Costing spare parts in reporting point

Hi,
    during back flush how can we track the price for spare parts like washers , while the situation is like this .. ie in one reporting point 5 washer used and in another reporting point 10 washers were used .
    How the quantity can be mentioned during backflush
Regards
s.kanna

Hi Anand,
             here the situation is we got aroung 1000 components in abom.in that we got washers  with certain qty as per standard,
             But in shop floor during manufacturing according to free space extra washers were added to tighten the assemply.here washer qty get changed .
             while running cost estimation as per BOM cost is getting calculated but our client says hw will u estimate the extra washer used in certain assembly.
             More over they require each assembly should be costed according to exact usage of washers to that particular assembly.
             here scenario is REM....period end closing....
             we are following cost estimation with washer qty as per BOM.
Regards
s.suresh kanna

Similar Messages

  • Report for Order and spare parts

    Hello every one, i am looking for a report which can tell me order number wise use of spare parts. It can be either in order or some seprate report. I have not find any such report till yet. Kindly help me in this.
    Regards
    Abhishek

    Baed on the requiremtns given, IW13 can also be auseful report for you.
    SM

  • Repair request spare parts costs transfer to COPA

    I have system configured that when I have repair request and I need to deliver a spare parts the cost of this are issued and booked with Outbound delivery document to FI. There is no costs on a repair request order.
    I wonder if it is any way to book the cost of mentioned spare parts cost to COPA as well?
    Thanks in advance,
    Rafal

    Hello
    Process is like below:
    1. Creating a repair request (VA01) for broken warranty item
    2. Delivery is done for the item with Post Goods Issue.
    Above steps create only material document with no FI document.
    3. In change order (VA02) for just created repair request in Repair TAB repairs and replacement Business decision is done.
    4. Deliver is done. In deliver there are two materials and after having the Post Goods Issue, system create material document and FI document (warehouse -> cost of sales)
    This is all the steps, no invoice is done issued for this process.
    Thanks for interesting,
    Rafal

  • Spare Parts on consignment at no cost during warranty period

    With new equipment being installed, several vendors have agreed to provide us with spare parts on a consignment basis without any consumption cost during the warranty period. When the warranty ends we'll either purchase the spares or return them to the vendor. Is there a standard SAP process for these parts? I've look into consignment processing but did not find a clean way to do this without an accounting entry. We are on ECC 6.0.

    Jody,
    Try asking the same question to the [Materials Management|SAP ERP - Logistics Materials Management (SAP MM); guys.
    PeteA

  • Report for outgoing service spare parts

    Hi,
    My client wants to have a report (gate pass or any proof for outgoing) for outgoing service spare parts for repair
    Is there any provision to have a returnable gate pass for service orders where goods are taken away for repair and to be delivered back to the plant.
    Pls suggest ur comments.

    Hi,
    You can do the Subcontracting scenraio for this service orders.
    So while sending the spare parts to vendor create the Subcontracting PO with item category L
    Send the parts in 541 mvt type to vendor.
    In MBLB you will get the report with respect to vendor how many parts you have sent to the vendor with value if you maintained for that part in the material master.
    rgds
    Chidanand

  • Mapping Spare part kit planning in SAP

    Hi,
    We have below requirement in Spare part Kitting process
    1)
    Client  makes compressors, which obviously have a lot of components, where one of the prime part is valve.
    2)
    Valve Kit is a finished product having components which are used in regular unit production also, where MRP Type can be VV or PD.
    3)
    This valve kit sold as a spare part.Customers buy these kits and typical assembly time is 1 day.
    4)
    This kit is not kept in stock and is assembled after receiving an order.
    5)
    To be ready for customer orders, client forecasts these kits (about 10000) and drives the demand for lower level components.
    6)
    When customer places an order, legacy system promises the dates based on availability of components. Date is promised to the customer based on the availability of the components. Also the requirement is passed on to the floor to assemble and shipped the same day.
    7)
    To meet above requirement, we proposed to use Forecast based planning, where system will create planned order for Kit assembly & component can be planned.Knowing there is a back drop i.e. planned order created thru forecast can be converted into production order.
    8)
    Then demonstrated “ATO – Assemble to Order” functionality in SAP. This uses strategy group 81 for the kit material XX-XXXX-XX. When a sales order is created for a material with strategy group 81, system immediately creates a planned order and as per component availability, proposes the next available date of the assembly.
    9)
    Since ATO is an MTO process, Planned order is tied to Sales Order and when production order goods receipt is done, stock is received into Sales Order stock. Hence Sales Orders do not consume the forecast.
    10)
    Question here is how to consume the forecast? When sales order is shipped system is not updating consumption data? This is important as today they use the consumption values to execute the forecast.
    If any one has come across similar requirement, please give other options keeping below points in view
    1. We should be able to plan valve kits may be thru forecasting or PIR's. This to start procuring components.
    2. When sales order is created, system should do availability check at component level.
    3. Consumption data should be updated if we use forecasting to plan kit or if we use PIR's, sales order should consume the demand. Consumption of forecasting requirement is also required.
    Thanks in advance.
    Hari

    Hi ,
    Looks like problem is due to
    - Need to do ATP at componnent level  which is only possible with Planning  strategy 81,82. You cannot use planning strategy 40( 40 considers forecast , sales order & consumption)
    - 81 ,82 planning strategy doesn't consume forecast for End item(Sales order entry material)
    You could use Sales order BOM function. It is provided for selling Kits. BOM is exploded in sales order & kit items are put as seperate sales order items ( 20... 30... 40 ) Here are steps.
    -  Create BOM with usage 5- Sales order relevancy of bom components is Ticked
    - Create Sales order with item which is BOM header. System will explode BOM & all items will be part of sales order as item.
    - You can configure Sale Price at End FG level, Inventory management( DO issue) at item /components level .
    - Forecast will be consumed at end item level.Need configuration
    - ATP check can be performed at componenet level
    Only thing is you will not have Plan order for doing assembly & there is no cost captured for assembly . Kitting donot involve much labor time.
    Hope it helps
    Jatin

  • Spare Parts / Screen Goes Black

    Hi guys,
    Anybody know a trustable source of getting spare parts of iMac in Europe? (better in Spain, but the UK will be fine)
    A couple of days ago my iMac just died. The screen turned off but i could hear the iMac running. I restarted in safe mode to check if that could be a Software problem and the it lasted on for a couple of minutes and it turned off completely. It never turned on again.
    I talked to the repair service and they said the most common cause could be
    1 - The Internal Power Source (around 200 euros of repair cost)
    2 - The Inverter (around 500 euros of repair cost)
    For a 3 years old iMac, paying 500 euros y NOT an option. I am a bit **** out about the reliability of Mac now.
    Anyhow, i have to resolve the problem or use it as a fairly big paper holder. I might buy the piece and ask a friend of mine who is an electronic engineer to help me out. I checked the iFix guides and also parts in the US and the cost of the Power Source or Inverter in never more than 100 euros.
    By the way, by reading on the Internet about this turn off monitor problem most of the people say the the usual causes are the Display Power Source or the Inverter, but it could be that the memory went bad too.
    Thanks for any help,
    S

    HI,
    It sure wouldn't hurt to try and boot from your install disc.
    Insert your install disk and Restart, holding down the "C" key until grey Apple appears.
    Go to Installer menu and launch Disk Utility.
    Select your HDD (manufacturer ID) in the left panel.
    Select First Aid in the Main panel.
    *(Check S.M.A.R.T Status of HDD at the bottom of right panel. It should say: Verified)*
    Click Repair Disk on the bottom right.
    If DU reports disk does not need repairs quit DU and restart.
    If DU reports errors Repair again and again until DU reports disk is repaired.
    When you are finished with DU, from the Menu Bar, select Utilities/Startup Manager.
    Select your start up disk and click Restart
    While you have the Disk Utility window open, look at the bottom of the window. Where you see Capacity and Available. Make sure there is always 10% to 15% free disk space
    Try Resetting the SMC
    Try Resetting the PRAM
    Carolyn
    Message was edited by: Carolyn Samit

  • Need field and table for spare part material and price for a given material

    Hi,
          In need to create a report with following fields:-
           Customer           Material          spare part material            spare part description             price                   currency.
    From which table and field I can get all this information.Please guide me.
    Hint.  cl30n transaction for material managemant.
             vk13 transaction for price maintenace.
    Regards.

    CL30N is a general transaction that can be used for any classification, but material master maintenance is usually MM01/MM02 or MM41/MM42
    Material description can be taken from table MAKT
    customer from table KNA1
    The question is what you are going to analyse? where do material and customer tie together? do you do the analysis on sales orders VBAK and VBAP ? or invoices  VBRK and VBRP? or customer material info record KNMT? 
    or do you capture this info in classification? then you get the values from AUSP
    Edited by: Jürgen L. on Aug 3, 2010 9:42 AM

  • Cost of goods sold report

    Hi all,
    Is there any standard report for Cost of goods sold by production order?Please let me know how to see cogs report by production order.
    Let me know how to calculate this cogs .
    Thanks,
    Sai.
    Edited by: fico sap on Jul 11, 2008 1:42 PM

    Friend
    Order shows material cost & activity cost ; you can charge over head as well
    Means;
    Total order cost = Material costActivty CostFOH
    You can check order wise planned vs actual cost KOC4
    if useful assign points.
    bukhari

  • "Error reading reporting point information" message no. RM111

    Hello friends,
    I am doing the Reporting point backflush for a material and getting the error "Error reading reporting point information", message no. RM111.
    i have given the milestone confirmation for the last operation in the rate routing for that material.
    Even in REM Profile, Mandatory Reporting time backflush is activated.
    In the production version of that material i have given the group of rate routing created for that material in Rate Routing field.
    I have created the product cost collector for that material and production version. With costing lot size 1, even i have calculated the cost for that product cost collector. Though regarding costing couple of errors came, than also i saved it.
    I am not sure whether system has created the reporting point while creating the product cost collector.How to check it?
    Now for that material we have created the planned order.
    Now when i am doing the backflush in MFBF t.c  by giving the material code,plant and production version, system is throwing the error " Error reading reporting point information.
    Thanks and Regards,
    Jitendra

    Hello siva,
    i executed the transaction MF30 as suggested by you, there system displayed following costing errors:
    "No control record for Activity type PLVD/1301/ASBY in version 000 / 2010 activity planning/qty planning
    Message no. KL023
    Diagnosis
    No activity planning or quantity planning has been carried out for Activity type PLVD/1301/ASBY in version 000 and fiscal year 2010.
    Procedure
    Activity Type Planning for cost centers or
    Planning Quantities and Prices for business processes.
    Even system is not picking the component prices, system throwing the error NO price could be determined for the material and  batch so and so.
    We are using the Preliminary cost estinmate.
    is because of this system is not able to create reporting point in product cost collector?
    Please Replay

  • What is best practice for dealing with Engineering Spare Parts?

    Hello All,
    I am after some advice regarding the process for handling engineering spare parts in PM. (We run ECC 5)
    Our current process is as follows:
    All materials are set up as HIBE's
    Each material is batch managed
    The Batch field is used for the Bin location
    We are now looking to role out PM to a site that has in excess of 50,000 spare parts and want to make sure we use best practice for handling the spare parts. We are now considering using a basic WM setup to handle the movement of parts.
    Please can you provide me with some feedback on what you feel the best practice is for dealing with these parts?
    We are looking to set up a solution that will us to generate pick lists etc and implment a scanning solution to move parts in and out of stores.
    Regards
    Chris

    Hi,
    I hope all the 50000 spare parts are maintained as stock items.
    1. Based on the usage of those spare parts, try to define safety stock & define MRP as "Reorder Point Planning". By this, you can avoid petty cash purchase.
    2. By keeping the spare parts (atleast critical components) in stock, Planned Maintenance as well as unplanned maintenance will not get delayed.
    3. By doing GI based on reservation, qty can be tracked against the order & equipment.
    As this question is MM & WM related, they can give better clarity on this.
    Regards,
    Maheswaran.

  • CRM Service - ECC Logisitcs Integration (Spare Parts in a Service Order)

    Hi Experts,
    We have been trying to configure a scenario for CRM Service Orders with SAP ECC logistics integration in CRM 7.0 EHP1.
    We are aware of the standard configuration wherein we assign one logistics scenario ( Purchase Requisition or Purchase Order or Reservation) for a specific service organization & Item Category for spare parts in service order.
    Our first query : Is it standard that the spare part will be automatically reserved if it is in stock (after ECC availability check from service order) and purchase requisition or purchase order is created only if it is not in stock?
    We also understand that while a reservation happens during Service order creation, the goods issue or material withdrawal happens only on service confirmation. If this the case, how will the physical delivery happen to customer? This is our second query.
    Please note that we are raising this query only for spare part items in service order and not for sales item in service order.
    It would be great if you could help us with this issue.
    Responses will be suitably rewarded.
    Thanks,
    Prish

    Hi Pritesh,
    Thank you for your prompt reply and help, appreciate the same, we would be going for the scenario where the service order in sap crm has saleable parts, the service order would get replicated to ecc as a sales order and the costs would get booked when the post goods issue is performed after creating the delivery in SAP ECC.
    Following are the configurations done
    1) Service Order type ZRVW is created in SAP CRM
    2) The same service order ZRVW is mapped in SAP ECC
    3) The service order in SAP CRM has the following number range and the same is kept internal
    4) The same number range is marked as external in SAP ECC in vn01 tcode
    5) The number range is assigned to the document type ZRVW in SAP ECC
    6) Item category determinations are done in SAP CRM, standard SRVS(Sales items are copied to YRVS)
    7) The same item category determination is also set in SAP ECC for Item category group NORM
    8) Item category determination is also set for ERLA as item category group in ECC
    9) The item category YRVS is set to delivery relevant in SAP ECC
    10) The standard schedule line is determined which is CP is relevant for delivery
    11) The sales area is also assigned to the document type ZRVW.
    12) In SAP CRM, the status profile YCONT is assigned, having the business transaction to be distributed, the status of the same is set to allowed for completed status
    13) The status profile has been assigned to the transaction type ZRVW
    14) Pricing configurations are also done in sap crm and sap ecc
    15) Now I am creating the service order ZRVW in SAP CRM, having saleable parts, customer's and material's exist in both systems having the same sales area, the status is set to completed at item and header level
    16) The system is throwing an error when I click on edit
    17) When checked In sap ecc the system says that the document does not exist
    18 I did open the error in SAP CRM and it says that there are some settings required for billing
    Since there is no billing relevance to this scenario in the item category the billing relevance is set to no billing
    Please advice further
    Kind Regards
    Atul

  • PR to be made for Spare Part

    Hi All,
    Standard PR:- 1500005005 is created for spare parts . Since the value of the PR is very high that is 60000 Euro it should not be in-ward to cost center. It should be in-ward to the inventory. At the time of consumption only cost center posting should happen. Since its spare part it cannot be an Asset PR.
    Which way PR can be made. (Account Assignment Category K - cost center & A - Asset is not suitable). Can this be done with out selecting any Account Assignment Category for this scenario?
    Help me out in resolving the client issue.
    Thanks in advance,
    Regards,
    sapuser

    Hi All,
    Material type:- FHMI - Prod. resources/tools. Both Qty & Value is flaged again's the plant.
    So for this PR without K - Cost Center & A - Asset in A/c ***. Catg it will be left (blank). Update it in this way for PR.
    After the GR is being Cleared then while doing the Invoice post updated the cost center. Hope this will resolve the problem
    Regards,
    Pherasath

  • REM Reporting Point line item with operation number 9999

    Dear guru,
    I run MFBF with a REM Profile that post Automatic GR and Activities.
    I have four operation in the material routing (10,20,30,40)
    For the first three operations I want to confirm them with target activities
    I define Third Operation with operation number 30 as "Reporting Point Operation"  and
    set the necessary settings for Reporting Point at Rem Profile.
    After the confirmation I check MF12 (display document log information).
    I see two reporting point line item : one for operation number 30 and one for operation number 9999
    The system update in table AFRU only operation 30.
    So I donu2019t know the activities confirmed with operation 10 and 20.
    Do you help me ?
    Thanks in advance.

    Hi dude:
    Once I had this problem, and was due to a wrong definition of the parameters used in the formula for calculating the activities in to the operations.
    You can chek it in the next path:
    IMG route
    Production > Basic Data > Work Center > Costing > Work Center Formulas > Define formula parameters for work centers & Define formulas for work centers
    Make sure that these parameters are correctly linked to the formulas.
    Please, let me know if this info was useful for you.
    Regards
    Omar Perea

  • MRP design for Service Spare Parts

    Hello,
    I am in process of designing the MRP run for service spare parts for construction and mining equipments business. There is a central warehouse and small depots.
    Help me out to design following MRP requirements.
    1.     MRP process is expected to consider stocks at all these locations i.e central ware house and depots. Optimization across locations and stock transfers to be considered.
    2.     MRP process is expected to consider open PO requirements.
    3.     MRP process is expected to consider in-house service orders reservations requirements.
    4.     MRP process is expected to consider open sales spare parts order demand from dealers.
    5.     Certain formula base forecast requirements for specific spare part
    If SAP standard solution is there or any work around is expected.
    Regards
    Sanjeev Dhavan

    1. MRP process is expected to consider stocks at all these locations i.e central ware house and depots. Optimization across locations and stock transfers to be considered.
    - MRP can be run for a whole plant or single material or MRP area(group together some storage location). I hope your warehouse is a plant so you can run the MRP at your plant(ware house) level.
    2. MRP process is expected to consider open PO requirements.
    - You should use consumption based planning but you need to identify what type of MRP you want to use.
        - reorder point planning     - forecast based planning      - time phased planning
        - in general all the above MRP will consider the open PO / PRs
    3. MRP process is expected to consider in-house service orders reservations requirements.
    -  this is possible by selecting proper MRP type, for ex. if you want to use reorder point planning, then you should use V1(Reorder point planning with external requirements) which includes sales order and manual reservation in net req calculation.
    4. MRP process is expected to consider open sales spare parts order demand from dealers.
    - Refer point 3
    5. Certain formula base forecast requirements for specific spare part
    - do you want to use forecast based MRP? what formula you want to use?

Maybe you are looking for

  • Watching DVD from MacBook Pro to Apple TV

    I'm attempting to watch a DVD from my Mac Book Pro via Apple TV.  I get the following message when it fails:  The viewer could not be moved to the selected screen. 

  • G5 Imac wont boot

    New since Jan '05 worked well before recent refusal to boot I know it's getting power b/c when i hold the on/off button the light at the lower right blinks once that's all it does, however any suggestions?

  • Can't Open Entourage

    I couldn't find a place to post this topic in the discussions so I'll try here. I know this is a Microsoft issue, but I just wanted to get some feedback. When I try to open Entourage, I immediately get an error message that says "Entourage cannot acc

  • Some u-tube links won't open

    SOME u-tube links won't open in a mail message. I get a message saying 'an error occurred, try again later'. They never open 'later'. Is there a work-around, or do I need a plug-in or something. Thanks

  • Help -Xerces validation problem!!

    I have a valid xml doc and a valid xsd. When I run the following code it chokes on every element. It says every element must be declared. Code: // Create a new XML parser XMLReader reader = XMLReaderFactory.createXMLReader(); // Request validation re