Confirmation of Combined Orders(AFS)

Hello Experts,
When i try to confirm an operation in combined order confirmation using J4a| transaction, the system gives the message ''check customizing about confirmation''.  But i can confirm the same operation through CO11n. Can anybody tell me what are the correct customizing settings?
Thanks & Best Regards,
Ramesh
Edited by: Ramesh Jiddigi on Nov 10, 2009 10:31 AM

Dear,
What is message no?
Parameters for order confirmations in customizing screen control is set to actual data (transaction OPK4).
Please check.
Also refer the OSS note 119348
Regards,
R.Brahmankar

Similar Messages

  • Auto Confirmation for combined order with quantity distribution

    Dear All,
    we need your help that we have using the auto-confirmation for normal production order , but got the problem in combined order confirmation for final operation , in final operation we are not getting quantity distribution with respect to child order.
    please suggest any BAPI is there?

    Not possible in standard system.

  • Quantity Distribution in last operation in combine order @ Co11n

    Hi,
    we are using MILL_OC and creating the combine order ,
    presently, we have requirement that at the time of last operation confirmation on combine order, the system proportionate equal ratio on original order where our client required that quantity distribution is being carried out manually on original orders.
    so please suggest what will be best solution to do so...!
    Regards,
    Sameer M. 

    Sameer,
    There are some customizing options which should allow you to cover your process.
    IMG --> Production --> Shop Floor Control --> Operations --> Confirmations --> Maintain confirmation parameter in the combination
    Let me explain in more detail the available settings:
    In your case, the value for 'Quantity Distribution' needs to be set to 'brought forward'. Press 'Enter'!
    The last parameter is automatically set to: 'Display Quantity Distribution Screen' - no other values allowed.
    If you now access your confirmation transaction the first screen which pops up is where you can enter the different quantities which should be confirmed against the original orders. Press 'execute' and you will get to the standard confirmation screen you are used to see. The total quantity to be confirmed is already calculated (based on what was entered on the distribution screen).
    The second parameter controls what you can do with the total confirmed quantity: changeable on the standard screen yes/no. If you change the yield quantity you will be asked to go back to the distribution screen and update your data there before you can save your confirmation. You can do so by pressing the button 'Quantity Distribution' on the standard screen in the confirmation transaction.
    If you set the parameter to 'not changeable' the total quantity field is grayed out. You can't make changes here, but you could again access the quantity distribution screen to make required changes.
    If you need to change the default values for the quantity distributions only now and again (maybe in your case only during the last operation confirmation) you can set the first parameter to 'back ground pressing'. So the screen sequence shown during confirmation is the standard. Set the third parameter to ' Display Quantity Distribution Screen'. With this setting there will be a push bottom in the standard configuration screen made available which is labeled 'Quantity Distribution'. If you press this button the quantity distribution screen will be shown where you can make the required adjustments.
    If you combine process orders you will have limited options.
    Hope these settings enable the desired process.
       Stefan

  • Combined order table

    Dear folks,
    please send me the table for the combined order in the AFS.
    And i want a report with reference  to the combined order for the operation quantity and WIP of the other productino orders, which are combined.
    Please provide the appropraite solution.
    Regards
    Srinivas

    There is a trick for adding a parameter to a condition:
    1. In the item drop down, select "Create Calculation..."
    2. In the New Calculation window, on the Show: dropdown, select Parameters
    3. Select the parameter you want, and click paste
    4. Then click OK
    The item in the condition will now show =:<Parameter>

  • Confirmations for Limit Orders in ECS

    In extended classic scenario when creating a limit order, there is an error in process in the local PO related to the follow-on documents for goods receipt with the following error message:
    'Combination of GR/IR control not allowed for external services'
    It is only possible to create the order in the backend if the Invoice Only option is selected in the Limit Order, but then this means it is not possible to create a confirmation for Limit Orders!
    Has anyone else come across this problem in ECS for limit orders?  As far as I am aware the functionality should work with GR-based invoice verification.  In the backend PO it is possible to create the same order without any errors!

    Monica,
    My analysis till now is:
    1) It is true that limit oders are not going with "Confirmation & Invoice" flag. We need to raise OSS.
    (There is one additional problem with this is "The vendor master flags don't get transferred to PO" for this you will have to implement the OSS notes 956083.)
    Now after applying this notes you see the standard functionality:
    2) If we are creating PO with "Invoice Only" flag then there are follwoing options:
    a) If the "GR based invoice" flag in vendor master is checked then the POs goes into D item category and you can enter a service sheet for them.
    b) If the "GR based invoice" flag in vendor master is NOT checked then the POs goes into B item category and you can enter invoice just after PO.
    I made change in V_T163Y for B item category and checked the flag for GR but then too I am not able to enter GR for item category B.
    Please assign points for useful answer as applicable.

  • Confirmed qty- if Orders placed at same time

    Hi
    We have an issue with the Confirmed qty in the sales Order while creating the orders through VA01 for stock items.
    If 2 users are creating the orders at the same time with  same qty 30, both orders are confirmed and DO will be created (Immediate delivery) even though the ATP qty is only 30. If we create the orders one after the other we dont have any issue( only first order is confirmed, and second order will not be confirmed).
    *This material is using the following values  during ATP.
    Avail. check        03  Check.rule   A
    is it the Standard SAP behavior ? is there any other solution , which will stop confirmation of qty if orders are created in parallel sessions?

    Hello DP,
    I would agree to Shuktiz's suggestion above.
    The setting mentioned by him will ensure that the Material Quantity is locked while one Sales Order is procesed & it would not be available to other Sales Orders..
    Hope this helps..
    Thanks,
    Jignesh Mehta

  • Confirmation of process order create : goods movement

    Dear Sir/Madam ,
             I am using the Transaction Code - CORK for confirmation of process order , but promblem is that when i am saving the goods for confirmation then material pi101 has some error i.e the material pi101 is locked by another user or something , then that is not confirmed but rest of the material which are having 531 movement are confirmed ,
    so i want that if the first material i.e pi101 which has 101 movement that should be confirmed first then after that rest of the goods having 531 movent confirm,
    i have already  searched the userexit for transaction cork i.e CONFPI05 when saving the data and another one is CONFPI06 for   Actual data transfer plz tell me what will be the logic and which structure to call in this userexit because in this userexit the structure which is present is not of use .
    thanks and regards ,
    arun

    Hi,
    I believe you would need to append the below line for your code for goods movement.
    wa_timetickets-order_itno = p_itno.  " Order item nos.
    Check & revert if it resolves the issue.
    Regards,
    Vivek

  • Confirmation of  production orders with several operations

    Hello,
    I am  using transaction CO11 in order to perform  confirmation of Production orders that has 3  operations...
    with this transaction, I have to enter 3 times the transaction for each  operation...
    could you please tell me a transaction where I can make the confirmation  for all operations in one step ? ( a kind of screen where I can access all operations and manage  the hours and quantities before saving.)
    thanks and regards

    Dear,
    How many such orders would you come across everyday for the confirmation to happen?
    Does the operation sequence remain the same across all the orders?
    Then,i would like to suggest a method,Im not sure how it can be adopted to your scenario
    Try this!!
    We can  group all the production orders on daily basis or in shift basis in a EXCEL spreadsheet.
    Through a BDC,we can migrate the information on a daily basis to SAP.
    Regards,
    Joseph Charles vaikathussery

  • Confirmation of Prd order

    Hi Friends,
    While i am tryinhg to do confirmation of prd order, i am getting this error  "No prices could be determined for object Activity type 1000/9999/xxxxxx"
    I am maintaining the prices in KP26 for the above activity.
    While i am trying to save the confirmation the error message saying " Confirmation terminated due to incorrect actual costs".
    Please help me to resolve this.

    closed

  • CONFIRMATION OF PROCES ORDER

    What do we confirm during confirmation of proces order?

    Hi,
    Transaction CORK is used for confirmation of process order.
    Pl. refer,
    http://help.sap.com/saphelp_46c/helpdata/en/05/603bc6462311d182b50000e829fbfe/frameset.htm
    Goto Process order>Completion confirmation of process order
    Regards,
    Senthilkumar

  • Confirmation of PM order, what FI posting will be done in SAP

    Dear Gurus,
    On final confirmation of PM order, what FI posting will be
    done in SAP ?
    Regards

    Hi Entry Will be
    Stock of FG Accunt debit
      to COGP Account
    Mann

  • Confirmation of production order - stock not updated

    Dear all
    On confirmation of production order,all dependent requirements as per bom (stock available at storage locations) should get updated ( as I set back flushing for all material stocks at material master level). But, when i do mb31, final product stock is updated, and bom stocks not getting updated.
    what is the reason.please give solution

    Hi GB,
    Please analysise the following :
    1.COGI what is exact error u are getting.
    2.Did u check the following options
      1. In the routing, the backflush indicator is set in the component assignment.
    2. In the material master record, the backflush indicator has the characteristic "Always backflush".
    3. In the material master record, the backflush indicator has the characteristic "Work center decides", the indicator being set in the work center.
    Use
    3.MB31 is for GR of stock means it post the stock at FG storage loactication ok.
    4.If u need to update in BOM stock , u have to do it by MB1C/MB1A with movement type 262.
    5.Check the stock in MMBE whether u have maintained ornot.
    Please check all those anf come back.
    Regards
    Jia

  • How to confirm a Sales Order from CRM 7.0

    Hi.
    The scenario occur into CRM 7.0 standalone.
    I have a sales order without delivery , however this sales order would be billed. The item category is relevance for billing with  Transaction-Related billing according  to order  quantity. The Billing type, Item category and  item category determination were completed, but, There is nothing on the Billing due list after I completed the sales order, May be the sales order mus be completed with confirmation action....
    Wich is the  standard transaction type and item category to confirm this sales order?
    Im traying to confirm the sales order into actions tab (order confirmation- Sold To), however  the system send me this message "the action definition in Customizing is configured so that it may not be changed in the dialog". I want to execute the action in the document, how to aplly this change?.
    Im traying Copying Control for Business Transactions ( SRVC) , but when follow-up transaction occurs (Covert Sales order to Confirmation) , the system send me this message " You need a service organization", I dont have this organizational Unit into CRM scenario,
    Regards.
    Thannks in advance.

    Hi.
    I have confirmed the sales order into status tab .
    regards

  • Quantity getting confirmed in sales order without any stock.

    Hi
    My issue is that , the schedule lines are getting confirmed in sales order , even though i have not posted any stock. How to prevent this from happening ?

    Hi Jalaj001, 
    --Go to T.Code  MM02 & in Sales:General/plant data assign availability check as 01 or 02 instead of KP.
    --In MRP 1 -mention MRP Type as PD-Planned MRP
    --Go VOV6 & select your Schedule line category & check mark the Availability
    --Go T.Code OVZ9 & select your availability check control & uncheck the Check without RLT in Replenishment lead Time.
    Let me know if your problem is solved
    Regards
    Pradeep

  • Stop Automatic creation and confirmation of Transafer Order for a doc type

    Hello All,
    There is a requirement that I need to stop Automatic creation and confirmation of Transafer Order for a particular document type.
    The issue is that sometimes the cycle goes upto creation of Invoice automatically but sometimes this does not happen. More over the user wants that the transafer order needs to be confirmed manually.
    Can u please provide the .steps involved for thie case.
    Thanks
    Chandrashekhar

    Dear Steve,
    Thanks a lot for giving reply with what I need to do, but I am unable to see result.
    I have down configuration like below even though system not processing Auto TO creation. Can you explain me if I have down any mistake below.
    Click on ‘Assign’ button,
    Press on ‘New entries’
    WhN = ‘900’
    Reference Movement Type = ‘101’
    Movement indicator = ‘B’
    Movement type for Whse Mgmt = ‘101’
    TR create Transfer Requirement = ‘X’
    Immed.TO Creation
    Mail confirmation for background processing = ‘01’.
    GR date = ‘2’

Maybe you are looking for

  • Best practice on publishing content

    Hi all, I would like to know what your best practices are in an easy publisching process for unstructed data for a intranet enviroment. Standaard i have to do several steps like create document, create iview to document, include iview on rol or works

  • Rgb to cmyk on indesign

    my document is in cmyk but when i want to select a colour it only allows me to select rgb colours, how  can i change my colour remetrix  space in cmyk thank you

  • Problem with OsCommerce : Safari just offers to download PHP files...

    When browsing my oscommerce website, Safari doesn't jump from a page to another, but only offers to donwload PHP files. I have to cancel several times to access other pages... Any idea of the trouble? Thanks.

  • Quicktime audio file on my iPod shuffle?

    I want to record a story I'm reading. I assume I can use quicktime for that? If so, how do I get that on my ipod shuffle?

  • Oracle SqlDeveloper Download

    Have been unsuccessful in downloading Oracle sql developer. Is it a technical problem?