Hi,
i have a CUA with a child system, but the child system has 2 clients (for exemple 100 and 200) one client for tests and the other for training.
the CUA is also a data source for our EP7's UME.
my question:
how can i create a user_test for the child system but only for the client 100 (not authorized to have access to client 200) and vice versa
best regards

>
Steve Bodell wrote:
> We have a range of child clients in our 1 single instance of CUA, our CUA sits on server with 1 other client that requires very little outage.  We have also retained the ability to do resets locally and have emergency accounts in place should CUA be down for an unexpected amount of time. 
>
> Steve
This will not work in our facility.  We have a Portal UME pointing to an ECC 6.0 (Master CUA) which is also using HR position base security.  All portal use must go to ECC 6.0 and have to have an account.  In order to properly simulate Portal and HR base position security, it is necessary to have a CUA in each landscape.
> Steve
> By having multiple clients in the same CUA instance - Dev, QA, Prod etc does not mean your users have to exist in all clients.
> Steve
True but we don't want unnecessary iDocs and also our PROD User IDs are all generated automatically via HR security (IT 105).  It is important to make PROD to be CUA master on its own landscape and not burden it with unnecessary child systems.
Again there is a number of ways to design a CUA but putting everything in one CUA IMHO is not a good approach when you have the flexibility of multiple CUAs.  Itu2019s not difficult to built CUAs so I donu2019t really see the benefit of not having one per landscape.
Another problem we encountered is during a refresh of QA from PROD is the source client must not have any CUA reference, so if PROD is the CUA master for QA & DEV this will pose another challenge.
There are some who choose 1 CUA for everything and making Solution Manager the master, this is fine as long as they can support it.  As a consultant you can design the CUA for the customers and not have to support it.  As a customer I have lived with supporting CUAs in DEV, QA & PROD.
I only recommend CUAs for each landscape and not pushing it as the only solution.  It all depends on your business requirements and available resources.
Good Luck!
Regards,
-John N.

Similar Messages

  • Dev qas and prd set up with different clients

    good day experts,
    If I have 3 different clients in PRD, is it recommended to have 3 qas and 3 dev clients as well? For instance, 3 clients in PRD which are 500, 510, and 520; do I have to have 300,310,320 for qas and 200, 210, and 220 for dev? for we have difference configurations and settings on difference clients.
    Please suggest! Thank you in advance!

    Hi,
    It is not mandatory that you have three clients in all system. General approach is as below:
    1) Development System- Sandbox Client, Development Client, Golden Master Client
    2) Quality System- Testing Client, Pre-Production client (not require always)
    3) Production System- One Production Client (If there is any special requirement then you can create more client)
    Thanks
    Sunny

  • CUA compatibility with 620 and Netweaver

    Hi All,
    We are planning to install CUA in production
    Since we don't utilized much Solution manager 3.2. We planned to use solution Manager as CUA master / parent and NetWeaver servers 2004 as child.
    But I am not sure if we can use 620 as master and 640 as client.
    I am unable to find any notes on compatibility.
    Please help us to find any known issues and best practice guide on it.
    Thanks,
    Vinod Kaduskar

    Hello,
    I have installed CUA in the described scenario (master in SolMan 6.20, clients in 6.40) without problems.
    I prefer the SolMan as CUA master because it is the central admin system (RZ20, CCMS, ...).
    There are some restrictions in LAW (license admin workbench). You have to upload the data of other clients via file. RFC is not possible, if LAW runs in 6.20.
    Best regards
    Rainer

  • What is the average duration of 1 full SAP life cycle or 1 end-to-end implementation. How long does it take to prepare DEV, QAS and PRD?

    What is the average duration of 1 full SAP life cycle or 1 end-to-end implementation. How long does it take to prepare DEV, QAS and PRD in any company?

    Anand,
    let me start with saying that the question you ask may not help you to determine the duration of your project. As Ryan and others stated the duration of the project is highly dependent on the scope of the solution you are implementing, geographical scope, amount of modifications/enhancements, number of languages, number of users that need to be trained, amount of standard processes customer is able to re-use in the implementation and many other factors (like quality of implementation contractor you will chose and availability of customer and implementors resources). I can probably go on for another couple lines, but I guess you get the idea.
    With that out of the way let's talk about some example implementations that will give you an idea - Ryan did great job outlining what I would call traditional approach above. I have couple examples where customers leveraged innovative deployment strategies that are available today. In particular the project teams leveraged pre-packaged services like RDS, World Template or Best Practices as their baseline solution and they built from there. Second acceleration technique customers now leverage is the deployment in the SAP HANA Enterprise Cloud to accelerate the time to initial setup of the system and thus move from traditional blueprinting to scope validation exercise that further shortens the time. There are other acceleration techniques we see applied in some cases like use of iterative implementation of the delta requirements on top of the baseline solution.
    Let me offer few examples to illustrate what I explained above:
    ERP implementation at Schaidt Innovations with 3 months long deployment of ERP solution using ERP RDS as a baseline (you can view their testimonial here - Schaidt Innovations: SAP ERP on HANA in the cloud - YouTube)
    Customer in Asia with global template deployment that leveraged SAP ERP for Manufacturing with deployment to cloud and 9 countries rollout (Japan, Korea, China, Taiwan, Hong Kong, UK, Germany and US). The initial deployment took 4 months for first country and 2 months for rollout into the additional 8 countries - so total of 6 months. The original plan using traditional approach with full blueprint and heavy configuration was estimated to be more than double of the actual deployment time.
    There are many other examples where customers follow the assemble-to-order delivery model for their project and gain significant benefits doing so. I suggest you to review some of the recordings we did in 2013 about this approach and if you are member of ASUG review the Agile ASAP sessions we did for ASUG PM SIG.
    Link to webinars: SAP A2O Webinar Series Schedule
    Let me know if you have any questions.
    Jan

  • PMS and Training and Event Management

    Hi Gurus,
    Our one the of the client implementing PMS and Training and Event Management.
    Could anyone suggest me what are the questions need to be asked in initial meeting with the client.
    and if anyone has configuration documents on PMS and Training and Event management please forward to me,
    my id would be [email protected]
    Regards,
    Rajesh Soma 

    The prerequisites of PMS is OM and PA is mandatory,
    PMS is just like an interaction between the manager and the employees in an enterprise, based
    On his work they are going to put some rating etc.
      In the standard system employee called as “Appraise” Manager called as an “Appraiser” and Manager’s Manager called as Higher level manager “Part Appraiser “ can be a self-peer & customer they can save & provide their Comments to  the “Appraiser”
    First you take the requirement form client side what are the process and how Appraisal system in client then you have to prepare one sheet like Preparation ,Planning,Process
    for business functions and other check below :-
    HCM, Performance Management (Flexible) 01 - SAP Documentation
    HCM, Performance Management (Predefined) 03 - SAP Documentation
    check below once :-
    Tcodes for PMS Basic Setting
    OOHAP_BASIC      Basic Appraisal Template Settings
    OOHAP_CATEGORY      Appraisal Category Settings
    OOHAP_CAT_GROUP Category Group Settings
    OOHAP_SETTINGS_PA PA: Settings
    OOHAP_VALUE_TYPE Standard Value Lists
    T codes for PMS Process
    PHAP_ADMIN     Administrator - Appraisal Document
    PHAP_CATALOG     Appraisal Template Catalog
    PHAP_CHANGE     Change Appraisal Document
    PHAP_CREATE     Create Appraisal
    PHAP_PREPARE     Prepare Appraisal Documents
    PHAP_SEARCH     Evaluate Appraisal Document
    start your work with above things any other post here again ......

  • I'm FURIOUS with Verizon and this is my LAST straw before I goto another company!

    I am writing this in hopes that I can resolve an ONGOING issue that I have addressed many times in the past with different levels of Verizon Wireless "customer service".  I have 1 phone call recorded(same way I am being recorded when I call in for training purposes, I do the same for ALL my phone calls) of an employee who shouldn't work at any company in customer relations let alone a GIANT like Verizon Wireless, who actually hung up the phone on me and disconnected me right about the time they were closing up because she was obviously sick of hearing my complaining.  So one Verizon associate hangs up on me and I have the transcript of ANOTHER "customer care agent" named Gina-Lynne who basically told me "oh well this is what it is and yes if you don't like it and want to go elsewhere let me give you the 800 number and their hours so they can cancel everything for you and by the way you have a 350.00 ETF but don't worry it will go down 10 bucks per month so its probably about 300 by this time". 
       That representative was my last and final straw before I leave Verizon as a whole.  My ENTIRE family is on Verizon Wireless with all new IPhones and my associates in my retail stores here on Long Island in New York, all have the new Galaxy Note and are thrilled with it and I'm getting replacement after replacement after replacement of the same GARBAGE, paper weight phones that have the same issues over and over repetitively.  I have gone through about 5-8 different replacement Blackberry Bold Touch phones before I gave up and the nice woman in customer care helped set me up with this "incredibly high speed and amazing battery life that lasts forever etc etc" with the Droid Razr Maxx HD.  I have already been through countless number of replacements of the Droid now as well and ALL I WANT IS A PHONE THAT WORKS AND HOLDS A CHARGE!   I haven't said BOO about the service issues I have been having or misled information I was given numerous times, I am a LOYAL CUSTOMER to Verizon Wireless and just want some customer service in getting me a new phone that works and not this Re-Furbished phone that I keep getting that is horrible!  I don't just use my phone for pleasure, I use it for business as well and i should NEVER be stopped from doing something at work or in my social life because my phone is constantly having issues of lagging and freezing and not browsing at all etc etc etc. 
       I NEED a supervisor or someone within the Corporate Verizon Wireless structure to call me as soon as possible hopefully this afternoon to resolve this issue.  Many companies are dying for business and want their customers happy and are now even willing to pay other companies Early Term Fees to get them on board with them.  Verizon used to be great with everything but I see them slipping MAJORLY in all aspects including phone service, 4g or lack of, and MAJORLY in customer service and knowledge regarding their own company who signs their paychecks. 
         I would like to get a different phone either a NEW high flying, high speed, long lasting battery phone if they make a NEW and improved Droid or something along those lines????  Maybe even at this point one of the iPhones which I have always hated and been against but now I see they are blowing everything away besides the NOTE but I don't like the size of the Note.  If someone could call me back so hopefully we can resolve this and I can stay a loyal customer and my family can stay loyal customers and my staff as well.  I DO NOT want to change carriers but it comes a time when you have to draw a line after being abused by the company you pay hundreds of dollars to per month and ON TOP OF EVERYTHING  they took away my employee discount because they were sending my mail to the wrong address and now I lost my 20% off and have been paying MOREEEEE for a non working phone!  This is absurd and I am hoping someone calls me today to resolve this and I can have a working phone by the time I leave work tomorrow because there is a Verizon Wireless store next to my job! 
       Thank you very much for taking the time to read this and look forward to speaking to someone as soon as possible! 
    >>Personal information removed to comply with the Verizon Wireless Terms of Service<<
    Message was edited by: Verizon Moderator

    I have the same question what time did you chat ? Just because you were speaking with someone that is representing Verizon does not mean you were speaking to a "Customer Service" agent. Customer service is only open during specific hours. After those hours the only people online is the Online Sales Department. It is very possible you were chatting with the sales department.

  • Sync contacts, calendars with yahoo and gmail

    Few days ago I lost some of my cell contacts and calendars syncronized with yahoo and gmail. I tried to resync again, reopening the account but it appears an advise telling: the contact sync coulnd't not be done, please train again later. I tried later many times but I cant. Some one has a solution????

    Few days ago I lost some of my cell contacts and calendars syncronized with yahoo and gmail. I tried to resync again, reopening the account but it appears an advise telling: the contact sync coulnd't not be done, please train again later. I tried later many times but I cant. Some one has a solution????

  • Hibernate OR EclipseLink...Which is best with Weblogic and Oracle DB?

    Hi All,
    In my company, we are using Oracle DB and Weblogic application server. So in the process to upgrade or switch to new ORM, we shortlisted two options - Hibernate and EclipseLink.
    I gathered following summary regarding both ORMs -
    Hibernate:
    1.     When you need to train people, like we are going to do next week – most of the companies have Hibernate experts.
    2.     When you hire new developers, most of them come with specific Hibernate experience.
    3.     When you need to consult with experts, both in the internet or consultants, you have LOTS of options. Endless forums and communities all regarding Hibernate.
    4.     Hibernate is an open source which has a huge community. This means that it will be improved all the time and will push the ORM market forward.
    5.     Hibernate is an open source which means you have the code to handle, and in case needed, fit it to your needs.
    6.     There are lots of plugins to Hibernate, such as validations tool, audit tools, etc. These becomes standard as well and dismiss you from impl. things yourself.
    7.     One most important thing with ORM tool, is to configure it according to your application’s needs. Usually the default setting doesn’t fit to your needs.
    For that sake, when the market has a huge experience with the tool’s configuration, and lots of experts (see point 1 and 3) – most of chances you will find similar cases and
    lots of knowledge about how to configure the tool and thus – your application.
    EclipseLink:
    1. Fully supported by Oracle. Hibernate no. In case of pb, it could be cumbersome to prove that it is a pure Weblogic one. Concretely, we will have to prove it (waste of time and complexity).
    2. Eclipse link is developed by Oracle and the preferred ORM in the Weblogic /Oracle DB world.
    3. Even if at a certain time EclipseLink was a bit late compared to Hibernate (feature), EclipseLink evolved very fast and we can consider now that they close the gap.
    4. No additional fee as soon as you have Weblogic license. You will need to pays additional fee if you want some professional support on Hibernate.
    5. We are currently relying on Hibernate for our legacy offer and are facing pb in second level cache (JGroups). Today, we are riding off this part!. Consequences are limitation in clustering approach (perf)
    6. On EclipseLink side we do succeed to manage first and second level cache in a clustering approach.
    7. Indeed Hibernate is open source, so you can imagine handling it. In reality, the code is so complex that it is nearly impossible to modify it. Moreover as it is LGPL, you need to feedback all the modified sources to the community systematically.
    8. All tests performed by Oracle concerning Weblogic are using EclipseLink. Moreover, Oracle says that some specific optimizations are done to manage Oracle DB.
    9. Hibernate comes from JBoss community.
    Right now we are preferring Hibernate but there are concerns/reasons like EclipseLink developed by Oracle and preferred ORM in Webogic/ Oracle DB world (compatibility of ORM with DB and App. server), support comparison with both ORM, which are preventing to finalize the decision.
    Please help me with you views and opinions and share you experience with us so that we can make a perfect decision.
    If you want you can also reply to me @ [email protected].
    Thanks.

    The way the ORMs are designed, integration with application servers are relatively simple, and all provides the same features. Also since WebLogic have been around for a while, all ORMs are all well tested in this configuration.
    Hibernate has lot more users, and is likely very often used with Oracle DB, so you can expect not much bug against Oracle DB, maybe even less bug than EclipseLink, which is not much used. EclipseLink does provide support for some esoteric Oracle DB features like hierarchical and flashback queries.
    OpenJPA and DataNucleus are also JPA compliant. It’s likely that Open JPA has a higher user base than EclipseLink, so less unknown bugs.
    Oracle paying support is well known to be a bad joke. It’s a negative return to use this channel, even if they would be free. So in reality, you end up to use the open (free) forum to get support.
    What’s was lacking with Hibernate before is Dynamic Fetch Planning, but they now have some support, see http://opensource.atlassian.com/projects/hibernate/browse/HHH-3414. OpenJPA was the first to implement this must have.
    EclipseLink has query in memory, which can be used, but the API do not help to leverage it, and EclipseLink’s leadership made it clear that they are not going to make it better, instead they want to push Coherence cache.
    Hibernate has an open API for second level cache, which mean you can get out of problem by using another implementation, for example, EHCache seems to be professionally tested, so I would be surprise you find obvious bugs.
    I cannot comment on Hibernate source code quality, but I can tell you that locking mechanism in EclipseLink is used to be very fragile, and many concepts are dispersed over the code base.
    The runtime monitoring of Hibernate have always been great due to the fact that JBoss have always been strong on JMX, EclipseLink has not much usable features on this.
    If I would be you, I would consider OpenJPA or Hibernate instead of EclipseLink, the main reason is that because EclipseLink has a so low user base, I have found lot of obvious bugs in production, like if I was the only user of it. Then, when I submitted bugs to the small development team, which do not encourage user base contribution, they were too busy trying to keep up adding the JPA interfaces on top of their existing proprietary APIs.

  • Copying files from local computer to a remote server which is not in Domain and with username and password?

    "I have one workstation with static IP, Wants to create batch file to log in to this,using user name and password, copy back up files from that workstation to my desktop with batch file, please help
    I am currently using batch file for back up for domain servers with robocopy commands in batch file  but one of the workstation is not in domain and has static ip , also it has username and password,
    Wants to create batch file on my desktop to log in this server---with username and password,, copy files from particular folder and paste it on my desktop in particular folder or auto create that folder,
    please help, "
    P Dave

    JRV,
    I can understand that, 1stly I am not a scripting guy, I know very very basic of this,
    2ndly, I need help , I am not asking anyone here to write code for me, I have already wrote that but its not doing which its suppose to do,
    check below screen shot, after running suggested script, it has mapped drive ,
    now I do not want to do that, I want just files to copy from that machine to my machine, and want script which I can run from any PC,
    Tried with UNC PATH as well, but not making any difference, its keep mapping that server drive to my computer
    P Dave
    JRV,
    I can understand that, 1stly I am not a scripting guy, I know very very basic of this,
    2ndly, I need help , I am not asking anyone here to write code for me, I have already wrote that but its not doing which its suppose to do,
    check below screen shot, after running suggested script, it has mapped drive ,
    now I do not want to do that, I want just files to copy from that machine to my machine, and want script which I can run from any PC,
    Tried with UNC PATH as well, but not making any difference, its keep mapping that server drive to my computer
    P Dave
    Bill - he still sees that "connection" although it isn't mapped it is attached temporarily.
    P - Log off and log back on and the attached connection will be gone.  It is temporary.   Again - knowing the basics of WIndows would let you know this.
    We have given you all of the answers that are possible.  There is no other way unless you have installed things like PowerShell and PowerShell remoting or an FTP server.
    If you do use a drive it can be just as easily deleted after you have finished the copy.
    Again: "NET USE /?" will tell you all of the options.
    Saying you know nothing is not an excuse for not thinking or looking more deeply into the suggestions made by those trying to help you.  This is not a MIcrosoft support forum or help desk.  It is a forum for admiinistrative scripting and assumes
    that those coming here are technically trained or experienced in the basics of Windows technology.
    ¯\_(ツ)_/¯

  • Need help with XML response to refresh document with context and prompts

    I've been working with the Restful api for a few weeks now and have been able to figure out most of what I need to automate testing of our reports. However, one task that I have not been able to figure out is how to refresh a document that contains both a context and two prompts for dates.
    Here is what I have tried, and what the API responds with.
    1) I queried the API for this document's parameters using the following call after logging in -
    headers = {:accept=>'application/xml', :content_type=>'application/xml', :x_sap_logontoken=>@token}
    url = "http://our.url.net:6405/biprws/raylight/v1/documents/12345/parameters"
    RestClient.get(url, headers)
    The response from the API is:
    <parameters>
        <parameter dpId="DP0" type="context" optional="false">
            <id>0</id>
            <technicalName>cQuery 1</technicalName>
            <name>Select a context</name>
            <answer type="Text" constrained="true">
                <info cardinality="Single">
                    <lov partial="false">
                        <values>
                            <value id="CTX_1">LOAN</value>
                            <value id="CTX_9">LOAN_APPLICATION</value>
                        </values>
                    </lov>
                    <values>
                        <value id="CTX_1">LOAN</value>
                        <value id="CTX_9">LOAN_APPLICATION</value>
                    </values>
                    <previous>
                        <value id="CTX_9">LOAN_APPLICATION</value>
                    </previous>
                </info>
                <values>
                    <value id="CTX_9">LOAN_APPLICATION</value>
                </values>
            </answer>
        </parameter>
    </parameters>
    2) This tells me I need to supply a context, so I then replace my RestClient.get call with a RestClient.put call with the following payload:
    <parameters>
         <parameter>
                <id>0</id>
                <answer>
                      <values>
                            <value id=\"CTX_9\"/>
                      </values>
                </answer>
          </parameter>
    </parameters>
    3) This satisfies the context portion of the refresh. The API replies with the following response, telling me I need to answer two prompts -
    <parameters>
         <parameter dpId=\"DP0\" type=\"prompt\" optional=\"false\">
              <id>1</id>
              <technicalName>psEnter value(s) for Start Date of Application Received Date</technicalName>
              <name>Enter value(s) for Start Date of Application Received Date</name>
               <answer type=\"DateTime\" constrained=\"false\">\
                    <info cardinality=\"Single\"/>
               </answer>
         </parameter>
         <parameter dpId=\"DP0\" type=\"prompt\" optional=\"false\">
                <id>2</id>
                <technicalName>psEnter value for End Date of Application Received Date</technicalName>
                <name>Enter value for End Date of Application Received Date</name>\
                <answer type=\"DateTime\" constrained=\"false\">
                    <info cardinality=\"Single\"/>
                </answer>
          </parameter>
    </parameters>
    4) Here is where I am having problems. I have tried all kinds of permutations of the below payload/response body. All I ever get from the API is a 400 - BadResponse error.
    <parameters>
         <parameter>
              <id>0</id>
              <answer>
                   <values>
                        <value id=\"CTX_9\"/>
                   </values>
              </answer>
         </parameter>
    </parameters>
    <parameters>
         <parameter type=\"prompt\">
              <id > 1 </ id>
              <answer type=\"DateTime\">
                   <values>
                        <value>2012-06-11T09:50:54.000-04:00</value>
                   </values>
               </answer>
         </parameter>
         <parameter type=\"prompt\">
               <id > 2 </ id>
               <answer type=\"DateTime\">
                    <values>
                         <value>2014-07-11T09:50:54.967-04:00</value>
                    </values>
               </answer>
         </parameter>
    </parameters>
    I am not very good with XML and the terminology around it, and I haven't received much training around using the Restful API other than the SDK documentation. I have a feeling there is something very basic that Im missing here. What is the correct XML needed in the response body to properly refresh the document?

    If you are more confortable with JSON, Raylight supports it as well.
    Best regards,
    Anthony

  • Pulse Generation application with DAQmx and a PXI-6624 module?

    What is the best implementation method for the following pulse generation application
    using LabVIEW, DAQmx and a PXI-6624 counter\timer module?
    I have two rising edge trigger signals (Trigger-1 and Trigger-2).
    There is ample spacing between each trigger. They never occur at the same time.
    I need to generate a single pulse (fixed width, variable delay) whenever Trigger-1 occurs and
    a finite pulse train (fixed width, variable delay, N-pulses) whenever Trigger-2 occurs.
    However, the output must appear on one counter output because this composite signal
    will be used as a trigger source for another PXI module in the rack.
    With DAQmx and a TIO counter\timer can I use both the GATE (for Trigger-1) and
    AUX (for Trigger-2) at the same time on the same counter to gate out the desired pulses?
    Trigger-1 would be wired to the GATE of CTR0. One Trigger-1 event would generate one pulse on the output of CTR0.
    Trigger-2 would be wired to the GATE of CTR1 and the output of CTR1 would be routed to the AUX input of CTR0.
    One Trigger-2 event at the GATE of CTR1 would generate multiple pulses on output of CTR0.
    Would DAQmx and the PXI-6624 TIO support this implementation?
    What is the best way to accomplish the task at hand.
    Thank You.
    Best Regards,
    Scooby

    Hi Scooby,
    I have looked into the application you have described and I see a potential problem with what you describe.  In DAQmx, it is not possible to call the counters of the same DAQ device in the same task, so you cannot have the finite pulse train generation and the single pulse generation tasks running at the same time.  What you can do, since you mention the triggers will not occur at the same time, is to stop one counter task while you are triggering another.  The way I would suggest you merge the outputs is with a two input Or logic gate to avoid damaging your counters.  Your signals will effectively be added together by this logic gate.   I do not see any way to merge the outputs internal to the DAQ device. 
    Please let me know if I can be of additional assistance.
    Laura

  • FREE SOFTWARE AND TRAINING FOR 'INSTANT E-COMMERCE' IN EUROPE

    FREE SOFTWARE AND TRAINING FOR 'INSTANT E-COMMERCE' from BEA Systems -
              the E-Commerce Transactions Company
              Attend BEA's free technical seminars, and you'll walk away with both the
              knowledge and the BEA WebLogic software to build and deploy
              personalised, reliable, and amazingly responsive Web sites.
              Don't miss these information-packed workshops scheduled for major
              European cities during March and April. We know you don't have time to
              waste, so you'll hear about how BEA can help you create "instant
              e-commerce."
              SEE HOW TO BUILD AN E-COMMERCE SITE
              With live demonstrations, we will lead you through the step-by-step
              process for building intelligent and reliable e-commerce sites. Learn
              how to build Web sites with a high-performance Commerce Server. During
              the three-hour seminar, you will see and hear practical insights into:
              · Personalisation and Portal frameworks
              · Creating 'shopping advisors' and building with EJB components
              · Ensuring reliability and scalability on the Web
              · Tying WAP into e-commerce applications
              LED BY BEA WEB TECHNOLOGY EXPERTS
              The sessions will be led by BEA technologists who have experience with
              hundreds of successful commercial installations to date using the BEA
              E-Commerce Transaction Platform - the solution used by organisations
              including British Airways, Vattenfall, Carrefour, Nokia, E*Trade,
              Deutsche Telekom, and Amazon.com.
              YOU GET A COPY OF THE LATEST E-COMMERCE SOFTWARE
              And, just for attending, you will walk away with a copy of BEA WebLogic
              Server and the new BEA WebLogic Commerce Server - the software you will
              see used to build an e-commerce site during the seminar. You will be
              able to practice your new skills as soon as you get back to the office.
              Seminar Schedule:
              21 March Zurich
              22 March Munich
              23 March Prague
              28 March Paris
              28 March Copenhagen
              29 March Hamburg
              30 March Frankfurt
              30 March Stockholm
              4 April Warsaw
              4 April Helsinki
              5 April Oslo
              6 April Dublin
              11 April Manchester
              13 April Madrid
              18 April London
              19 April The Hague
              20 April Brussels
              20 April Milan
              These practical workshops are FREE of charge, but spaces are very
              limited, so we advise signing as soon as possible.
              Visit http://www.bea.com/events/instant/ to find out more details and to
              register.
              Please note that the technical information at these seminars will be
              given in English.
              Best regards,
              BEA Systems, Inc.
              The E-Commerce Transactions Company
              www.bea.com
              For conference registration by phone: +32-11-300-640
              Learn how to build reliable, personalised e-commerce Web sites -- and
              walk away with FREE BEA software.
              Visit http://www.bea.com/events/instant/ to sign up for one of BEA's
              European 'Instant E-Commerce' seminars.
              

    You could look at www.cartweaver.com
    It plays very nicely with Dreamweaver.
    Nadia
    Adobe® Community Expert : Dreamweaver
    Unique CSS Templates | Tutorials | SEO Articles
    http://www.DreamweaverResources.com
    Web Design & Development
    http://www.perrelink.com.au
    http://twitter.com/nadiap

  • Captivate 5.5 Template -- Settings for Demo and Training modes

    Hi
    I am trying to create a Captivate 5.5 template for our simulations which will be captured in both Demonstration and Training modes.
    In the template file, I go to Edit > Preferences > Modes, select the both the modes (from the drop-down list) and make required settings, and save the template.
    Now, when I try to record a new project based on this template, I am asked to select any one of the modes. As a result, I get only one type of output. How to get both modes in one go? Is there a workaround?
    Thanks for your help.

    You'll need to add your simulation capture slides to the template AFTER capturing the two outputs.  The template can only really be used as a shell to add introduction and conclusions, as well as quizzing etc.
    Since (as Lieve points out) you end up with separate files for each different output, you'll also need to use the templates to create a shell project for each different output, and then paste the slides from the captures into the shell as it were.
    Quite frankly, you're better off doing things this way anyway (capturing first and then pasting the capture slides into another shell project) because in any capture project you need to do quite a bit of editing and culling of duplicates or redundant captures.  It's quicker and easier to do this editing when the project file is smaller.  So what I do is clean up my captures first to get down to the minimum number of slides required for the simulation, and then paste those slides into my project file generated from the template.  I do the copy/paste after culling out the unnecessary slides, but before saving the capture file. That way, I always have all of the original captures as a backup in case I went too far in the culling.  Only after the project has been finalised to I go back and delete the original captures.

  • Anybody know where I can find tutorials and training materials for Adobe Output Designer

    Hi everybody,
    I am a graphic / web designer and newly appointed on a project requiring Adobe Output Designer skills. Now, I've already searched in a lot of places: but still couldn't find a reliable source of tutorials and training materials for Adobe Output Designer.
    Can anybody help?
    thanks a lot in advance,
    ovlique

    The DJI cameras were first supported in ACR 8.3 and more support added in ACR 8.4:
    Lens profile support | Lightroom 5, 4, 3 | Photoshop CS6, CS5 | Camera Raw 8, 7, 6
    You will need PS-CS6 or PS-CC or PSE12 with current updates on OSX 10.7.x or Windows 7+ to use this version of ACR.
    However, even if you have an older version of PS or older OS, if you can install the Adobe DNG Converter, you can copy these lens profiles to the User's lens profile folder and they might be seen.  I can give more specific instructions about doing this if you are unable to update PS's ACR to 8.3/8.4.

  • How to compare versions of DMEE Format Tree in DEV, QAS and PRD

    Hi,
    Is there a way to compare version of the DMEE Format Tree in DEV, QAS and PRD?  I would just like to ensure that version in DEV is in sync with the ones in QAS and PRD before I do my changes.  It seems that Version Management of Transaction DMEE can;t compare the versions in the three systems.  Thank you very much for your inputs.
    Best regards.
    Brando

    Brando.
    DMEE is a standard transaction which will be in sync with all the servers in your landscape unless there is any customisation done and the request is not yet moved.What problem are you facing when you are trying to do REMOTE COMPARISION ?
    K.Kiran.

Maybe you are looking for

  • Connected to wifi but can't access internet

    My MacBook connects to the internet through wifi, but ipod, iphone and ipad only connect.  Even though the bars are there indicating connection, I can't access the internet on any of the 3 devices.     When I reset the router it the devices can acces

  • Problem in DATE saving: all years are in the 21th century !!

    Hi for all, I'm using a lot of date items in my application and I have a problem caused by data format: in form fields, I enter dates in 'DD/MM/YY' format. So I had always a systemic concatenation of '20' to the year 'YY' always this : dispalyed data

  • Is it safe to delete ALL caches and/or receipts?

    is it safe to delete ALL files and folders under "user/library/caches"? I was surprised to see how big it has gotten. and is it safe to delete "macintosh hd/library/caches"? how about receipts located in "user/library/receipts" and/or in "macintosh h

  • How can I turn off HDD power management at boot and resume?

    From what I understand, putting 'hdparm -B 255 /dev/sda' in /etc/rc.local is not the way to do it (and probably won't work for resume from suspend). What is the recommended way to do this?

  • ACE - bridged mode - blocking Traffic