Customizing sequence views on multiple PC's

I have customized the execution view of my sequence editor to display test step limits (hi and low), and module execution time.
I would like to know how to "copy" these settings to another test system (PC), without having to go through the manual process of setting up the view on each test station PC?
Thank you in advance for your help.
Jim

What Adam posted will work for a User Interface, if however, you are wanting to do this for the sequence editor, I think the sequence editor saves this setting in the layout
file. There is a current_layout.bin file in the same directory as
specified above. Or you can use the Sequence editor options dialog - UI
Configuration tab to save and load specific configurations. It saves the layout files to a directory underneath the cfg directory (usually either C:\ProgramData\National Instruments\TestStand 4.2.1\Cfg\SeqEdit or C:\Documents and Settings\All Users\Application Data\National
Instruments\TestStand 4.2.1\Cfg\SeqEdit depending on your OS).
Hope this helps,
-Doug

Similar Messages

  • Custom dashboard view for multiple connected management groups

    Hi all,
    I've connected 2 scom management groups and I'm able to see the connected alerts in the alert views.
    Is it also possible to show those connected alerts in a dashboard view ? Because the Show Connected Alerts - button is not availble in dashboards views. Is it possible to filter on mgmt group in dashboard views ?
    Kind Regards,
    J. M.

    It is possible, but not without customization. Also, as Alexis mentioned, you could populate a custom field with management group information. It's overkill to use SCORCH just for this, as this could be achieved with much less effort using the command
    channel and a relatively simply powershell script...
    Jonathan Almquist | SCOMskills, LLC (http://scomskills.com)

  • Multiple sequence view to the same batch

    Dear All,
    When I use Batch model of two stations I would like to have two sequences view as I get two executions view or two reports view.
    The main gold is to have for each Socket three tabsequence view\Execution view\Report view.
    Tnx

    NewSCRUser wrote:
    Hi Daniel,
    The checkbox doesn't effect on the sequence view tab only on how to display the execution view tab(tile horizontally or documantlly)
    If my batch model contain 4 sockets so I expected to 4 sequence view,4 execution view,4 report view
    How do I produced 4 sequence view per batch
    Are you talking about the sequence editor or an operator interface? There is only ever really one edit time copy of a sequence file in memory at a time, so showing it in 4 views would be misleading. At runtime, copies of the sequences are made for each thread that runs them, but they all come from a single edit time copy originally. Why do you want 4 edit time copies of the sequence? What exactly are you trying to do?
    -Doug

  • How to implement the sequence view controls in the customized LabVIEW UI

    Hi,
    I'd like to use LabVIEW to run the TestStand Sequence, and show the execution windows in the UI.(something llike the attached image)
    I followed my senior's method : connected the sequence view controls into the TestStand UI Execution View Manager as objects.
    Then use the register event callback to build a callback VI.
    The callback VI is checking which the RunState of the Execution Manager is stopped and assigning the execution to that Execution Manager.
    Though it works, but really confuses me, needless to say to you all.
    Could someone give me some suggestion how to show the execution windows in the LabVIEW UI? I'll appreciate your help.
    Solved!
    Go to Solution.
    Attachments:
    Multi_UUT_SequenceView.PNG ‏65 KB

    It's too complicated to answer your question in simple words.
    Please take a detail look at the following links. It comes with some basic concepts and tutorials regarding how to use TestStand UI in LabVIEW.
    http://www.ni.com/white-paper/7560/en/
    http://www.ni.com/white-paper/14376/en/

  • Error message: The preset used by one or more sequences in this project requires third-party components that could not be located. These sequences will be modified to use a custom sequence setting instead. To continue editing using the original preset, qu

    Hello all,
    I can't open a PP project without this error message appearing:
    "The preset used by one or more sequences in this project requires third-party components that could not be located. These sequences will be modified to use a custom sequence setting instead. To continue editing using the original preset, quit the application without saving the project, reinstall any third-party components that are required and reopen the project".
    What I had been doing before this occurred was editing a PP project using ProRes sequences and multi-camera editing. Multi-camera was not working very well and after a few attempts to fix that I gave up and finished the job cutting 3 layers of video instead. AME refused to render the three finished sequences of over 1hr duration so rendered final videos from the PP sequences.
    I tried deleting plists for AME, PP and QT, repairing disc permissions and rebooting but there was no improvement.
    Client is satisfied for now but will want to come back to this job at a later date so decided to uninstall and re-install AME and PP in the hope both would be ready to work properly when needed again. AME works fine in conjunction with a different PP project but now I can't open the PP project in question without the above error message appearing.
    Having searched the net it would seem that the problem may be caused by ProRes but I haven't been able to find a definitive solution for the problem. Does anyone know either:
    1. How to fix this?
    2. If I chose the "modified using a custom sequence setting", can I be sure that my sequences will look the same even if they don't use ProRes? The final deliverable format will be mp4 so as long as the overall look doesn't change then I can  afford a change in the edit codec. It's just that with three sequences over an hour long, I don't want days of work to be ruined.
    Other older PP projects of mine open and work fine.
    Premiere Pro CC 8.2.0
    Media Encoder CC 8.2.0.54
    OSX 10.10.2
    Any help would be greatly appreciated.
    Duncan.

    Adobe web chat come up with a solution.
    Open the PP project.
    Export your sequence or project as a Final Cut Pro XML file.
    Set up a new PP project.
    Import the Final Cut Pro XML file.
    This will get you back up an running.
    Since getting back to editing this project I have found that some things will be lost or change in using XML:
    You will lose position key framing, black video clips, dissolve fx, audio levels, audio dynamic fx, the ability to open a multi camera clip and change the camera view.
    You will keep cut points, crop fx.
    Not perfect but only took a couple of hours to save 3 days work.

  • Infopath to design WYSIWYG Custom List Views on 2013

    We are migrating to SPO 2013.  Playing with InfoPath 2013.
    I know it's dieing, but InfoPath has always frustrated me.  Some much potential yet so out of touch with what users seem to need IMO.  Far from user friendly enough to let users maintain their own forms too IMO.
    But really my biggest gripe with SharePoint in general is that it misses the mark with Custom lists and Views.
    Why doesn't SharePoint and/or InfoPath address the need for more flexibility and Design options in the Custom List View. My users are constantly looking to build View pages that to reflect paper forms they use to have.  They always seem to
    have to settle for the way the list view looks.  InfoPath does not seem to address Read Only Views of List Data ??
    - No List Mode (View vs Edit)
    - No Label control
    - Field Names do not display unless you hover over the control. 
    - No WYSIWYG drag and drop designer - only grid cells.
    - No easy or clear way to get URL Query string values
    - No way to build complex expression fields, say I want to build a URL Link using some list field data and the ID from the URL query string on the form? Possible?
    - Better/easier way to join and bind in multiple Lists and multiple data sources?
    One other challenge we have is that SSRS can't be integrated into SPO and is being dropped from Azure.  The SSRS designer is leaps and bounds better than InfoPaths IMO.
    Considering SPO 2013, might there be another product or IDE coming in (maybe FoSL) that will address all of these? How about Visio, Excel, PDF
    Thank You.

    Thank You for your response.
    A little of both :)   ... But am very interested in hearing about practical development options.  But the catch is that we are waiting to see if something shows up that will enable users to build these views without development.
    I have been seeing new Apps show up on the o365 store that look promising, but none of them are quite there yet IMO ...  like Ninetex forms, Lightning Data Viewer, BlackCompass Data Viewer, List Designer, OData query Builder.  We've
    actually demoed every single one of them.
    We have also been playing with oData Connections from Excel and Visio web Access Web parts.  We can't get Data connections to refresh from Excel apparently unless we buy Power BI and we are still trying to figure out Visio on SPO.
    I know we can create a SharePoint 2013 App that binds in SPO List data and use .NET controls to arrange them on a page.  But that would put a developer and a deployment process in front of that View.  We can also use SSRS and create a one row report
    - but SPO does not support integrated SSRS and we would have to authenticate  on-Prem SSRS against  ADFS which we have not yet configured here.

  • Custom Split views don't work like the use to pre- Project 2010

    Hi
    Either we've lost some functionality along the way, or there must be another way of doing the following...
    Up until and including version 2007, I was able to create multiple custom split views in a file (or global.mpt) where the I could specify a different Task Form (e.g., "Predecessors & Successors" or the "Work") depending on which custom
    split view I selected.
    In 2010 and 2013, you have to manually select the Task From you want; the custom split view won't can help you get the specific Task Form you want ((e.g., "Predecessors & Successors", "Work").  At least that has been my experience...
    does anyone have a solution apart from needing to write a VBA event handler?
    Thanks in advance,
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    I agree with Dale. Project remembers the last set of details applied in form views such as Task Form. Using VBA event handlers you can change this behavior.
    1. Open the project file on which this change should be applied.
    2. In the View ribbon, click Macro command and select Visual Basic
    3. If you want the details displayed in the Task Form to be applied to the current file, double click "ThisProject" node under the VBAProject(your file name) or else double click "ThisProject" node under ProjectGlobal (Global.MPT)
    4. Paste below lines in the Project_Open event handler. Save the code.
    Private Sub Project_Open(ByVal pj As Project)
        ViewApplyEx ApplyTo:=1, BuiltInView:=pjViewTaskForm
        WindowActivate TopPane:=False
        ViewShowPredecessorsSuccessors
    End Sub
    5. You can replace the last statement ViewShowPredecessorsSuccessors with another statement that is compatible with Task Form view
    Sai PMP, PMI-SP, MCTS Project, MVP Project

  • [ADF Help] How to create a view for multiple tables

    Hi,
    I am using Jdeveloper 11G and ADF framework, and trying to create a view to update multiple tables.
    ex:
    Table A has these fields: ID, Name
    Table B has these fields: ID, Address
    A.ID and B.ID are primary keys.
    B.ID has FK relationship with A.ID
    (basically, these tables have one-to-one relation)
    I want to create a view object, which contains these fields: B.ID (or A.ID), A.Name, B.Address.
    So I can execute C,R,U,D for both tables.
    I create these tables in DB, and create entity objects for these tables.
    So there are 2 entity objects and 1 association.
    Then I create a view object based on B and add fields of A into the view:
    If the association is not a "Composition Association",
    when I run the model ("Oracle Business Component Browser") and try to insert new data, fields of A can't edit.
    If the association is a "Composition Association", and click the insert button, I will get
    "oracle.jbo.InvalidOwnerException: JBO-25030: Failed to find or invalidate owning entity"
    If I create a view object based on A and add filed of B into the view:
    When I run the model and try to insert new data, fields of B can't edit, no matter the association is or is not a composition association.
    So... how can I create a view for multiple tables correctly?
    Thanks for any advices!
    Here are some pictures about my problem, if there is any unclear point, please let me know.
    http://leonjava.blogspot.com/2009_10_01_archive.html
    (A is Prod, B is CpuSocket)
    Edited by: user8093176 on Oct 25, 2009 12:29 AM

    Hi Branislav,
    Thanks, but the result is same ....
    In the step 2 of creating view object, I can select entity objects to be added in to the view.
    If I select A first, and then select B (the "Source Usage" of B is A), then finishing the wizards.
    When I try to create a new record in the view, I can't edit any properties of B (those files are disabled).
    If I select B first, and then select A in crating view object, the result is similar ...
    Thanks for any further suggestion.
    Leon

  • In A3, How Do I Apply One Of My (many) Custom Metadata Views To The Viewer?

    In A3, it appears that both the Viewer and Browser are limited to just 2 views: Basic and Expanded.
    In A2, I had many custom metadata views that I could easily change via the Metadata-pane (now gone) in Prefs. depending on the type of workflow, customer needs, etc.
    Now, if I'm limited to just 2, I'll have to go in and manually change the composition of A3's 2 views for each workflow. If this is the case, I see it as a big step backwards. This is the type of limitation that iPhoto often has, and flexibility is what I expect from a Pro-App.
    I spent a great deal of time developing custom metadata views for various workflows so that I could align the various displays in Aperture to each workflow. What do I do now?

    Just stumbled over this thread:
    Yes, its the truth. There is no way to quickly change the display of Metadata in Browser or List View.
    You can tell from the form of the Settings - Window (Command - J) that there is no way anymore. You have one Standard View, and one Extended.
    Strange. I did not use it a lot, I always display pictures to customers with no metadata, except when we do a selection on site (and then its standard with only rating).
    wok4

  • No accessory view in custom table view cells.

    Hello Everyone,
    I have been having problems with my accessory views in my custom cell views. I am expecting that the accessory views will show up by only setting the accessoryType property correctly. Below is a link to my class for the custom cell view. I am setting the accessoryView to UITableViewCellAccessoryDetailDisclosureButton.
    I didn't know how to paste code in here, so I have pasted my code here: http://pastebin.com/m3ba5d9de
    Thanks again,
    Uday

    Hi
    View is always a better option..using a view you can avoid the naming convention problems associated with fields or Table names.
    Thanks
    -Rajesh

  • How to create wizard for a custom mainenance view/view cluster

    Hi Experts,
    I have created 5 custom maintenance view and have maintained all the views sequencially and have made the first mainenance view as the start view & header entry and all other views are child or subview of the header view in a custom view cluster. But I want a wizard to help the user / end user successfully enter all the required values for all child views, it will help  the user to navigate  from the start view to all the child views where the fields of the wizard will be associated to the child maintenance views.
    Please suggest how to create wizard for view cluster.
    I'll give max reward point for the helpful answer.
    Thanks in advance
    koustav

    Hello Pasapula
    When you are in the View Cluster maintenance dialog (SE54) click on dialog "Events".
    Below the field for the view cluster you have an additional field <b>FORM routines main program</b>. There you have to add the main program containing the FORM routines called by the VC events.
    For example: I had defined a normal report containing an include with all the FORM routines. The report contains only the following lines of coding:
    report zus_0120_u1.
    * Common Data und access routines for user exits in VC maintenance
    include LSVCMCOD.
    include  zus_0120_f1. "FORM routines for VC events
    Now in the "Events" dialog of the view cluster maintenance you assign your FORM routines to the events.
    Regards
      Uwe

  • Custom secure views report is not restricting the data

    Hi,
    I have created few custom secure views reports and in which I have used the per_people_f , per_assignments_f secure views but when I am running this report from different responsibilities like (US Resp, UK Resp) it is producing the same number of records. From US resp it should produce the US employees and from UK it should produce the UK employees but this is not happening currently.it is a simple sql script which I registered as sql*plus executable.
    Can any one suggest if I am missing some thing? Urgent help would be appreciated.
    Thanks,
    Ashish

    Pl post details of OS, database and EBS versions. How have you implemented security ? What kind of concurrent program are you using ? Pl provide details. Also see these MOS Docs
    How To Enable Hr Security on Custom Reports?          (Doc ID 369345.1)
    Understanding and Using HRMS Security in Oracle HRMS          (Doc ID 394083.1)
    Need Custom Security Profile To Restrict Based On Employees Organization          (Doc ID 445142.1)
    HTH
    Srini

  • "...in a custom Sequence Preset Editor."

    On page 1011 of the Final Cut Express User Manual, in the section "The Export QuickTime Movie Command", in the second paragraph, it suggests that there is a way to create a custom Sequence Preset. I quote:
    "You can also choose to use the existing settings of the clip or sequence you are exporting, or create customized settings in a custom Sequence Preset Editor."
    I desperately want to create a custom sequence preset. The last video I did for work I did at 1920 x 1080. The video is going on the companies site at 576 x 324. So I would rather just work in that size. But I cannot figure out how to create a sequence that size. Dose such a "Sequence Preset Editor" exist? And, where would I get one?
    Any help offered here would be most graciously welcomed.

    I don't really know what it means by that. However, in the paragraph before it it says:
    +"You can use this command to export Final Cut Express clips or sequences with their current settings or any of the sequence settings available in Final Cut Express. This command allows you to choose settings based on sequence presets in Final Cut Express"+.
    I can only assume that it means you can take the file into another program like Compressor to choose more settings instead. Or maybe it is referring to Quicktime Conversion, which gives you more options in exporting...
    Maybe someone else will know, but for now I am puzzled.

  • How to test and develop the HTML/Backbone custom content viewer on IPad?

    Hi
    I have been tasked with developing and amending the HTML/Backbone custom content viewer as nicely detailed and explained by Derek Lu here:
    https://www.adobe.com/devnet/digitalpublishingsuite/articles/html-default-library.html#
    I can see that by removing the reference to libs/AdobeLibraryAPI.js in Index.html i am able to "test" on the desktop.
    <!--
        The DPS library/store API.
        The include below should be commented out when testing on the desktop.
    <script src="libs/AdobeLibraryAPI.js"></script>-->
    and that data is bought in via the fulfilment XML feed and the parse method is called on Librarycollection.
    I have made the changes to hook up the viewer to bring in some folios that we are developing.
    However, although this provides the ability to test and develop on the desktop in one form since we are using JS and Backbone, there are various checks within the provided code to see if ADOBE.isAPIAvailable.
    If it is, then the behaviour is different than on the desktop, so once the viewer is packaged up and put on the IPad there is disparity between what you were able to check and test on the desktop version against what is shown on the IPad.
    The question therefore is... is there a quick way to develop and test on the Ipad ... it doesnt seem like a viable option to develop blindly on the desktop and then package up the content viewer within Adobe DPS to check how those changes behave on the IPad?
    To re-iterate the viewer is to make use of backbone / js example to provide greater functionality and options for customisation.
    Thanks in anticipation.
    Dave

    Thankyou for taking the time to respond and for providing such detailed articles on adobe dps development, it is much appreciated.
    I had completely missed that article and was struggling to find anything useful from googling!
    Dave

  • Oracle Apps EUL with Custom Discoverer Views

    Disco Environment:
    OracleBI Discoverer 10g (10.1.2.2)
    Oracle Business Intelligence Discoverer Plus 10g (10.1.2.54.25)
    Discoverer Model - 10.1.2.54.25
    Discoverer Server - 10.1.2.54.25
    End User Layer - 5.1.1.0.0.0
    End User Layer Library - 10.1.2.54.25
    Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi
    Oracle Applications R12 EUL
    All,
    Up until now, we have been placing our Discoverer custom views in our apps schema. From a "keeping track" perspective and from a "keep Disco views separate from apps" perspective, we are inclined to create a custom schema to place all of our custom Discoverer views. I have heard that Noetix does this as well.
    To accomplish this, we were planning to provide a grant select to all tables, views and synonyms (with a limited execute rights to some packages).
    The easiest thing to do is to keep on doing what we are presently doing. We have a naming schema in place that enables us to quickly identify all custom Disco views.
    Can I have people whom have implemented a custom schema for their Disco views in apps let me know how this has worked for them? This type of Disco environment appears to require a lot of communication between the Disco staff and the DBA to make sure these grants are set-up correctly.
    Thanks,
    Patrick

    Hi,
    All the eBS sites I have worked on have created the majority of their custom views in the APPS schema using a naming convention to separate them from the seeded views. The reason being is that the SQL in the view (including all the function calls) is run with the privileges of the owner of the view. If the view is defined in another schema, then this schema must have access to the APPS database objects which can be a lot of work to set up because it is very hard to identify the dependencies and unnecessarily opens up the security on the APPS schema.
    Where the data is held in custom tables and there are views on these custom tables, then both the tables and the views are held in a separate schema.
    Rod West

Maybe you are looking for

  • Itunes won't open 'error: new itunes library'

    My itunes was playing up. Not recognising my iphone 4s. It then told me I had to install the new itunes to make m iphone compatible with the computer. I did so and now the itunes will not open saying "Error: New Itunes Library' WHY?!? This is really

  • Sync imac iphone and ipad

    Is it really possible to get an iMac, and iPhone to sync?  I purchased my 27" iMac in February and have spent likely 100-150 hours trying to get these to sync.  Apple technical support is nearly useless... talked to them again as calendars weren't sy

  • Creating a TOC in Pages 09

    Created a document using a BLANK word processing format in Pages 09, not a template. I want to create a Table of Contents. When I review the users guide, it states that I need to use a template in order to create a TOC. What do you think

  • Questions about the keyboard

    Hi all, I have set up a Hungarian keyboard in Settings > Keyboard > International keyboard, but I still get the default English keyboard when I write something. What have I done wrong? Another question, most of the time the keyboard switches between

  • Problem installing net beans

    Hi, I installed the JDK 5.0 netbeans4.0 bundle a while ago, yet I feel more comfortable with netbeans 3.6. I decided to uninstall netbeans 4.0 and download and install netbeans 3.6. However when I try to do this I get this error - "a suitable JVM cou