Create Purchasing Requisition from IW31 - BADI, user exit
Hi
I need to do changes to purchasing requisition which is getting created from IW31.
Is there any BADI, user exit etc. I can use?
Hi Elena,
Try these user exits.
CNEX0013 Order: Cust. enhancement: Default item category comp. a
CNEX0026 Customer enhancement for general inspection of material
CNEX0027 Customer enhancement: Plant, storage loc. finding for c
IWO10004 Maintenance order: Customer check for order completion
IWO10005 Maintenance order: Cust.-specif. determination of profi
IWO10006 Maint. order: Fcode exclusion through cust. enhancement
IWO10007 Maint.order: Customer enhancement - permits in the orde
IWO10008 Cust. enhancement: Determination of tax jurisdiction co
IWO10009 PM Order: Customer Check for 'Save' Event
IWO10010 Maint. order: Cust. enhancement for determining WBS ele
IWO10011 Maint. order: Customer enhancement for component select
IWO10015 Maintenance order: F4 Help for user fields on operation
IWO10016 PM Order: Cust. enhancement to check operation user fie
IWO10017 Determine external order number by customer logic
IWO10018 Maintenance order: User fields on order header
IWO10020 Maintenance order: Automatically include task list
IWO10021 Automatic task list transfer when creating order from n
IWO10022 Determine calendar from user exit
IWO10023 Service order: Change header data for advance shipment
IWO10024 Service order: Changes to items for advance shipment
IWO10025 PM/SM order: Finding responsible cost center
IWO10029 Inclusion of bill of material in PM/SM order
IWO10030 Preset Fields for Event Object
IWO10031 Hide personnel number in PM/SM order
IWO10033 Customer-Specific Authorization Check Maint./Service Or
IWO10034 Operation status based on the status of capacity reqs
Regards,
Vijay
Similar Messages
-
Creating Purchase Requisitions from within PS (ie from network)
When creating purchase requisitions from within Projects Systems (ie activating them from a network) is there a "standard" way to put a cost center on the Purchase Requisition? Currently no cost center is put on the account assignment. We are looking at doing a custom field on the network header to hold the cost center and then a user exit to take this cost center and put it on the purchase requisition (and reservations) but before we go to all this trouble thought maybe I should check to see if I am missing something obvious? Is there a more straight-forward way to accomplish this? We know that we cannot edit the account assignment in ME52N becuase the PR originates from the network and therefore can only be changed from the network.
Any input welcome. Thanks.Dear Laura,
When you will create Purchase Requistion through Network, system automatically takes account assignment category as "N" i.e Network. This you can not change in ME52N transaction.
So this is a standard practise for generating Purchase Requistion through Network in PS Module.
As you said putting Cost Center in Network Header as a Account Assignment Category which will go up to PO creation by using some User Exit which will not be possible in PS Module as per my knowledge is concern.
But you want to keep Cost Center as as a Account Assignement Category you need to create manual Purchase Requisition through ME51N transaction.
Hoping this will be useful to you.
Regards,
Sandeep -
Purchase requisition release procedure through User-Exit
Hi Workflow Guru,
I have a requirement to configure purchase requisition workflow . the workflow should trigger through release strategy.
The approver should determine through user-exit and the approver should determine based on value and quantity and that can be define in user-exit. as per my knowledge the value should mantain in SPRO-Release procedure. Please clarify me is it possible through user-exit. I am worked on user-exit for release procedure based on purchasing group.
Thanks in advance.
Regards,
Ranjan TiwariHi,
There is BADI ME_REQ_POSTED
in method POSTED you can write your code to trigger the workflow and get the information related to release strategy and
Purchase requisation .
for more than one PR use below logic .
LOOP at im_eban into gwa_im_eban .
concatenate gwa_im_eban-banfn gwa_im_eban-bnfpo into gwa_objkey .
add data into container -----------------
gwa_event_container-element = 'PurchaseRequisition'.
gwa_event_container-value = gwa_im_eban-banfn.
append gwa_event_container to gi_event_container.
clear: gwa_event_container.
gwa_event_container-element = 'ItemOfRequisition'.
gwa_event_container-value = gwa_im_eban-bnfpo.
append gwa_event_container to gi_event_container.
get the other details and create event to start workflow .
select single * from eban into lwa_eban where banfn = gwa_im_eban-banfn
and bnfpo = gwa_im_eban-bnfpo .
if sy-subrc <> 0 .
call function 'SWE_EVENT_CREATE'
exporting
objtype = 'BUS2009'
objkey = gwa_objkey
event = 'zcreated'
tables
event_container = gi_event_container
exceptions
objtype_not_found = 1
others = 2.
ENDLOOP .
Hope this will resolve your issue.
Thanks and Regards,
Deepanker Dwivedi -
Create purchase requisition from Sales Order
Hi,
Is there a transaction to convert directly a sales order into a purchase requisition or even purchase order?
When our sales orders are too big our suppliers send the material directly to our customers and right now we do the PO manually.
Best Regards,
CarlosGoto VOV6 and assign SLca CS with Order type for PR
Goto IMG>SD>Sales>Sales Documents>Sales Document Item > Assign Item Categories - Assign TAS to the Sales document
IN material master, Assign the Item category group (BANS)
Create a sales order, and upon saving in shedule lines you can see that the PR is created.
Maintain a source list and a vaild info record for the material vendor combination
Run ME59N, which will automatically converts the PR to PO
Award points if helpful -
Creation of purchase requisition from Webdynpro Java
Hi all,
I have a requirement that i should create purchase requisition from webdynpro java. i imported all required BAPI in the webdynpro. But i am not getting what should i have to give as input paramater. I have imported the Bapi_Requition_Create. Please help me on thin what sould be the input parameter i should pass.
Regards,
ShreeharshaShreeharsha,
you can check out the fm inse37 and see what are the importing and tables parameters
Thanks
Bala Duvvuri -
Make item to create Purchase Requisition and Work Order
I have a requirement for a Make item to create Back to Back Purchase Order from Sales Order. At the same time, need to create Work Order from Sales Order for the same item. I have done all setups for Back to Back order and able to create Purchase Requisition from Sales Order line. But how to create Work Order. What are the setups to achieve this? Thanks
Ajith_Kz; Consultant wrote:
I have a requirement for a Make item to create Back to Back Purchase Order from Sales Order. At the same time, need to create Work Order from Sales Order for the same item. I have done all setups for Back to Back order and able to create Purchase Requisition from Sales Order line. But how to create Work Order. What are the setups to achieve this? ThanksI guess it can't be done..when u say u created a purchase req?i was just wondering how did the system let u to create a POR when you say it is a make item?
HTH
Mahendra -
Purchase Requisition from CRM Service Order
Hello Everybody,
I am trying to create Purchase requisition from Service Order for Service(Material type DIEN) as well as Material (Material type HAWA). I have maintained all the necessary configuration in CRM as well as ECC, like in CRM, Logistic integration we maintained settings for Purchase requisition and in ECC we have maintained Document type and schema for the purchase requisition.
For information purpose, I have created Service Material in ECC as DIEN and item category group as LIES.
As soon as we save the Service Order in CRM with that item category, it should create Purchase requisition in ECC and the document flow in CRM should get activated.
Currently we are not able to create Purchase requisition in ECC.
Kindly let me know if theres any configuration settings missing in CRM as well as ECC or if note to be applied.
Best regards,
Anup BansalHi Anup,
I am facing purchase requisition creation problem for service products from crm.
I have seen your query which was posted on same issue, so i thought i could get some help.
The problem here is when i am saving the service order i am getting the below message.
Enter a (default) purchasing group for material group SUB_MC (Notification E CRM_SRV_LOG_EXT_OLTP 002).
I have actually downloaded mat_dien materials from ecc to crm and for material purchase group is already assigned for one plant, but still not able to recognise.
Please help me out.
Thanks in advance. -
IW31-Create Purchase Requisition automatically from PM order - Release 5.0
Dear Experts,
Currently we are working in the 4.6C Release but we are doing the migration for 5.0. In PM, in the 4.6C release when we
create a PM Order in tcode IW31 we select a component and the system shows us the screen to inform the quantity and
automatically the system shows us a screen to Create Purchase Requisition where we can fill or select some fields.
However, when we create a PM order in the 5.0 using the same tcode, the same material type, the system creates
automatically the Purchase Requisition without to show us the screen to fill or select the fieds. I´ve checked the customizing
comparing the systems but I couldn´t find something.
I was wondering If you could help me with this issue?
If my comments are not enough to understand me, please let me know...
BR
ValdevairDear friend,
Do check configuration node at
plantmaintenance and custonmer service - maintenance and service processing -maintenance and service orders - functions and settings for order types - define change documents,collective pur.requisitionsindicator,operation no.interval
here for your order type and plant , check whether generation of PURCGHASE REQUISITION from maintenance order settings.
there will be three options
1) never
2) from release
3) immediatly.
hipe this will help you.
Regards,
pardhu -
BADI-User exit required for updating Purchase order header field -IHREZ
Hello All,
We have requirement in our business to update the purchase order header field "our reference" EKKO-IHREZ with some text field. We need a BADI/user exit that can be used for updating this field . We have checked the BADI ME_PROCESS_PO_CUST and unfortunately we are not able to use this BADI as it getting triggered in enjoy SAP transactions ME21N , ME22N etc. We are not creating the purchase order manually and we are using ME59N for creating Purchase order . Hence we are looking for some user exit/BADI that can be used in ME59N for updating the purchase order header field IHREZ.
Thanks in advance for your immediate response .
With regards,
Joseph Anand BTRY using the exist u2022 EXIT_SAPLME59_001
You can also later on add this field by BAPI_PO_CHANGE -
How to create a purchase requisition from the EP
1. How to create a purchase requisition from the EP & What are the pre-requiste?
Hi,
You need to create a SAP transaction iview for purchase requisition transaction and link it to the role and to the user to view purchase requisition transaction.
First you need to create a system in portal to link to the R/3 system. For creating system check this link.
http://help.sap.com/bp_epv260/EP_EN/documentation/EP/N03_BB_InstallGuide_EN_US.doc
For linking portal with R/3 and view the Purchase requisition check this link
Configuring EP for connecting to SAP R/3
Regards
Arun -
BADI / User exit for Purchase order(ME21N) after saving the document
Hi expert,
I need the BADI / User exit for Purchase order(ME21N) after saving the document
This is for email sending after create the purchase order so PO document number will be the import parameter
pls help me
point will be reward
Regards,
GaneshHi Ganesh,
Could you please share your solution?
Thanks.
Hoops
Edited by: Hoops on Jun 13, 2011 10:51 PM -
BADI / user-exit for MD02 while creating Schedule Lines
Hi experts,
I have a problem with implementation that I'm designing.
Current situation:
While MRP run (MD02 or background) new Schedule Lines are being created in reference to MM Scheduling Agreement.
Example:
04.08.2014
SchLne
5500000415/00010
200
04.08.2014
IndReq
VSFB
200-
05.08.2014
SchLne
5500000415/00010
300
05.08.2014
IndReq
VSFB
300-
2 Schedule Lines where created - for wuantity 200 and 300.
Target:
There is a need to create more than one Schedule Line per day during MRP run. According to example there should be for example 2 Schedule Lines in 04/08 and 3 Schedule Lines in 05/08 all for quantity = 100. There is possibility to change Schedule Lines in ME38, but there is a need to make a change during creatin while MRP run.
04.08.2014
IndReq
VSFB
200-
04.08.2014
SchLne
5500000415/00010 *
100
04.08.2014
SchLne
5500000415/00010 *
100
05.08.2014
IndReq
VSFB
300-
06.08.2014
SchLne
5500000415/00010 *
100
06.08.2014
SchLne
5500000415/00010 *
100
06.08.2014
SchLne
5500000415/00010 *
100
So instead of creating only 2 Schedule Lines, MRP should create 5.
I'm looking for a BADI/user-exit to edit Schedule Lines which are to be created by MRP and change it tn reference to the needs.
I found only one BADI:
BADI: MD_CHANGE_MRP_DATA
method: CHANGE_MDPSX_MDBS
The priblem is that this method is only being executed when there are Schedule Lines which already exist.
Maybe some of you have done some extension similar to mine? Please give me advice where I should put extension.
Thanks in advance!Dear Saravaran,
Thanks for the reply.
This will not suits to us. The provided BADI will works upto Posting the material document in transaction MIGO and it will not considered for the FI level entries.
Hope you could have understand mine requirement.
The requirement of mine is:
While doing the GR with ref to PO the material documnet will be posted and subsequently FI documnet will be generated in Background. While generating the FI document i need to manipulate the values for the G/L. So that the manipulated values will be flow into BKPF and BSEG tables.
Thanks.
Regards
Swamy -
How To Restrict Users To Only Create Purchase Requisitions with Item Catalog?
Hi, everyone
Please help me,
How To Restrict Users To Only Create Purchase Requisitions with Item Catalog? is it possible?
Regards, ManuelHi Steenie Norman
First click on the text item ---> Tools ---> Property Pallete ---->
and change the Keyboard State to Local Only also this Depend in your OS
hope this useful ....
Regards
Mohammed -
Creating Purchase Requisition/Order from a CRM Service Order
Hello,
My client is using CRM 4.0 with Service Industry add-on.
I am trying to kick out a purchase requisition from a service order, but does not go through.
The Service Order is released in CRM and an internal order does get created in R/3. The material that I am using is a service product (defined in R/3 and used in CRM) and I trying to procure External services.
All the requisite configuration in CRM and R/3 have been done.
I get an error message E06 436 (In case of account assignment, please enter account assignment data for Item).
Would appreciate any feedback in this regard.Hi,
I am working on the some scenario. Based on the limited documentation, it appears that you have to create a service master in R/3 that is than replicated to CRM (object SERVICE_MASTER). I did this, and this works. However, I am facing the issue that there is no sales data assigned to the service product in CRM, while you do need this (service order is not complete).
I hope that I will have an answer for this, and then I think that it should work.
The PO that is created in R/3 will contain an item with item category D and account assignment F (in our case, as we work with internal orders as account assignment object).
The receipt of the service provided will then be posted by means of a service entry sheet in R/3. -
BADI/User Exit for custom table update from Delivery
Hi
Our requirement is to update a custom table with the delivery number and other related details when the picking status is changed to "C". Kindly suggest BADI/User exit for this requirement .
Thanks in Advance for your immediate help .Hi Joseph,
See SAP Note 415716 - User exits in delivery processing. It says when you have the document number available, what is permitted, what not, ....
I hope this helps you
Regards
Eduardo
Maybe you are looking for
-
How to run Java Card Program in a Simulator
I m Narendra Reddy studying in India and have taken Java Card for my B.E. final year project. i also acquire knowledge of Whole Java Card Development Life Cycle but i found much more difficulties to implement those ideas into java card. so, Will you
-
Every time I rotate my phone from portrait to landscape and back again the view has jumped up about 3 screens--say for instance I'm reading a message board, and I rotate to landscape to view a picture, when I rotate back I'm looking at comments way h
-
Need your advise on ehp1 bpm task ui type
hi, we are in the procedure of building a workflow template based on ce ehp1 bpm platform, when i setup the task ui, i met the following problem. i can not use the abapwebdynpro as the task ui. So my question is, can the abap webdynpro be used as th
-
Inserts Do not go to Indicator in Timeline
When I select the "Insert" button in the Source Panel, the clip (which has "in" and "out" points) does not go to the correct spot in the sequence timeline. But rather, it goes to a spot earlier in the sequence (where the timeline indicator IS NOT).
-
Configuring the listener behind a firewall
We are setting up a database server behind a PIX firewall router. The PIX remaps IPs into internal IP addresses so inside the firewall the host IP will be 10.0.0.x for instance. Has anyone been able to make this work so that a listener inside the fir