Costing and Production Version

I am doing a costing run for material that has more than one production version defined for it. I want the costing run to pick up by default a prod version that we want to use for costing. However, it does not pick that up by default and instead we have to manually assign it in CK11n. Is there any way to make that Production Version default in the costing run. Please let me know. Thank you

Hi,
You can maintain the default Production version in Material Master - Costing1 View, under Quantity Structure section.
Hope this helps... Reward your points,
Regards,
Prasobh

Similar Messages

  • Urgent-material and production version

    Is there a way i can pull the report or details for materials and production version used in a company code?

    Hi,
    USE Transaction C223
    BR
    Diwakar

  • Subcontracting (Multiple Vendors Involved) and Production Version's

    Hello all,
    I would like to know more about this stuff. So do share your valuable thoughts.
    I was trying out a sub contracting scenario with multiple Vendors and Production Versions involved. The production version is designated in such a way that lot size/quantity of the requirement determines which of the available version's to be taken into consideration whilst generating procurement proposal via MRP.
    #1. Production Version:
    5 Version's of the BOM are assigned to various lot sizes.
    #2. I had 5 different info records created for the material-Vendor combination. Each one of them were assigned with a Prod version to it.
    Sample:
    #3. Post these settings i had a MRP run executed. Well !!! the results were different off-course. I neither did see the procurement proposals classified based on the prod version nor the first prod version assigned to the procurement proposals ( i meant i had a different prod version(version 4) assigned to the procurement proposals generated).  
    Questions:
    #1. Well the first thing that did strike my mind was how could i get the source list work for such scenario's ? I guess i can't go with quota arrangement coz which would split the procurement proposals into many halves and assign's it accordingly to the vendor.
    #2. How come production version 4 given the top priority here ?
    Source List state:
                             a. I had an item (tried the others as well) checked with fixed vendor indicator but the info record of the material-vendor combination had a different Prod. Version in it (well not PR4, i can guarantee you on that)
                             b. I had nothing marked with fixed vendor indicator. Results post MRP still did pick the same prod version (Version 4).
    #3. Last but not the least how can i get this thing to work ?
    Please do help out.
    PS: MRP 4 selection Method: 2 - Selection by Prod.Version
    Regards,
    Rahul

    Hello Rajen,
    Well as per your comment "
    Regarding the splitting, Not Always.
    There are two types of quota arrangement - Allocation quota and splitting quota."
    so meaning that allocation quota doesn't split the procurement proposal is it ? If so how are they assigned to vendors ? any other criteria being used up here
    Anyhow i had a new lot size method created with the splitting quota field unchecked. So how do i proceed from here ? meaning that how should i manage my quota file to not have my procurement proposals split ?
    Please do help out.
    Regards,
    Rahul

  • Difference Aetween Overhead Cost and Product Cost

    Sir,
    What is the difference between Overhead Cost and Product Cost
    Thanking You
    Juhi

    Product cost indicates the cost of making a product which includes
    1) materials (contained in the BOM)
    2) labour  (specified in the routing)
    3) Overheads (charged via costing sheet).
    1) and 2) are directly identifiable to the product made.
    3) is not possible to directly associate to a making of product. This is more a common cost. Eg. Material handling charges. The material handling department, say, employs a few workers to do material transfer from warehouse, their cost is hard to associate to a particular production order.  Hence, usually a percentage is applied , where in the order is charged proportionate to use of materials in that order. The corresponding credit is given to the Material handling departmnet/cost center.

  • Costing variant and production version

    We have two costing variants "C" (used to create current cost estimates) and "F" (Used to create Future cost estimate). All of the production versions in the system have a validity date of 9999. Is there a way to tell the system to use one production version when costing using Variant C and another version when costing is done using variant F.
    Or if that is not possibel than how do we use one production version in 2011 while recosting current standards and another production version in 2012. (Remember the production version that we are using currently in 2011 has a validity date of 9999)
    Regards

    Hi
    In your Costing Variant - You have a tab callled "Qty Structure Control".... Here you can specify BOM Determination and Routing Selection id.... i.e. If the BOM / Routing attached to the prod version can be assigned a specific BOM Determination Class and Routing Selection id, it can work
    OR ELSE
    While doing CK11N, you can manually specify the Prod Version in the "Qty Struct" Tab..... Create an LSMW for CK11N and you can do a mass costing like CK40N.... CK40N does not have this option of specifying Prod Version
    I would prefer 2nd option
    Br, Ajay M

  • REM Product cost collectors and Production version

    Hi All,
    Can some one pls let me know
    What are the product cost collectors in REM and how to create the product cost collectors ?
    What is the production version and the difference between production version and controlling version?
    Thanks & Regards,
    Bujji

    Dear Bujji,
    A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
    [Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    [Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    A production version determines the various production techniques that can be used to produce a material. It defines the following information:
    Alternative BOM for a BOM explosion
    Task list type, task list group, and group counter for assignment to task lists
    Lot-size restrictions and period of validity
    A material can have one or more production versions.
    It can be defined in the Material Master (txn MM02) in one of the following views:
    MRP 4
    Work Scheduling
    Costing 1
    The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
    BR,
    Antje

  • Costing - Multiple Production Versions and Recursive BoMs

    Hi All,
    We have a production and product costing scenario as follows:
    Production versions 10, 20 and 30. It takes all three versions to manufacture the finished material and there are no intermediate products in this scenario. 10 and 30 are to be costed and 30 is a recursive BoM with the input from version 10 also being the output. 10 is the main production step with components but 30 is a recursive BoM sometimes only with the output material as the input and sometimes with a more complete BoM but which includes the output material as an input component.
    The quantity input appears to be the same as quantity output for the recursive element.
    If anyone has come across this scenario and you can let me know what design principles you followed I would appreciate it.
    We are getting iteration error messages when costing production version 30 and even reducing the input quantity below 95% of the input as per the SAP documentation does not fix the error message.
    Any help you can give will be greatefully received.
    Thanks.
    Regards,
    Tim

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • Product Costing and Production Planning

    Hi,
    Is Product Costing absolutely required before implementing Production Planning, specifically PP orders? My client does not want to plan costs or need any cost estimates. They want to use a PP order to check availability for a BOM, and then issue it out to an external vendor for services. After this material is processed by the external vendor, he would ship it back and we would be doing a goods receipt at the parent level of the BOM. The whole purpose of this is to get the accurate price of the BOM parent which would include all service costs. This parent would finally be sold via the regular SD sales order process. Our Logisitics consultant suggested that the only way this could be accomplished is a PP order. All this looks okay, but he also mentioned that a PP order cannot work without Product Costing and the process cant be accomplished CO-PC. I am unable to grasp why SAP would force us to have costing when the client doesnt need any cost estimates, planning etc. Could any one please tell me if we need CO-PC for this scenario?

    Dear SAPFicon,
    Technically, to run PP without using product cost planning would cause a lot of problems during business process of production order. Because, once a production order is created then the data structured is freezed in the PO and if there is any missing data it will cause errors. Any errors in production order would stop the following transactions. We never know what would be the error level of the production order. The worst case, the production or should be cancel and start it all over again.
    But by using product costing or product cost planning, this is a preliminary step to prevent and eliminate any error of the products tobe produced.
    So, ideally, there is one person in charge to ensure that the products which be produced in the production orders are free of error.
    So, the product costing is an integrated module that take data from variouse module such as PP, MM, CO, HR.
    The product costing use the Logistic master data such as folllowing;
    1. Bill of material
    2. Routing
    3. Work center
    4. Material master
    How you can say, that running PP without PC will run, while the to run the smooth production order, you need to mandatory parameter in Material Master that belong to Costing area.
    Without having product costing, I can assure that your client will trap in a lot of troubles with their business process.
    Please see the online documentation for product costing for a better overview or you are welcome to ask again
    Regards,
    Irhasni

  • NA KOSA012 and Product Version deletion

    Good Day
    I have an issue when trying to delete a production version from the material master.
    The SAP message NA KOSA012 appears explaining that the version can not be deleted. I have checked the settings which the note suggests and everything appears to be correct. There are no open production orders in WIP either.
    I have never had this issue before when trying to delete a version
    Any idea's?

    Hi,
    Please check whether all the conditions as per the below link are satisfied.
    http://help.sap.com/saphelp_47x200/helpdata/en/75/122e98f0bb11d2b6780000e82d81c3/frameset.htm
    Regards
    Kannan

  • Capaity levelling and production version

    Dear SAPper,
    I curious about somecases in levelling.
    My client got 8 machine work center and they aware of capacity
    I create eight produciton version.
    MRP always put new planned order to first production order.
    After that my client would like to do capacity levelling.
    The problem is although they assign to other machine but the production version is not change
    leaving inconsistency of production version and new work center after capacity levelling
    is there any way we can capacity levelling considering produciton version too?
    Please kindly help.
    Best regards,
    Freddy Ha

    Dear Freddy,
    1.The system always picks up the first production version as a default,if more than one more production
    version exists for the same lot size,validity dates.
    2.Either you have to lock the production versions so that the system picks up the open production
    version or maintain different validity dates or Lot size.
    3.I'm not sure whether the system considers the prod version also during capacity leveling.
    check this link,
    http://help.sap.com/saphelperp60_sp/helpdata/en/1a/f2f33419ec8d44e10000009b38f844/frameset.htm_
    Regards
    Mangalraj.S

  • CO41 and production version

    I am converting planned orders to production orders using CO41. Is there a way I can get the production version field to appear on the CO41 output screen so that like other fields I can change it before pressing the 'convert' button
    thanks a bunch

    Dear John,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • Costing and Production order

    Hi,
    Please give me clear idea on Production order , order settlement and variance.
    When we settle the production order and this is mandatory to settle the order?
    What entries posted in system while order settlement.
    What is the difference between production and variance.
    Please ............
    Sateesh Kumar V

    Hi Sateesh
    Production Order after completion of the finished product is to be settled to Inventory in case of Make to Stock order. When you transfer to Inventory, the a/c entry will be Inventory Dr and Cr to Inventory change a/c(Prodn order). This transfer normally happens at Standard Cost because you'd given Price Control indicator S in the Inventory (Material) master.
    Variances arise because prodn order would have received various costs based on Allocations, etc and it transfers out at Std cost. Entry will be Dr Price difference a/c and Credit Inventory change a/c (prodn order). Now you can see that Prodn Order is fully settled.
    S Jayaram

  • Standar cost and product cost collector not updating the new price

    Hi,
    Created Standard cost estimate for one FG product and runned the product cost collector. Based on that consumption delivery everthing is made. Later on the work center and activity type changed in routing. Now i am trying to run the standard cost with new activity price (due to work center change) for the current period, system is showing only the previous rate(previous period) and it is not updating the new price becuase of already we have created the product cost collector.
    Can any one give the suggestion for how to update the new price in standard cost as well as new price updation in product cost collector.
    govind.

    Hi
    1. If the original cost estimate was run in the current month - Then you cant re-release cost estimate unless you reverse it from CKR1
    If the cost estimate was of previous months - then you can definetely release it again
    2. In cost collector, you need to manually cost it again using the Preliminary costing feature... Your cost coll will then show 2 cost estimates i.e. One from Original date to current date-1, and 2nd from Current date to 31.12.9999
    br, Ajay M

  • Urgent-production version and material

    Is there a way i can pull the report or details for materials and production version used in a company code?

    Post this in MM forum.
    SAP ERP - Logistics Materials Management (SAP MM)

  • BOM, Routing and production order

    Hello Guru,
    we notice something, our material 1256 has maintain four alternative bom as of this date:
    Alt BOM       MRP4 Prod version  BOM stat       PV lot size  Routing Grp    Route Lot
    1                          ACA                            02                 0 to 0             5000001            0 to 999
    2                          ACB                            02                 0 to 0             5000002            0 to 999
    3                          ACC                            02                 0 to 0             5000003            0 to 999
    4                          ACD                            01                 0 to 0             5000004            0 to 999
    can the difference be of lot size can be a factor why still even though alt BOM 1 with PV ACA was still pick when we do CO01 and CO41 in creating production order? we have already set-up in master data MRP4 tab Selection method = 3 which a expert also advise us to do for those inactive bom material not create a order, but doing this still not solve our problem
    and also does in MRP4, under the selection method, INDIVIDUAL/COLL can affect the selection of production version when creating order? what does the following works:
    blank = ?
    1 = individuals requirements only
    2 = collective requirements only
    thanks a lot
    ryan
    Edited by: Ryan on Dec 12, 2008 9:40 AM
    Edited by: Ryan on Dec 12, 2008 9:42 AM

    Hi Ryan,
    - As all the production version containes same Lot size.So system will pick first which system finds in C223.
      So each time you will find default selection of Production version ACA in Plan Order and Production Version.
    blank = ?
    1 = individuals requirements only
    2 = collective requirements only
    Blank means Individual and Collective both.
    What I have observe with this selection is whenever you are going to plan for MTS system will plan with collective requirement and in case of MTO it will plan with Individual requirements.
    May be others have some other idea (Actually I also want to verify it).
    - No there is no impact of Individual/Collective requirements on Selection of Production Version.
    Regards,
    Dhaval

Maybe you are looking for

  • Ipod cannot be recognized by pc and wont turn on! help

    my ipod video is only a month and a half old and then just yesterday i was still using it around 12 noon then around 1 pm it wont turn on! i tried to reset it, made some simple troubleshooting but it wont respond waaaa when i connect it to my pc the

  • Line item not copied in SDF /KN when creating based on Return order

    Hi, Anybody , can help me? I try to replace a damaged good returen by the customer,by doing the follwing actions. 1 Creat return order based on orginal oder. 2. Try  to create SDF/KN based on Return oder, but line item is  not copied. How can solve t

  • Orbit sound dock not displaying as bluetooth device

    Hi, I have purchased an orbit sounddock which has bluetooth enabled. My iphone displays it when I connect via bluetooth and plys music with no isues. However, my new macbook pro doesn't display it as a device to pair. No issue with seeing my magic mo

  • How to process of Pipeline materials for bill pass

    All SAP MM Gurus, My scenerio is like we procure Nitorgen gas thru pipeline, the vendor give the bill of nitrogen gas which our plant consume. then How I Process the bill, like Purchase Order, Goods Receit and Invoice Verification. But when I post GR

  • Bluetooth mouse not working

    Bluetooth mouse not working. can click and scroll but pointer will not move.