Create STO,Delivery and PGI delivery from an interface

Hi,
We are using a third party WMS system to manifest and ship orders froma  distribution center to a store. The only data that is going to come into SAP is the Bill of Lading as to how much has shipped for a material to the store from the DC. This has to drive a Stock transport order cycle of creating an STO, create and PGI delivery. As we are building the interface,  I am a bit confused as to how we can make all this happen from one data feed.  Since there is only one feed and it has to trigger mutliple processes should we trigger multiple idocs (different types) to trigger the STO creation, create the delivery and PGI it (Delivery 03 idoc)?
Will it be too cumbersome to build all this logic in the interface?
Another option would be to create the STO using the feed, then run VL10B in a given time interval (Background) to create the delivery.
However, I am not 100% sure how you can spawn off a PGI job? Even if I were to run the VL02n program in the background how can I populate the pick quantity?
Any insight would be very useful.
Thanks..

My assumption is just you need to adopt delivery qty as pick qty.You are not doing any TR ,TO as your ware house is third party managed.
you need to define the picking form EKOO to your shipping point type and then the quontity will copy
You can do it in the difintion of the shipping point, you have to difine send time = 4
I will explain how need to  set up this automatic picking, and then you can
work backwards from there. The automatic picking you are experiencing
is actually related to the output type EK00 assigned to your shipping
point.
Consider the following two setup steps which will result is automatic
picking:
Set the output type to EKOO, in the print picking list of the shipping
point in customizing.
Make sure the parameters below are set:
Message Language
Number of Messages
Send Time <<<<<<<<<<< this must be set to 4 (send immed)!!
Transmission Medium
1) you have to set the parameters for EK00 in the shipping-point-
maintenance in customizing:
-> Enterprise Structure
-> Definition
-> Logistics Execution
-> Define, copy, delete, check shipping point
2) as second step you define the shipping-print-parameters in
customizing:
-> Logistics Execution
-> Shipping
-> Basic Shipping Functions
-> Output Control
-> Define print parameters shipping
-> Shipping (Spec.case)
Therein there should be an entry for every shipping-point, where
you like to use the picking-list EK00!
If you have 1 & 2 setup for a particular shipping point you will
experience the "automatic" picking of deliveries.
and finally picking storage  location determined as per storage conditions maintained in material master.

Similar Messages

  • While creating sales order I am getting  Sanctioned party list blocked  but I am able to create delivery, and PGI

    Dear GTS Experts,
    While creating sales order I am getting  Sanctioned party list blocked, but I am able to create delivery, and PGI.
    Where Is the wrong ?
    Thanks a lot
    Venu gopal

    Dear Venu
    Based on your message shown in the system, can you check the field in Control Settings for System Reaction in the Document type settings via Application Levels in the feeder system. This Field '' System Response in Feeder system if SAP GTS fails'' should be maintained with ''A''. I think in your case it could be 'Blank'' Thats why the system is allowing you to create the subsequent documents accordingly.
    Please let me know if any further inputs required.

  • Delivery and PGI

    Hi Gurus,
    Can any one help me in this regard. what is Exactly difference between Delivery and PGI? As well as explain me in functional.
    Thanks in advance.
    Regards
    Dwaraka

    Dear Dwarak,
    the creation of delivery means that you create the delivery document but there is no goods movement yet. After creation of delivery the requirements of the sales order will be removed from the sales order to the delivery, but the goods are still on your plant. The delivery has its own availability check (whoch works on other levels than in the order, for example you can do ATP-check on the batch level). oreover during delivery you can pack your material via Handling Units. There are also some other processes which are running during creation of the delivery.
    The last process is the book of the goods issue. At this moment there is a real goods movement, requirements of delivery will be deleted and the goods leave the plant.
    You have a possibilioty to finish a delivery process by a normal goods issue (with the goods movement), but you can do it also by another way (confirm service), of you deliver not the reals goods, but, for example, you deliver a service.
    I hope, this explanation will help you a little bit further in understanding the delivery process.
    Kind regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • DELVRY01 to preform both Delivery and PGI

    Hi All,
    Can i use the basic type DELVRY01 to do both Delivery and PGI.
    If yes, what additional inputs i need to provide.

    hello again.
    the 15/02 line item remains open because it was not copied into your delivery document.  what you entered in the delivery, the system interpreted as a manual entry and not as an item from your order.
    despite the order giving a schedule line of 15/02, you were still able to enter the same material in your delivery manually.  this could be because of the availability of stocks which have not been reserved for other orders.  if there are enough stocks, you will be able to post goods issue (you can even specify goods issue date, within the opened posting period).  the 'complete' status of picking and goods issue refer only to the delivery document and not of the items in the order.
    the system also treats your manual entry as a sort of 'overdelivery', meaning this is in addition to your order quantities.  despite your manual entry, the system will still bill your customer based on actual deliveries.  overdelivery is allowed unless you prohibit this in configuration and perhaps copy control.
    for you to complete the status of the sales order, you need to either reject the 15/02 item, or to create another delivery with reference to the order but this time specifying 15/02 as delivery date.
    hope this helped you.
    regards.
    Edited by: jonathan yap on Feb 14, 2008 11:45 AM

  • STO with and without delivery

    Hi All,
           sorry for troubling you all again. last question on STO.
    1) when STO is required to be with delivery only then only we use IMG > step up stock transport order> Assign Document Type, One-Step Procedure, Underdelivery Tolerance
    there is no need to assign document type in the step--> Assign Document Type, One-Step Procedure, Underdelivery Tolerance,  if it is without delivery in step --  ?  is it like this?
    i created a document type <b>zubd</b> by copying the std UB. and did the setting in the STO with the help of SD consultant.
    i assigned the new STO document type  ZUBD in step
    Assign Document Type, One-Step Procedure, Underdelivery Tolerance
    now when i am trying to assign document type UB in the step;
    Assign Document Type, One-Step Procedure, Underdelivery Tolerance
    <b>the system is giving me error message : an entry already exists with the same key</b>
    am i right if i make the interpetation for STO with and without delivery like this:
    1) for STO without delivery there is no need to do IMG in the step Set up stock transport order. we can use the std doc type UB or the one created by copying UB.
    2)  for STO with delivery we have to do the settigs in IMG for set uo stcok transport order
    thanks and regards
    Kavita

    Hi Kavita,
    You are Right,
    Assign Document Type, One-Step Procedure, under delivery Tolerance
    In this step, you define which document type is to be used for a certain combination of supplying plant and receiving plant.
    <b>There is no need to maintain IMG setting forStock Tranfer Order  Without SD delivery</b>. because main moto of assignment of Document type is to specify which delivery type is to be used.
    for this we allready maintain IMG setting before this srep >Assign Document Type, One-Step Procedure, Underdelivery Tolerance at
    <b>Assign Delivery Type and Checking Rule</b>:
    In this step, you specify whether an SD delivery is to be created in the case of a PO with a certain combination of supplying plant and document type. You can also specify which delivery type is to be used.
    The delivery determines how a delivery is handled.  I.e. stock transfers without a billing document or for stock transfers with a billing document.
    Regards
    Sanjay l

  • Stock transfer order (STO) Without delivery and With delivery?

    Hi experts,
    Could any body explain step by step procedure
    Stock transfer order (STO) Without delivery and With delivery?
    Thanks
    Reddy

    Hi
    Stock Transport Order Without SD Delivery.
    U dont have to maintian sales view for the materials.
    1. Extend the material to those 2 plants.
    2. Create UB purch document.
    3. Goods issue wrt to the STO in the supplying plant ( 351 mvt type).
    4. Good Receipt in the receiving plant ( 101 mvt type ).
    5. Invoice verified (MIRO).
    U should have specific pricing procedure for STO. In MEK0 u have to choose the appropriate pricing procedure with the accrual key linked for freight charges.
    Vishal...

  • Outbound delivery and pgi without sufficent stock

    Hi,
    I would like to know few things regarding.
    1. Can we process outbound delivery and PGI without having sufficent stock.
    2.if yes than what will be the status of document flow.(when i did it system showed  following message, sales order-being processed,outbound delivery-being processed, and conformaton of service-completed.
    3.if we can not do pgi and delivery without sufficent stock than what is alternative for the same.
    Kindly reply as soon as possible.
    Thnaks
    Rahul

    1)  Yes.  It is based on your item category like TAX, you can post the goods issue and system will not check for stock availability.  It is also subject to other parameters like
    a) ticking the Negative stock field in material master
    b) ticking the box for your Valuation area in OMJ1 etc
    2)  As I said above, if you use item category TAX and do PGI, then in document flow, you can see Confirmation of Service against this delivery document
    3)  Stock should be made available
    thanks
    G. Lakshmipathi

  • Delivery and read receipts from mail - how do i do it?

    delivery and read receipts from mail - how do i do it? i used to do this on pc from outlook..... just new at this stuff... thanks

    Hmm, had a bit of a look round but it doesn't look like it's particularly straightforward, esp if you want to turn it on or off on a per mail basis:
    http://email.about.com/od/macosxmailtips/qt/et_request_recp.htm

  • Delivery and replenishment delivery

    hello all,
    I would like to know the difference between delivery and replenishment delivery. pl. let me know in which scenario replenishment delivery is used and how it is created.
    Thanks,
    Maxx

    Hi,
    Longman online dictionary:
    to put new supplies into something, or to fill something again
    Dictionary.com:
    to make full or complete again, as by supplying what is lacking
    Cambridge online dictionary:
    to fill something up again
    Well, I think in terms of SAP it is used in the same meaning: if you use a material somewhere continually (consume it continually) you need continually supply that material to be able to continue your consumption.
    In SAP you use this expression in connection with
    - storage location MRP scenario
    - fixed bin replenishment
    - KANBAN replenishment
    - generally in connection with material staging
    - etc.
    Please consider that characteristics of this processes: you "continually" produce / consume (e.g. raw) materials and that's why you need "replenishment".
    In connection with certain MTO scenario where certain raw materials are very specific and are used only once maybe there's no point in speaking "replenishment".
    The procurement of these goods seems to be a very simple process (very simple purchasing activity).
    So, I think delivery is delivery and there's no separate "replenishment delivery" type / document, a delivery becomes "replenishment delivery" because it is used for "replenishment".
    (E.g. delivery created with reference to STO can be called replenishment delivery if you provide the raw materials from one plant to another, or from one SLoc to another SLoc).
    Just my ideas..
    Regards,
    Csaba
    Edited by: Csaba Szommer on Jan 27, 2009 9:39 PM
    Edited by: Csaba Szommer on Jan 28, 2009 8:16 AM

  • Authorization for PO fields of over delivery and under delivery tolerance

    Hi,Any one know how to set authorization for PO fields of over delivery and under delivery tolerance?
    For example to allow certain user to edit the these fields but other users will be only display mode.

    Better create variant for restricting fields over & under delivery tolerance for certain users than applying authorization.

  • I created in iMovie, and extracted audio from one of the clips to use in the title sequence.  All is well, export to iDVD and it plays OK, but when I burn the DVD the audio for the titles does not play. Any suggestions?

    I created in iMovie, and extracted audio from one of the clips to use in the title sequence.  All is well, export to iDVD and it plays OK, but when I burn the DVD the audio for the titles does not play. Any suggestions?

    I am on a MacBook Pro with OS 10.6.7 running iMovie '11 and iDVD 7.1.1.  Thanks for any input.

  • I would like to create a pop-up window appear from Labview Interface. In this window, I will have a slide control and an image taken from a camera. The main VI have to run while pop-up window is open. How can I do ?

    When I pushed a button, this pop-up window has to appear. There will be a slide control and a picture from a camera in this window. Is it possible to make appear this windows while main VI Interface continue to run ? How can I do this ? Thank you for your answers.
    Cyril.

    Here you go. This is simple example. Maybe not the best way, I am just
    beginner in LV and still not comfortable with data flow that much. I prefer
    events, so I would change this to use Event Structures.
    When you click on OK button on SliderMain, it opens Slider.vi. Now both
    windows are open and you can interact with both. Now if you click on OK
    again with Slider.vi open, you run into problems. Only thing I did was
    change VI properties of slider.vi, mainly window appearance.
    vishi
    "Cy" wrote in message
    news:[email protected]..
    > I would like to create a pop-up window appear from Labview Interface.
    > In this window, I will have a slide control and an image taken from a
    > camera. The main VI hav
    e to run while pop-up window is open. How can I
    > do ?
    >
    > When I pushed a button, this pop-up window has to appear. There will
    > be a slide control and a picture from a camera in this window. Is it
    > possible to make appear this windows while main VI Interface continue
    > to run ? How can I do this ? Thank you for your answers.
    > Cyril.
    [Attachment SliderMain.vi, see below]
    [Attachment Slider.vi, see below]
    Attachments:
    SliderMain.vi ‏16 KB
    Slider.vi ‏11 KB

  • Under delivery and over delivery tolerances at prod order level

    Hi, Pls advise how to maintain the under delivery and over delivery tolearnce at production order level (other than maintaining material master)? is ther any setting at order type or order level? pls advise.

    Dear,
    Go to Co01or CO02 click on Good Receipt tab here you will get option to maintain the under delivery and over delivery tolerance at production order level. There is no other setting than this and material master.
    Regards,
    R.Brahmankar

  • Over delivery and under delivery tolarance limit.

    Hi all,
    I want to configure the over delivery and under delivery tolerance limit
    fix i.e. 5%.
    Any user can give tolerance up to 5% and not more than that.
    Please help me
    Regards,
    anant

    Hi,
    U can configure the same . Please refer
    SPRO-MM-PURCHASING--PURCHASE ORDER--SET TOLERANCE LIMITS FOR PRICE VARIANCE
    Here u can finalise the upper and lower limits as 5%. the PO shall automatically pick up the same.
    Hope this helps.
    Regards,
    Prasanna
    Award pls if helpful.

  • Problem in Creating Delivery  and PGI

    Hi Guru's
           My sales process is  Sales Order-- Delivery( PGI is not done here)- Billing-- (PGI is done after doing Invoicing)
          (1)  My user created one delivery for a quantity of ( say 100 quantity) and forgot to pick and assign batch in the delivery and created an invoice for the delivery. (Usually the system will ensure the delivery quantity and picked quantity is same when doing PGI and since we are not doing PGI before Billing the system allowed to create an invoice)
          While doing PGI the system is not considering this quantity because quantity is assigned and an excess quantity is showing in Stock Overview.how to correct this. and my situation is i cant cancel the invoice and assing the batch and do PGI.
        how to correct this quantity difference ?
      (2) Recently when doing Physical inventory they adjusted the quantity in the system by decreasing the quantity by said 100 quantity but there is a problem in doing new delivery( short of 100 quantity) because the already invoiced delivery is showing a requirement of 100 quantity. In order to do delivery they added that  100 quantity with same batch number.
             I want a solution for this please help me
    regards,
    Ravi Kiran
          I

    Hi Ravi kiran
    As your process is different so you need to go with the new sub-routine and you need to assign that   sub-routine in VTFL .then only the problem can be solved. . But if you are doing order related billing then in VTFA you need to maintain the item category . and also check the feild Overdelivery in 0VLP Then you can change the quantity in the delivery level
    Regards
    Srinath

Maybe you are looking for