

  • Production date of finished goods

    Dear Experts,
    How to check production date of finished goods products.
    wilson

    Hi..
    what I would say that production date would be the confirmed finish date.. if you open any production order..there is a field for this confirmed finish date.. it is the field which gets updated when u do the GR of finished product...
    Let me know if u have different requirement.
    I think Prasobh seems to be more accurate to ur requirement...
    Neeraj
    Edited by: NEERAJ BHARDWAJ on Mar 27, 2009 8:12 AM

  • Every time system create new production order after releasing sales order c

    Hi Guru,
    FG material strategy: 82 (sales order creates production order).
    After creating the sales order it goes in to credit block. Whenever we release sales order from credit block through VKM1, system has created production order. We confirmed this production order and delivered.
    But after this sales person change the sales order value, because of which again sales order goes into the credit block and after releasing sales order from credit block system create new production order even if one production order already confirmed and delivered against the same sales order.
    *Every time system create new production order after releasing sales order credit block.
    Thanx & regards
    pnu

    PNU,
    So, to restate:
    In MD04, you have Unrestricted Sales order Stock ('E' Stock) on hand.
    In the same MRP segment, and against the same Storage Location as the stock, you have a Sales Order requirement that was recently blocked and unblocked.
    During the unblocking event, the system produced a new production order.
    This is not normal.  If the above accurately depicts your situation, I would look for an altered Strategy 82, or a userexit.  SAP ATP (the beginning event of the Strat 82 process) will normally first check for the availability of stock.  Only if the stock is not available, then it will create the new production order.
    Best Regards,
    DB49

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

  • Get Material Descrition of Production Order

    Hi,
    Could you tell me how to get material description of production order, I cannot found the field in table of AFKO and AFPO. Thanks.

    Dear Portfolio,
    Inorder to get the Material Description, please follow the following steps:
    (1) Match AFPO-MATNR with MAKT-MATNR.
    (2) Get hold of MAKT-MAKTX (Material Description) filtering by SPRAS = 'EN'
    Regards,
    Abir
    Don't forget to award Points *

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Upgrade production order after modification BOM

    Dear Gurus,
    we need upgrade the quantity requirement in the production order after the modification the quantity in the Bom ?
    Is possible read newly the Bom whit the one operation confirmed ?
    The component modificated don't allocated a this operation but for example a the operation in status initial.
    Thanls a lot
    PP TEAM
    Daniele Pistilli

    Dear Toto,
    if only one operation is confirmed then cancelation for that operation
    then go for READ PP MASTER DATA option
    or if u have relesed only one operation & confirmed only that operation (not full order)
    then try to change in component in PRD prder itself in CO02 & realse that particular operation & confirm it
    check & revert back
    Regards
    kumar

  • Incorrect Result of Material Availability in production order

    Hi gurus,
    we have a problem with material availability in production order CO01. When my list of materials is checked OK with option availability material and I modify the quantity of some material. With this modification, e.g. quantity 99.999, the logical result of my material availability would be NO OK, but the system answers is OK. I think he material availability doesn't recalculate the availability.
    I will reward with a lot of points!!!
    Thank you
    Dan

    in the availability check screen of the prod order, find out the which check group is being called. and find out the scope of check,
    then in the custmisation, change the setting of the scope of check.
    Trx code OPJJ, deselect/select the indicator "check without RLT".  if there is tick in ur current system then uncheck it, it the tick is not there then tick it.
    your issue will be solved.
    Regards,
    Pravin Mukkawar

Maybe you are looking for

  • Fork and BPM

    Hi I am using Fork in the BPM to collect and merge 3 messages. This is same as STD pattern "BpmPatternCollectMultiIf". It is working fine, it collects--> transforms --> sends. But always two PE are in "In process" state with a "clock" indicator. I tr

  • I'm tryin to transfer PDF from hotmail to adobe reader ?

    How do I transfer my PDF 's in my hotmail account to adobe reader, there's no (open in) button on my iPad 3

  • QuickTime ruined Flash *.swf in web and doesn't show most trailers

    Hello there, Guys I've big problem with QuickTime 7.1.3 most of flash games in the web and flash ads.. totaly flash website Does not work at all with this last version of Quiktime also most of the movies trailers doesn't work take this e.g. http://ww

  • Background JPG Stretch to Browser Size

    I have a gradient saved as a jpg and have set it as the background image for a page. I want it to stretch it to the size of any browser window so it will completely fill the background. How do I accompilsh this?

  • P6N SLI Plat & Bios 1.31, what's the verdict?

    For you guys who've already flashed to bios 1.31 how's it running?  Has it corrected any issues that you had with previous bios versions?  Will your machine allow the keyboard to start on a cold boot?  I almost did it however I just couldn't make mys