Check stock availability in non-PROD loc

Hello,
I have set my production st/location(PROD) in material master, When I creates the prod order it always check the stock availability in PROD location and pops up missing parts as stock is in raw materials loc.
Can we set something, so that while prod order creation, it should check stock availability in all raw material locations (but not in PROD).
added laterly----
I think it can be done via OPJJ, no sto loc inspection, but what could be the pro/cons for setting this indicator.
Please suggest.
Regards,
JPS
Edited by: Bhatti JPS on Apr 7, 2010 5:35 PM

JPS,
If you make the OPJJ setting, it will check all storage locations in that plant, including PROD.  Depending on what this StLocn is used for, this is probably OK.
Some companies 'stage' their materials, which means they move stock from RM stockroom to a production floor staging area location.  Then, they run their ATP.  'Missing parts' means they have to go to the RM Stockroom, get the missing stuff, and move it into the production staging area.  For these companies, they want PROD checked exclusively.
Other companies (sounds like your company) don't stage their components.  They run their prod order ATP checks, and any missing parts list they hand to the expeditors, who may go to the department that makes the subassembly (manufactured component), or may go to Purchasing department to expedite the RM (Purchased component).  
It really depends on the business requirements.
Rgds,
DB49

Similar Messages

  • Checking Stock (Available Stock)

    Hi,
    I have a requiremnt to develop a report to show Available Stock of the material.
    While displaying the stock it should check the quantity of the open orders and duduct that from the stock.
    i.e Available Stock = stock - quantity of open orders
    As I know we can see all open orders using transaction VA05
    or we can find all open orders in VBUK/VBUP with status = A
    from where we can calculate the quatity of open orders.
    but I have gone through one program in which the developer used table VBBE and field OMENG for quantity of open orders,
    here I have noticed that I have taken some orders where we get using transaction VA05 but those orders not exist in table VBBE so I am bit confused in this, please let me know if any one have clear idea on this...
    Thanks in Advance
    Venkatesh

    Hi
    Try Tcode CO09 to view the ATP quantities. The ATP quantities are the Available To Promise - which are not assigned to any sales orders or customers and are free for sale.
    Thanks,
    Ravi

  • Check stock availibility while making reservation slip

    Our users want the system to check available stock for every item
    While issuing reservation slip (t-code : MB21,IW31,MB22,IW32).
    ie. if material are not available(stock = 0)in our company
    for all plants
    then user cannot save the document with error message.

    Check this forum. it's already discussed and answered.
    [Dynamic availability check for goods receipt - OMCM;
    Edited by: seesen_rs on Jan 24, 2012 6:08 PM

  • Check 4 availability of stock

    hi,
    getting demands from APO. I need to create planned orders. b4 creating planned order i need to check stock availability and open production orders.
    how to check this. I think, AUFBAUEN_MDPSX_ANZEIGEN can be used.
    But I dont know how...plz suggest

    Hi,
    You'll need to make some modifications to standard if you want that to occur.  You will have to consider which plant and storage location should be looked at.  Do you really want Unrestricted Stock - would not ATP be better.  You can get ATP from the function  IVFP in the program SAPMV45B (the button on the item overview screen).  Otherwise you'll need a developer to look at modifications to:
    structure RV45A,
    program SAPMV45A,
    screen 4009.
    Hope this helps
    Regards
    Nick

  • CHECK ON AVAILABLE STOCK INTO STOR. LOC. PROJECT BUSINESS

    Hi All,
    When adding a material on a material network (material master has indicator: individual / collective 1 into MRP4 view), immediately a Purchase req. is created for Q stock. Stock is received via PO into project stock. This is the normal process.
    But if when there is still unrestricted stock available for this material into a stock loc. (within the same plant we creating the material network), how to check first automatically the unrestricted stock before the PR for Q stock is created for material requirements.
    Your inputs will be rewarded...
    Thanks & regards,
    Krishna

    Any inputs on this issue....
    BR,
    Krishna

  • Block Stock consider during MRP Run and Stock availibility check

    Dear All,
    I am facing the stock availibility check , Sytem consider the Defective material which is Block in same storage location ,and system not generate the Planned order .
    -Blocked Material stock 100, and requirement 100 then system not generate the planned. Client need the system generate planned order 100 , Because 100 material is defective.
    I have configured the system scope of availibility , Block stock check remove , but problem is not solve.
    Thanks
    Rajesh Tiwari

    Dear ,
    Can you please re-check your MRP plant parametrs in OPPQ wether   you have selected blocked stock( Available Stock tab )  option by chance ?
    Please de-select the same  and re-run MRP.Generally MRP does not consider block stock  in net requirement calcualtion .One more thing  , MRP does material avilablity check as per OMJJ set up ( define availbality chek ) but does not consider the same while doing net requirement calcualtion to generate PR rather it goes down to MRP plant parametrs ( oppq or oppr )
    Hope this is clear
    Regards
    JH
    Edited by: Jiaul Haque on Sep 16, 2010 9:29 AM

  • Stock tranfer b/w sto loc with in plant

    how to do stock tranfer b/w sto loc with in plant

    Hi
    as mentioned by Rama Krishna, STO process can be mapped for storage location to storage location transfer. This feature is available from 4.7 (I think service pack 200 or something).
    You have to do configuration
    Check in SPRO - MM - Purchasing - Purchase order - Set up STO - Set up STO between S loc.
    The remiaing process is like normal STPO.
    regards
    Srinivas

  • Cannot download movies using "Check for Available Downloads"

    I was downloading a few movies to watch when iTunes crashed. After starting it back up again, I tried to use the Store->Check for Available Downloads option. I keep getting the error message "Unable to check for available downloads. The network connection has timed out." I've tried signing out and signing back in, downloading from 2 different computers, using wired and wireless connections, and downloading from my account page. None of these has helped, and after contacting the iTunes help staff I received an email asking me for more info. I gave them the info and sent the email on Saturday and haven't received a response. Does anyone have a solution?

    They fixed it! I just got an email saying that a digital booklet I was trying to download had started the problem and was stopping many further downloads. They removed the booklet and I'm downloading fine now. They will reinstate the booklet into my download queue once all the other media finishes downloading. Use this link to report your problem. Hope you have success!
    http://www.apple.com/support/itunes/contact.html?form=account&topic=iTunes%20Sto re%20Account%20and%20Billing&subtopic=Billing%20Inquiries

  • Automatic BOM Selection as per Stock availability

    Hi...
    I have a query.....How can i set an Automatic BOM selection as per stock availability
    Problem is that the client is having more than 1 type of raw material which can be used, so the user needs to consume the ROH as per the stock availability, in that case he has to manualy check and amend the Production Order accordingly.
    Hence, i want to set a system wherein the system would do the checking of the ROH material and then select that material and execute the production order accordinly.
    Requesting your valuable inputs.
    Thanks in advance,
    Harris

    Harris,
    Please explore the possibility of defining "Alternative Item Group", in the BOM Item level details(Basic data tab).
    From Application help for your referance,
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Regards,
    Prasobh

  • Customer Order Assigned to Tranport Order. Stock Available ?.

    Hello everybody,
    Our system release is 47.200.
    We are looking for run  a transport order assigned to a customer order.
    What happens:
    We have prepared the customizing and also a user exit to have the option to work with the assigned orders.
    Currently we can create the suppliers assigned orders
    and also we can create assigned transport orders.
    The problem appears when we want to make the expedition of the assigned transport order VL10G, then the system says that we don’t have stock available and that is not true because we have stock available Unrestricted Use.
    4999200004 000010 Only 0 ST of material 0401010 available
    4999200004 000010 An item with no delivery quantity is not permitted.
    The system looks the stock available for customers not the stock
    Unrestricted Use.
    Is possible to make a customer order assigned to Transport Order and this looks the stock available in the status Unrestricted Use.
    If we have to make a movement every time that we have stock available for the transport assigned order.
    It will not be a good process, will be very manual or if we will have to create a not standard Program sure that it will make mistakes...
    We are looking for this solution and sure that in a future we will need for
    the same with intersociety orders.
    Thanks for advance,
    Regards,
    Xavier Carbó

    Hi,
    I will explain our problem step by step:
    1.- In our system we have made the configuration to be able the assigned orders:
    When we make a customer order we can create an automatic purchasing order
    if we change the item category of the customer order.
    Also we can create a Transport Order.
    2.- We use the Transport Orders to send material from the central warehouse to
    the little warehouse.
    3.- The Transport Order is similar as Purchasing Order, the different is that this
    kind of order make a Picking / Delivery note in the central warehouse.
    With this delivery note we make the reception in other warehouse.
    4.- The problem that we have appears when we want to create
    the Picking / Delivery note. with VL10G
    At this moment the system says that we don't have stock available.
    Our Assigned Transport Order is looking the Customer Stock Available
    not the  Unrestricted use stock that is our normal stock ATP and is where
    we have always all our stock ATP .
    5.- For prepare the delivery note I have to make a material movement
    of stock to translate the Unrestricted Stock in Customers stock ATP.
    If I have to make this movement every time it will be very manual and
    we will do mistakes sure.
    I want that the Assigned Transport Order checks the Availability with the
    ATP Unrestricted Stock.
    I don't know if we can do something to find an automatic solution for the ATP,
    for us it will be very interesting because we can prepare this Transport orders
    connected to the Customer Order and this will be great.
    Thanks for advance,
    Xavier

  • Stock/Availability updation terminated(MD04)

    Hi all,
    After posting of GR with MB31, i was refresh the Stock/Availability list. While refreshing it was terminated. And an error message displaye as " Express document update was terminated received from author SAP". But GR documet was posted.
    What s the problem with my steps? Kindly explain.

    Dear Gopinath,
    Check for the lock entries in the T code SM12,select the relevant one and delete it.
    Check in MB51 for the latest document along with the time and for movement.IF its prsent and if found
    ok in MD04 also means leave it as such.
    Check and revert back.
    Regards
    Mangalraj.S

  • Rush order :-Even though stock available  Sytem is not ablet   to confirm

    Hi all,
    In case of Rush order- insipite of  stock available in the system  its not able to confirm the quantities .
    Immediate delivery is not happening because of this
    Please let me what might be the reason?
    Regards
    Anil

    Hi anil maripady
    As you are doing rush order , first of all go to VOV8 and check the following things in  rush order document type :
    1) Shipping Conditions - immediate
    2) Immediate Delivery - [X}
    3) Lead time in days - NIL
    Now go to  MD03 and check how much  stock is available of that material and how many open orders are also there with that material in that plant
    Another option go to MMBE and check how much stock is there for that material in that plant and storage location
    Regards
    Srinath

  • Resource availability during Non-Working Hours and Weekends

    Hi Gurus,
    Aim: Make the Resource available during Non-Working Hours and Weekends
    Requirement: CRP functionality enabling
    In CRC2 I have selected capacity tab and in capacity header under 'Change Interval and Shifts' button. I have Inserted a new Interval period and given the validity from/to dates(Non-Working day - Saturday) and Saved.
    When i execute the Capacity Planning CM01, there is no change. The Resource availability still shows as "0"hrs for this particular date and for rest of the days it shows as 8hrs.
    I have checked the same even after executing the MRP, No change in Capacity Planning Overview - Still the available Capacity Showas as 0
    Please guide me, how can i use my resource during the holidays. Means make the system understand that the defined day is a working day though it is holiday as per factory calendar
    Please correct me whether am i missing any settings or i should follow some other logic
    Regards,
    Tam

    Hi Partha,
    In workdays i dont have any such option "2"
    As per standard list I could see only 3 entries in the possible values(F4) popup
    "Blank" - Working days according to factory calendar
    "0" - Non-Working days(Overrides factory Calendar)
    "1" - orking days(Overrides factory Calendar)
    I have even tried with option "0" and "1" its still the same, when i enter the period From and To date the fields for the entries Shift start and end date, workday, Shift Seq, Length of the shift, No.of shifts.........are jumping to the next line item.
    Because of which i understand that the entered values is not corresponds to the newly defined period
    Pls guide me to how to make the resource available during non working days
    Regards,
    TamNen

  • QI stock availability & releasing

    as it is configured in the system, QI stock is available stock, and won't trigger missing parts for the production order. however, is there a way in the system, that when i release an order, it would restrict me, because stock is still in QI and hasn't been UD-ed.?

    Hi raf timan 
    In transaction OPJJ - Define Scope of Check uncheck the incl.quality inspection stock for the respective availability check entered for the mateial in the material master(02).
    This setting will exclude the stocks available in quality during availability check in production order.
    To restrict the production order release when there is a stock deficit of the input materials, goto transaction OPJK - Define Checking Control select the entries for respective plant, order type and business function 2 - Check availability during order release.
    Go in to detail in the material availability tab in the Mat. release enter 3 -No release if parts are missing. This will restrict the release of order when stock deficit.
    Regards
    Soundar

  • Change existing stock items from Non-Batch to Batch Management Method

    Hi,
    Any prerequisites before changing the existing stock items from Non-Batch to Batch Management method which have On hand stock qty? Please advise.
    Thanks & Regards,
    Priscilla

    Hi
    You can change the method only when, available Qty becomes zero.
    OR
    you can do one workaround :
    Make Goods Issue of that Item and take value of stock in any GL,
    and then change the method of that item, then make Goods Reciept by using that GL which was used in Goods Issue.
    Regards
    Manoj S

Maybe you are looking for

  • Bridge CS4 won't output to pdf multiple images with same filename

    Hiya...my googling efforts have thus far failed! I've got CS4, and in Bridge, I created a New Smart Collection to find all filenames in a folder containing "." or ".jpg" - which in turn searched through all the subfolders like what you used to be abl

  • Customization of reports

    Hi, In case of customisation of a report SAP FI Functional consultant has to work with ABAP people... Can anyone please let me know with an example, how a FI Functional Consultant discuss about the new report requirement with ABAP team? I mean for th

  • Keynote Plays Only in Rehersal Mode on LCD Projector

    I have a macbook and the latest version of Keynote. I use a Optima EzPro 735 LCD portable projector. When I play my slide show it only shows it in rehersal mode (two side by side screen with the time and timer at the bottom). Yesterday I had no probl

  • [SOLVED] Unity-Overlay Scrollbar.. trying to get it working...

    Hi, I'm trying to enable the unity scrollbars inside XFCE. I have installed the latest gtk2-ubuntu and gtk3-ubuntu, but run into problems. When installing gtk2-ubuntu everything hangs and I cannot login to a XFCE session. gtk3-ubuntu installs fine, b

  • Outgoing payment automatically printed once add.

    Hi, I'm facing a problem, when user add outgoing payment (payment mean by cheque), after successful add the outgoing payment, SAP system automatically print (send to printer) the outgoing payment. Anyone face the same problem? Regards, Muhamad