Customer Order Assigned to Tranport Order. Stock Available ?.

Hello everybody,
Our system release is 47.200.
We are looking for run  a transport order assigned to a customer order.
What happens:
We have prepared the customizing and also a user exit to have the option to work with the assigned orders.
Currently we can create the suppliers assigned orders
and also we can create assigned transport orders.
The problem appears when we want to make the expedition of the assigned transport order VL10G, then the system says that we don’t have stock available and that is not true because we have stock available Unrestricted Use.
4999200004 000010 Only 0 ST of material 0401010 available
4999200004 000010 An item with no delivery quantity is not permitted.
The system looks the stock available for customers not the stock
Unrestricted Use.
Is possible to make a customer order assigned to Transport Order and this looks the stock available in the status Unrestricted Use.
If we have to make a movement every time that we have stock available for the transport assigned order.
It will not be a good process, will be very manual or if we will have to create a not standard Program sure that it will make mistakes...
We are looking for this solution and sure that in a future we will need for
the same with intersociety orders.
Thanks for advance,
Regards,
Xavier Carbó

Hi,
I will explain our problem step by step:
1.- In our system we have made the configuration to be able the assigned orders:
When we make a customer order we can create an automatic purchasing order
if we change the item category of the customer order.
Also we can create a Transport Order.
2.- We use the Transport Orders to send material from the central warehouse to
the little warehouse.
3.- The Transport Order is similar as Purchasing Order, the different is that this
kind of order make a Picking / Delivery note in the central warehouse.
With this delivery note we make the reception in other warehouse.
4.- The problem that we have appears when we want to create
the Picking / Delivery note. with VL10G
At this moment the system says that we don't have stock available.
Our Assigned Transport Order is looking the Customer Stock Available
not the  Unrestricted use stock that is our normal stock ATP and is where
we have always all our stock ATP .
5.- For prepare the delivery note I have to make a material movement
of stock to translate the Unrestricted Stock in Customers stock ATP.
If I have to make this movement every time it will be very manual and
we will do mistakes sure.
I want that the Assigned Transport Order checks the Availability with the
ATP Unrestricted Stock.
I don't know if we can do something to find an automatic solution for the ATP,
for us it will be very interesting because we can prepare this Transport orders
connected to the Customer Order and this will be great.
Thanks for advance,
Xavier

Similar Messages

  • Sales order assigned in Purchase Order

    Hi Gurus,
    I want a report where i can find out sales order no's assigned in purchase orders. Is there any way to find out?
    I need to manually go to details of each PO to see the sales order no. assigned.
    Please revert back asap.
    Thank You

    ---

  • Sales Order Assignment not seen in Production order after MRP Run

    Hi,
    I am running a Scenario with Strat 50.
    I am maintaining Strat 50 thru MRP Group in MRP 1 View.
    Creating Production Order through Sales Order.
    When i am running MRP thru MD02 I am able to convert it to Planned Order but when i convert Planed Order to Production Order, i am not able to get Sales Order assignment in production order
    Please guide me,
    Thanks in advance,
    Harris

    Dear Harris,
    Sales order planning is done via MD50 not MD02.Hence,please execute the MRP run via MD50.
    This will copy the requirement from SO and the appropriate procurement proposal will be generated,say planned order.
    Here we will be able to view the sales order assignment.
    Regards,
    Joseph Charles Vaikathussery
    Edited by: Joseph  Charles on Nov 3, 2010 4:26 PM

  • Sales order field in production order

    Hi Gurus,
    I see there is a field sales order assigned to production order. In my scenario when we create a sales order production order gets created automatically in background due to the strategy group. So in production order, i see a field sales order and also i can see the sales order number in that field which is fine.
    But when we create a sales order with reference to quote, then in production order i see the quote number displayed in sales order field in the production order.
    My client wanted to have sales order number rather quote.
    Please suggest.
    Thanks,
    Quantum.

    Hi,
    Please note that if sales order stock has already been assigned to a quotation, the stock of the resulting orders is also managed under the quotation number.
    If you require to tag the sale order no to the production order then define the requirement type not as the make to order. This you can control at item category level also. While for sales order make requirement type make to order related.
    While doing so please note that you have to use the special rule to determine the requirement type which will based on the item category and mrp type.
    Hope this will help you.
    Thanks and regards,
    Atul

  • Check stock availability in non-PROD loc

    Hello,
    I have set my production st/location(PROD) in material master, When I creates the prod order it always check the stock availability in PROD location and pops up missing parts as stock is in raw materials loc.
    Can we set something, so that while prod order creation, it should check stock availability in all raw material locations (but not in PROD).
    added laterly----
    I think it can be done via OPJJ, no sto loc inspection, but what could be the pro/cons for setting this indicator.
    Please suggest.
    Regards,
    JPS
    Edited by: Bhatti JPS on Apr 7, 2010 5:35 PM

    JPS,
    If you make the OPJJ setting, it will check all storage locations in that plant, including PROD.  Depending on what this StLocn is used for, this is probably OK.
    Some companies 'stage' their materials, which means they move stock from RM stockroom to a production floor staging area location.  Then, they run their ATP.  'Missing parts' means they have to go to the RM Stockroom, get the missing stuff, and move it into the production staging area.  For these companies, they want PROD checked exclusively.
    Other companies (sounds like your company) don't stage their components.  They run their prod order ATP checks, and any missing parts list they hand to the expeditors, who may go to the department that makes the subassembly (manufactured component), or may go to Purchasing department to expedite the RM (Purchased component).  
    It really depends on the business requirements.
    Rgds,
    DB49

  • Report on daily sale,stock availability,pending order,Ageing report

    Report on
    daily sale for time period
    stock availability
    pending order
    Ageing report

    Dear Goutam
    Through VF05, you can see sales daily.
    For stock MMBE
    For Pending Order, VA05
    Thanks
    G. Lakshmipathi

  • Stock Tranport Order - Reversal of Stock Transport Order in VMS

    Dear All,
    Cross Company Code Stock Tranport Order with delivery is created across company code & delivered.
    Now we want to go for reversal of this.
    We are using Vehicle Management System.
    Is it possible? If so, pls let me know how to do it.
    Expecting ur expertise on this.
    Regards,
    Ramesh

    You can do reversal using VL09 if Goods Receipt at the receiving plant is not complete.
    Other-wise cancel the GR then do VL09.
    Thanks,
    Ashish

  • MD73 - not displaying customer order assignment

    Hi,
    I am having 2 materials - both set up with planning strategy 40.
    For one material, Customer order assignment is displayed in MD73 but for other material it is not displaying.
    MRP-1 to MRP-4 viewa are same for both parts.
    What else shall I need to check  ?
    Please advise ASAP and oblige.
    Best Regards,
    Mitesh Desai

    Hi All,
    I am still looking forward to advise from experts .
    Thanks in Advance,
    Best Regards,
    Mitesh Desai

  • Rush order :-Even though stock available  Sytem is not ablet   to confirm

    Hi all,
    In case of Rush order- insipite of  stock available in the system  its not able to confirm the quantities .
    Immediate delivery is not happening because of this
    Please let me what might be the reason?
    Regards
    Anil

    Hi anil maripady
    As you are doing rush order , first of all go to VOV8 and check the following things in  rush order document type :
    1) Shipping Conditions - immediate
    2) Immediate Delivery - [X}
    3) Lead time in days - NIL
    Now go to  MD03 and check how much  stock is available of that material and how many open orders are also there with that material in that plant
    Another option go to MMBE and check how much stock is there for that material in that plant and storage location
    Regards
    Srinath

  • Stock available in order to buy the Macbook in NYC

    I'm going to NYC in one week and I need to know where can I find stock available in order to buy the Macbook, because I read Apple stopped the production, Thanks!
    OSCAR

    Or you can save $150 by buying one from the Apple Refurbished Store. http://store.apple.com/us/browse/home/specialdeals/mac/macbook

  • Make to order(MTO) and make to stock(MTS)

    Hi friends
    Please Send the details about Make to order(MTO) and make to stock(MTS) process and configuration .if u have any documents pls send to my mail ID : [email protected]
    Regards
    Balu

    dear balu
    MAKE TO ORDER AND MAKE TO STOCK notes
    Make to order Scenario
    1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
    2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
    3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
    (a) Make to order using sales order
    (b) Make to order using project system (not relevant for SD application)
    4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
    5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
    the strategy group (MRP 3) in MMR
    the MRP group (MRP1) in MMR
    the item category and MRP type (MRP 1)
    6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
    MAKE TO ORDER PRODUCTION (PROCESS FLOW)
    First Create a material with MM
    Basic data1:
    Give Material name : Cycle
    Material group : 010
    Division : MA
    Net Weight : 10 Kg's
    Gross Weight : 10Kgs.
    Sales: Sales org.1 :
    Base Unit of Measure : EA
    Delivering Plant : RAMA
    Output Tax : 1 ( Full tax)
    Sales: General/Plant :
    Availability Check : 01 ( Daily Requirements)
    Trans.,group : 001
    Loading Group : 0003
    MRP 1:
    MRP Group : 020 ( Make to Order Production)
    MRP type : PD (MRP)
    MRP controller : 000
    Lot size : EX ( Lot-for-Lot order quantity)
    MRP 2:
    In-house Production : 1
    Schedule Margin Key : 000
    Forecasting:
    Forecast Model : D (Constant Model)
    Accounting 1:
    Price control : V ( Variable Price)
    Variable Price : 4000
    Price Unit : 1
    Then enter & Save.
    Material 769 created.
    Create a Sales order with VA;
    Order type : OR
    Sales Organization : RAMA
    Distribution Channel : RA
    Division : MA
    Sales Office : RAMA
    Sales Group : RAM, .............. Enter
    Sold to Party: 6000000000
    PO number : 55 , PO Date : 04.06.2007.
    Item Overview Tab:
    Material 769, Quantity : 100
    Enter & Save the Document.
    Sales Order 8212 Created
    Create Production Order with CO:
    Enter Sales order number: 8212, Item No. 10
    Order type: PP, Enter
    Click on FLAG,
    Select Generate Operation and enter NO,
    save the Document.
    Production Order Created: 60002725
    Confirm the Production Order with CO15.
    Enter Production Order No. 600075 and save the Document.
    Now the confirmation Order will be saved.
    Create Goods Receipts with MB31.
    Movement type: 101
    Order: 6002725
    Plant: RAMA
    Storage Location: RAMA
    Enter and Save, you will get Document Posted: 50000068931posted.
    Check the Stock Position with MMBE
    Material: 769
    Plant: RAMA
    Storage Location: RAMA
    Execute (F8), here we can see the stock at Sales Order Stock.
    Create Delivery with VL01N, Billing with VF01 and Post to Accounts.
    Make-To-Stock Production:
    Purpose
    we describe the planning of a product for make-to-stock production. After requirements planning, you analyze the stock situation and convert a planned order into a production order. You also enter a sales order that is not relevant to the planning. The production order is then released and saved. After the material withdrawals and confirmation of the operations, you analyze the production variances. The sales order is delivered and settled.
    Process Flow
    1. Planning a Product
    T.code: MD61
    Logistics Create Production  Production Planning Demand ManagementPlanned Independent Requirements
    2. Creating a Sales Order
    T.code: VA01
    Logistics Sales and Distribution  Sales  Order  Create
    3. Executing Multi-Level Requirements Planning
    T.code: MD02
    From the MRP node, choose PlanningSingle Item - Multi-Level
    4. Converting the Planned Order into a Production Order
    Tcode: MD04
    From the MRP node, choose
    EvaluationsStock/Reqmts list
    5. Withdrawing the Material for the Production Order
    T.code: MB1A
    Logistics GoodsMaterials Management Inventory Management  Goods Movement Issue
    6. Confirming the Production Order
    T.code: CO11N
    Logistics Time Ticket Production  Production Control Confirmation  Enter For Operation 
    7. Creating a Delivery
    T.code: VL01N
    SingleLogistics  Sales and Distribution  Shipping and Transportation With Outbound Delivery  Create Document  Reference to Sales Order
    8. Creating a Billing Document
    T.code: VF01
     Logistics Create Sales  Billing Billing document
    rewards if it helps
    siva

  • Error:Assign handling Unit from one Process order to another process order

    Hi Experts,
    I am facing different issues in assigning handling unit from one process order to another.
    Business process:
    1. Two similar Process Orders are existing in the system
    2. Delivery is created for first process order using LP10 for one or more components
    3. TO is created in foreground using VL06P
    4. TO is confirmed by providing in stock available Handling Unit (HU) / storage Unit details Using LT12
    5. Customized transaction is used to reassign newly created HU (created in previous step) from first process order to second process order. As a result many steps are performed in background for delinking the HU from first process order to second process order (including creation of different TOs)
    I am facing different issues in the process:
    1. Sometimes while confirming the TO in step 4: error is received as "Reservation item 0065 with material 4013959300300 does not exist" OR "Reservation item with material does not exist"
    2. If the TO is confirmed in step 4. I am facing error in step 5 as "Warehouse number  does not exist (new selection required)"
    Both these errors are standard errors and I could not find much information on them in SCN also.
    If anyone can throw light on any of them then it would be great.
    Please let me know if any additional information is required.
    Thanks
    Harsh Aggarwal

    Hi Manish
    Thanks for your response. Actually, the customized program is used only in fifth step and not till TO confirmation so that error is not related to Customized program. However, in some cases I am able to do the confirmation but the error is received in 5th step i.e. Warehouse number  does not exist (new selection required)"
    Any further guidance you can provide. I will ask ABAP to check the customized program but the error seems to be a standard error.

  • In  sale sorder based production order can i consume unrestirced stock

    HI,
         i am creating Production order using co08 with respect to sales order.the
    ( bom items)components to be cosumend for that production order should be sales order stock compulsory.
    if i want to consume against sales order how can i consume stock which does not have sales order assignment. i think only through 231 movement type.
    if there any possibe pls sugggest
    regards
    madan mohan

    Hi madan,
    Other than the way of converting the unrestricted stock to the sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material  to blank in the production order components.  If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order.  you have to remove that and make it blank.  then proceed with material availability check, if the unrestricted stock is avl for the material / storage location then the same will be commited to the production order.
    reg
    Kiki
    award points if this is helps

  • Make to Order - where is Sale Order Stock

    Hi All
    I have a Configurable Product, say Book. The Customer places the Order say for 1000 Books but does not give the details of the Ship-to parties. The Order is taken into Production and the Ship-to particulars are available one day prior to the despatch. The requirement is that the User has to create multiple Ship-tos in 1 Sales Order (Costing, Wastage calculation etc., is done Sales Order-wise) and will enter the Quantities for the Ship-to parties only when he receives the despatch instructions from his Customer.
    The Sales Order initially is created for 1000 Nos with no Ship-to Party being entered at the Item level (Item No: 10, Material # Book; the Classification editor contains the required Characterstics when the Order for 1000Nos is entered for the first time). The Order is produced and the Stock is available as Sale Order Stock for 1000 Nos. When the despatch details are received, the Ship-to parties are entered in the Sales Order {Sales Order entry will now look as: Item # 10, Book, 700 Nos for Ship-to # 1 and Item # 20, Book, 300 Nos for Ship-to # 2}. When the 2nd Line Item is entered in the Sales Order, the Classification Editor opens once again, though this is ignored and no values are set.
    Issue:
    a) Delivery could not be handled through VL10; it had to be done through VL01N.
    Delivery could be created and PGI done for Ship-to # 1 only but unable to do PGI for 300 Nos for Ship-to # 2. The error I get is that there is no Sales Order Stock (1000 Nos have been produced initially and after doing PGI the balance of 300 Nos (meant for Ship-to # 2) is getting displayed in MMBE but is appearing as Item # 10. The Requirement Class is shown as KEM in the Sales Order.
    b) When the 2nd Line Item (Item # 20) is entered in the Sales Order, the Schedule Line shows about 7 days into the future although Sale Order Stock is available.
    Have I missed something?
    Regards
    Ramana ND

    Manoj
    The so-called 2nd Line item is nothing but the same Material and this Quantityis already available in Sale Ordertock (part of 1000 Nos); this had to be shown as a 2nd Line Item coz there is a different Ship-to party. Btw... the requirement Class type in the Procurement Tab in VA01 for both the Line Items shows KEM...
    My question is: why is the so-called 2nd Line Item is being treated separately? The Order is for 1000 Nos and all I am doing is splitting the Quantity between the 2 Ship-to.. The Sales OrderStock clearly shows 1000 Nos which I am not able to Ship-to #2 coz Item # 20 does not show Stock in MMBE ... Only Item # 10 has Stock of 3000 Nos ...
    Regards
    Ramana ND

  • Engineer to Order Scenario-Target Costs and Stock Valuation

    I have got a query  pertaining to Engineer to  Order Scenario. A production order has been created with WBS element as the account assignment .Its a valuated project stock scenario, with configurable material. As per SAP standard behaviour  and my limited knowledge, the Goods Receipt for FERT/HALB happens according to either of the four strategies:
    •     Standard Price ( if there exists one)
    •     Customer Exit COPCP002
    •     Sales Order Cost Estimate
    •     Preliminary Order Cost Estimate for prod order
    However ,I have come across a case where although a preliminary order cost estimate exists for the production order, the system is not able to determine target costs. As a result the entire variance is posted as remaining variance at the time doing a variance calculation on the production order. Moreover at the time of Goods Receipt for FERT material,the system passses an entry Price diff A/c -Debit to Cost of Production, instead of debiting Inventory  and crediting cost of production(Price Control is S, no standard price exists for the material)
    Thus my query is :
    1) In case of Engineer to Order Valuated Stock Scenario where prod order is created with reference to WBS element, how is the standard price (or target costs for version 0) determined
    2) Under what situation at the time of goods receipt ,will an entry " Price diff A/c Dr & cost of production-Credit will be posted, instead of  Inventory A/c being debited?
    Awaiting a reply
    -Regards
    Amit Kulkarni

    Hi Amit
    the easy answer first: The standard price is just taken out of the material segment without WBS assignment. That means if you maintain a standard price in the accounting view of the material master for the material number + plant that will be the fallback to be used. That will at least reuslt in a inventory posting, instead of pure price differences (against a price of zero)
    Why your production order cost estimate could not be derived I cannot say. But he first startegy will be to search for the cost estimate to the WBS. Is there not something in the project system to perform a project costing and save it? in that case that will be searched and used for the order target cost and inventory posting.
    best regards,
                      Udo

Maybe you are looking for