Cor1(process order)
HI All,
My requirement is to create a idoc for the process order which is released from COR1.(idoc part is completed)
Can any one suggest me a badi which will triger while releasing the process order from COR1 (not cor5),
i worked with workorder_update and BEFORE_UPDATE but they are not satisfying my requirement bcoz when releasing a process order from COR1 the order number is not creating it is in the form of %00000001..so i need a badi which will get the process order after it is saved and has to triger the code which we written in that badi.
Hi Suresh,
I have red your problem while create the idoc in process order release from COR1 transaction. I hope that u have overcome this problem.
Now i had same problem where we have to find the find the idoc is configured for process order COR1.
Gopal
Similar Messages
-
Dump while creating Process Order -COR1
Hi,
I am getting dump while creating a Process Order thru COR1. the dump error discription GETWA_NOT_ASSIGNED .HI omprasath rajendiran,
Do you solve the problème, because i get the same problème with COR1 ? -
User Exit for Changing Quantity in Process Order , COR1, COR2
Hi All,
Can anyone point me towards the light in User exit related to COR1 and COR2.After the Creation of Process order while saving i need to write a code that rounds off the quantity values.
I tried to change the values in the below user exits but i was not succesfull.
CCOWB001 Customer exit for modifying menu entries
COIB0001 Customer Exit for As-Built Assignment Tool
COZF0001 Change purchase req. for externally processed operation
COZF0002 Change purchase req. for externally procured component
PPCO0001 Application development: PP orders
PPCO0002 Check exit for setting delete mark / deletion indicator
PPCO0003 Check exit for order changes from sales order
PPCO0004 Sort and processing exit: Mass processing orders
PPCO0005 Storage location/backflushing when order is created
PPCO0006 Enhancement to specify defaults for fields in order header
PPCO0007 Exit when saving production order
PPCO0008 Enhancement in the adding and changing of components
PPCO0009 Enhancement in goods movements for prod. process order
PPCO0010 Enhancement in make-to-order production - Unit of measure
PPCO0012 Production Order: Display/Change Order Header Data
PPCO0013 Change priorities of selection crit. for batch determination
PPCO0015 Additional check for document links from BOMs
PPCO0016 Additional check for document links from master data
PPCO0017 Additional check for online processing of document links
PPCO0018 Check for changes to production order header
PPCO0019 Checks for changes to order operations
PPCO0021 Release Control for Automatic Batch Determination
PPCO0022 Determination of Production Memo
PPCO0023 Checks Changes to Order Components
STATTEXT Modification exit for formatting status text lines
Reason was the data related tp materials was not accesble at this point and residing in resb internal table .
Any suggestions ? Ideas ?
Thanks in advance,
GowriHi,
Try with BADI <b>WORKORDER_UPDATE</b>.
Regards -
Change Production version during creation of Process Order COR1
Hi,
Scenario:
Based on the entered Material, Plant and Order type system need to trigger a popup asking the user to select the Production Version. This should happen before clicking on SAVE button, so that all the values will be populated correctly based on the changed VERID.
I did not find a user exit that enables to change the Production Version (VERID) value. So I thought of displaying the popup in the user exit EXIT_SAPLCOZF_003 which will be triggered before initial screen appears, export the selected value and pass it to a User Exit or BADI where VERID can be changed. But cannot find a user exit to do it.
Please help me find a User Exit or BADI to change the Production Version during creation of Process Order using COR1 transaction before clicking on SAVE button.
Thanks,
Manoj.Hi Manoj,
So - almost four years later - I saw your post and I saw myself in the very same situation as you did...
I found a solution for those who wants to change the production version of the production order from the sales order creation: create an enhancement in the function module 'MD_VERSION_SELECTION' and you are good to go. -
Fiscal year 2010 Not allowed while creating Process order in COR1
Dear Friends,
We have gone SAP live in the month of October. The fiscal yeat we are using is 2011 as the client is Indian client. I have made the fiscal year variant for 2011 (V3). The FI document posting with Fiscal year 2011. It is also creating the Controlling document and Profit center document without any problem.
We have also made the period open as 2011 in MMpv and MMRV. The goods receipts is working fine and the finance entry and material document gets generated for the fiscal year 2011.
Now we are creating the process order in COR1 and getting the error message Fiscal year 2010 not allowed as below.
Fiscal year 2010 is not allowed
Message no. F5568
Diagnosis
The fiscal year entered (2010) is different from the fiscal year derived from the posting date and fiscal year variant (2011).
System Response
Error.
Procedure
Correct the fiscal year entered.
In KP26 we have maintianed for activity price for 2010 & 2011 and the system is picking the data for the fiscal year 2010 data and not the FY 2011 data.
I have checked in OKEQ (Costing version '0') The valide start date for FY2011 is 01.04.2010.
Is there any other place to maintain the fiscal year in Controlling area or Prodduction Planning???
I last my patient last 5 days doing R&D. Can any one help me where the fiscal year is picking and why it is picking FY 2010??
Regards,
DevendranHi Ajay,
Thank you for your comments. I have checked the Factory calendar and that is 2010 (January to December). We have tried to change to 2011 but the system automatically picking the date from January 1st 2011 to 31st December 2011. I am unable to create calendar year with date from 01.04.2010.
I have discussed with my PP consultant about this issue, he is telling the factory calendar nowhere related to Fiscal year. Do you have any idea how to change the factory calendar of 2011 from 01.04.2010 to 31.03.2011?? Is there any there reason why my system considering the Fiscal year 2010 instead of 2011???
Your inputs will defenitely help me to get an clue.
Regards,
Devendran -
BADI for COR1 transaction(Process orders)
HI All,
My requirement is to create a idoc for the process order which is released from COR1.(idoc part is completed)
Can any one suggest me a badi which will triger while releasing the process order from COR1 (not cor5),
i worked with workorder_update and BEFORE_UPDATE but they are not satisfying my requirement bcoz when releasing a process order from COR1 the order number is not creating it is in the form of %00000001..so i need a badi which will get the process order after it is saved and has to triger the code which we written in that badi.Hi Suresh,
My Application is also like that but instead there is COR5. Is it possible to pass me the codes you used using BADI. Eventhough its not satisfying ur requirement, I just want to see how ur doing it.
Please.
Thank you. -
Fiscal Year Not allowed while creating the Process order (COR1)
Hi Friends,
My Indian client is following the Fiscal year of 2011 for the period of April 2010 to March 2011). We have gone live one month before. But now the problem we are facing is while creating the process order (T.Code COR1) system gives the error message "Fiscal year 2010 is not allowed".
The Diagnosis shows as below
Fiscal year 2010 is not allowed
Message no. F5568
Diagnosis
The fiscal year entered (2010) is different from the fiscal year derived from the posting date and fiscal year variant (2011).
System Response
Error.
Procedure
Correct the fiscal year entered.
I have Checked the Controlling area version. Fiscal Year 2011 starts from 01.04.2010. This issue is only at the time of Process oder creation and not in other module like FI, MM, SD, PS, QM and PM. I have checked with V3 Variant also and there is no problem with that.
Can any one help me where the setting is missing or what whould be the probable reason for this issue.
Regards,
DevaHi Prakash,
Thank you for your reply. I have checked the MMPV and MMRV set up and that is fine with fiscal year 2011. We are also processed lot many Material receipts for the fiscal year 2011. I have checked with OB52 for finace it is opened for the entire year of 2011 from 2009 for all periods.
We are facing only when we try to create the process order. When we enter the starte date as 24.11.2010 the derived period shows as fiscal year 2011. But entered fiscal year shows as 2010. We are not entering any other dates in the process order.
Is there any other probablity the date is picking from any Production related set ups??
The costing version fiscal year 2011 starts from 01.04.2010. So no problem with Controlling area. I have Checked the Factory calendar. The calendar starts from 01.01.2010 to 31.12.2010 for the year 2010.
Is there any other possibility of the missing settings or problem in date control???
Regards,
Deva -
Costing Error While creating Process Order in COR1
Hi when i am trying to release the process order in COR1, I am getting the below error *The business transaction
cannot be carried out*
System status CSER is active (ORD 00000000001)
Message no. BS013
Diagnosis
Object ORD 00000000001 has system status CSER (Error in cost
calculation). According to this status, transaction 'Release' is not
allowed.
Procedure
You can only carry out the requested function if this is allowed
according to the status of the object.
Kindly Help me to fix this issue
thanks
Kishore
Edited by: Emergys Corp on Jan 6, 2010 8:23 AMhi,
goto OPJH and check the nature of the status profile assigned to the PP order type..
hope this mite help
regards
sayeed -
Hi all,
I'm just trying to send standard LOIPRO idoc when a process order is saved on COR1 / COR2 transactions. First of all I've decided to do it via user-exit but I've seen that the order number (AUFNR) is not determinated yet, so finally I'm doing it with the BADI WORKORDER_UPDATE (method BEFORE_SAVE) where there is all the data ok.
Until this point all goes fine. To send the standard idoc there is the program RCCLORD but as the order is not saved on the system tables I cannot do a submit, so I'm doing a call to the function where the idoc is send of the program ( CLOI_MASTERIDOC_CREATE_LOIPRO ). All seems to be ok, but finally it goes allways to a short dump because at the end of the function there is a commit instruction ( and it seems it is not possible into a BADI ).
There is a easy way to do it or am I on the correct way?
I'm trying a lot of possibilities ( and it doesn't work for distinct causes ) but allways the start point is the avobe process.
Many thanks in advance.
Legoles_Ok, I believe I have this solved...
CORn
--> Create or change a PP order, release and save
BADI WORKORDER_UPDATE~BEFORE_UPDATE
--> Do your checks and call a custom function module (ZZ_SEND_IDOC) sending the aufnr, matnr, and werks. Cal this FM starting new task destination 'none'.
ZZ_SEND_IDOC (RFC-enabled)
--> wait up to 60 seconds (so update finishes)
--> add code to see if the record is no longer locked
--> Fill parameter table rsparams with aufnr, matnr, werks, logical system, and mess type
--> submit RCCLORD and return
parallel processing rules say you should not use a submit in the FM but it is working for me.
With this I can avoid using batch jobs to send these out. Yay. -
Process order Release COR1/COR2 depending on result of derivation
Hi All,
I have a requirement , where in Transaction COR1/COR2, I enter all the details and go to Release using the FLAG button at the time of doing Release i get one pop-up called Result of Derivation with Error/Warning/Information with either OK/Cancel.
If i do OK , i can still release the Process order though i have Error in the result of derivation pop-up.
My requirement is , if there is any error in this result of derivation i should not be allowed to Release the process order .So either the OK button should be disabled or i should display a error message at the time of saying OK ,if there is any error and don't allow release.
Please guide some enhancements.
Thanks,
RajendraWith help of workorder_update badi
-
BADI/EXIT - COR1 (block release process order without number batch)
Hi Gurus,
There are a BADI ou User EXIT in the transaction COR1 to block the release Process Order without number of batch created??
In COR2 OK, but COR1 I don´t find. I tried all the possibilities that knew!!!
Thank´s
CleberHi,
The below user exits are avilable for COR1.
EXIT_SAPLCOKO_001
EXIT_SAPLCOKO_002
EXIT_SAPLCOKO_003
EXIT_SAPLCOKO_004
EXIT_SAPLCOKO_005
EXIT_SAPLCOKO_006
Check if you can use any of the above.
Regards,
Soumya. -
Need BAPI for COR1(Create process Order)
Hi Gurus,
I need a BAPI or Function module for create process order (Tcode - COR1)
for which i am passing Plant, storage location,produced material number, quantity to produce,
received material,quantity to recived.
Regards,
Vijay MekalaHi,
is there any other BAPI or function module for COR1...
Regards,
Mekala Vijay -
COR1 create process order change field value when save(PPCO0001)
Dears
When tcode: COR1 create process order, i want to change some fields value on the tab: "Goods Recpt", for example the field: Goods Recipient: , anyone konws how to do this? now i am trying to using the exit: PPCO0001( EXIT_SAPLCOBT_001)
in thie eixt tables POSITION_TABLE : has this field: WEMPF (Goods Recipient) , i add some coding to change this field and save , but the change is not affect on the order . that is when open the order just create , this field is still empty.
do i need some other process or call some other functions or some other exit to do this?
thanks a lot for your posting.
Edited by: Jackyguoguo on Mar 11, 2010 3:51 AM
Edited by: Jackyguoguo on Mar 11, 2010 4:21 AM1. Use BADI: WORKORDER_UPDATE--> Method: BEFORE_UPDATE
2. Use ASSIGN "(SAPLCOBT)AFPO_BT[]" statement to access and modify the desired fields.
Regards,
Suraj -
Process Order COR1 Screen Elements
Dear gurus
While create Process Order using T-Code COR1
Field
GLUZP
GSUZP
is disabled how to enable it
Regards
Saad Nisar.Looks like you'll have to dig into the logic of function module 'SCREEN_SEQUENCE_CONTROL' for this.
The FM logic is table driven (T185* tables), but changing those entries for standard transactions is considered a modification and will result in a repair. If that doesn't bother you, then I suppose it'd be possible what you want. -
Process Order-COR1 Issue/Clarification
Hi,
My PP Consultant is raising a doubt related to Process Order.
In Process Order Display,COR1 transaction Code,If we see process order Itemization view it is giving some amount for the Material in FIXED VALUE column.
What is this Fixed Value and where it is coming from?Kindly advice me.
Thanks
SunithaHi sunitha,
In KP26 fixed prices for activities will be maintained. System considers the same and accordingly displays in Itemization of the process order. Check with the price maintained and Fixed costs displayed in the Itemization.
Hope.. clear to you.
Thanks and regards
Venkat.V
Maybe you are looking for
-
I just don't know where specifically to put the RAM at in the preferences option. I mainly use it for digital painting and sketching on this. (not so much painting on this but digital art)
-
[sapsem] BI-IP: Documents with restricted key figures in WAD
Hello, we use documents for characteristics in WAD (BI IP) suscessfully. We would like to use documents also for restricted key figures. Example: 0Version has "document property" defined in RSA1 We have a restricted keyfigure ED_K10 with the restrict
-
Why does stroke color change when i move layers?
ok, i have a lavendar box with black stroke on green layer. on blue layer i have everything else: text, lighter lavendar bg, graphics. when i move the box on top of the bg layer, it looks fine, see below but i need for the small box to be undern
-
Hi Friends We have data sources 2LIS_02_ITM, 2LIS_02_CGR, 2LIS_02_SCR and 2LIS_02_SGR activated and up and running delta properly. Due to some loads failed, we are doing re-init the loads.We are about to delete setup tables for purchase (02) componen
-
IronPort WSA S650 Faild to acquire the server manifest
Hello, I have a demo WSA S650 from cisco and the appliance can't download the definition updates and asyncos updates. IronPort WSA S650 According: http://www.cisco.com/en/US/prod/collateral/vpndevc/ps10128/ps10154/eol_c51-716512.html The WSA is End o