Selection of Costing Sheet in Production Order

Hi friends,
I have one query, details of which are as  follows.
Costing sheet in Requirement Class - Blank
This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
Is this system behavior correct as per SAP Standard?
Kindly advise on the same
Regards
Madhusekhar Gupta G

Hi Madhu
1. Production order gets coating sheet from the valuation variant assigned to order type
2. The valuation variant that you assign to Plant is for standard cost estimate only
3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
You can assign different costing variant to the same order type per plant
Br. Ajay M

Similar Messages

  • Costing sheet in productin order

    Hi,
    When we are creting production order system is not taking the costing sheet automatically. But we confiugured all the things properly. We configured order type, cost component structure, costing variant, valuation variant everything. Please guide me on default assignment of costing sheet to production order or order type.
    Sateesh Kumar

    Hi Sateesh,
    Try this
    IMG--ControllingInternal OrdersActual Postings-- Overhead Rates---- Maintain Costing Sheet and Overhead Key in Sample Orders
    You enter the following in the model order:
    Costing sheet
    Overhead key
    If you use the model order so defined as a reference order for an order type, the costing sheet entered in the model order and the overhead key are also used for this order type.
    Hope this helps
    Regards
    Pratiksha

  • Short Dump while executing costing run or production orders

    Hi Guys,
    While executing the costing run or production orders saving, we are getting short dump.  it is the debugging is showing its fingers at A035 which is related to maintenance of overhead rates.
    We have maintained the overhead rates correctly. There is no issue.
    This could be some thing related to OSS notes as well.
    Just wanted to know if it has got something to do with OSS notes or something else.
    Please throw some light in this regard
    Thanks in advance

    Hi,
    In what program there is a dump? I mean, what is the log saying?
    Regards,
    Eli

  • Cost center to production order

    hi friends
    i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
    sapians

    Hi,
    You have to check two things before executing this assessment cycle.
    1. Check the allocation structure whether you have assigned the assessment cost element and
       settlement of cost element to ORD (ticked in by cost element box).
    2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
       Have a check of the cycle before saving.
    Regards,
    Sadashivan

  • Cost center for Production Order

    Hi all,
         We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
    With Regards,
    R.Mahendiran.

    Hi,
         Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
    To understand the difference
    201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
    261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
    Hope this clarifies your doubt.

  • How Assign Costing sheet to Purchase Order?

    Dear MM,
    Please Guide me How Assign Costing sheet to Purchase Order?

    Hello,
    For costing sheet please refer the link below:
    http://help.sap.com/saphelp_45b/helpdata/en/7e/cb815e43a311d189ee0000e81ddfac/content.htm
    These Costing sheets are assigned to cost elements and then to the cost center.
    By using Account determination field in PO you can assign the category for cost center and assign your costing to PO.
    Please refer the below link for Account determination for a PO:
    http://help.sap.com/saphelp_470/helpdata/en/75/ee0de955c811d189900000e8322d00/content.htm
    Hope the solution is useful
    Regards,
    Swetha

  • Target cost for a Production order

    Hi
       How to get Target Cost for a production order?
    Thanks
    Naga

    Well Naga, Right now I’m on HR implementation , but I programmed same kind of requirement two years before , but I got planned cost and actual cost .
    I also notice “cost analysis" the cost is not exact , it wont read the value from KP26 of that particular month .
    Here I am talking about 4.5b system.
    You can find the sales order ref on production order, and your production order is made up of your different kind of material like scarp, raw, semi-finished etc
    Here are the steps I followed .
    1- I read the material which you can see in material component on production order in Co03.
    After that I take the qty and also multiply by the cost at which machine is posted .
    I have that programs, as I need to find out . I’ll post you later .
    But you have to read the tables afko,afpo,afru,caufv,cost ..etc
    Do you see information structure I refer you , If i am not wrong this CO3 ( cost analysis ) report use report painter ( Tr.Gr51,Gr52 ) . you can also see by going in to said transaction which information structure its populating . This’ll also help you.
    Hope this’ll give you idea!!
    <b>P.S award the points.!!! DOn`t forget :)!!!!</b>
    Good luck
    Thanks
    Saquib Khan
    "Knowledge comes but wisdom lingers!!"
    "Some are wise and some are otherwise"

  • Costing Error in Production Order

    Hi
    I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
    No itemization available for the corresponding material on the plant.
    Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
    Thanks in Advance.

    Hi
    If you are creating first time production order for the material  using standard price you have to do standard cost estimate  using ck11n
    In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to  and execute..Here only system asks for Itemisation.. Just press enter.
    After that Update standard price using ck24
    mark and release your standard price  for the materail..
    Reward points if useful..
    Regards,
    MSH

  • Costing issue in production order

    Dear all
    My problem I have 25 pc component quantity . first6 I have issue (261) 1 quantity against that  sys has generated one material doc and then issued(261) 24 quantity ,sys has generated second material doc. In production order cost analysis  is showing 25 quantity planned cost but in actual cost showing only one quantity .why?
    Means EX . material cost is 1 rs in material master .
    planned cost is 25
    actual cost is showing 1 rs for first issue material cost
    why system is not showing rs 25 actual cost in cost analysis in production order?

    Surendra,
    A silly question but worth asking, have you tired displaying the order after the 2nd goods Issue, so times database updation take time. Please check now.
    Regards,
    Prasobh

  • Product cost v/s Production Order cost

    Hi all Guru's,
                            Can any one help me in understanding difference between product cost and production order cost in SAP.
    Will give full marks for helpful answer.
    Thanks,
    Abhishek
    Edited by: ABHISHEK AGRAWAL on Jan 29, 2008 9:46 AM

    Dear Abhishek,
    Standard Cost Estimate or Material cost Estimate is nothing
    but the standard cost for the Inhouse Manufactured materials
    (FERT) = Raw Materials Cost + Activity(Operation Cost)
    Cost+Overhead Cost if maintained for the Company code.
    This cost will gets stamped in the material master in Costing2
    view,under Current Planned Price field.
    This cost will be the Planned Cost of the Production order and
    after confirmation of the order the actual cost and the variances
    for the production order can be viewed.
    So the Production order cost is for the order quantity say for
    Eg: for a quantity of 100.
    The cost(variance) will be settled against that production order
    after confirmation and TECO status.
    I hope this will be helping you.
    Regards
    Mangalraj.S

  • Periodic cost settlement for production order

    Hello All,
    Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
    Thanks & Regards,
    Alok Tiwari

    WIP entry gets passed to accounts if the order is not in DLV or TECO status.
    or else variance gets calculated.
    Two GLs which gets hit are
    Change in stock a/c Dr.
    To Inventory Price Difference a/c Cr.                or vice versa......
    Regards,
    Divraj

  • Settlement of Cost Center And Production Order Variance

    Dear All
    I have just started to learn SAP Controlling. I am able to get hold of  some materials on Controlling. May I request the experenced forum memebers to please explain the following
    1. How data flows from FI to CO and PA
    2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
    and a source where I can get some material on this topic. Your immediate replies  and valuable peice of advice will help me a lot
    Thanks
    Arvindh

    Dear All
    I have just started to learn SAP Controlling. I am able to get hold of  some materials on Controlling. May I request the experenced forum memebers to please explain the following
    1. How data flows from FI to CO and PA
    2. When cost center and production orders are settled, how the variance are settled and which accounts/ modules get effected
    and a source where I can get some material on this topic. Your immediate replies  and valuable peice of advice will help me a lot
    Thanks
    Arvindh

  • Authorization for Cost Analysis in Production Order

    Hi,
    Can I maintain the authorization for displaying cost analysis in production order.
    I try to create transaction variant....into ZCO02 and ZCO03
    but in COOIS it is still branching to CO02 when changing and CO03 when displaying.
    I want to disable the cost analysis view in production order so PP people can not access it.
    is there any idea?
    Please help.
    Best regards,
    Freddy Ha

    Hi,
    as i know K_ORDER is authorization for internal order.
    We have activate the check in SU24,
    but when we tried to trace the authorization when CO02 -> GOTO -> COST _> ANALYSIS
    this auth K_ORDER is never check.
    Did I miss something here?
    Best regards,
    Freddy Ha

  • Transfer to PA the target costs of a production order

    Hi everyone,
    How can I transfer to PA the target costs of a production order?
    Thanks
    Cátia Pereira

    Hi
    1. Check your settings in KE4U - Strategy 001 must be assigned to PV=01 and Rec Type F
    Tick the "Mat Cstng" indicator and assign COPA Qty Field ABSMG
    2. Assign costing key to Mat Type in KE4J or KEPC
    3. assign Cost Comp Str to VF in KE4R
    4. Assign Value Fields to your variance categories in PA Transfer Structure....
    Tick "Variances to Costing Bsed COPA" in your settlement profile
    Br, Ajay M

  • Assessment of Cost center to Production orders

    Hi,
    I would like to run assessment of overhead costs of Production Departament to production orders.
    However, I get such warning message when creating the cycle:
    "System error: An invalid transaction was used to check whether or not a business transaction is allowed.  The transaction Assessment of Overhead costs is not allowed for object type 'Production order'"
    "You cannot carry out the requested function for object ZL. 10000001.
    Procedure
    Please contact your system administrator."
    What settings are needed to allow assessment to production orders. I heard that it is possible to make an assessment of CC to production orders.
    Best wishes,
    Karol

    Hi,
    I managed to activate assessment to Production orders in BS12.
    I activated business transactiun RKIU for PP orders object.
    Now it's possible to allocate costs from Production Department CC to production orders.
    However, I have some problem of other nature.
    When I do the standard price calculation - the Overhead costs from Production Departament CC are calculated as % overhead using costing sheet. It is done by cost element with cost element ctg 41.
    The actual Production Departament CC overheads are allocated using assessment. Other cost element with cost element category 42 is being used here.
    How will the system calculate production variances in this case?
    Do u think it is possible to match these two different cost elements?
    Will this CE with 41 ctg be considered during variances calculation and if yes - which variance category will it be.
    I am uncertain about that, cause in normal cases - activitity CE or materials consumption CE are the same in actual and target. In my case overhead CE are different in actual and in target.
    Can u help me with that?
    Best wishes,
    Karol

Maybe you are looking for

  • Problem with Sender Adapter File Content Conversion

    Hi all! I have a question about file content conversion in sender file adapter. I have file like: {field1 field2 field3 field4 $ {field5 field6 field7 field8 And i need to get file like: <dealings> <deal> <field1>{field1</field1> <field2>field2</fiel

  • Why is it photoshop CS4 worked flawlessly with my fonts in Snow Leopard, but are making CS6 crash in

    I transferred all of the fonts starting with 'A' into font book and all of them had either a yellow or red dot next to them. They all worked fine in photoshop CS4. What gives? Will Adobe fix this and make them compatable? I have a fortune invested in

  • Audigy SE and Logitech X-

    I had SB Li've and had no problems with it for a long time, but for some reason it died on me and I got Audigy SE and now I am having problems with my speakers, I can only hear sound from FL and one with the power button and volume on (I think its FR

  • OpenSSH 4.3p1 Compile Issues (Bad OpenSSL Headers)

    I was upgrading the version of OpenSSH on my other systems and thought I would also upgrade it on my Mac. The distributed version was OpenSSH 3.8p1 IIRC. First I find that the version of Zlib is out of date. Not surprising and very excusable. So I fi

  • Deployment of two SDOs -- jndi name is already in use

    (this was accidentally posted earlier -- I deleted that post and created this one) Hello, I am on jdev 11.1.1.17 and am working with the Oracle SOA Suite.  I have an application and have 3 projects each with an ADFBC module and Application module Ser