Convert a scatter graph with multiple data series into individual graphs

I am trying to convert a scatter graph with multiple data series into individual graphs, with the series having the same formatting as in the graph when all series are together.
Normally, if I delete any series, the color scheme for all the other series vanishes. I can then waste more time in having to re-adjust the  color and shape of the series, but this is tedious. This, I do not want. Is there an automated way to do this?
Ideally, of course, all series would appear in little subsections in the space of the former one graph, all with individual axes, but I can't have all, so I'll settle with having several individual new graphs, each with just one series, and with the original
formatting.
Thx.

How about creating a copy of the chart, and then setting all series except one to be transparent (no line, no marker)? Repeat for each series.
Regards, Hans Vogelaar (http://www.eileenslounge.com)

Similar Messages

  • Scatter Plot With Multiple Data Series

    Hello,
    I would greatly appreciate any help you guys could give me.
    I need one scatter plot that shows 4 different groups of data. They all go with the same X and Y axis values, though.
    I can get a scatter graph with ONE group, but it won't let me add in another one. I tried the clicking and dragging the new cells, and the shift clicking, but the data just will not go into the chart. It's like it doesn't recognize it.
    I think I read something about sharing the X values? But I don't know how to do that?
    Thanks a ton in advance!!

    Pop,
    Badunit's example is one possible arrangement that you might have described; that is, one column for X values and several columns for Y values. This is the case when you should respond that you are sharing X-values. With all the data in one table, you can select it all at once, so you don't have the problem with dragging additional series into the chart.
    The Numbers User Guide PDF's first chapter is the place to start getting your bearings - you will learn how to distinguish Header vs. Body rows and columns. It's worth the effort to take another look at it.
    Since you are using a Scatter Chart, it's important not to use a header column for X because X values must be Numeric, as opposed to Text.
    Jerry

  • X-y Scatter chart with multiple data series

    Hi,
    How do I create an x-y scatter chart with more than 1 data series?  For example:
    Series 1
    x__y
    1__0
    2__5
    3__9
    4__7
    5__2
    Series 2
    x_____y
    0.5___0
    1.3___4.8
    2.6___12.3
    4.1___8.4
    4.9___3.2
    I can do this with 2 seperate graphs but I need them on the same graph.
    Is there a limit on the number of series that can be placed on a single x-y scatter graph?
    Many thanks.

    Please re-post if this is still an issue or purchase a case and have a dedicated support engineer work with you directly:
    http://store.businessobjects.com/store/bobjamer/DisplayProductByTypePage&parentCategoryID=&categoryID=11522300?resid=-Z5tUwoHAiwAAA8@NLgAAAAS&rests=1254701640551

  • Report Builder with multiple data series

    I am not able to figure out how to create a bar chart using
    multiple data series in the Report Builder. I can do it with
    explicit CFML coding but not in the Report Builder. I am running MX
    version 7 with the current (as of 9/1/07) download of the Report
    Builder.
    My table contains visit information by site, with standard
    demographics on each visit (age, race, gender, etc.) I am trying to
    analyze the data by site, for example, race by site.
    I am using an SQL statement to sort and group by site &
    race. I can get a chart of the number of visits for each site or
    the total number of visits by race across all sites. But I can't
    get race by site. The SQL statement looks like this:
    SELECT race, site, COUNT(*) as counter
    FROM visit_info WHERE userid = #session.uid#
    GROUP BY site, race ORDER by site, race
    Every variation I have tried for showing race by site either
    leaves out part of the results or creates a bar chart that has the
    race and site categories as separate entities (White, Black,
    Chinese, Site1, Site2, Site3, etc). I've also tried creating a
    combined variable (site_race) but that doesn't seem to fare any
    better.
    Any help would be appreciated.

    Pop,
    Badunit's example is one possible arrangement that you might have described; that is, one column for X values and several columns for Y values. This is the case when you should respond that you are sharing X-values. With all the data in one table, you can select it all at once, so you don't have the problem with dragging additional series into the chart.
    The Numbers User Guide PDF's first chapter is the place to start getting your bearings - you will learn how to distinguish Header vs. Body rows and columns. It's worth the effort to take another look at it.
    Since you are using a Scatter Chart, it's important not to use a header column for X because X values must be Numeric, as opposed to Text.
    Jerry

  • Charts with Multiple Data Series in One Color

    I am trying to create a pie chart to reflect the different areas of my budget in four categories. However, my budget is divided into several smaller categories across several columns and I can only get the cells in the first column to register even though the additional cells show up in the Inspector as part of the series.

    Jerry,
    Thanks for the info. I'll give that a read when I get home today. In a roundabout way I tried part of that. I created my chart with my data for Mammallia and the time periods. Then I selected the occurrences for Synapsids and dropped them in, but it added them to the first data set in the chart? I'm guessing I was doing something wrong, but I'm unsure of what. Numbers/Excel has never been a strong subject for me, but I'll try your advice and see what I come up with.
    Reading your post again, the last way seems the most simple and I feel a little foolish for not thinking of that myself. Oh well, that's how we learn right? Thanks for your help!! You saved me a lot of hassle.
    Best regards,
    Mitch

  • How to tune performance of a cube with multiple date dimension?

    Hi, 
    I have a cube where I have a measure. Now for a turn time report I am taking the date difference of two dates and taking the average, max and min of the date difference. The graph is taking long time to load. I am using Telerik report controls. 
    Is there any way to tune up the cube performance with multiple date dimension to it? What are the key rules and beset practices for a cube to perform well? 
    Thanks, 
    Amit

    Hi amit2015,
    According to your description, you want to improve the performance of a SSAS cube with multiple date dimension. Right?
    In Analysis Services, there are many tips to improve the performance of a cube. In this scenario, I suggest you only keep one dimension, and only include the column which are required for your calculation. Please refer to "dimension design" in
    the link below:
    http://www.mssqltips.com/sqlservertip/2567/ssas--best-practices-and-performance-optimization--part-3-of-4/
    If you have any question, please feel free to ask.
    Simon Hou
    TechNet Community Support

  • Adhoc Query Requirement with Multiple Data Source

    Hi All,
    I have a Adhoc Query Requirement with Multiple Data Source. Is there any way to achive it. Other than Resultant set and bring into Model.
    Thanks
    SS

    You can compare stuff in the EL, but I don't think this is what you need.
    You can just use Java code in the backing bean class for all the business logic. You can use DAO classes for database access logic. Finally for displaying you can use the JSF tags such as h:outputText.

  • Publication for Deski report with multiple data providers

    Hi,
    Has anyone been able to get a publication working that uses a Deski report with multiple data providers as the source? I'm trying to get a publication working that uses dynamic recipients and personalization. When I try to schedule the publication, I get the error "Object not found". 
    Thanks,
    Debbie

    Debbie,
    That's standard.
    It's useful for emulating outer joins in reports.
    Say you've got a sales report where you want to display all 12 months of the year in a crosstab whatever month you run in.
    We're only in May at the moment though. With one data provider (SALES), you'll get a crosstab with just up to May for your months.
    If you create a separate data provider called MONTHS to return the months in the current year, you will then have a merged dimension of YearMonth in both.
    In your crosstab if you just use YearMonth you'll get just the five months. If you qualify it with its data provider name (in our case MONTHS), you'll see the full twelve months shown.
    I hope that clears it up for your.
    Regards,
    Mark

  • Web Analysis : populate the same table with multiple data sources

    Hi folks,
    I would like to know if it is possible to populate a table with multiple data sources.
    For instance, I'd like to create a table with 3 columns : Entity, Customer and AvgCostPerCust.
    Entity and Customer come from one Essbase, AvgCostPerCust comes from HFM.
    The objective is to get a calculated member which is Customer * AvgCostPerCust.
    Any ideas ?
    Once again, thanks for your help.

    I would like to have the following output:
    File 1 - Store 2 - Query A + Store 2 - Query B
    File 2 - Store 4 - Query A + Store 4 - Query B
    File 3 - Store 5 - Query A + Store 5 - Query B
    the bursting level should be give at
    File 1 - Store 2 - Query A + Store 2 - Query B
    so the tag in the xml has to be split by common to these three rows.
    since the data is coming from the diff query, and the data is not going to be under single tag.
    you cannot burst it using concatenated data source.
    But you can do it, using the datatemplate, and link the query and get the data for each file under a single query,
    select distinct store_name from all-stores
    select * from query1 where store name = :store_name === 1st query
    select * from query2 where store name = :store_name === 2nd query
    define the datastructure the way you wanted,
    the xml will contain something like this
    <stores>
    <store> </store> - for store 2
    <store> </store> - for store 3
    <store> </store> - for store 4
    <store> </store> - for store 5
    <stores>
    now you can burst it at store level.

  • BI+ Reporting With Multiple Data Sources

    Hi -
    We've been using BI+ Reports with multiple data sources on separate grids. We are wondering if there is a better way to ensure the user has their point of view bar in sync between the the data sources. In our case, both Data Sources are separate HFM applications with all the dimensions identical except the account which is defined on the report. We are not using Metadata Management.
    I'm aware of the "Merge Equivalent Prompts" in the Preferences > Financial Reporting window, but this does not always ensure the users have the same point of view.
    What practice are other companies using to make sure the user runs the reports accurately with both point of view bars pulling the same entity/year/period.
    Thanks in advance.

    Thanks for your answer, however my question - I know it looks quite messy - is not directly related to data templates, my problem is that at the moment I am using a stored procedure following - almost exactly - what another procedure does in oracle EBS to call a BI publisher report.
    1. This procedure populates some temporary table with the xml data where the concurrent request picks it up and uses it to populate the BI publisher template.
    2. However I can't go and specify the XML location in my data template as this is not an option for us (i.e. reading the xml from the temporary table), so I am looking for another way to populate the BI publisher template (Note: I can't as well include the SQL queries in my Data template).
    Thanks ;)

  • Target Spry RowID on page with Multiple data sets from another page

    Hi all,
    I am trying to target a specific data item, on a page with
    multiple data sets, from a link on another page. (I also have to
    pass the link through Flash, but lets start with the simple
    part...)
    You can take a look at the site in progress here:
    http://www.3andband.com/TestSite/iframeTest3.html
    From the Home page I want to link to specific news or concert
    items on the News page
    I have been trying to get SpryURLUtils to do it but I can't
    seem to get it working.
    Any help would be greatly appreciated.
    Thanks!
    Ben

    did u try if it even passes the row value?? with a simple
    alert? alert(params.row)
    Also maby u need to reorder the scripts to this;
    <script src="../SpryAssets/SpryURLUtils.js"
    type="text/javascript"></script>
    <script src="../SpryAssets/xpath.js"
    type="text/javascript"></script>
    <script src="../SpryAssets/SpryData.js"
    type="text/javascript"></script>
    <script src="../SpryAssets/SpryCollapsiblePanel.js"
    type="text/javascript"></script>
    <script src="../SpryAssets/SpryEffects.js"
    type="text/javascript"></script>
    <script src="../SpryAssets/SpryAccordion.js"
    type="text/javascript"></script>
    and your js script
    var params = Spry.Utils.getLocationParamsAsObject();
    var dsConcerts = new
    Spry.Data.XMLDataSet("includes/concerts.xml", "Concerts/concert");
    dsConcerts.setColumnType("image", "image");
    var dsNews = new Spry.Data.XMLDataSet("includes/news.xml",
    "News/item");
    //Set an observer so that when the data is loaded, we update
    the current row to the url param value
    dsNews.addObserver({ onPostLoad: function(ds, type) {
    dsNews.setCurrentRow(params.row); }
    function MM_effectBlind(targetElement, duration, from, to,
    toggle)
    Spry.Effect.DoBlind(targetElement, {duration: duration,
    from: from, to: to, toggle: toggle});
    So url params get loaded before the data

  • Data Extraction from Multiple data sources into a single Infoprovider

    Hi Experts,
    Can anyone send me links or examples on how to extract data from multiple data sources into 1 Cube/DSO.
    Can anyone send me example scenarios for extracting data from 2 data sources into a single Cube/DSO.
    Thanks
    Kumar

    Hi Ashok,
    Check the following link from SAP help. Ths is probably what you are looking for.
    [ Multiple data sources into single infoprovider|http://help.sap.com/saphelp_nw70/helpdata/en/e3/e60138fede083de10000009b38f8cf/frameset.htm]
    Data from multiple data sources which are logically related and technicall have the same key can be combined into single record.
    For example, if you have Sales order item and sales order item status .
    These both have the same key - sales order and item and are logically related.
    The Sales order item - provides information on Sales order item - material , price, quantity, plant etc.
    The item status  - povides information on delivery status, billing status, rejection status....
    These are two different data sources 2LIS_!1_VAITM ad 2LIS_11_VASTI.
    In case you have few master data attributes coming from different systems ie tow data sources in different systems say completely defines your master data. Then you could use a DSO or infoobject to combine the records.
    If you want to see aggregated data you use a cube.
    ie say you want to analyzae the customer revenue on a particular material and a particular project.
    The project details would come from Project syatem and Sales details fom sales flow.
    The data is then combined in the DSO with key cutomer and sales area say.
    Then it is aggregated at cube level...by not using sales order in the cube model...so all sales order of the same customer would add while loading the cube.. to give direct customer spend values for your sales area at aggregated level.
    Hope this helps,
    Best regards,
    Sunmit.

  • Defining a scatter chart with multiple series

    I am trying to create a scatter chart with two series.  I am using CR8.5 and CR2008.
    I am having difficulty with my data being presented correctly when I attempt to define the scatter chart.  The data is temperature and weather use/sqft for two different years.
    Year Period Temp Energy Use/sqft      Year Period Temp Energy Use/sqft
    2012 1/2012  52  3.7172               2013 1/2013  52  3.1712
    2012 2/2012  62  3.7015               2013 2/2013  57  3.1449
    2012 3/2012  70  3.7937               2013 3/2013  63  3.2039
    2012 4/2012  76  3.9882               2013 4/2013  71  3.4551
    2012 5/2012  82  4.2213               2013 5/2013  81  3.9903
    2012 6/2012  87  4.4875               2013 6/2013  85  4.3650
    2012 7/2012  90  4.4727               2013 7/2013  87  4.2072
    2012 8/2012  86  4.6154               2013 8/2013  87  4.2560
    I would expect to see something similar to the attached images of an excel files scatter chart.  When I defined the scatter chart in Crystal Report, I need to define a field for 'On change of', and 2 'Values to show'.
    I understand that this would not show the expected scatter chart but I went this direction as the series is to be the year.
    On change of:
    - Year
    Show values:
    - Temp
    - Energy Use/Sqft
    Problem is the sum of both is being shown. I am trying to keep the series together by year and showing each record as retrieved from the database.
    Thank you,
    Jim

    You can try using this charting tool for generating scatter charts:
    http://htmldb.oracle.com/pls/otn/f?p=31517:58
    Denes Kubicek

  • "Scatter" Chart with Multiple Values per Date

    APEX Gurus,
    I need to plot a chart with multiple y-axis values along the x-axis.
    Here's an example:
    X-Axis (Date) Y-Axis (Number)
    1-JAN-07 1
    1-JAN-07 2
    1-JAN-07 3
    2-JAN-07 1
    2-JAN-07 2
    3-JAN-07 1
    Right now, APEX displays the X-axis (Date) as separate values on the x-axis. But I want all three 1-JAN-07 values to line up vertically under x-axis. I am currently using a line chart for this. And it displays a "dot" for each value (depending on my max rows value).
    Any insight would be much appreciated! And thanks in advance!
    Susan

    You can try using this charting tool for generating scatter charts:
    http://htmldb.oracle.com/pls/otn/f?p=31517:58
    Denes Kubicek

  • To comapre a single date with multiple dates

    Hi All,
    I am using fetch xml report in which there are two table Opportunity and activity
    One Opportunity with have multiple activity
    Opportunity has a field  called new_dateofapplication
    and Activity has a field called StartDateActivity which have multiple values
    i need to compare these dates somehow as below  but it didnt work
    =iif((Fields!new_dateofapplicationValue.Value)<=(Fields!StartDateActivityValue.Value),sum(Fields!ActivityDurationValue.Value),0)
    for e.g
    Any help much appreciated
    Thanks
    Pradnya07

    Hi Simran08,
    According to your description, you have two tables in your report. Now you want to compare the date in Opportunity table with the date in Activity table, sum all activity hours which their date are later than the start date. Right?
    In Reporting Service, if you want to compare two values in IIF() function without using Lookup/LookupSet, these two data fields need to be in same scope. Your date are from different tables. It seems you have different datasets for those tables. This may
    be the reason why you can’t make your expression working in your report. And for comparing data from different datasets, we only have Lookup/LookupSet function. However, this function is only working in conditions where the value of one field is equals to
    the value of the other field. So we can never use this function to judge if the value of one field is greater/less than the value of the other field. So in your scenario, it’s impossible to find a solution if your Activity table only has those two columns.
    Also if you get the total hours in that way (like you post in your picture), you can’t figure out how many hours in total hours are spent on each program. But I guess it supposed to have some fields in your Activity to show clients and program. If so, you
    just need to set groups in your table and get total in group footer. It will looks like below:
    If possible could you post the dataset and table structure or any other detail information about your report? That can help us tested your case in our local environment and do further analysis. Thank you.
    Reference:
    LookupSet Function (Report Builder and SSRS)
    Best Regards,
    Simon Hou
     

Maybe you are looking for

  • Fail with quickstart with fresh install the All-in-one Installer

    Hi all, I install the quick install with all-in-one installer, and start the Endeca Server from program menu, and then I can get to the http://localhost:8080, and login successfully. Then I start the Integrator, open the quickstart project, but when

  • Warning 10.4.3 upgrade delete System & Users Squirrelmail config files.

    Just installed the 10.4.3 upgrade. After the upgrade was done I noticed WebMail settings was back to default. So I had to set everything up again. But what makes me angry is all the users preferences has been reset aswell. I haven't read anything abo

  • FCP v4.5 Won't open under certain user

    Yesterday, one of our G5 machines quit loading FCP, but only under a specific user. Others users can still run FCP, no problem. I have deleted the FCP preference files from his home folder to no avail. Any advice? Thanks

  • What are different between software VM-FEX and hardware VM-FEX?

    Hi everybody, I am confuse software VM-FEX and hardware VM-FEX. Does the software VM-FEX is Emulated mode and hardware VM-FEX is VMdirectpath mode? If i design a VM-FEX, is there must have nexus 1000V or not ? Is  Nexus 1000V and VM-FEX must work tog

  • Render farm for DCP creation

    We are starting to get more and more requests to make DCPs for clients and we need to speed up the process. Currently doing a DCP through the Wraptor AME plugin takes around 20 hours for a feature length film. It's a bit faster if we do tiffs through