Costing Log in production order creation

Dear All,
I’m having a material with a component which we do not cost. Component material has marked ‘do not cost’ tick box in costing 1 view in material master.
Costing for the header material is done using CK40N after attaching BOM and routing. However when I’m trying to save a production order for the header material it creates a costing log. See below screen shot.
I do not need to maintain a price for the component material since I’m getting it free of charge from a vendor. (Through a free purchase order) This scenario was running properly in AFS 5.0.
But it gives a costing log in AFS 6.5. In need to save the production order without any costing log. Please help me on this.
regards,
Jeewana

Hi Jeewana,
In BOM for the respective material under BOM Item data - Status/Lng text Costing Relevency indicator - Make it Blank. Do Read master data in order after the change, error will not come.
Thanks & Regards,
Ramagiri

Similar Messages

  • Short Dump while executing costing run or production orders

    Hi Guys,
    While executing the costing run or production orders saving, we are getting short dump.  it is the debugging is showing its fingers at A035 which is related to maintenance of overhead rates.
    We have maintained the overhead rates correctly. There is no issue.
    This could be some thing related to OSS notes as well.
    Just wanted to know if it has got something to do with OSS notes or something else.
    Please throw some light in this regard
    Thanks in advance

    Hi,
    In what program there is a dump? I mean, what is the log saying?
    Regards,
    Eli

  • APO: RRP3 automate Production order creation from planned order ?

    Hi everyone ,
    I have got a business requirement in APO where in Open sale orders uploaded in R/3, needs to be converted to Planned order and subsequently to Production order in APO-PPDS tcode RRP3 at all stages. They want to automate this process rather than doing it
    manually.
    Can anyone tell how is this possible . Any BAPI or function module available to do this . Please help.
    Regards,
    Syed

    Hi,
    1.You need to run the heuristics Planning of standard lots SAP_PP_002  in /SAPAPO/CDPSB0 by specifying the time profile
       and  strategy profile, planning version and propagation range, product and location.
    2. Convert PPDS Planned Orders created to process orders thru /SAPAPO/RRP7 by specifying the product location start date of the order for production order creation.
    Out put of step 1- For sales order requirement, PPDS Planned orders gets created.
    Out put of step 2- PPDS Planned orders are converted to production orders.
    Thanks,
    nandha

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • FM for creation of production order creation

    Hi All,
    Can anyone tell me the BAPI for the production order creation.
    BAPI for creation of production order through CO01 transaction code.
    Thanks in advance
    Ramesh.

    Hi,
    Please check this FM CO_ZF_PRODUCTIONORDER_CREATE.
    Regards,
    Ferry Lianto

  • Selection of Costing Sheet in Production Order

    Hi friends,
    I have one query, details of which are as  follows.
    Costing sheet in Requirement Class - Blank
    This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
    Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
    Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
    I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
    When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
    So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
    I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
    Is this system behavior correct as per SAP Standard?
    Kindly advise on the same
    Regards
    Madhusekhar Gupta G

    Hi Madhu
    1. Production order gets coating sheet from the valuation variant assigned to order type
    2. The valuation variant that you assign to Plant is for standard cost estimate only
    3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
    You can assign different costing variant to the same order type per plant
    Br. Ajay M

  • Selection Of BOM & Routing at the time of production order creation

    Hi guys,
    Please clarify how i can go about for the following mentioned scenario
    I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
    At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
    Awaiting for a quick response
    Vijai

    Hi vijai prasad shanmugam ,
                                              In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected  Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
    As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
    But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
    Please Let me know if I can help you in any way regarding this........
    Please reward the points......... in you find the ans helpful.....
    Thanks
    Kaushik

  • IDoc Configuration for Production Order Creation and Change

    Hi All,
    Please Help me out for IDoc Configuration for Production Order Creation and Change
    I have found the IDoc for Production Order
    Messgae Type : LOIPRO and IDoc type : LOIPRO01
    Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
    I have done following Configurations:
    1. RFC Destination created for XI system
    2. PORT was created for XI
    3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
    I need to know how to do the followning.
    1. How do i configure the outbound Production order idocs when Production Order is created or changed.
    2. in NACE (Output control) which is the Application for Production Order.
    3. How can I set IDoc as output Type for Production Order Creation.
    Thanks in advance
    Dhanabal T

    Hi Michal,
    I know that it is the old thread but still want to get clarified from you out of curiosity.
    Unlike other IDOC, i actiavated change pointers for LOIPRO
    1.message and idoc type is linked
    2.function module , message type , idoc type is linked
    function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
    3.BD64, distribution model is created and distributed
    4. port and partner profile is in place.
    5. IDOC is not getting generated after creating the process order.
    do we need to activate the change documents for the message type in BD52,
    if yes can you please provide the object types for the same.
    or i am missing something else. please guide me in this regards.
    Thanks in advance for your time.
    S.Janagar

  • Notify of Production Order Creation service

    The SDN WIKI for Integration of Manufacturing Execution Systems states that...
    "Now, as of Enhancement Package 4, each time a production order is created in SAP ERP, that action automatically invokes the Notify of Production Order Creation service operation, which informs the MES system of all the details of the new production order. "
    I am not able to locate any further documentation and definition of the Notify of Production Order Creation service.   Please provide assistance on where to find documentation of this service.

    Look at these links , may get some help ....
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/create%252bproduction%252bplanning%252border
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/find%252bproduction%252border%252bby%252belements
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/change%252bproduction%252border
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/espackages/find%252bproduction%252bplanning%252border%252bfor%252bapproval%252bby%252belements%252b(SCM)
    Regards
    Abhishek

  • Cost center to production order

    hi friends
    i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
    sapians

    Hi,
    You have to check two things before executing this assessment cycle.
    1. Check the allocation structure whether you have assigned the assessment cost element and
       settlement of cost element to ORD (ticked in by cost element box).
    2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
       Have a check of the cycle before saving.
    Regards,
    Sadashivan

  • Cost center for Production Order

    Hi all,
         We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
    With Regards,
    R.Mahendiran.

    Hi,
         Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
    To understand the difference
    201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
    261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
    Hope this clarifies your doubt.

  • Manual production order creation in MTO

    Dear collegues,
    I am stuck in a scenario:
    I have a finished item A. strategy 20 is used.I created sales order for A in plant 1000. MRP run in plant 1000 happens. Through special procurement key 40, system generates planned order in plant 2000. Planned order is converted to production order. I can see in assignment tab of production order,  Production plant is 2000 and planning plant is also 2000. Till here it is ok. I will do GR against production order in plant 2000 and through SD route I will send it to Plant 1000.
    But when I create manually production order in CO08, always system sets in assignment tab of Production order , production plant as plant 2000 and planning plant as 1000. How to avoid this? Why manual production order is not like MRP generated planned u2013production order?
    Kindly help.
    Regards.

    Give below a try in sandbox (Not from experience, so not sure if it works):
    At the time of production order creation, maintain the production plant in Sales Order & ensure the demand flow to MRP is switched off at schedule line (If you're not sure, take help of your SD person).
    The order created in CO08 should now have production & planing plant as same. Once that is done, switch back the plant in Sales Order & release the demand to MRP. (I hope the cut over plan has addressed the sales & MRP flows, so no inputs from my end)
    If the above does not work, then revert with details.

  • Blocking of production order creation

    Hi All,
    I need a help on blocking of production order creation.
    I have few materials for which deletion has been activated in material master. But for these materials, while creating production order it is allowing to create by showing some warning message. But I want to totally block creation of production order.
    Regards,
    Vijay

    Dear,
    Youneed to define for block for productio.OMS4 --> create new one material status (08) for "Blocked for Prod Order" and set the prodution.
    If u want plant specific block then do not use this indicator in basic data 1 view ,use it in purchasing alse and MRP view.
    Please check with Message No M7-127 at OMCQ. Here u can set error message
    IMG>MATERIAL MANAGEMENT>INVEN>DEFINE ATTRIBUTES FOR SYSTEM MESSAGES. message no M7127
    Change the warning message to error. Then create the production order and check.
    Or Archieve material by SARA
    Regards,
    R.Brahmankar

  • Target cost for a Production order

    Hi
       How to get Target Cost for a production order?
    Thanks
    Naga

    Well Naga, Right now I’m on HR implementation , but I programmed same kind of requirement two years before , but I got planned cost and actual cost .
    I also notice “cost analysis" the cost is not exact , it wont read the value from KP26 of that particular month .
    Here I am talking about 4.5b system.
    You can find the sales order ref on production order, and your production order is made up of your different kind of material like scarp, raw, semi-finished etc
    Here are the steps I followed .
    1- I read the material which you can see in material component on production order in Co03.
    After that I take the qty and also multiply by the cost at which machine is posted .
    I have that programs, as I need to find out . I’ll post you later .
    But you have to read the tables afko,afpo,afru,caufv,cost ..etc
    Do you see information structure I refer you , If i am not wrong this CO3 ( cost analysis ) report use report painter ( Tr.Gr51,Gr52 ) . you can also see by going in to said transaction which information structure its populating . This’ll also help you.
    Hope this’ll give you idea!!
    <b>P.S award the points.!!! DOn`t forget :)!!!!</b>
    Good luck
    Thanks
    Saquib Khan
    "Knowledge comes but wisdom lingers!!"
    "Some are wise and some are otherwise"

  • Mandatory field in Production order creation field

    Dea All,
    I want to have a field mandatory at the time of production order creation. in CO01 Goods Receipt Tab there is a field of Goods Recipient in the second last row. Please guide me how can i make it mandatory field.

    Dear,
    Yes it is possible through the user exist, input check is carried out for enhancement PPCO0018.
    User exit PPCO00018 should use ful for order header screens GENERAL ASSIGNMENT, GOODS RECEIPT and CONTROL tab.
    Or go to SE51 enter program  SAPLCOKO Screen No 5190 click on change and the Lay out here you can define it as Input field Take help from technical person.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Major lacks in deployJava.js

    I was initially excited when I discovered the Deployment Toolkit. Especially I liked: 1. The thorough browser- and JRE version-checking, and the automatic redirecting to download if JRE wrong or lacking. 2. The not having to hand-code the JavaScript

  • JDBC Receiver Adapter with Native SQL String

    Hi experts I need to use a JDBC Receiver Adapter with Message Protocol of Native SQL String, but I don´t understand how to create my data type for XML Document Format. I studied the following example from the SAP Library, INSERT INTO tableName (colum

  • Xm create Error: Disk isn't accessible

    Hi, I tried to start a VM from the OVM manager and it produced the following: 12:31:32,015: Starting operation 'Virtual Machine Start' on object 'd3bcd3595f354eb18c6298ae55679f10 (mldbovm4s)' Job Internal Error (Operation)com.oracle.ovm.mgr.api.excep

  • Set metric threshold for default metrics

    Running Grid Control 10.2.0.4; have not had the time to go through an upgrade to 10.2.0.5 yet. There are several metrics I am interested in setting a threshold for, specifically the Streams Replication metrics. When I click the "All Metrics" link on

  • Can't  get into Lightroom

    Hi all. For some reason I can't access Lightroom on my new windows 8 computer.  Some background.... I had a windows 7 computer  with Lightroom  5 from a disk loaded on it. Worked fine .  Then I  downloaded  the Lightroom update 5.7.  Lightroom has no