Hello,
i have a SENT- Signal and try to create a VI which is calculate the CRC-4. I did not make it. The polynom is x4+x3+x2+1 and the seed value is 0101. I need a VI which is calculate the CRC-4 for the SENT- Signal.
Maybe someone can help me?
Best regards
Sebastian

Do you have examples of inputs and expected outputs?  There are many variations on CRCs and it is hard to get it figured out without some test data.
There are only two ways to tell somebody thanks: Kudos and Marked Solutions
Unofficial Forum Rules and Guidelines

Similar Messages

  • Calculation for subcontracting item of type N (non stock) as it for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • TAX not Calculating for Unplanned Delivery cost in MIRO

    Dear All,
    I am having an issue with Unplanned delivery cost in MIRO,
    We have to do an accounting of a invoice/PO which contains in addition to actual Value the Unplanned Delivery cost also, and for which also the TAXes also applicable with ED 10% and ECess 2%,SHcess 1% ,
    Now in MIRO if i want to enter these Packing and forwarding chanrges in Unplanned delivery cost, but the TAX rates is not calculating for the same.
    The TAX rates are calculating only for the values other than Unplanned delivery cost.
    What i want TAX also need to be calculate based on the TAX code choosen in MIRO or as flow that of PO.
    I have checked in OMR2, there we have mentioned Default Unplanned delivery cost tax code as ED NIL.
    Can any where in the setting we can say by default the TAX rates should calculate as that of PO or whatever TAX codes we have choosen in MIRO.
    How to achive this, pl help.
    Regards,
    Nagaraj S

    hi
    the screen shot i sent is also of 4.7E
    now u can check OMR2 for default tax code for unplanned delivery cost
    can u show us the screen shot of the details tab of MIRO
    also check in SPR>MM>LIV>Configure How Unplanned Delivery Costs Are Posted
    here what value u have maintained  ,we are using 2 as (2     Different G/L line)
    regards
    kunal
    Edited by: Kunal Ingale on May 19, 2010 6:18 AM

  • Calculation of cost for subcontracting item of type N (non stock) as it calculating for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • MTU size for ATM Interfaces

    Hello,
    We are using Cisco 3662 with OC-3 ATM interfaces. I have configured the interface and sub-interfaces with a MTU of 9000. However, when I run extended ping with a sweep range of 56 bytes to 8500 bytes, the pings timeout at approximately 4000 bytes. The timeout is set for 2 seconds. I have noticed when I use a "show interface atm 2/0" that the "length violation" increased but not the crc.
    The OC-3 interfaces are connected to Macroni ASX-1200 switch. The ASX used UBR. The router interface is configured as a PVC 10/30 using AAL5Snap.
    How can I achieve a large MTU throughtput? What is the maximum MTU that can be achieved through a OC-3 interface?
    Thanks...

    I ran into this same problem and was told by TAC that the MTU for an ATM Interface should not exceed 4700.
    Hope this helps

  • Automatic calculation for batch characteristic

    Conversion factor is a batch characteristic which is to be calculated based on the other batch characteristics values entered by the user at the time of confirmation.
    I have maintained the objectdependency in the batch class (023). The dependency type maintained is "Procedure".  The batch class is assigned to material master. The formula is as follows
    $self.conversionfactor=((($self.actthickness-0.067)*$self.density)
    ($self.paintgsm$self.metalgsm))*$self.width/1000
    The formula is appearing in 2 lines in the dependency editor. There is no syntax error. As well as the dependency status is also "released".
    But at the time of confirmation, if the values of the other characteristics are entered, no calculation for the characteristic conversion factor is done by the system.
    Can anybody please guide on this???
    Regards,
    Manish

    thanks a lot

  • Distortion in Save For Web interface

    I am still having problems with my Save For Web interface. Attached is a screen where you can see that with just the Optimized view showing (in this case 72%), the picture looks as expected. But if I go to 2-up or 4-up views, the 2nd image (which was the 72% Optimized) is now all pixelated as if it were a GIF.

    OMG!  How many years have I been using this program and I have never noticed this until now?!?
    Sorry for the brain fart and thanks for pointing that out!!! 
    I am really having a good laugh at myself about this one!
    Jules

  • Interest calculation for vendors

    Hello gurus,
                     In interest calculation for vendors, In interest on arrears calculation(vendors) t-code (obv9) Here wht we have to configure the steps, like Infirst step i had given,,
    Account symbol             Currency                 G/l Account
    0002                                  inr                       40009(interest)
    Then second step wht i have to give for vendors,, if it is  general ledger we will give 2000(g/l a/c paid).
    My question is wht we have to give in second step......For Vendors...
    Regards,
    Assign Points.

    Hi,
    vendors and customers interest is p type.and it is item interest calculation. The t.code f.2a, f.2b. Try with this.
    If helpful assign points,
    Rams

  • BEx report -two different calculations for a result for one key figure how?

    All,
    Maybe someone could help me with the following, we have a requirement to setup for one key figure two calculations for result rows. One result (average) for one level, and on a higher level -grand total have a (sum), as for our business it makes sense to do it this way. We have setup average for this KF, we get correct results (see below values 7,5 & 6,5) however for the grand total (across multiple products) so for one level up we need to have a different calculation. How could we achieve this?
    Here is an example:
    location     product          inventory     
    AAAA     11111          5     
    AAAA     11111          5     
    AAAA     11111          10     
    AAAA     11111          10     
    AAAA     Result          7,5      ---> average
    AAAA     22222          5     
    AAAA     22222          6     
    AAAA     22222          7     
    AAAA     22222          8     
    AAAA     Result          6,5       -
    > average
    AAAA     Result (across products)          14      ---> here I want to have a sum of averages

    This could be achieve only IF you upload a hierarchy for product inventory with different levels, wherein each level show subtotals and finally grand total will be shown at the end of the results.

  • How to prevent BPC from automated calculating for hierarchies / nodes?

    Hi experts,
    I am looking for a practicable way to prevent the system from automated calculating for hierarchies, and especially for nodes within hierarchies?
    Let's say, I have ENTITIES (AS A HIERACHY) in rows and ACCOUNTS in COLUMNS. Now I want the system to block adding up the values for one specific account on node XY. Instead of the sum of all base member entities, the cell for account XY should be left empty.
    Is there a practicable way to deal with this?

    Hi Stefan,
    you can prevent the system to calculate a node by editing the Formula Property  in the Dimension.
    You can insert 0 or null to the Formula field for the specific element.
    But in this case the values from your leaf elements lying under your node wont be calculated  even in higher hierarchy nodes.
    For ex.: with the following structure
    -A
    ---A1
    A11
    A12
    ---B1
    B11
    B12
    If you set A1 to 0, the top node A will only be calculated by values of B1
    Regards
    Jörg

  • How to address HP Printer Software Update 3.0, iTunes 12.0.1 update that sits in the App Store, 'Calculating' for days with no install?

    The App Store indicates there is a Software Update that appears to include the HP Printer Software Update 3.0 and iTunes 12.0.1
    Unfortunately, the software update fails to install. Instead, it just sits there 'Calculating' for days with no progression on the status bar of the overall update.
    The update buttons of both the HP Printer Software Update 3.0 and iTunes 12.0.1 are both greyed out, with no progress bar.
    Not sure of what the issue is, there is no warning or error dialog box that appears or any indication of an application that may be interfering with the install.
    Any advice? 
    MacBook Pro (17-inch, Early 2011) 2.3 GHz Core i7, 4GB RAM

    Thanks for the suggestion. I wanted to install the individual updates but because I had settings to automatically download and install updates, whenever I opened the App Store, the system would try to download and install, preventing me from canceling the update to execute each application update one at a time.
    After changing the settings from automatically downloading and applying updates, followed by a restart. I was able to open the App Store and run each individual update.
    Thanks again.

  • Fixed 30 Days calculation for any month..Not working fine when Split Occurs

    Hello Everybody,
    I am stuck with an issue..which is creating problem when there is a split..in Normal Conditions it's working fine...Kindly help me out on the same.
    We have to calculate the Salary on 30 Days fixed basis and not on calender days...
    <b>eg  For January Salary will be calculated based on 30 days and not on 31 days and for Feb also on 30 days not on 28/29 days.....</b>      Every thing is working fine for normal payroll i.e without any splits..
        <b>But if there are any splits  in the month then calculation for 2nd split goes wrong ....</b>
        Eg.  person is hired on 02feb 2007 and he got re-org on 17 feb 2007 with basic as rs.10000
      As per Clients requrement it should be calculated as  :
    for period 2nd Feb 2007 - 16th Feb 2007 : 10000 * 15/30  : Working Fine in SAP
    for period 17th Feb 2007 - 28th Feb 2007 : 10000* 14/30 :  Not Working  Properly  <b>In SAP calculation is done  as 10000*12/30</b>
    <b>We want it to calculate as 10000* 14/30</b>
    Kindly let me know wat can be done :
    1 How can i write PCR..if that needs to be change
    2. If user exit then how shall i go about the same
    if some body has any 3rd option let me know...
    Regards,
    Ketal Parikh

    Hi ,
    Solved the issue by writing rule.
    Regards,
    Ketal
    Edited by: Sikindar on Jul 3, 2010 10:28 PM

  • Hi all, i'm new and facing a problem while creating a new file for Xcode. I can't select the box "with XIB for user interface" if the subclass is "UIViewController".this problem happen after i upgrade Xcode to 4.6 version.Appreciate for any help rendered.

    Hi all, i'm new to Mac book & Xcode. I'm learning and facing problems while creating a new file for Xcode. Before i upgrade the software, i have no issue to create simple steps in apps. After upgrade Xcode to 4.6 version, i'm facing lot's of issue eg.
    1) "the identity "iphone developer" doesn't match any valid certificate/ private key pair",
    2) can't select the box "with XIB for user interface" if the subclass is "UIViewController"..
    Appreciate for any help rendered.

    Mikko777 wrote:So what is the best?
    I wouldn't judge. I've been to Arch for a week, you know? But as said, it's VERY close to it.
    What I dislike after a week is makepkg not handling dependencies automatically (which would be overhead, so probably not appropriate).
    Mikko777 wrote:Also theres KDEmod for modular kde, dunno if its for 64 bits tho.
    Don't actually need that as said ... I see no real benefit of having that other than not beeing a KDE user or having Gentoos useflags.
    Mikko777 wrote:PS:You produce a lot of text and welcome smile
    Yeah. Wonder why I'm still employed? So do I ...

  • Creation of Server Proxy for  Message interface with External Defination

    Dear All,
    I am getting a problem while generating a server proxy for the inbound interface . The request message used in the inbound interface is a external definition which is uploaded using a XSD file. The XSD file was supplied by a third party which is having very high complex strucuture and used lot of abstract data types in the design. When i tried to generate the proxy in the R/3 system (Transaction SPROXY) for the inbound interface i am getting following error.
    Interface uses external and internal message definitions
    Message no. SPRX122 *
    Diagnosis
    In a message interface you can use messages from different sources:
    Message types and fault message types edited in the Enterprise Services Repository
    Messages imported into the Enterprise Services Repository (external definitions, RFC, IDoc)
    In the current message interface, message types from different sources have been used. Since messages from these different sources must be handled differently during proxy generation, such a mixture of messages within a message interface is not possible.
    System Response
    The interface cannot be generated.
    Procedure
    Change the interface definition accordingly in the Enterprise Services Repository.
    Please guide me, how to generate the proxy for the interface with external defination message. I could nt geneate manullay, because it is having very high complexity and its a big structure.
    Is there is any way to generate the proxy for interface with external definition
    Regards
    Vijayanand

    Hi,
    i.       Import your message schemas from external definitions, or RFCs or IDocs from SAP systems. These definitions already contain data types.
    ii.       Create a message interface and reference the messages of the external definition, or the RFC or IDoc message.
    Check this, it may help you
    http://help.sap.com/saphelp_nw04/helpdata/en/3f/01623c4f69b712e10000000a114084/content.htm
    REgards
    Seshagiri

  • What determines the price and tax calculation for consignment stock?

    Hi All,
    anyone knows how the price and tax are calculated for consignment stock? in other word, among the info record , contract or material master, what determines the price and the tax calculation for consignment stock?
    please advise, your input will be rewarded.
    thanks,

    First preceeding is taken by contract and then info records of consginment

Maybe you are looking for

  • In HR-ABAP?

    Hi experts, I am doing a report in HR-ABAP.As I am new to this field I want some help from your's.the rport is abt I need to get pernr,complete name(CNAME),basic pay(betgr),Gross pay(SUMBB) using structures p0000,p0001,p0002,p0008 and table pa0000,pa

  • Resending the Succesful messages in XI

    Hi, We have a scenario where we have to resend a few successful messgaes again from XI, I tried resending it from both SXMB_MONI and Runtime Work Bench but is resulted with the error.When I tried to resend one from the RWB I get the error as 'Unable

  • Report field substibution on URL Redirect

    I am using ApEx 2.0 I have a page with two report regions based on SQL queries, joined by a common column. The master region is read only and in detail region, I changed the attribute of one field to display as text. So, for example, the Master regio

  • How\When check or point out a bug in an osx application ?

    Is there a web page where check number of issues by application... I need to know if there is a signaled bug in preview and may be inform about this and check if my signalation is acceptable or ignored... thanks...

  • We have two Mac's, just got time capsule, is there a way to delete doubles? such as pictures?

    We have two Mac's, we have backed them up on time capsule, we have doubles, can we do any thime to stop it doing doubles?