Currency issue in WBS element
Hi,
I want to maintain two different cost centers belonging to different company codes (one with USD and other with INR) in WBS element level in requesting and responsible cost center field. When I do this, I'm getting an error message stating that "currency in requesting company code must be company code currency". Please let me know how to overcome this issue and maintain cost centers with two different currencies.
Aman
Aman,
This is standard functionality cost center company code should be same as WBS company code.
Question:
Why you want to assign cost center's from diferent company code to one WBS element?
Thanks
Aby
Similar Messages
-
Multiple milestone creation issue for WBS element 'BAPI_PROJECT_MAINTAIN'?
Hi all,
I am using 'BAPI_PROJECT_MAINTAIN' to create Project definition,WBS element & milestone for WBS at once.
The program is working fine if one wbs element have one milestone.
But If any of the WBS elements have more than one milestone, the milestones are not creating properly.
The bottom level WBS milestones are creating for some higher level WBS. some milestones are not at all
creating. I am not getting any error message.
Code for mile stone section is :
**fill milsestone data for WBS in BAPI structures
lv_mlstno = lv_mlstno + 1.
it_wbsmilestone-milestone_number = lv_mlstno.
it_wbsmilestone-wbs_element = it_wbsdata-ID.
it_wbsmilestone-milestone_usage = it_wbsdata-mlstn.
concatenate it_wbsdata-edatu+6(4) it_wbsdata-edatu+3(2) it_wbsdata-edatu(2) into it_wbsmilestone-FIXED_MILESTONE_DATE_BASIC.
it_wbsmilestone-SALES_DOC_DATE_INIDICATOR = it_wbsdata-faktp.
it_wbsmilestone-INVOICE_PERCENTAGE = it_wbsdata-fproz.
append it_wbsmilestone.
clear it_wbsmilestone.
**fill milsestone data for WBS in BAPI update structures
it_wbsmilestoneupd-milestone_number = cs_x.
it_wbsmilestoneupd-wbs_element = cs_x.
it_wbsmilestoneupd-wbs_element = cs_x.
it_wbsmilestoneupd-milestone_usage = cs_x.
it_wbsmilestoneUPD-FIXED_MILESTONE_DATE_BASIC = cs_x.
it_wbsmilestoneupd-SALES_DOC_DATE_INIDICATOR = cs_x.
it_wbsmilestoneupd-INVOICE_PERCENTAGE = cs_x.
append it_wbsmilestoneUPD.
clear it_wbsmilestoneUPD.
**Fill bapi table method project1 for the creation of WBS milestone
**milestone will be created only after the creation of WBS elements first
**lv_refnum is the link to wbs element, which is already appened to it_methodproject
it_methodproject-refnumber = lv_refnum.
it_methodproject-objecttype = 'WBS Milestone'.
it_methodproject-method = 'Create'.
append it_methodproject.
clear it_methodproject.
endif.
How to resolve the issue?
Please help.
Thanks,
vamshiHi Ravi,
Thanks for your continuous reply.
The problem is solved.
I have passed the, reference number of WBS element creation to milestone creation in the 'Method' table.
Thatswhy it is picking wrongly.
I have corrected this by passing different reference numbers to WBS and milestone creations
based on their tables.
Thanks,
Vamshi -
Equipments Issued for WBS element
Hi all,
A Functional Location can be added to a WBS Element. We have came up with a requirement that once the equipments are issued against a WBS element, those issued are required to be installed at particular functional location automatically.
How we could cater this?
We need to do this without a ABAP development.
Thanks in advance.hi sank.N
if in Order settlement profile is u maintain default settlement category as WBS ,and mention WBS no account assignment tab in eqpt,f.loc then when u create MO on that eqpt or f.loc then in settlement rule u can find the WBS no .... and also for automatic assignment of F.loc to WBS in case of PM-PS intregration for managinig shutdown maintenance etc
regrds
pushpa -
Issue in WBS element Status in BI
Hi,
Can I reopen the WBS element from closed to release status? If yes how it again will be update to BI system?
Kindly help me.Hello again,
I´m sorry I missed the BI part...I have no knowledge on that side. Maybe other experts my assist here.
Regarding JEST: An object can have more than one current status. You can filter out those status from JEST that are inactive
(field INACT) and those that are user status (code starting with 'E' in field STAT).
In order to identify the status codes with their names and description you may check table TJ02T.
Unfortunately there is no other more direct way to check this in tables.
Hope this helps and sorry again for the missunderstandin
Rgds
Martina -
Hi experts,
Since Thursday 10th we have a very strange issue in our production environment.
One user has modified a WBS element using CJ02 transaction.
The user seems to have modified the currency field with a very strange value.
Instead of EUR which was the previously value, the WBS element now contains 31.12
The user told me he only wanted to modify the user field USR09 with '31.12.2009'. Maybe he made a mistake ... he doesn't know.
When I use CJ02 the field currency is in display mode.
When I try to modify the currency on another WBS element which accept such modification : I get an error message telling me that the input value 31.12 is not accepted...
=> How can a user enter such a value in a currency field ?
=> How can we change back the Currency value to EUR (in CJ02 the field is in display mode only).
Thank you for your help.
Regards,
PhilippeNot getting any clue. But it is always advisable to share error / information message no. along with it. If you are getting any message no. please share it's detail along with description.
With Regards
Nitin P. -
WBS Element report in both currency- Urgent
hi
I want to pull WBS elements report in Both USD and CAN $ together but i do not know whr to do it.
plz tell me whr in Project System i can do this
plz help it is very urgent
Thanks
ManishHi Manish,
Use transaction code <b>CJI3</b>. When prompted, input controlling area, and on prompt for DB Profile, input <b>000000000001</b>. Input the WBS element in its field and execute. Once the report is displayed, Use the "<b>Change Layout</b>" icon to select the fields "<b>Value COCurr</b>", "<b>Value ObjCurr</b>", "<b>Value TranCurr</b>" etc. pull these across from the right hand side to the left hand side using the directional arrow. Press "Enter". The figures would now show in the report for the various currencies.
I hope this helps.
Do not forget to award the points please.
Regards,
Jacob -
GR/IR difference with foreign currency - WBS element
I am working in the MM area and hadling Service entry sheets, GR and Invoice, Finance is complaining and having problem at project(WBS Element) closing time. we are using Project system to control budget. Now finance is not able to close budget code because they are having commitment and giving error. the situation is like below: There is a difference of .01 AED in the Foreign currency amount, finance also claim that system was behaving OK with 4.6C, Now after upgrade to ECC5(4.7) it has started this problem
Goods Receipt:
3,702.73 USD 13,600.00 AED
Invoice Receipt:
3,702.73 USD 13,600.00 AED
Service Entry Sheet:
3,702.73 USD 13,600.01 AED
Please help me to sort out this problem
Mazhar
Message was edited by:
Mazhar HussainHi
Header exchange rate picked up at time of PO creation with reference to document date in header.
If you fix exchange rate then it will be same for all items in purchase order.
In your case if exchange rate is different then check whether you have done goods receipt in two lots (say 8 items first and then 2 items) with different posting dates. Check accounting documents generated and in that document check translation dates for checking exchange rate in OB08 transaction.
And in invoice what is the currency you are using - if you do not use any special currency (foreign) then PO currency will be picked up. If exchange rate fixed indicator is not there in PO - depending upon system baseline date (posting date) exchange rate will be coming.
Thanks -
Unable to close the WBS element because of inventory issue
Hello
We are facing one issue where we are trying to close one WBS element but getting error that stock still exsists.
When i checked in table MSPR i found that for one of the material in the WBS element the physical inventory process is still not complete
Physical Inventory Blocking Indicator ,Indicator that specifies that the stock is blocked for a physical inventory has value A(Physical inventory not yet completed for amterial) in that table for one of the materials.
KIndly advice how to complete the proces and close the WBS.Dear,
Check the links:
Physical inventory block in material master
Re: Physical Inventory & Goods movement process
Cycle count not counting correct number of items
Regards,
Syed Hussain. -
Issue in BAPI_PS_PRECOMMIT in mass creation of WBS Elements
Hi,
I am facing a issue with BAPI_PS_PRECOMMIT.
we have the following WBS Hierarchy:
S - Proj, (level1)
S-XXX WBS Element (level2)
S-XXX-001 WBS Element (level3)
I have created a program for mass creation of WBS elements creation
which uses the following BAPI's
BAPI_PS_INITIALIZATION
BAPI_BUS2054_CREATE_MULTI
BAPI_PS_PRECOMMIT
BAPI_TRANSACTION_COMMIT
The proj: 'S' and the level2 WBS element: 'S-XXX' already exist in the system.
When I run the program for delta load, so as to create the following level3 WBS elements:
S-XXX-001
S-XXX-002
S-XXX-003
The system is throwing the following errors at the BAPI_PS_PRECOMMIT:
1. Final Check of the project definition and WBS elements: Error
2. Validation unsuccessful
Pls help me on this.
Thanks,
DeepakCheck the WBS elements doesn't exist already in your system.
Here is what I coded some days back for deletion of Network Activities, most of the things are same.
You are doing for WBS element.
* Call to initialization BAPI Before Delete
CALL FUNCTION 'BAPI_PS_INITIALIZATION'.
* Call to Network Activity Deletion BAPI
CALL FUNCTION 'BAPI_BUS2002_ACT_DELETE_MULTI'
EXPORTING
i_number = t_bapi_activity-network
TABLES
it_delete_activity = l_t_del_vornr
et_return = l_t_bapiret2.
DELETE l_t_bapiret2 WHERE type <> 'E'.
READ TABLE l_t_bapiret2 INDEX 1.
IF sy-subrc EQ 0. "If error in Deletion
MOVE: f_idoc_contrl-docnum TO t_idoc_status-docnum,
l_t_bapiret2-type TO t_idoc_status-msgty,
'CNIF_PI' TO t_idoc_status-msgid,
l_t_bapiret2-number TO t_idoc_status-msgno,
l_t_bapiret2-message TO t_idoc_status-msgv1.
MOVE c_idoc_status_error TO t_idoc_status-status.
APPEND t_idoc_status.
ROLLBACK WORK.
EXIT.
ELSE. "If Delete is successful COMMIT
* Call to PreCOMMIT BAPI
CALL FUNCTION 'BAPI_PS_PRECOMMIT'
TABLES
ET_RETURN = l_t_bapiret3.
* Call COMMIT BAPI
* CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
ENDIF.
The other solution is use BAPI_PROJECT_MAINTAIN. -
Issue on distribution of quantity to WBS elements in invoice
Hi SAP Gurus,
I have an issue with the distribution of quantity to WBS elemements in SAP.
There is a purchase order with 6 line items. For the first line item a quantity of 3 is ordered and the same quantity of 3 is assigned to 7 WBS elements in the account assignment tab. There were 3 invoices created for this line item. For a particular WBS element a quantity of 1.050 was assigned and when we drilled down through the 3 invoices we found only a quantity of 1.028 is assigned to this Particular WBS element. Can someone please tell me as to why this mismatch has happened.
Thanks in advanceHi Raman,
I am sorry but this is not the case . There are 7 WBS elements used for this PO. The quantity is distributed to 7 wbs elements as follows.
Percentage Quantity
1st WBS element- 8.7 0.261
2nd WBS element 17.4 0.522
3rd WBS element 18.2 0.546
4th WBS element 8.8 0.264
5th WBS element 6.4 0.192
6th WBS element 5.5 0.165
7th WBS element 35 1.050
This is the assigned structure in the PO for all the 7 WBS elements. But when you look into the 3 invoices a quantity of 1.028 has been distributed to 7th WBS element and a quantity of 0.214 has been assigned to 5th WBS element which is causing the mismatch
Also in the 2nd and 3rd invoices only 6 wbs elements are used. Can you please tell me as to why there is a WBS element missing in the 2nd and 3rd invoices if the splitting is happening automatically.
Regards,
Dwarik -
Issue with order or sequence of wbs elements appearance in planning layout
Hi Experts
we have an issue with order or sequence of wbs elements appearance in BPS planning layout.
In BW - 0wbs element - hierarchy order is as below
1
2
3
4
5
6
7
8
but when we check the same wbs element in BPS planning layout, it appears as below
1
2
3
4
6
7
5
8
Request you to advice how to correct the order.
Best Regards
krishnaHi,
I came across a similar situation once. I dont remember exactly.
We have two different DataSources on wbs hierarchy. The hiearchy was loaded using the two datasources.
By mistake we were trying to use the hierarchy created by Datasource2, instead of hier created by datasource1.
Can you check that. -
Currency display problem in Report using WBS Element
Hi Experts,
PCS report displying different values aginest same WBS elements, in different currency.
Report painter tool has been used.
Requirement is to display entered currency in the report.
i.e the currency which is entered in selection screen.
Regards,
OamkarHi Experts,
PCS report displying different values aginest same WBS elements, in different currency.
Report painter tool has been used.
Requirement is to display entered currency in the report.
i.e the currency which is entered in selection screen.
Regards,
Oamkar -
Problem issueing material from one WBS element to another
Hi Guys, This is my first post so be kind.
Our projects during their life cycle change their WBS element sub number. Example New project starts with WBS element # E.7029.00.010 at some point in the project it moves on to the next level and the WBS element changes to E.7029.00.020 later in the project it will again change to E.7029.00.030. Ok you get the idea.
Now the problem. When the project is at the .020 level we purchase inventory and recieve it into project inventory under the WBS elemement E.7029.00.020.
Now the project has moved on to E.7029.00.030 and we want to create a production order to make a prototype. The WBS element for the production order is E.7029.00.030 but the inventory is still under WBS element E.7029.00.020. When we go to issue the material to the job it says there is none in inventory under WBS E.7029.00.030. Which is right it is all under E.7029.00.020.
Is there a way that we can store the inventory under E.7029.00 and be able to issue it to any sub group of E.7029.00 so that it would not matter if the current WBS is E.7029.00.020 , E.7029.00.030 or E.7029.00.050?
Since our BOM's can be quite extensive and often contain a large number of new components this would be of great assistance.
Thanks for your time and consideration.The project moves on to another stage. During the development of new products the project goes through several stages before the new product is released for production and sales. For example:
Stage 10 - concept
Stage 20 - initial design
Stage 30 - design refinement
Stage 40 - Bata testing
Stage 50 - Final design
Stage 60 - Production process design
At each of stages 20 - 50 changes to the BOM can occur. Material would be purchased at stage 20 and could continue to be used through the rest of the stages including after release to production. But if the material is purchased during stage 20 then it sits in inventory under the WBS element ending in 020 but when the project moves on to the next stage the material will be used to produce prototypes for stages 30 - 60 as long as the material is included in the BOM at that time. -
WBS Element based Output Issue
Hi All,
I m having two inputs. Project ID and WBSElt Assume that inside one WBS there are four other WBS Elements. I can give any one among four WBS elts as input with Project ID. How can i filter the data based on the selected WBS elt? Plz help me out.Hi
I will give you the example for the selection
example:
Project 1
Level 1 WBS
Level 2 WBS element
Level 3 WBS element 1
Level 3 WBS element 2
Now if you want select WBS element 1 and 2 with the project 1
enter
Project ID: Project 1
WBS Elements: Level 3 WBS element 1 to Level 3 WBS element 2
so the system will diaplay the relevant data's.
Please try and revert back
Thanks
S.Murali -
WBS Element Actual Cost and 'Detailing the Value Type ' issue
Hello BW Experts ,
I want to extract the WBS Element Actual Cost and Revenue.
I have selected the data source 0CO_OM_WBS_6 .
In this data source there is a field Detailing the value type ' 0VTDETAIL.
As per SAP BI Help if the value of this field exists between 1 to 4 then it is actual cost of WBS ( also Key figure Category 0METYPE should be 1000 for actual cost and for revenue it is 1001).
value 4 of 0VTDETAIL means CO Activity Allocations.
When I see the data from this data source in RSA3 , I could not get any WBS whose 0VTDETAIL is 1 to 4 and Key Firgure Category as 1000, value type = 10.
Is there any other data source I should select in order to get actual cost for WBS ?
I can see the settelment cost whose 0VTDETAIL = 5 through this data source in RSA3.
But I want to see the data for the Actual Cost whose 0VTDETAIL = 4 .
What could be the reason ?
Thanks in advance .
Amol.Dear Oscar,
Thanks for your response,
The Actual Cost posted by our Functional Consultant is USD 250, but i am getting the Total Actual cost is ZERO (Sum of -250 +250) as i shown above.
the posted actual cost is +250, finally we need this figure only,
if i do restriction on Sender receiver Indicater field with S than i will get Actual Cost 250, but in SAP standard RKF for Actual Cost there is no restriction on Sender receiver Indicater field (S & H)
I hope you got my point now.
Thanks
Amar Reddy
Maybe you are looking for
-
Divorcing multiple devices from one itunes account
We have one Apple ID / iTunes account with multiple devices attached. I would like to divorce all devices and have each member of the family with their own Apple ID/itunes, but don't want to lose the content (music etc) that has been accumulated over
-
When I add a new event in iCalendar I cannot make the duration longer than 3 hours. How can I make it longer?
-
Headphone jack no longer working after repair
Recently I had a issue with my macbook pro so I had it repaired at the Apple Store(problem with the display). They replaced the logicboard(2nd time in 4 months) and the battery. Now after taking it hope and plugging in my external speakers into the
-
How Integrate a Java Program with Javafx
Hi All, I am new to javaFx. I want to call a java class method in javaFx Program how to call. Please help me out. Thanks In advance
-
I photo won't upgrade message about bought by different user or cancelled
upgraded to Yosemite, iphoto upgrade posts the message, can't upgrade because bought by a different user or cancelled, neither of which is correct, worked perfectly before upgrade, any suggestions