Connect R/3 to cProject

Hi,
I want to create a function module in cProject that is called from R/3 side. but I don't know which table to store up the connection information to connect cProject and R/3. I would like to use function module 'SCWB_RFC_PING' in R/3 to check cProject connection.
In addition, what should I set up to connect servers between cProject and R/3? Please give some idea on that.
Thanks in advance.
Cheers,
Helen

Hi,
In order to connect cProjects to systems with which connection is allowed, eg - accounting integration, CATS integration, etc or to have object links with R/3 all you need is just a RFC connection. A RFC connection is created using SM59 transaction.
In case you have connect to R/3 and use some custom built functionality, there are two scenarios:
We are assuming both cProjects and R/2 to be different boxes.
1. Connect from R/3 to cProjects
Create RFC connection (SM59) in R/3 system pointing to cProjects system.
If writing a custom function on cProjects server, make sure it is Remote enabled.
To call this custom function in cProjects server from R/3 server use call function '<Function_name>'
destination <RFC_Destination_name>.
If calling a standard cProjects function from R/3, make sure it is a remote enabled function and call function using the destination clause.
2. Connect from cProjects to R/3
Create RFC connection (SM59) in cProjects system pointing to R/3 system.
Calling function remains same.
In case you need to call a standard funtion that is normal (not remote enabled), create a custom wrapper function that is remote enabled and internally calls the normal standard funtion.
Pl note that RFC destination names are always case sensitive.
I hope this clarifies all doubts. If it doesn't pl write back. If it does, reward appropriate points and close the thread.
Regards,
Reema.

Similar Messages

  • CProjects object link greyed out in DMS

    Hi Everyone,
    We have cProjects 4.5 setup in our environment.The RFC connections to SAP DMS have been established. DIR's of all 'Document Types' can be assigned to a project successfully.
    Now,in DMS, for a DIR XYZ,'cProjects Elements' object link has been established.However, when we attempt to add a Element in cProject Elements, the netire section gets greyed out and a message is displayed as follows.
    " Object link to DPR_OBJLNK cannot be changed in this transaction,Message no. 26321 ". Its understood that linking cannot be performed from CV0*n transactions. In that case,from where would this feature be enabled?
    Regards,
    Pradeepkumar Haragoldavar

    Hi.
    we have the same problem.
    SAP ECC 6.0 on client 300, cProject on client 400, RFC connection established.
    From cProject we can link DMS documents to tasks.
    But, in DMS we can't see the link to the cProject task (object DPR_OBJLNK).
    Is it possibile to see cProject tasks linked from the DMS documents ?
    Is it possible to link cProject tasks directly from DMS documents ?
    Thanks.

  • WebDAV & cProjects/cFolders

    I'm having a problem connecting via WebDAV to cProjects 4.0, but I can't find what steps I must have missed. We do not have Enterprise Portals installed.
    The URL for cProjects is http://xxx.yyy.zzz:8001/sap/bc/webdynpro/sap/cprojects
    In SICF I've created an alias of <i>default_host/cpr_webdav</i> which refers to <i>default_host/sap/cpro</i> and have activated the service <i>default_host/sap/cpro</i>.
    In the cprojects "Settings for webDAV" config I've set <b>URL 1</b> to http://xxx.yyy.zzz:8001/cpr_webdav and ticked cProjects & cFolders.
    I'm using <b>'My Network Places'</b> -> 'Add <b>Network Place'</b> to connect to webDAV and I use <i>http://xxx.yyy.zzz:8001/cpr_webdav</i> as the network address. A login is requested and I enter my SAP UserID and Password (which is the same for all 3 clients on this system). I then get an error message 'The folder you have specified does not appear to be valid'.
    I've also tried adding <i>"?sap-client=xxx"</i> to the end of the URL to force a specific client with the same result.
    Are there any additional authorisation objects required?
    Are there any prerequisite services which need to be enabled?
    Have I missed any steps?
    Thanks for any help as I'm tearing out what little hair I have left

    Hello Paul,
    you do not need the Enterprise Portal to be installed to use the WebDAV functionality.
    The name SAP NetWeaver Portal drive is a little bit misleading.
    It is called Portal drive, since it is the WebDAV client for the Knowledge Management (KM) of the portal also.
    When using the SAP NetWeaver Portal drive with cFolders no portal is required as the SAP NetWeaver Portal drive acts also as WebDAV client for cFolders. The SAP NetWeaver Portal drive is a 3rd party WebDAV client from a company called XYTHOS (http://www.xythos.com/home/xythos/company/company.html), which can be used by SAP customers for free.
    You can download the Installer for the SAP NetWeaver Portal drive from SAP Service Marketplace under http://service.sap.com/swdc
       -> Download -> SAPSupport Packages and Patches -> Entry by Application Group
                -> SAP NetWeaver -> SAP NetWeaver -> SAP NetWeaver2004s -> Entry by Component -> Frontend -> Portal Drive 4.4 
    Documentation:
    Integration of cFolders with a WebDAV Client
    http://help.sap.com/saphelp_ppm400/helpdata/en/1b/8688428b42c553e10000000a1550b0/frameset.htm
    Configuration of SAP NetWeaver Portal Drive for KM (most of the stuff is valid also for cFolders)
    http://help.sap.com/saphelp_nw04s/helpdata/en/42/e6753939033ee5e10000000a1553f7/frameset.htm
    Working with Folders in Windows (Portal Drive) for KM (most of the stuff is valid also for cFolders)
    http://help.sap.com/saphelp_nw04s/helpdata/en/42/c99b91341a6bade10000000a1553f6/frameset.htm
    Important:  you must not use the Microsoft WebDAV interface. It does not fit to cFolders as there are security issues with using Microsoft WebDAV (my network üplaces) together with cFolders
    Regards
    Peter

  • Connecting cProjects 4.5 to SAP R/3 4.7 possible ?

    Hi Guru's,
    we have the challange in an customer project to connect a cProjects 4.5 to a SAP R/3 4.7 system. The installation guide said that the component ECC 5.0 is mandatory for the connection from cProjects 4.x. So this component is not part of R/3 4.7 of course. The question is: is there a official possibility to connect a cProjects 4.5 system to SAP R/3 4.7?
    Thx a lot for your support ...
    Jochen

    Hi Jochen,
    there is no standard solution for this. However we have done this on customer-specific basis and could offer a consulting solution. I do not have the details at hand, but you can drop me an eMail with your business details as short reminder and I will try to get the information for you.
    Better - of course :o) - would be to consider an upgrade of the R/3 system or to wait for this upgrade, if it is planned for the near future anyway to avoid efforts for you.
    Best regards
    Thorsten

  • CProjects to DMS connectivity issues

    Hi Everyone,
    We are currently integrating SAP DMS in cProjects.When we try and open the originals of a DIR, the following error messages are displayed:
    Application log contains messages for links to SAP R/3 DMS
    Message 1: Create Document Link to a New Folder ( application log - subobject: LNK_2_NEW_FOLD )
    Cross checked the RFC connection b/w the systems. Seems fine. Please note that SAP DMS is on ECC5.0 and cProjects4.5 is hosted on CRM 7.0 server on two separate systems. Do let know incase you have resolved issues along similar lines. Thanks.
    Regards,
    Pradeepkumar Haragoldavar

    Steve,
    I have seen this issue many times before and it always turned out to be an issue on the Telco network. It's quite possible either the line itself or some equipment on the provider network mayn't be provisioned for DATA or faulty equipment on their network.
    Let us know how you do with it.
    HTH
    Sundar

  • PS GUIDs and how to connect to cProjects

    Hello,
    I am trying to transfer fields to my implementation of GCC_PS_PROJECT_LABEL~CHANGE_WBS_ELEMENT. Unfortunately I don't get my own values to be accessible in this method.
    To access my cProjects customer fields I would like to do the following in the method GCC_PS_PROJECT_LABEL~CHANGE_WBS_ELEMENT:
    - Lookup the BAPI_BUS2172_GET_DETAIL to get my fields. Unfortunately I don't have the project_guid...
    And I have no idea how I can get the neccessary project_guid if I have only the "project_definiton" that is of type ps_pspid or the DPR_TV_PROJECT_ID_CO.
    Could someone tell me how to connect this data and how to lookup to the cProjects details?
    Thx in advance for helping me with this,
      Vanessa

    where r u working?
    ask your help desk to give the URL link to down load vpn
    after downloading install it, its just like a wizard
    you need to give your userid and password , and secureid number
    secureid is a small device which displays a number(say a 6 digit number ) this number is keeps on changing for every one minitue.
    you need to enter the number which is displaing while you are trying to connect to vpn.
    in the middle of connecting to vpn if your secureid number changed , you need to login once again by the same procedure

  • CProjects Roles, HTTP Connection, RABAX_STATE error

    Hi All,
    1. Which are the standard cProjects Roles to be maintained ? Where we can have that list ?
    2. How to maintain or say configure the HTTP connection for cProjects (steps for doing it)?
    3. Getting the termination type error : RABAX_STATE, how to resolve it ?
    Points for userful information.
    Thanks and regards,
    Nishit

    Hi
    Answer to your 1 question is given below
    The following single roles are delivered with cProjects:
    SAP_CPR_PROJECT_ADMINISTRATOR     :Create projects (project definitions).
    SAP_CPR_TEMPLATE_ADMINISTRATOR     :Create, change, read, and delete all templates in cProjects.
    SAP_CPR_USER     :Use cProjects, but no authorization to perform any activities in a particular project. To do this users need project-specific authorizations, which can be distributed either directly or through their assignment to a role.
    The following composite roles are delivered with cProjects:     
    SAP_CPR_DECISON_MAKER     :cProjects decision maker. Contains the role SAP_CPR_USER.
    SAP_CPR_INTERESTED     :cProjects interested party. Contains the role SAP_CPR_USER.
    SAP_CPR_MEMBER     :cProjects team member. Contains the role SAP_CPR_USER.
    SAP_CPR_PROJECT_LEAD     :cProjects project manager. Contains the role SAP_CPR_PROJECT_ADMINISTRATOR and SAP_CPR_USER
    SAP_CPR_TEMPLATE_RESPONSIBLE     :cProjects template responsible. Contains the roles SAP_CPR_TEMPLATE_ADMINISTRATOR and SAP_CPR_USER
    Edited by: Yogesh  Pande on Dec 18, 2008 5:38 AM
    Edited by: Yogesh  Pande on Dec 18, 2008 5:41 AM
    Edited by: Yogesh  Pande on Dec 18, 2008 5:43 AM

  • CProjects 4.0 :: Task and subproject connection table

    Hello!
    Could u please name tables where connection task and it's subproject is recorded in data base?
    I'm using multi-project management with subprojects but I haven't found any connection in DPR_TASK table. I wounder where it records how master project task connecteed with subprojects.
    Best regards,
    Valerie

    Hi Valerie,
    Probably CGPL_RELATION and CGPL_HIERARCHY might help.
    Let me know if this works.
    Regards,
    Vivek Pandey

  • CProjects 4.0 : Task and subproject connection table record

    Hello!
    Could u please name tables where connection task and it's subproject is recorded in data base?
    I'm using multi-project management with subprojects but I haven't found any connection in DPR_TASK table. I wounder where it records how master project task connecteed with subprojects.
    Best regards,
    Valerie

    Answered in the other topic.

  • Error while saving project in cProjects

    Hello,
    I am getting following error while saving a project in cProjects-
    Access via 'NULL' object reference not possible.
    Details of the error are given below-
    Can somebody please help me resolve this error?
    Thanks and regards,
    Milind Dumbre
    Error analysis
         An exception occurred that is explained in detail below.
         The exception, which is assigned to class 'CX_SY_REF_IS_INITIAL', was not
          caught in    procedure "FINALIZE_OBJECT_BEFORE_SAVE" "(METHOD)", nor was it propagated by a
         RAISING clause.
        Since the caller of the procedure could not have anticipated that the
        exception would occur, the current program is terminated.
        The reason for the exception is:
        You attempted to use a 'NULL' object reference (points to 'nothing')
        access a component (variable: "LR_CALC").
        An object reference must point to an object (an instance of a class)
        before it can be used to access components.
        Either the reference was never set or it was set to 'NULL' using the
        CLEAR statement.

    Hi Milind,
    You may check the settings by navigating to the following path
    IMG --> Collaboration Projects --> Connection to external systems --> Accounting Integration
    -->  Define Object Links for Accounting Integration.
    Check if the RFC destination has been correctly maintained. You may check the correctness of the RFC settings via SM59.
    Let me know if  this helps.
    Regards,
    Vivek Pandey

  • Cproject - Problem during exprort a project to ms project

    Hi,
    I use cproject tool to create the project: IT Project. The project schedule is exported to XML as following:
    <?xml version="1.0" encoding="utf-8" ?>
    - <cPr:cProjects xmlns:cPr="urn:cProjects">
    - <Project>
    - <ProjectData>
      <NUMBER>P2</NUMBER>
      <CONSTRAINT_TYPE>2</CONSTRAINT_TYPE>
      <START_DATE_FIX>2007-09-13</START_DATE_FIX>
      <CONSTR_TYPE_FIN>3</CONSTR_TYPE_FIN>
      <FINISH_DATE_FIX>2007-09-20</FINISH_DATE_FIX>
      <PRO_TYPE>000000000000001</PRO_TYPE>
      <MASTER_LANGUAGE>E</MASTER_LANGUAGE>
      <DESCRIPTION>ICT PROJECT</DESCRIPTION>
      <ACT_WRK_UNIT_EXT>H</ACT_WRK_UNIT_EXT>
      <SCHEDULED_START>2007-09-13</SCHEDULED_START>
      <SCHEDULED_FINISH>2007-09-20</SCHEDULED_FINISH>
      <CREATED_BY>LONGNV</CREATED_BY>
      <CREATED_BY_NAME>LONGNV</CREATED_BY_NAME>
      <CREATED_ON>2007-09-13</CREATED_ON>
      <PRO_CATEGORY>1</PRO_CATEGORY>
      <TEMPLATE_ID>TEMP3</TEMPLATE_ID>
      <LAST_CHANGE_DATE>2007-09-13</LAST_CHANGE_DATE>
      <LAST_CHANGE_TIME>13:42:55</LAST_CHANGE_TIME>
      <LAST_CHANGED_BY>LONGNV</LAST_CHANGED_BY>
      <LAST_CHANGED_BY_NAME>LONGNV</LAST_CHANGED_BY_NAME>
      <PRO_TYPE_TEXT>Development Project</PRO_TYPE_TEXT>
      <CAUSE_TEXT>Specify reason</CAUSE_TEXT>
      <ISTAT>I1700</ISTAT>
      <TXT30>Created</TXT30>
      <STATUS_TEXT>Created</STATUS_TEXT>
      <GUID>DC61A9C97A4CB9F1BD5D001A927DA25C</GUID>
      <ACT_WRK_UNIT_EXT_MSEHT>h</ACT_WRK_UNIT_EXT_MSEHT>
      <ACT_WRK_UNIT_EXT_MSEHL>Hour</ACT_WRK_UNIT_EXT_MSEHL>
      <SEVERITY_TEXT>No Value Set</SEVERITY_TEXT>
      <LONGTEXT />
      </ProjectData>
      <ProjectRoles />
      <Resources />
      <Tasks />
      <Checklists />
    - <Phases>
    - <Phase>
    - <PhaseData>
      <NUMBER>200000000000000000072007</NUMBER>
      <DURATION>8</DURATION>
      <DESCRIPTION>Phase 1</DESCRIPTION>
      <CONSTRAINT_TYPE>2</CONSTRAINT_TYPE>
      <START_DATE_FIX>2007-09-13</START_DATE_FIX>
      <CONSTR_TYPE_FIN>3</CONSTR_TYPE_FIN>
      <FINISH_DATE_FIX>2007-09-20</FINISH_DATE_FIX>
      <SCHEDULED_START>2007-09-13</SCHEDULED_START>
      <SCHEDULED_FINISH>2007-09-20</SCHEDULED_FINISH>
      <CREATED_BY>LONGNV</CREATED_BY>
      <CREATED_BY_NAME>LONGNV</CREATED_BY_NAME>
      <CREATED_ON>2007-09-13</CREATED_ON>
      <CHANGED_BY>LONGNV</CHANGED_BY>
      <CHANGED_BY_NAME>LONGNV</CHANGED_BY_NAME>
      <CHANGED_ON>2007-09-13</CHANGED_ON>
      <SCHEDULED_START_LATE>2007-09-13</SCHEDULED_START_LATE>
      <SCHEDULED_FINISH_LATE>2007-09-20</SCHEDULED_FINISH_LATE>
      <DURATION_UNIT>TAG</DURATION_UNIT>
      <GUID>DC61A9C97A4CBBF1BD5D001A927DA25C</GUID>
      <ISTAT>I1700</ISTAT>
      <TXT30>Created</TXT30>
      <STATUS_TEXT>Created</STATUS_TEXT>
      <PHA_TYPE_TEXT>Enter a phase type</PHA_TYPE_TEXT>
      <SEVERITY_TEXT>No Value Set</SEVERITY_TEXT>
      <DURATION_UNIT_TEXT>Days</DURATION_UNIT_TEXT>
      </PhaseData>
    - <Tasks>
    - <Task>
    - <TaskData>
      <NUMBER>00010</NUMBER>
      <EXTERNAL_ID>210000000000000000182007</EXTERNAL_ID>
      <CONSTRAINT_TYPE>2</CONSTRAINT_TYPE>
      <START_DATE_FIX>2007-09-14</START_DATE_FIX>
      <DURATION>7</DURATION>
      <CONSTR_TYPE_FIN>3</CONSTR_TYPE_FIN>
      <FINISH_DATE_FIX>2007-09-20</FINISH_DATE_FIX>
      <WORK_UNIT>H</WORK_UNIT>
      <DESCRIPTION>task 1</DESCRIPTION>
      <ACT_WRK_UNIT_EXT>H</ACT_WRK_UNIT_EXT>
      <REM_WRK_UNIT_EXT>H</REM_WRK_UNIT_EXT>
      <PRIORITY>001</PRIORITY>
      <SCHEDULED_START>2007-09-14</SCHEDULED_START>
      <SCHEDULED_FINISH>2007-09-20</SCHEDULED_FINISH>
      <CREATED_BY>LONGNV</CREATED_BY>
      <CREATED_BY_NAME>LONGNV</CREATED_BY_NAME>
      <CREATED_ON>2007-09-13</CREATED_ON>
      <CHANGED_BY>LONGNV</CHANGED_BY>
      <CHANGED_BY_NAME>LONGNV</CHANGED_BY_NAME>
      <CHANGED_ON>2007-09-13</CHANGED_ON>
      <SCHEDULED_START_LATE>2007-09-14</SCHEDULED_START_LATE>
      <SCHEDULED_FINISH_LATE>2007-09-20</SCHEDULED_FINISH_LATE>
      <DURATION_UNIT>TAG</DURATION_UNIT>
      <GUID>DC61A9C97A4CBDF1BD5D001A927DA25C</GUID>
      <ISTAT>I1700</ISTAT>
      <TXT30>Created</TXT30>
      <STATUS_TEXT>Created</STATUS_TEXT>
      <TSK_TYPE_TEXT>Enter project type</TSK_TYPE_TEXT>
      <PROCESS_TEXT>Specify Reason</PROCESS_TEXT>
      <WORK_UNIT_MSEHT>h</WORK_UNIT_MSEHT>
      <WORK_UNIT_MSEHL>Hour</WORK_UNIT_MSEHL>
      <ACT_WRK_UNIT_EXT_MSEHT>h</ACT_WRK_UNIT_EXT_MSEHT>
      <ACT_WRK_UNIT_EXT_MSEHL>Hour</ACT_WRK_UNIT_EXT_MSEHL>
      <REM_WRK_UNIT_EXT_MSEHT>h</REM_WRK_UNIT_EXT_MSEHT>
      <REM_WRK_UNIT_EXT_MSEHL>Hour</REM_WRK_UNIT_EXT_MSEHL>
      <SEVERITY_TEXT>No Value Set</SEVERITY_TEXT>
      <DURATION_UNIT_TEXT>Days</DURATION_UNIT_TEXT>
      <TASK_ID>00000000000000000019</TASK_ID>
      </TaskData>
      <ProjectRoleAssignments />
      <Relationships />
      </Task>
      </Tasks>
      <Checklists />
      </Phase>
      </Phases>
      </Project>
      </cPr:cProjects>
    I got the below error page when I export to MS project
    Error when processing your request
    What has happened?
    The URL http://sap0806.cybersoft.vn:8000/sap/bc/webdynpro/sap/cprojects/ was not called due to an error.
    Note
    The following error text was processed in the system BP1 : Enter a valid start and end date
    The error occurred on the application server SAP0806_BP1_00 and in the work process 0 .
    The termination type was: ERROR_MESSAGE_STATE
    The ABAP call stack was:
    Function: DURATION_DETERMINE of program SAPLSCA4
    Method: FILL_MSP_TASKS of program CL_DPR_MSP_UTILITY============CP
    Method: FILL_MSP_PROJECT of program CL_DPR_MSP_UTILITY============CP
    Method: CONVERT_DPR2ABAP of program CL_DPR_MSP_UTILITY============CP
    Method: MSPC_GENERATE_XML of program CL_DPR_MSP_UTILITY============CP
    Method: PROVIDE_MSPC_DATA of program CL_DPR_MSP_UTILITY============CP
    Method: GET_MSC_XML2 of program CL_DPR_UI_LOG_TRANSFER========CP
    Method: EX_NEXT_FORMAT2 of program /1BCWDY/1MYG96LSBGWA42FNEL10==CP
    Method: IF_COMPONENTCONTROLLER~EX_NEXT_FORMAT2 of program /1BCWDY/1MYG96LSBGWA42FNEL10==CP
    Method: ONACTIONEX_FORMAT2_NEXT of program /1BCWDY/1MYG96LSBGWA42FNEL10==CP
    What can I do?
    If the termination type was RABAX_STATE, then you can find more information on the cause of the termination in the system BP1 in transaction ST22.
    If the termination type was ABORT_MESSAGE_STATE, then you can find more information on the cause of the termination on the application server SAP0806_BP1_00 in transaction SM21.
    If the termination type was ERROR_MESSAGE_STATE, then you can search for more information in the trace file for the work process 0 in transaction ST11 on the application server SAP0806_BP1_00 . In some situations, you may also need to analyze the trace files of other work processes.
    If you do not yet have a user ID, contact your system administrator.
    Error code: ICF-IE-http -c: 600 -u: LONGNV -l: E -s: BP1 -i: SAP0806_BP1_00 -w: 0 -d: 20070913 -t: 112719 -v: ERROR_MESSAGE_STATE -e: Enter a valid start and end date
    HTTP 500 - Internal Server Error
    Your SAP Internet Communication Framework Team
    PS: I've never exported successfully any project to MS Project.
    Please help me
    Thanks
    Long

    Hi long nguyen,
    Have you configure the backend system
    1)c -project -- collorabration -->connection to external system --> Microsoft project integration --> ( assing field to import/export to c project)
    2)c-project integration with MS client or MS server . from which method your trying
    thanks
    sunil jawalkar

  • CProjects 4.0 - SAP R/3 4.7 - Accounting Integration problem.

    Dear all,
    I have performed all steps necesaary for accounting integration in cProjects and SAP R/3 FI System.
    I can even see and assign the cost rate that I have created in cProjects to a project role.
    System also calculates the  cost for the role multiplyin the cost rate with the number of hours the resource has been assigned.
    However, it also displays the following warning messages:
    1. An error occurred in Accounting (system QASCLNT777) 
    2. Function module "IAOM_CPRO_MISC_RFC_CPDEF_CHECK" not found. 
    3. No cost center could be determined for organizational unit 00000000 
    4. Maintain a revenue element for cost/revenue rate ZZ_000001 
    5. Error occurred in accounting - check the costing in the ERP system
    When I execute the transaction COCPCPR in R/3 system, I cannot see the internal order, but see the project name under "Internal Orders not created"
    Regards,
    Reema.

    Hi reema, if we refer to the documentation pertaining to accounting integration for cProjects 4.0, we see that the prerequisities is ECC 6.0
    Please see below from the help documentation
    Integration
    To be able to use the functions of accounting integration, you have to implement the Internal Orders (CO-OM-OPA) application component and Project System (PS) in SAP ECC 6.0.
    Prerequisites
    You need to make a number of Customizing settings in both the Collaboration Projects and SAP ECC Implementation Guides (IMG):
    Settings in the Collaboration Projects IMG
    You selected the Controlling in mySAP ERP setting in Customizing for Collaboration Projects under Connection to External Systems ® Accounting Integration ® Activate Integration as the Accounting Integration Scenario.
    I feel the error messages are thrown because you are using SAP R/3 4.7.  I see from the SAP notes, for CATS integration with cProjects 4.0 and SAP R/3, SAP consulting is available, but nothing is mentioned for accounting integration.

  • BW,cProjects Reports are not working

    Hi Gurus,
    we are using EP7 EHP 2 for PPM 5.0. We have activate all BW contents In BW system but when we click on any report link on report tab in PPM portal system  ,it is just showing default web template but when we run the same report from BW system ,it is running fine.
    When I checked url , it is pointing to BW backend system but not getting web template name.
    Do I need to do any configuration in spro (launchpad)?
    Kindly suggest.
    Thanks in advance
    Regards
    Shashwat Gupta

    Hi Florian,
    Thanks for reply.
    I have maintained SAP_BW in portal and it's working fine. In PPM backend we have maintained RFC connections.
    User is also exist in both the system and we have configured SSO between systems.
    Report links are available on wd abap application APB_LAUNCHPAD .
    One thing that I can notice that there is no iview available for all those BW /cProjects reports in portal content.
    I am sure weather I am missing some configuration on PPM backend or BW backend system.
    If you know the configuration step,please let me know.
    Kindly suggest.
    Thanks in advance.
    Regards
    Shashwat gupta
    Edited by: Shashwat Kumar Gupta on Jun 1, 2011 9:47 PM

  • CProjects - DMS integration:26 036 You are not authorized for with doc.type

    Hi Experts,
    I need to use cProjects integration with DMS. When I try to create a link to an existing document I find the following error:
    26 036 You are not authorized for with document type DRW
    My user has authorization to the doc type in the DMS system (linked by RFC to cProjects system). I also have defined the object link in the document type.
    Do you know which configuration may be missing?
    Thanks in advance!
    Neil

    Hi Niel,
    How is the RFC connection established between DMS and cProjects system? Do check the authorizations of the RFC user through which the connection is established.
    Regards,
    Vivek Pandey

  • Synchronizing Business Partners for cProjects

    Hi all,
    We are on cProjects 4.0, ECC 6. We are trying to create Business Partners of the employees via report HR_SYNC_PERSON. The required settings are made for HR Integration in transaction OO_CENTRAL_PERSON.
    On running the report, we are getting the following error:
    Internal error in IGS1, GB. RFC: Connection error 00000000CP
        Message no. GEOCODING004
    Diagnosis:
        An internal error occurred during geocoding or in a related geocoding program.
    Any suggestions on how to rectify this error?
    Thanks,
    Vivek Pandey

    Hi Vivek,
    It may be not the best forum to post this issue, even the cProject is involved.
    After my brief investigation, the notes 454042 & 934412.should give you some helps at this issue.
    If the problem remains, please  the component BC-SRV-GEO (geographic function) is the right one,  I donot know, which forum it belongs to.
    Kind regards,
    Zhenbo

Maybe you are looking for