CProjects "accounting Tab" role/resource assignments missing

Hi, I have assinged the Project Taks with roles and resources but when i navigate to the "accounting tab"  and expand the Project structure , the assignments are not visible, However the costs and rev related to the assignments are updated in the back end ( ECC PS).
Is there some thing which would stop the display of these assignments in the "accountig tab" ?
thanks
Edited by: ankushkap on Feb 18, 2011 5:29 PM

Hi,
If you are working in Portal than Claer the Cache and Re-login again.
Thanks
Arbind

Similar Messages

  • Project builder link is not working in cProjects accounting tab.

    Hello All,
    I have a problem in the cProjects accounting tab where when I select the WBS element in the PS project the page opens where the links to the different systems are seen and when i select to the Project Builder:Display WBS element link it takes me to the initial Screen of the ERP systems instead of taking me to the Project Builder transaction code.
    Thanks and regards,
    Lohith

    Make sure the article that you want to share is un-protected from folio Producer dashboard because all articles are protected by default. And other coupkle of settings to enable social sharing.
    I would suggest you go through this documetation here that explains detailed social Sharing instructions http://help.adobe.com/en_US/digitalpubsuite/using/WSf6ef983f54a76485-3d39e50113568f15d7f-8 000.html

  • CProjects-MS Project - import and export of task-role-resource assignment

    Hi,
    We are on PPM5.0
    We are currently working on cProjects-MSP client integration.
    What we have not been able to configure for import/export so far is:
    1. Task-Role-Resource assignment
    Whereas we are are able to import/export the "Person Responsible" and "Role Responsible" fields, we have not been able to align the task-role-resource assignments.
    We see a "Resource Name" column (Standard) in MSP. When we click on the drop down, we see all the roles from the cProjects project. But the alignment does not happen.
    Summary:
    On export and import, we need to automatically see the role-resource-task assignment. How is this possible?
    2. Code field to "VC_BUPA_GUID" gets a number which is not the BP ID.
    Is it possible to import the BP numbers in MSP. Also, how can we assign a number to the role in MSP such that on import into cProjects, the role is already staffed with the corresponding BP.
    3. Is it possible to export all the resources (BPs) into a drop down in MSP - like we see the Project Type, Role Type etc.
    Thanks.

    Hi Anuradha,
    Thanks for your inputs.
    When we export to MSP, we see the cProjects roles under the "Resource Name" drop down in MSP.
    However, they are only seen when we expand on the drop down.
    For e.g. RoleA, and RoleB are two roles in cProjects project, along with many other roles.
    Both of these roles are assigned to a task, say TASK1.
    When exported to MSP, we expect both of these roles to show against TASKI, as "RoleA, RoleB" under the "Resource Name" column. However, these roles are not seen. They only appear as elements of drop down, along with all other roles in the project, when we explicitly click on the drop down.
    Please let me know if I are missing out on something.
    Thanks.

  • Controlling Cockpit (COCPCPR) link in Accounting tab (cProjects)

    Hi,
    How can I have the controlling cockpit (COCPCPR) link to appear in the accounting tab?
    I have been able to configure the services for other object links. However, we also want the cocpcpr link to appear under the "Accounting" tab so that a user can use this link to correct cockpit errors, if any, instead of logging in to the R3 system to correct them.
    Please advise.

    Hi Nk, thanks for responding.
    We are on PPM5.0, and have accounting intergration for automatic replication to PS.
    The replication works. However, we have the need to visit COCPCPR at times to remove warnings/errors.
    I have seen COCPCPR link appear under the cProjects Accounting tab earlier (in some other implementation).
    However, I don't see any such link/button in my implementation. We have implemented the object link services by which we are able to get to the object in R3 (in another system). However, the COCPCPR link does not appear under the Accouting tab.
    We have PPM and PS on different systems.
    Thanks.

  • Some Activities are missing Resource assignments form an imported v7.0 file

    Hello,
    What could cause missing resources from an activity after importing a v7.0 project?
    I received an imported v7.0 file which is found to be missing some resources. The schedule owner provided the exported file along with a Activity Cost-Loading Report. The ACR lists each resource's activity associations. I created the same report only to find missing resources (materials, money, etc.)
    Digging into the schedule do not provide any resolution.
    Interestingly, 2 resources are being assigned 3 times to the same activity and only one is showing up on the imported file. Again, the schedule owner's program does include.
    The file is exported from a server based and imported into a standalone. The schedule owner is not a superuser/admin unlike the standalone.
    Thanks for your time!
    Best Regards.
    Keith
    Knowledgebase Solution:
    "XER with duplicate Roles/Resources on an activity is not importing all the roles/resources [ID 905700.1]
    If the same resource is assigned to an activity multiple times, one of the following fields must be unique for the additional resource assignments to be
    imported. The fields are:
    - Activity ID
    - Project ID
    - Cost Account ID
    - Resource ID
    - Role ID
    - Price / Unit
    This is by design.
    Workaround for importing XER:
    Within the Import wizard, on the Update Project Options dialog, select the Modify button. Set the Action for Activity Resource Assignments to Insert
    New as shown below.
    Please Note: This will only work if you are NOT using timesheets. If using timesheets do not try this or risk losing timesheet data."
    Works but be aware that actuals are not updated. Had to provide a unique identifier as stated above in order for actuals to be reported.
    Keith
    Edited by: Keith on Jul 10, 2010 11:03 AM
    Edited by: Keith on Jul 14, 2010 9:56 AM

    Hello,
    I working for a retail giant company, they bought Adobe LiveCycle and its in their laptop, where am working
    I am developing an VISITOR Adobe Interactive Form, i have Designer 8.1 and Reader 9.0 in my Windows 7 Laptop. When i checked the menu EDIT-->form properties --> Compatability, its Adobe XML form File (XDP)
    When i opened this VISITOR interactive form in a browser, right clicking and checked form PROPERTIES, then i saw the "PDF Version: 1.6 (Acrobat 7.x)"
    I am trying to debug my Java script on a VISITOR interactive form, i found this link in google
    http://forums.sdn.sap.com/thread.jspa?threadID=950914
    But, when you see my case, i did not see the mentioned MENU-->EDIT-->PREFERENCES-->CONSOLE stuff on my development, pls. see the below screen shots and suggest me how to put the debugger settings in my case,
    1_I did not see any MENU here on the LiveCycle Designers in order to set the settings of debugging my Java Script
    ==============================================================
    2_I did not see any MENU either on this tab of PREVIEW of PDF.....in order to set the settings to debug my Java Script
    ==============================================================
    3_I guess.... this is not the EDIT item on MENU your are referencing in your SDN answer, because, i did not see any PREFERENCES option under this EDIT
    ==============================================================
    4_If i open any external (this is Adobe Acrobat Guide downloaded from Google) PDF, there i can see MENU_EDIT_PREFERENCE items_but, in my developement I can not see this stuff in order to put debugger settings
    Thank you,

  • Revenues are not coming in the accounting tab page in cprojects

    Hi all,
    I am configuring the mulitilevel controlling on account assignment in cprojects with Project system. 
    I have given cost/revenue rate in customization along with revenue element.  The revenue element i categorised in the cost element category of "11".Then the cost element has assigned to controlling area and then to company code and then i replicated these values also.
    Apart from the above, is there any other setting i forgot? Please help me.
    Thanks

    Hi,
    (A) Which costing varianr you use
          PCO2 --> internal order
           PS06 --> Easy cost planning
    The costing variant controls how the costing is to be carried out. With it, you control:
    -->Whether the costing results are to be regarded as plan costs or actual costs
    -->Which prices are used to value the materials, internal activities and external activities
    -->How overhead surcharges are calculated
    (B)Define cost & revenue rates for the project role & enter the validity details. The start date and end of the validity dates should be within the organization and project dates ( IN C PROJECT )
    then go to make seeting in ERP
    C PROEJCT --> ACCOUNT INTEGRATION --> MAKE SETING IN ERP ( R/3 SYSTEM)
    (C) In CONTROLLING check the costing varaint
    (D)Settings for “Define Controlling Scenario
    (E)Assign Cost Elements and Activity Types
    Check this setting any thing is missing .
    and also check in Cproject Resoure tab page --> Costing  tab
    planned cost and Revenues
    CHECK AND REVERT BACK
    THANKS
    SUNIL JAWALKAR

  • Hide Accounting Tab in CProjects

    Hi All,
    I want to hide the "Accounting" Tab in CProjects, depending on user authorizations.
    I tried to realize it with BADI "DPR_DETAIL_TAB_CTRL".
    Unfortunately in this BADI I can only hide tabs on detail level e.g.
    tabs for tasks, phase etc.
    But how can I hide tabs on a higher level like the "Accounting" Tab?
    Thanks in advance.

    Hi Hans ,
    You can try with the Badi DPR_DETAIL_TAB_CONTROL, it can hide the Tab dynmically.
    See the example codes for details:
    Sets a detail tab Private (invisible) or Changeable (visible)
    Do not use Mandatory or ReadOnly
    Example: Set Document Tab invisible (Private) for Project
      CASE cs_property-association.
        WHEN cl_dpr_api_co=>sc_association_documents.
          CASE lv_object_type.
            WHEN cl_dpr_co=>sc_ot_project.
              cs_property-property = cl_dpr_fc_property=>sc_private. "Private: No 
    Kind regards,
    Zhenbo

  • MISSING ACCOUNTING TABS IN THE ITEM MASTER

    I did an LSMW for new items for different plants that we have.  When I check the item in the item master I find the accounting tabs missing.  There are approximately 630 items that need to be fixed.  Does anyone know how to add the accounting tabs to a large group of items.  I tried MASS t-code and it didn't work.

    Hi,
    for the 630 items missing accounting compose an LSMW again with the required legacy file(data upload) information using MM01 transaction.
    This should add the accounting views for the required materials.
    regards
    sadhu kishore

  • Console 4.x is missing the ACCOUNT tab

    When I create or modify users or groups with Console, the ACCOUNT tab is
    missing.
    (See attachment)

    If you encounter problem with customizing toolbars then see:
    * http://kb.mozillazine.org/Corrupt_localstore.rdf

  • Phone account tab on jabber on windows missing

    Hi All,
    i had a problem with jabber on windows, i already login and can do a IM and see the presence, but i cant do voice/video call,
    when i try to see the setting on file - options - i cant see any phone account tab, that should be i used to put my phone configuration,
    i use a BE6K with unified PM, are anyone experienced this before?
    thanks
    Nafi.

    You need to add the following on your xml for the phone account option to show on the newer Jabber versions
      Not_Set
    Save the file as jabber-user.xml to test,
    Get the file to this folder:
    C:\Users\User\AppData\Roaming\Cisco\Unified Communications\Jabber\CSF\Config.
    If this solves the issue upload the xml as jabber.xml on a TFTP.
    Hope it helps!

  • Disabling Roles, Resources, Proxies subtabs in Profile tab of Self Service

    All,
    I am looking for ways to disable 3 (Roles, Resources, Proxxies) of 5 subtabs under self service UI -> Profile -> My Profile subtabs. Any suggestions on how to go about this either programmatically or using configuration.
    Thanks in advance.
    Prasad.

    Not possible without UI Customization

  • Role - Resource - Task Assignment

    All,
    We have a requirement where a cProjects task may spread along for, say, 6 months. Resource needs to work on this task for only 2 days per month, every month (say) (Work - 12 days).
    When the role is staffed for 6 months, this resource will not be available for the other projects. And therefore, we want the resource assignment to the task to drive his availability.
    Is there a way out? Or do we have to staff the role 6 times (with the right dates)? The second option works, I know, but is not an elegant way to do it.
    Thoughts/opinions.
    Regards.

    Thanks Niranjan for your attempt.
    The business isn't quite liking the idea of doing so much when a resource is supposed to be working on the task 2days/month. For every time that the resource is to work, the cProjects user would have to staff to the role (or create a role, as you suggested). Everytime, the dates have to be mnaully entered for staffing, Project Role, Resource to task assignment and so on.
    They want this to be done at one place and would like this data to reflect elsewhere. For e.g. when the resource is assigned to the task, this data should drive availability of the resource - is what they want.
    Let me know if I am missing on any of the obvious functionalities of cProjects resource management that I may try to resolve this issue.
    Thanks again.

  • Error: "failed to load book because the requested resource is missing"

    I book a book via the iPad. The book appeared in my library no problem with the "new" tag and stuff, but when I tap it to read I get an error "failed to load book because the requested resource is missing." Any ideas? I'm on the road, so I haven't synced or backed up or anything..
    I've also verified that I have a good connection, etc. I'm able to hit the "store" button and browse the store no prob, as well as web, etc.
    Any thoughts?

    I believe I may have the answer to these many concerns. 
    When a book is over 20 or so megs, iBook will sometimes make an attempt to download on the iPad (when it should not). This causes problems. Perhaps the one you are experiencing. Therefore you have to wait until you are on a wifi connection before purchasing dictionary-like books. But if you've already made the mistake of downloading, theres no guarantee wifi will correct this. 
    What worked for me (like others have already mentioned) is that if you have an iphone or touch you can download it from there, sync with your computer and sync your iPad later. The book(s) will transfer just fine as long as you have this enabled on your devices.
    Initially this didn't work for me because in my frustration with a prior issue I took the liberty to create another iTunes account. Therefore iPad purchases were not visible on my phone. So be sure to have the same accounts activated on your devices and iTunes. 
    Yet even further diagnostics may need to be explored as I'm still prompted to provide my password every time i open iBooks (as if the download is still pending). Kinda afraid to revert to factory settings over a small issue. In the coming update Apple should fix these problems altogether. Hope this helps!

  • PS Project not appearing in cProjects Accouting tab

    I am able to create the PS Project from cProjects through status management (Flag for transfer) after the required accounting intergation and other configurations.
    However, I have a concern when I am linking an existing PS project to a newly created RPM Item and cProjects Project.
    I carried out the following:
    1. Created a PS Project with a WB Structure
    2. Created an RPM Item (with auto creation of cProjects Project)
    3. Under the item, uploaded the PS Project created under step 1, to the item
    4. Saved the upload
    Result:
    The PS Project structure is replicated in the cProjects operational project.
    Concerns:
    We now want to synchronize the accounting aspects in PS from cProjects Project (like we do when we mark a cProjects project to "Flag for transfer"). However, the newly linked PS project does not appear under the "Accounting" tab in cProjects.
    Please advise.
    Summary:
    Having linked an exisiting PS project to a new created item and cProjects project, we want the operation to continue as if the PS project was created by flagging the cProjects project.
    Thanks.

    Thanks... this helps me get to a part of the problem.
    Now that I have RPM item and a cProjects project linked to a PS project, I can manually link the cProjects tasks stc. to the PS WBS elements as relevant.
    In such a case, how will "Falg for Transfer" imopact this project? I mean, whereas "Flag for transfer" in other cases create a new PS project which we can see under the accounting tab, what happens when we set this status after we have manually linked the cProjects project to a PS Project. Also, how does the accounting updates take place in this scenario (from the cProjects front end)?
    Thanks...

  • My iBooks will not open, I receive a message that states: "Failed to load book because t he requested resource is missing." How can this be repaired/resolved?

    My iBooks will not open, I receive a message that states: "Failed to load book because the requested resource is missing." How can this be repaired/resolved?

    If you can't open a particular ibook then try deleting it from the bookshelf via the Edit button at the top right of the bookshelf, and (assuming that it's still in your country's store) redownload it via the Purchased tab in the ibookstore in the app (or if you have a copy of it on your computer's iTunes library sync it back from there).

Maybe you are looking for

  • 2011 Macbook Pro 17" reviews

    Hello all, Thanks to a little family mix-up, I may be needing to upgrade myself to a new notebook this year. I've been looking, and I'm going to grab a computer that will last me for a good while. I work with a lot of ad design/ video editing tasks a

  • Mail Receiver Adapter - Flat File as Attachment

    Hello, I would like to send a flat file as attachment using an E-Mail receiver communication channel. The flatfile is picked up beforehand using a file sender channel, so there is only routing necessary in PI. Is it possible to send the flatfile as a

  • Installing external hard drive

    I've recently begun working a new PBG4, after years on a Pismo/FW w/OS9.2. I've yet to use my LaCie D2 hard drives on the new PB. Do I need to install the drivers from the LaCie disks, or does OS 10.4.2 have the drivers, like it does for printers? I

  • Can I create iWeb hyperlinks from individual slides in slideshow?

    I have made a slideshow in iPhoto and dragged it onto my iWeb homepage.   I now want to make links between each individual slide and one of my pages.  Is this possible.  When I click the link icon in the inspector the slides on the slideshow will not

  • Man, is there a way to organize VST's better in Audition 3?

    I finally upgraded my Waves Mercury bundle, and apparently they stopped supporting DirectX after version 6 - I now have version 7. I personally liked the DirectX support because it was separated from my VST collection, and also had it's on WAVES tab