Control the Post Date  when use BAPI_OUTB_DELIVERY_CONFIRM_DEC to PGI !

Dear all,
   How can I control the Post Date (WADAT_IST) when I use BAPI_OUTB_DELIVERY_CONFIRM_DEC to PGI?
Thanks to help me.

In ECC 6.0, I used this BAPI to perform the picking using this way:
1. Implement enhancement point  BAPI_OUTB_DELIVERY_CONFIRM_D01 in enhancemnt spot ES_SAPLV50I to set the update picking flag on delivery control structure.
GS_DLV_BAPI_CONTROL-UPDATE_PICKING = 'X'
2. Implement enhancement of standard BADI SMOD_V50B0001. Use method EXIT_SAPLV50I_004 to loop at table CT_VBPOK and update the fields VBELN and POSNN with suitable values.
There is one problem with this solution, though.  The delivery quantity cannot be updated.  Any increase in the delivery qty ITEM_DATA-DLV_QTY actually updates the picked quantity on the delivery.  Consequently, there is little practical use of this technique.
John

Similar Messages

  • Controlling batch production date when using PI sheets

    Hello,
    The batch production date for some products is first entered at process order release. However, the GR is done using PI sheets. The GR entry via PI sheets takes the current date as the manufactured date and overwrites the old batch production date in the batch
    Does anyone out there know if there is a way to control this so that old production date is not overwritten with the GR entry date?
    many thanks.

    Dear,
    For this you need to use the setting..Batch classification in foreground for the movement type. Do the setting in OMJJ.
    Coem back after you try.

  • Controlling the header size when using sub templates

    Hi All,
    I have a conditional header subtemplate which has a different company logo for each country. I have a header sub template which has the list of all possible logo's which are conditinally invoked from the main template. Everything works fine. But the header size if too huge. I have tried different options of reducing the margin-size, setting vertical alignment to the top, but none of them seems to make the header size any smaller. Pls help.
    Thanks
    Swarna

    Hi,
    once i upload the rtf to the server With the static url i am able to view it . the problem is occuring only when i add the ${HTTPSERVER} in the import statement. I have set the property "Disable external reference" to false.
    Here is my static URL
    <?import:http://myserver:9704/xmlpserver/HeaderFooter.rtf?>
    After adding property of HTTPSERVER in xdo.cfg file URL is
    <?import: http://${HTTPSERVER}/HeaderFooter.rtf?>
    further i am even able to download the file when I run the static URL.
    Please let me know if any settings need to be done

  • How to do not insert the message content in the Message Inbox when use MFMessageComposeViewController control

    Dear all.
    In my app use the MFMessageComposeViewController control to send SMS message.The message content will be inserted to Message Inbox of iPhone.
    How to do not insert the message content in the Message Inbox when use this control?Because my message content has been encrypted. I don't want user can see them.
    Thanks

    I can't remember the steps, but if i'm not wrong, there are many "next" to click, and at the last windows, there is one dialog box with "do not show this message again".Maybe something to do with the registry, to enable to view this dialog box again. Date: Thu, 2 Feb 2012 06:38:24 -0700
    From: [email protected]
    To: [email protected]
    Subject: How to enable  the option "do not show this message again" in dreamweaver cs5
        Re: How to enable  the option "do not show this message again" in dreamweaver cs5
        created by Murray ACP in Dreamweaver - View the full discussion
    So, you open Site manager, click New, and then what?  I'm trying to understand which dialog you dismissed.  Can you help me?
         Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page: http://forums.adobe.com/message/4180872#4180872
         To unsubscribe from this thread, please visit the message page at http://forums.adobe.com/message/4180872#4180872. In the Actions box on the right, click the Stop Email Notifications link.
         Start a new discussion in Dreamweaver by email or at Adobe Forums
      For more information about maintaining your forum email notifications please go to http://forums.adobe.com/message/2936746#2936746.

  • What G/L Accounts are Updated Accordingly when the Posting Date is Changed?

    We are on SAP 2007 PL15, and our new fiscal year started 1 July 2008. Beginning on 1 July, whenever we change the posting date on a marketing document to a date in June, the following message appears:
    Newly Entered Posting Date Relates to Another Posting Period. Do you want to update G/L accounts accordingly? [Yes]  [No]
    Does anyone know what G/L accounts would be "updated accordingly" based on Posting Date? We did not get any such message last year when we were on SAP 2005.
    Thank you,
    Mike

    Dear Mike,
    Make be the exchange rate difference acount or related.
    Wish it is useful for you .
    Regards
    Apple

  • Tax Code removed on changing the posting Date in Purchase Order

    Dear All,
    This is with reference to the Purchase Order Document tax part, the document has been defined with the approval procedure and document series followed as annual series. The document series is linked to the period indicator as I am using the monthly series for the A/R & A/P Invoice.
    Now some Purchase Order was generated in the last month i.e. 30 NOV 07 which has gone for approval. These document are approved in the current month (Dec 07) & user are trying to add the records it displays the message as "Date deviates from permissible range [Purchase Order - Posting Date]  [Message 173-11]" as the period indicator is changed to Dec 07 in document numbering.
    The problem is when user changes the document date to Dec 07 for posting; system removes the tax codes, which is available in the document. Now as this is approved document user is not able to change or renter the tax codes.
    In this situation what can be done as the same case will again happen for the next month.
    Pls. provide the solution / work around for this problem.
    Regards,
    Yogesh Jadav

    hi yogesh,
    Cancel/Close the created purchase order.
    First you should change docduedate in posting period upto december 2007/end of fiscal year,by following the below path.
    (Administration->sytem intialization-> general settings--> posting period tab)
    Create a new purchase order.
    Send it for approval,authorizer can change date as required,
    once the posting date changes,tax code get refreshed,authorizer
    need to select tax code once again.
    <b>Tax code normally get refreshed when you change posting date it's normal
    system behaviour.</b>
    After authorizer does above changes,he can approve purchase order.
    Once purchase order is approved,orginator can add it as purchase order in draft stauts.
    <b>After approval we can not do any changes in purchase order.</b>
    Hope my solution will solve the problem.
    Thanks,
    With regards,
    A.Jeyakanthan

  • Problem with the Posting Date of Goods Receipt or Invoice Receipt for PO

    Hi All,
    I am working on 2LIS_02_SCL - Purchasing Data (Schedule Line Level),
    For our report, we should get the scheduled PO quantity,actual PO qty, Scheduled date and actual date in the report.
    we are getting all these fields from the above extractor...
    For a PO which is opened (Delivery Completion indicator not set) - we where getting all field as in ECC(ME23N)
    But for a PO which is finished(Delivery completion indicator is set) - we where are getting actual GR qty,planned qty,planned or scheduled date at schedule line level.But we are not getting the Posting Date of Goods Receipt or Invoice Receipt for PO from history EKBE for all the schedule line.
    ex:
    for open PO
    PO num         item num   schedule line    Planned date   actual date  difference  actual qty  planned qty  difference
    450002432   10                        1              01/10/2011    02/10/2011       1 day          100             100             0
                                                     2              02/10/2011    04/10/2011       2 days        200             400            200
                                                     3              03/10/2011    07/10/2011       4 days         300            300              0
    For the same PO when it is Finished or completed(Delivery completion indicator is set)
    PO num         item num   schedule line    Planned date   actual date  difference  actual qty  planned qty  difference
    450002432   10                        1              01/10/2011    07/10/2011       6 day          100             100             0
                                                     2              02/10/2011    07/10/2011       5 days        200             400            200
                                                                    03/10/2011    07/10/2011       4 days         300            300              0
    for all the schedule line its displaying the last posting date(i think its taking from EKKO table)
    Is there any possibility to get that posting date history ....

    You can have multiple receipts against a PO schedule line, but this extractor is not meant to go to that level of granularity.  Please try to use 2lis_02_sgr instead which provides goods receipts per PO schedule line.

  • Choose Posting Date when entering Bank Statement

    Version: 2007A SP00 PL49 (and newer)
    Problem: Because of SAP note 1296726, you have to use the bank statement date as the posting date for the corresponding journal entries and reconciliations.  This is not flexible: if I have a bank statement of 24/06/2009 and I want to reconcile an invoice with posting date 30/06/2009, I get an error: "Reconciliation date must be on or after the last posting date for
    transactions selected for reconciliation Message 3821-3".  Using 30/06/2009 as posting date for this particular row is not possible because the posting date of the bank statement is 24/06/2009 and you will get the same error again because you reconcile that row JE with the total bank statement JE at date 24/06/2009 containing a journal entry on 30/06/2009 (namely that row JE).
    Since PL49 and the fix of SAP note 1296726, it is no longer possible to use a different posting date and bank statement date and this is the main cause of the problem above.
    Current Workaround: Don't reconcile the invoice when entering the bank statement and do this manually after you have finalized the bank statement.
    Proposed solution: Make an extra field "posting date bank statement" in the "Bank Statement Details" window where the user can choose on which day he can post his bank statement (just like in other documents like invoices, ...).  In the problem described above the user could choose 30/06/2009 as the posting date, but keeping 24/06/2009 as the statement date.

    >
    Avinoam Fraenkel wrote:
    > Pieter
    >
    > I had some feedback recently that the cumulative journal posting in the Bank Statement Processing functionality which is unique to the Belgian localization may in fact not be a general requirement from a business process perspective in Belgium
    This is true. I completely agree with that.
    >
    > If this is true then my preferred approach to solve this issue is to provide the standard Bank Statement Processing functionality to Belgium where each separate Bank statement line creates a separte posting with no collective cumulative posting being made.
    >
    > Please confirm if this approach will be acceptable to you.
    I'm not a business man, but an IT expert.  But as far as I know, your approach is correct.
    Before we used SAP in our company, our previous accounting software made only one journal post for each Bank statement.  This way, the (series) numbering of the journal posts correspond to the bank statement numbers.
    >
    > If so then I will need to do some further research and will consider this approach in our future version planning.
    >
    > Aside from the above I will add your proposal to the future change list but cannot currently guarantee if and when it will be implemented.
    Thanks for taking my proposal into consideration.
    >
    > In the meantime I would ask you to kindly use the workaround of performing manual reconciliations after bank statement finalization.
    >
    > Thank you for raising this issue and providing your solution proposal.
    >
    > Grateful thanks,
    >
    > Avinoam
    You're welcome!
    Regards,
    Pieter Verhaeghe

  • Substitution method to change the posting date in FB50

    Guys,
               My client requires the posting date to be blank in FB50. I used substitution method to do so, but its validating only after FB50 comes into picture. I want the posting date to be blank as soon as the transaction is entered. Did any one come acorss such situvation?
    Thanks in advance,
    Isaac

    Hi Smart,
    When your user is on FB50 screen, ask him to empty the posting date field and from the menu choose System -> User Profile -> Set Data (yes, you read it right, it is Data, not date - and date is also data!!!). That will save blank posting date in user parameters (SU3). Exit FB50 and re-enter. You will see that Posting Date is blank, but is also greyed out. Don't worry, enter Doc. Date and press 'Enter' key. It will open up Posting Date field as initial and your user can enter any date he wants, provided the posting period is open.

  • Validate the posting date for profit centre documents actual/plan

    Hi,
    I have an requiremnt where we want system to validate the posting date for profit centre documents actual/plan, Functionality should be same as system check  posting period for FI documents maintained in OB52 and controlling cost centre documents posting period maintained in OKP1.
    For creating Profit centre document activity types are available in Tcode 0KEO.
    I have come across Exits EXIT_SAPLPC08_001 and  EXIT_SAPLPC08_002. But i am notsure whether we can use these and implement these.
    PLease suggest what can be done to achieve this.
    Regards,

    Hi,
    U can use subsititution and specify that the profit center could be your head office or the store as per your req...
    I think thats the only option we have..
    Cheers
    Raghu

  • How to change the posting date in UD stock posting for a HU managed item?

    Hi,
    We are using Handling Unit managed items with QM activation. For a specific HU managed material, we wanted to post the stock on a previous date. We have created PO on a back date and made GR also on a back date. Now the problem is, the system has generated an inspection lot. Now while trying to do UD and stock posting, I do not see the "Doc" tab which we normally see in UD stock posting for normal inspection lots (non-HU managed items) for changing the date.
    I don't see any other way to change the posting date for the HU managed item in UD stock posting. Anyone can help please?
    Thanks & Regards,
    Madhavan Krishnamoorthy.

    I don't think you can.
    Craig

  • How to change the posting date of confirmations?

    Hi,
    In my company CATA is scheduled as a background job and uses some ABAP logic to set the correct posting date for the confirmations that are transferred to the PS module. As a result of a wrong date entry in the table which is used in the ABAP logic, all the confirmations (8572) that should have had posting date in February got posting dates in March.
    As far as I can see some of the options are:
    - Use CN48N and cancel one and one confirmation
    - Manually add 8572 confirmations with the correct amount of time, employee number, periode, posting date etc.
    Due to the amount of confirmations this procedure will be very time consuming.
    My questions is what is the best procedure to correct the posting date for 8572 confirmations with wrong posting date?
    Regards,
    Petter Kvalvik

    hi
    write a LSMW or BDC to cancel the confirmation and correct it by another LSMW or BDC program for correct date.

  • Issue with the Posting Date of the Purchase Order.

    Hi All,
    There are fields in BW like SSL1: Time OK, SSL2: Qty OK, SSL3: Time & Qty Ok, SSL4: Days Late (Routines are written to calculate). These fields will indicate whether the delivery against a GR is OK or not with respect to Time, Quantity and the No. of Days..
    But here the issue I am facing is
    If there is only1 delivery/ GR against a single item the calculation in BW are correct - i.e. for a particular PO if there is only one delivery the above fields like SSL1: Time Ok, SSL2: Qty OK will show like the delivery is done within the specified time and everything is OK (in case if it is delivered within the allotted time)
    But if there are multiple deliveries or multiple GR's  posted for one PO item, the calculations are going wrong i.e. even if the delivery is done well within the specified time it is showing the wrong calculations like it is delievered too late. Because in this case the earlier dates are overwritten.
    Can anyone throw me some light on how can I go about solving this issue.
    I am thinking of declaring the Posting Date as the KeyField of the DSO as of now it is a Data field  I also want to know the impact of assigning this as a Keyfield.
    Thanks in advance,
    Prasapbi

    Hi,
    As I understand, you have a DSO based on Purchase Order and your key field is PO and its line item. The problem as you stated will always be there if you have multiple deliveries/GRs created for a single line item because the system will overwrite the entries for same key.
    Problem with adding Posting date as keyfield will be that then your key will be PO-PO Lineitem-Date. When PO will be created, the Posting date will be blank(correct me here if I am wrong), therefore you will have one entry for same PO-line item combination. One without date and other with date, which again would be incorrect. If my assumption about Posting date was wrong, even then your data may not be correct because then you may have many entries with same posting date which again would overwrite each other.
    If there is any direct link between PO line item and number of deliveries that will get created for them, then you can bring that field in DSO as keyfield. But I don't think there is any such field.
    Looking at your report requirement, I would suggest that you make a DSO based on Goods Receipts and then calculate these keyfigures by comparing the dates between GR posting date and PO line item date.
    Else you can change the way your datasource works(if its generic one based on function module). Since your main requirement is to check whether the GR posting date has met your SLA or not, you should fetch all the details only when GR is created and make your key field as PO-PO Line item-GR

  • Unable to create a billing document , have to change the posting date

    Dear All,
                      I have performed the following steps:
                     1. I have created Customer
                     2. Created a material.
                     3. Linked the customer to the material
                     4. Post initial stock for the material.
                     5. Create a Sales/Order.
                     6. Displayed the sales order and recorded the scheduled delivery date.
                     7. Created the delivery for the sales order.
                     8. Transfer the stock from the warehouse management
                     9. And update the order.
    While updating the order I selected post goods issue and it would not go ahead because the posting date is not there in the posting period. Where do I change the posting date. I could not find it anywhere. I did not enter the date anywhere.
    Thank you,
    Sandhya

    Hello Sandhya
    Here is how MMPV works.
    Lets say I am at the end of the May month 05.31.2009 so lets say period corrresponding to this is 05/2009.
    Now if you want to post data in June perios 06/2009 should be opened.
    Here is what I will do in MMPV
    Enter my company code
    Instead of using periods I will use date which will be 06/01/2009 (mm/dd/yy format in my example)
    Check radio button check and close period
    Click on remaining checkboxes.
    Execute
    The effect of this will be that the previous periods will be closed and June will be opened.
    In your case since no one has opened periods after 2006 so may be you will have to repeat this step for each month until you reach current period if that is the one in which you want to post goods issue.
    Thanks
    Vikas

  • How can forbid changing data when using BAPI  'BAPI_MATERIAL_SAVEREPLICA'?

    I am using BAPI  'BAPI_MATERIAL_SAVEREPLICA' to creat material master data in batch.
    But this BAPI also can be used for change mode.
    How to forbid the change of MAT data when use this BAPI?
    TKS a lot~~
    I am looking foward to your response~~~

    you have to find out what the user did before your program goes ahead and starts the BAPI.

Maybe you are looking for

  • Sync a folder between two users on the same computer.

    I would like to sync a folder between two users on the same computer so that they are always the same when I access them from either user.

  • Every app is crashing?

    Every app is crashing including Apple apps.

  • First time video in Flash

    Hello. I am new to Flash (a bit late perhaps in this day and age!) but anyhow I am to produce a banner with a movie inside that will only play when the user pushes the play button. I have tried and failed so many times. The movie just plays no matter

  • Can't open motion 5.02 doc in 5.03

    The automatic update for motion 5.02 to 5.03 has stopped previous created files from being opened. This is critical for any update - be able to open my projects in the new version of the software. What is the solution??

  • Why backup files are all 6..5 GB size?

    hi I'm taking backup using rman and backup of my database divides into 6.5GB pieces? Why it's so?