Create a WM Transfer Requirement against Reservation

Hello,
I have the following request.
Currently we use PM module and create a PM Order and then users put the components, once that is done, a reservation is created.
I have the request to implement WM with this process.
That they need to continue using is the reservation and against this,m create the transfer requirement.
The question is, what steps I need to follow, I required to use mov type 261, but I cannot see the requirement type for "Reservations", I only see:
B     Purchase Order
D     Storage bin
F     Order
K     Cost center
L     Sales document
Should be created one for reservations like:
R    Reservation
what else shpould be updated? any user exit to include that?
Thanks so much for the help.

We have that exact scenario, and implemented WM last month. This is the process:
- WO created in PM with Components. WO saved and Reservation created automatically.
- In MM, Tcode MB1A to issue material out with MOv Type 201. This automatically creates a TR AND a TO. You can switch that off if you want, that was our requirement.
- TO is confirmed when goods are actually taken out of warehouse.
We have no developments or user exits, it's all standard and it's working perfectly.
Check OMLR and make sure to assign your movement type , and put an X on the "Create Transfer Requirement" column (we use 201, not 261). see snapshot:

Similar Messages

  • Creation of TR or TO against Reservation

    Hi all,
    I'd like to create a TR (transfer requirement), or even better directly a TO (transfer order), against a Reservation.
    Could this be done in standard ECC6?
    Thx for your inputs.

    Hello,
    As far as my understanding, reservation is for proceeding for IM transaction for specific plant and storage location. It has nothing to do with WM. If your storage location is WM managed then TR will be automatically created when you proceed for IM transaction with reference to reservation.
      For ex- when you post the IM transaction with reference to reservation ex- GI to cost centre 201 movement type, your TO will automatically created and conform as per below setting.
    (I)Do the OMLR setting for auto TR creation and immediate TO creation. If this is done then system will create the TR and TO automatically.
    (II)Even you can confirm the TO immediately (OLMLActivity transferDefine movement type Flag the setting of TO confirmation of related movement type).
    Thanks
    Milind

  • Transfer HU for Reservation

    Hi,
    We need to use HU for the scenario below.
    We are producing HUs and transfer them to the semi-finished SLoc.
    After, production lines are creating reservation for semi-finished materials. We transfer HUs against reservations.
    But for the material document, reservation tab is not there. And RESB-ENMNG field is not updated.
    For the scenario above, what do you suggest?
    Thanks.

    Hi,
    Check the below link
    http://wiki.scn.sap.com/wiki/display/ERPSCM/HU+Creation+on+HU+Managed+Storage+Location
    Based on the above link, you can find that HU are created and managed in HUM location and  once your SFG is produced you can pack the same and manage in HUM location as HU's which can be picked later in the delivery.
    Thanks,

  • Transfer Posting against 301 reservation

    Dear All,
    I have created reservation with movement type 301. I want to transfer posting against this rservation. System is not showing this reservation in MB26 and while using MIGO, system is saying no reservations available.
    Could you please help.
    Regards
    Karan

    Kindy Read the Rule of the forum - Too many questions in single thread
    For better response post single questions.

  • Transfer Requirement for Movement Type 262 (Cancel With Ref to Reservation)

    Hi Experts,
    it is possible to configure the system to create a Transfer requirement for movement type 262 (Cancel With Reference to reservation) ?
    When i execute a movement type 262 (Cancel with reference to Order), the system creates a Transfer Requirement, i can process it in transaction LB12. Now i am using the movement type 262 to Reservation, but the system does not create a transfer Requirement.
    I am using SAP ECC 6.0.
    Thanks in advance,
    Alejandro López.

    Hi Alejandro,
    Can you clarify what process you are performing by this comment? .. "_Now i am using the movement type 262 to Reservation"_.
    As per standard process TR (transfer requirement) creation takes place as per the setting in IM-WM interface. Please check in Tcode OMLR, if TR create field is having "X" for the warehouse and reference movement type record. Normally whenever any material document gets posted in IM, MM-WM interface provide the decisions about which WM movement type to pick for warehouse and data about TR , PCN and TO creation.
    Hope this will help.
    Regards,
    Sudhir

  • Transfer Requirement for Movement Type 262 to Reservation

    Hi Experts,
    it is possible to configure the system to create a Transfer requirement for movement type 262 to reservation?
    When i execute a movement type 262 to Order, the system creates a Transfer Requirement, i can process it in transaction LB12. Now i am using the movement type 262 to Reservation, but the system does not create a transfer Requirement.
    I am using SAP ECC 6.0.
    Thanks in advance,
    Alejandro López.
    Edited by: Alejandro López on Feb 28, 2011 1:55 PM

    Hi Alejandro,
    Can you clarify what process you are performing by this comment? .. "_Now i am using the movement type 262 to Reservation"_.
    As per standard process TR (transfer requirement) creation takes place as per the setting in IM-WM interface. Please check in Tcode OMLR, if TR create field is having "X" for the warehouse and reference movement type record. Normally whenever any material document gets posted in IM, MM-WM interface provide the decisions about which WM movement type to pick for warehouse and data about TR , PCN and TO creation.
    Hope this will help.
    Regards,
    Sudhir

  • User Exit / BADI for Transfer Requirement Create

    Hi All,
    I have looked into the system and i could not find any User Exit or BADI for creation of Transfer requirement. This is for manual creation through LB01 and not interface with PP or IM. I am aware of the Userexits available for those, but i could not find any for WM TR Manual creation.
    Let me know if you are aware of any.
    Thanks
    Jithin

    When you create a transfer requirement, i want to make it mandatory to enter the destination bin, for example. The Transfer Requirement should not be saved if it is not entered.
    I know we can do this by creating multiple movement types for each destination, but i want to know if there is a way where the user can enter the destination when creating a TR with a single movement type.
    Jithin

  • Transfer Requirement not getting created

    Hi All,
    My query as below;
    Production order is created using KANBAN (Control Cycle/Supply Area is defined) using classic KANBAN.
    WM is in place and all the setting related to TR/TO creation for WM movement type 103 is in place.
    When i am trying to receive this Production after completion it is not creating the TR/TO, while as material document is getting generated and shows the stock directly in interim storage type 901 without creating TR and TO.
    Further i checked there is indicator in Production order i.e "Kanban indicator" that gets checked automatically when Production order is created using KANBAN Processs and if i remove that indicator forcefully, TR and TO is getting created normally.
    Please provide some inputs where can be the problem and how TR and TO can be created normally eventhough KANBAN indicator is checked in Production order and where i can found the setting related to "KANBAN INDICATOR".
    Appreciate your help.

    Hi Maddy
    Thanks very much for your response.
    1. When you use KANBAN, you define separate KANBAN storage location, which is different from WM-managed replenishment storage locations, and separate KANBAN interim storage area with storage bin.
    Yes different storage location is defined which is not WM-managed in supply area.
    As you said Control Cycle is defined, see if the interface is properly defined for both of these Sloc.
    Where i can check whether interface is properly defined or not.
    2. See if you have defined the KANBAN replenishment strategy with Control type Transfer Requirements from a Storage Location which is being controlled by WM in the Customizing for Production under KANBAN > Replenishment Strategies > Define Stock Transfer Strategies
    Actually for a material two strategies are defined like;
    1) In-house Production strategies-0003-
    supply area is defined with storage location which is IM managed.
    And when this order is completed and i am trying to receive this in WM SLOC (usally whatever SLOC we have defined in supply area it proposes that SLOC at the time of receipt but i am changing this manually to WM managed SLOC) using transaction MIGO, it is directly taking the stock to 901 interim storage type and in total the stock increases but the problem is when TR is not getting created i am not able to take this to the storage bin as per strategies defined.
    2) Stock Transfer Strategies-This is working fine and in that TR/TO is working fine.
    3. For TO to get created automatically by the system from the transfer requirement, see if an indicator Automatic TO creation in the replenishment strategy is set or not. Yes this is set for stock transfer strategies but i didn't find option to check the TO creation automatically for in-house production strategy
    4. Also, check that you have set up a suitable replenishment movement type for KANBAN in the Customizing for Warehouse Management under Activities > Transfers > Define Movement Types (i.e.standard is 350 for KANBAN replenishment)-Yes this is also defined correctly.
    Appreciate your more inputs on this.

  • Creating transfer orders based on transfer requirements

    Hi,
    I have a requirement to create a transfer order based on a transfer requirement and also in that transfer order I need to specify the SSCC pallet number as Storage Unit Number.
    I have searched the SCN and found that I should use FM L_TO_CREATE_TR. I also see that I should fill import structure it_trite with storage bin related data.
    I am on a 46C system and I do not have the it_trite structure. I have seen comments that it exists in 45B and I also see it in ECC6 systems.
    I cannot find any related notes on OSS.
    Can someone confirm that 46C should not have this import structure? How am I supposed to specify storage unit number if that import structure is not there? Are there alternative FM's I can use?
    best regards,
    Glenn

    A solution has not been identified...query closed.

  • Urgent :--------- Transfer Requirement creating for the delivery

    Hi Gurus,
    For a Delivery document Transfer Requirement and as well as Transfer Order is creating,
    Based on Transfer Order picking was happening in the WMu2026 the PGI for the delivery and Billing properly is happening.
    But Open Transfer Requirements are laying for each delivery document, here source is respective storage type and bins and destination storage type 916 and bin is delivery number.
    Please suggest me how the it is happening where we did configuration mistake.
    Regards
    madhu

    Hi,
    I think you set TR creation indicator for IM mvt 601 (reference mvt) under SPRO > LE > WM > Interfaces > IM > Define Movement Types - LE-WM interface....
    Please check it. If it is set delete it.
    BR
    Csaba

  • FM to create a Transfer Order from Transfer requirement

    Hi all,
    Can you please send me the FM to create the TO from Transfer requirement No with some code.
    Thanks & Regards,
    Sreeman

    Hi
    Use the fun module
    L_TO_CREATE_TR
    for your requirement
    see the std programs where it is used and do accordingly
    LLCMBF23
    LLSAMF0R
    RLAUTAT0
    Regards
    Anji

  • MIGO 101 -- create one transfer requirement (TR) for several GI postings

    Hi,
    here is a problem I want to solve:
    - When we are receiving our finished goods we do several (consecutive) postings, e.g. 2x50 for a total of 100.
    - The total (100) is managed in one batch.
    - Currently we get one transfer requirement (TR) for each GR posting
    - Instead we want to cumulate all quantities posted into one TR (in order to create one transfer order from it).
    Is there a standard SPRO setting for this?
    Is there a user exit for this?
    Thanks for any hints / ideas.
    Andreas

    The problem was resolved.
    Thanks in advance

  • Bapi for create transfer requirement   - LB01

    Dear friends:
       Is there BAPI to create transfer requirement?
       Thanks!
       Regards
       Samuel

    hi
    good
    try this
    BAPI_FIXEDASSET_OVRTAKE_CREATE BAPI for Legacy Data Transfer                                            
    BAPI_INTERNALORDER_CREATE      Create Internal Order From Transferred Data                              
    BAPI_PDTRANSCO_CHECKACTINPUT   Plan data transfer: Check activity input                                 
    http://www.planetsap.com/LIST_ALL_BAPIs.htm
    thanks
    mrutyun^

  • Bapi for create transfer requirement

    hi!
    i am looking for bapi to create transfer requirement?
    thanks
    regards
    yifat

    Hi,
      There is a function module for this:
    FORM create_tr USING p_l_squit
                   CHANGING p_subrc
                            p_tanum.
    *clear the variable which will store transfer order numner
    CLEAR p_tanum.
      CALL FUNCTION 'L_TO_CREATE_TR'
        EXPORTING
          i_lgnum                        = ltbk-lgnum
          i_tbnum                        = ltbk-tbnum
          i_squit                        = p_l_squit
          i_tbeli                        = p_l_squit
          i_bname                        = sy-uname
          i_commit_work                  = c_x
        IMPORTING
          e_tanum                        = p_tanum
        EXCEPTIONS
          foreign_lock                   = 1
          qm_relevant                    = 2
          tr_completed                   = 3
          xfeld_wrong                    = 4
          ldest_wrong                    = 5
          drukz_wrong                    = 6
          tr_wrong                       = 7
          squit_forbidden                = 8
          no_to_created                  = 9
          update_without_commit          = 10
          no_authority                   = 11
          preallocated_stock             = 12
          partial_transfer_req_forbidden = 13
          error_message                  = 99
          OTHERS                         = 14.
    Assign sy-subrc
      p_subrc = sy-subrc.
    ENDFORM.
    regards
    Aveek

  • Creation of transfer orders using reservation

    Hi,
    We have requirement to create a transfer order against goods movement reservation. In standard SAP, the transfer orders get generated only after posting goods issue for reservation. However, we need to create transfer orders first so that we can print the pick list first and the post the goods issue against those reservations.
    I know this is possible for outbound delivery. However, I have tried all ways to do this for reservation and could not find solution.
    Please help.
    Thanks,
    -Shekhar

    i have a similar requirement. I have not come across any solution to it in Standard. Then i opted for ABAP. Found a BAPI for the creation of TR and TO. the better option is the creation of TR rather then creation of transfer order. the user will be confirming the source storage bin where as the destination storage bins will be assigned based on the movement type.
    Once we have the movement type in reservation, we will create a transfer requirement with the respective requirement type. Destination storage bin will be defined by the movement type (or based on any configuration that you may have done).
    this will be used to create a transfer order where the user will be able to opt for the source storage bin.
    Hope this will be of any advantage to you.

Maybe you are looking for

  • How to use elapsed time function with state machine in Lab VIEW

    Hello I've been trying to use state machine with elapsed time function in order to sequentially start and stop my code. The arrangement is to start the code for 1 minute then stop for 5 minutes. I've attached the code, the problem is when I place the

  • IPod Touch not being recognized in iTunes

    Hello Apple Discussions, my name is Wong Meng. iPod Details: iPod Touch 4G FW: 4.2.1 I just ran across a problem with my iTouch where it would be recognized in Windows under My Computer, but iTunes would freeze and lag when it loaded when my Touch wa

  • User did not respond

    I cant believe that mac has this problem i wish i would have read this problem here before i spent all this money on the mac. I have the new macbook in Qatar(middle east) with a speedtouch 536 and the linksys wrt54g wireless router. I have tried ever

  • How do I get my account to be available in a store

    When I try to update my items or actualize my items under App Store, I get a message that says "Account Not in this Store"  "your account is not valid for use in the Honduran store.  You must switch to the US store before purchasing."  How do I resol

  • USER NAMES LIST BASED IN A QUERY

    Hi I want to create a user names list base in a result of a query. I must give access to specific users which are in table, this table is for accesing to the oracle portal. But for defining what users must have access I need another table which conta