Hi,
The UOM conversion is maintained in the SPRO.
But for costing the unit is maintain in Activity say POWER as unit H
But in the production they maintain the receipe activity unit for POWER as unit MIN.
So when you upload the KP06 & KP26 with activity qty,the activity qty should maintain in H.
So when you have the cost run in CK11 then the system will capture automatically for the per ton production the consumption of power activity in MIN.
So if you want to know the what is conversion factor then it is standard UOM definition in SPRO.
SAP NetWeaver--General Settings---Check Units of Measurement
Regards,
Raj

Similar Messages

  • How to use own UOM conversion for PO creation...

    Hello Experts,
    We have a requirement wherein we need to use our OWN UOM conversion(UMREN and UMREZ)
    instead of getting it in the inforecord or the material master. Currently we are using BAPI
    BAPI_PO_CREATE1 to create PO.
    Is there anything that I can do to make the PO creation bypass the inforecord and
    the material master UOM conversion. For example in ECC we have 1 CV = 10 EA. We want it to be 1 CV = 15 EA.

    Hi Guys,
    Any help? Any exits/BADIs/enhancement spots that I can use?

  • UOM Conversion for Catalogs

    Hii,
    We are on Global Catalog Implementation.For a global catalog, we have US users, for certain items there UOM is gallons, for the same items, the european users want in liters
    can we do the UOM conversion with the OCI Interface BADI  BBP_CATALOG_TRANSFER
    Is this the correct BADI.we have other option like creating again a seperate catalog for certain set of users.
    Which is Best Pratice.
    Please advise me.

    Hi
    You can use the BADI <b>/CCM/CHAR_VALUATION</b> to create, change, or delete the values assigned to catalog characteristics before they are written to the database, or after they have been read from the database. You can modify both static characteristics and customer-specific characteristics.
    For more details check the BADI definition help.
    Rgds
    Reddy.

  • UOM conversion for material

    Organization purchases yarns
    1000Kg yarns
    It is available in unit of 2 Kg each
    So one yarn is of 2 Kgu2019s
    Each yarn has 50000 Mtrs of thread
    ( 25000 mtrs / Kg )
    The stock will be of 500 yarns of 2Kg each.
    Issue to production 250 yarns to produce cloth of 5000 mtrs.(cloth width of 250 threads)
    After consumption balance is returned back to stores
    So
    250 yarns are returned each of length 45000 mtrs
    The weight of each yarn will be 1.8 Kg
    The consumption in production in Kg 50 Kg
    Balance will be 1000 u2013 50 = 950 Kg
    Now the stock is
    250 yarns of 2 Kg each = 500 Kg
    250 Yarns of 1.8 Kg each = 450 Kg.
    Issue of 400 Yarns for production of 20000 mtrs cloth (cloth width of 400 threads)
    Issue 250 Yarns of 2Kg
    Issue 150 yarns of 1.8 kg
    Consumption will be 400 * .8 Kg = 320 Kg
    Return will be
    250 yarns of 1.2 Kg
    150 yarns of 1 kg each
    Balance will be
    250 Yarns of 1.2 Kg  = 300 Kg   ( length 25000 mtrs)
    150 Yarns of 1 Kg  = 150 Kg   ( length 20000 mtrs)
    100 Yarns of 1.8 Kg = 180 Kg ( length 45000 mtrs)
    Total 950 -320 = 630 Kg
    I want to see inventory look like this so next I can select issue for the production of cloth with different length and breadth
    How shall I maintain this in SAP
    How to manage UOM and conversion factors ?
    Can u iterate it with making issue and receipt transactions as described??

    If this question is still relevant - such textile related questions are dealt within in SAP for Mill Products, this is also where we address the requirements of the cable industry.
    In cable we typically deal with the requirement to check ATP not for the total quantity alone, but considering the individual lengths available.
    There are multiple ways to model this.
    Most flexibility is through characteristic dependent planning in APO where individual length on a batch is a characteristic.
    But you can also acchieve a lot already when using batch specific units measure. Here it strongly depends how you would like to model the batch, be it for the individual cone, or for the "bundle". A good search term here is "single unit batch".
    If you are interested to reactivate this discussion, raise your hand now.
    - Stefan

  • DATE FORMAT Conversion FOR SQL Reports

    Hi,
    Am building a report and am stuck here where this piece of code that throws the following error
    The conversion of a varchar data type to a datetime data type resulted in an out-of-range value.
    My query goes some thing like this
    DECLARE @StartDate varchar(15),
    @EndDate Varchar(15)
    SELECT @StartDate = '01/08/2014',
    @EndDate = '31/08/2014'
    SELECT DISTINCT
    [Operation] = CASE WHEN p.DATE_OF_START BETWEEN @StartDate AND @EndDate THEN 'Add'
    ELSE 'Update' END
    FROM SNZ_HR_Reporting_POSMGNT as s
    LEFT OUTER JOIN PERSON as p on s.EMP_NO = p.EMP_NO
    WHERE s.CHANGE_DATE BETWEEN @StartDate AND @EndDate
    The date format in the column DATE_OF_START  is like yyyy-mm-dd 00.00.00.000 .
    My question is how to convert this format to dd/mm/yyyy format and execute the queries
    Many Thanks,
    Bhanu

    SQL Date Format:
    http://www.sql-server-helper.com/tips/date-formats.aspx
    Please Mark This As Answer if it helps to solve the issue

  • Data rate conversion for f4fpackager

    Hello,
    I am woundering what Adobe suggest in the following matter. So, when I use f4f packager command line tool,i supply --bitrate value, but I know it in bps (say 500,000 bps). And f4fpackager wants it in kbps. So, should I divide by 1024 or 1000? Does that matter as far as that switching point for client logic? What would Adobe recommend?

    It should be 1000 & not 1024.

  • Mass deletion of alternative UOM conversion

    Hi Colleagues,
    Does anybody knows is there an easy way for mass-deletion of alternative unit of measure conversion rules in material master?
    Thanks,
    Artashes

    I did the following way:
    1. created a recording which always deletes the second line in Additional data-> uom conversions.
    2. by multiply running this recording via lsmw will delete all uoms.
    3. I was not able to do it at once as different materials has different numbers of alternative uom entered.
    Thanks,
    question closed.

  • Tcode /SAPAPO/TSCUBE  - UOM conversion

    Dear All,
    I would like to know about how the value of a key figure is copied from the infocube to a DP planning area using tcode /SAPAPO/TSCUBE.
    I have the following scenario.
    Infocube has key figure value as 2000 EA,
    The planning area UOM is ST
    Product Master base UOM is EA
    Product Master alternate UOM has 1 ST = 5 EA
    When I execute the tcode /SAPAPO/TSCUBE  to copy data from the cube to the planning area, the value is copied as 2000 ST which means no conversion of the UOM in cube to the UOM of planning area takes place. It should ideally convert 2000 EA to 400 ST using the alternate UOM in product master.
    Is this how the program functions such that it only copies the key figure value ignoring the conversion factor between UOMs of infocube and planning area?
    Any ideas?
    Thanks in advance
    Ehsan Ahmed

    Hi
    Yes it works as you are expecting. It should read the data from product master base UOM. To enable, you must have the characteristic assigned to the product in the POS and then maintain UOM conversion in the product master (you get the description as well).
    There are some gotchas...you can convert at a 'higher' level, but every product must have a UOM conversion for the UOM you wish to convert to, otherwise it might not work.
    Hope this helps...
    Thanks
    Amol

  • Data type conversion JCO To ABAP( Double to DEC)

    Hi,
      I want to update a field having data type as DEC with length 11 in APO system using JCO.Whatever i give as input is not getting reflected in APO system. Instead i get some different value.
    It seems that there is some data type conversion for that field..
    Thanks
    Archana

    if(tableName.equals("BAPI10001LOCPRDVERS2"))
                                                           table.appendRow();
                                                           //System.out.println("getting inside table "+tableName);
                                                           table.setValue("SOP112","PRODUCT");
                                                           table.setValue("SCMTEST111","LOCATION");
                                                           table.setValue("1001","LOCTYPE");
                                                           table.setValue("SCMTEST111","LOCATION_INT");
                                                           table.setValue("000","PLANNING_VERSION");
                                                           table.setValue("5000","SAFETY_DAYS_SUPPLY");//this is the field having problem
                                                           table.setValue("5","SAFETY_STOCK");
                                                           table.setValue(" ","SAFTY_STOCK_CALC_METHOD");
                                                           table.setValue("5.00","OPENING_PERIOD");
                                                           table.setValue("15","FORECAST_HORIZON");
                                                           table.setValue(("20000"),"VMI_PROM_LEAD_TIME");
                                                           table.setValue("0","MINIMUM_LOT_SIZE");
                                                           table.setValue(bd1,"TARGET_DAYS_SUPPLY");

  • Mass Maintainanace for UOM Conversion

    Hi,
    How to do the mass maintainanace of UOM conversion in Basic data1 view> Additional Data> UOM? In MM17, MEINH is not there. Please convey.
    Regards

    Hi:Please follow below steps:
    1) Go to MM17, then select table marm,then execute
    2) Then you will be able to see two tabs named"data records to be changed and data records to be created"
    3) check selection box "Do not change existing data"
    4) To populate materail which needs to be mass maintained UOM, then click "data records to be created" tab
    5) In "Specify values for the reference" area, you need to fill in material and UOM which will be refered from e.g kg(suppose kg had been maintained)
    6) To input material and UOM which needs to be mass maintained in area "specify data records to be created" e.g PC
    7) Execute and save.

  • Data conversion for new sob

    Dear Viewers
    on 11.5.10
    We are creating a new SOB with a change in currency from Feb-11 as this is the requirement
    For the same, we need to do data conversion.
    I have a confusion for Purchase Orders and Sales Orders
    Purchase Orders:
    Open purchase orders will be converted, means the unfulfilled PO`s i.e the ones not received and are fully open.
    The PO`s which have been recieved but not delivered, Requested the users to clear the intransit receipts.
    The PO's which are partially received, what to be done for them?
    If a PO is fully received and Delivered will not me converted to the new SOB as its not an open PO
    but If invoice comes after Feb-11, than how the matching will be done?
    What if a return has to be made moving forward in FEB-11 under new SOB
    Sales Orders:
    Open sales orders will be converted, that is the ones that have been entered and not yet booked.
    Users have been requested to clear off the Sales order lines which are already pick confirmed but not yet shipped, hence they will be shipped and interfaced to AR
    For the Sales orders that have been booked, those lines that are not yet processed further will also be converted.
    Now what if a receipt comes after feb 11, how to handle this as the sales order wiould not have been converted?
    Please give your advise on the data migration strategy for PO`s and SO's.
    Please do add any point that may have been missed by me
    Appreciate your help
    Thanks
    Emm

    emm wrote:
    Purchase Orders:
    Open purchase orders will be converted, means the unfulfilled PO`s i.e the ones not received and are fully open.
    The PO`s which have been recieved but not delivered, Requested the users to clear the intransit receipts.
    The PO's which are partially received, what to be done for them?
    If a PO is fully received and Delivered will not me converted to the new SOB as its not an open PO
    but If invoice comes after Feb-11, than how the matching will be done? <br>Business needs to take a decision whether they are fine with matching the POs manually (i.e. referring the documents and verify), in this case you may capture the PO information in a DFF in the Invoice distribution. Otherwise if it has to be converted identifying the POs under this scenario, you may consider converting those maintaining receipt close tolerance as 100% and matching type as 2 -way (again business approval needed to handle audit issues) in order to avoid the receipts/delivery conversion etc.<br>
    What if a return has to be made moving forward in FEB-11 under new SOB<br>Ideally returns can be done using Miscellaneous/Account Alias Issues specifying the appropriate transaction reasons to clarify the scenario.<br>

  • Settings for costing data in order types for plant maintenance

    i want to know the purpose of settings for costing data in order types for plant maintenance. do we need to do it for sure i mean are those settings mandatory to analyze the costs on work order

    Yes you need to maintain those settings, as the plant maintenance orders are also considered as cost objects and in order for you to post any cost, you need to have a cost object.  Unless you maintain these settings, the cost you posted cannot be settled to a cost center.
    Assign points as a way to say thanks.
    Madhav Nanduri

  • Can anyone Explain about Data conversion for Material master In SAP MM

    Can anyone Explain about Data conversion for Material master, Vendor  In SAP MM
    Thanks

    Hi,
    Refer following link;
    [Data Migration Methodology|http://christian.bergeron.voila.net/DC_Guide/Data_Migration_Methodology_for_SAP_V01a.doc]

  • Data conversion for communication between Java and C/C++ program

    The real problem, i guess, is about data type conversion between Java and C programs. For instance, and int is supposed to be 4 bytes in Java, and also in C/C++. But, as far as I know, the size of and int in C depends on the processors architecture, so if it were a 64 bit arch., size of and int, double, etc. in C, would change. The real scenario would be a communication between a 32 bit machine (Java) and a 64 bit machine (C/C++).
    First of all, is this assumption correct?
    If so,
    how is it possible to deal with this problem in Java?
    Is there any way to know 'type length' automatically? or
    would it be necessary to modify the Java program to work with a C program in 32-bit or 64-bit arch?
    thx in advance

    cotton.m wrote:
    Yes you should develop the C part of the protocol first and then build from there.
    See http://forum.java.sun.com/thread.jspa?threadID=5243547 for a previous discussion of this topic.
    I understand what you mean, also the topic you referenced. I will explain the situation a bit more. The protocol is already defined: (16 bits message size, 16 message id, 32 bit time, etc.); it is also defined in C (structures and so on). So it would be easy to write my Java code using the specified protocol in bytes, and C types wouldn't be necessary to be considered. But, let's say that the C code can't be modified, and I thought (and don't know yet if its correct), that size of C types CAN changed depending on architecture. So if size changes for C types (code is specified in short, int, etc, and not in bit format), it all would be a mess, if I don't implement something in my Java code.
    cotton.m wrote:
    I don't believe that 32 or 64 bit enters the equation here at all.Maybe 32 o 64 doesn't mind, but sparc or PC could take a point here. Communication would be between a sun solaris sparc and windows x86 PC. But if type size in C/C++ does not change, I wouldn't really have any problem then...
    The situation is not ideal, I know, but is what I have; and I think I could have problems if I run the C program in other machines; so I would have to try to solve it whithin my Java Program.
    I hope it is clear now what I need.
    thx
    Edited by: MGasa on Jan 16, 2008 1:51 AM

  • Data Conversion for Project Module

    Dear all,
    I have a requirement to perform data conversion for Project module from 11.5 to R12. I am new to this module. Can anybody can outline (or provide documentation reference):
    1)Source tables in 11.5
    2)Data Selection for source tables in 11.5
    3)Validations need to be performed for data clean up
    4)Interface tables and interface programs in R12
    Thanks,
    Sudip

    See the following links for information on all R12 interfaces
    Oracle Integration Repository Documentation Resources Release 12 (Doc ID 396116.1)
    Note: 462586.1 - Where are the Oracle® Release 12 (R12) API Reference Guide?
    https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=462586.1
    Note: 458225.1 - Release 12 Integration Repository
    https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=458225.1
    If you are on 11i, go to irep.oracle.com
    Hope this helps,
    Sandeep Gandhi

Maybe you are looking for

  • How long does it take to write spectralview

    I am trying to modify the functions of the spectraview to my own needs. However i am unable to edit the spectralview that was created. What is the approximate time to develop spectralview

  • WRT54G/ access point??

    I have been using the Linksys WRT54G v5.1 as my primary router for 4 or 5 years. I have now upgraded and was wondering if it is at all possible to hook up my linksys WRT54G at a second location in my house as an access point to increase the signal? I

  • Warning msg for finally

    I got a warning message for a finally statement, attached at the end. Could not figure out why. The code is simple and followed. Please help. Thanks!!! ======================================= import java.util.*; import java.io.*; public class TestFin

  • Lion deleted all my backups !

    Hi, after insalling Lion (10.7.3), it made a backup on time machine (approx 20 GB) and all went fine. Next backup, I noticed the message "deleting old backups" (or something like this). I though it was just some clean up after the installation... tak

  • I have an oooold Wacom tablet

    that was given to my by a friend, and a G4 (obviously). The Wacom tablet (Intuos GD) has a 4 pin (male and female and female, not sure which one goes where) s-vid cabe, but the Mac has a 7 pin female s-vid port. Should I try and find an adapter or sh