Database copy from EP prd to EP qas
Hi Portal Experts,
We had deployed java patches on Quality system but not yet Production. Before deployment we had backup (/usr/sap/SID) & database on Qas . Now we are facing lot problems with functionality and configurations. So we tried to restore back system with backup data but we failed to restore it database level but we can able to restore file system (/usr/sap/SID). So Now we are planning to copy database from Production to Quality system.How can I get db level from Production to Quality? Please provide me solution for my problem.I am awaiting a lot for right process...
Thanks.
What are you wanting to copy? without knowing that we cant tell you what profile to use.
Regardless, you can import data from tables in PRD that do not exist in QAS - hence the error. You need to import the transports FIRST that relate to any and all changes to the tables/structures, then run the client copy with the profile based on the type of data you want.
Clients copies are not used to 'create' systems, only 'refresh'
Similar Messages
-
Remove mailbox database copy from DAG
Hi There,
We would like to remove the mailbox database copy from our exchange server as we are lack of the space on our fixed vhd and we hope to be able to free about 100GB from the passive database copies as we have deployed DAG. is there any guidelines or procedures
to safely remove the database copies? currently, we have 4 mailbox servers, HQMB01, HQMB02, SSMB01, and SSMB02. HQMB01 and HQMB02 is already part of DAG members by itself. however, on ssmb01 and ssmb02, we also add in HQMB01 and HQMB02 as the DAG member,
thus they can fail over to HQMB01 or HQMB02 if their server have issue. in this situation, SSMB01 and SSMB02 passive copies is also inside our HQMB01 and HQMB02. As the our HQMB01 and HQMB02 is lack of the disk space and we would like to remove SSMB01
and SSMB02 from the DAG, thus we could remove the passive database copies. The following is the picture of the activation preference for all servers. what is the procedures and the guidelines to remove mailbox database copy and also remove the server from
the DAG members? we are quite confuse and worry that after we are removing wrongly and cause the active database to lost as we understand that there is replication happening between them. as we have 4 mailbox servers from which server we should perform
the task? Wish to get some advises from the exchange guru from this forum. we are on exchange server 2010 sp1 and windows server 2008 R2.Thanks so much.
Name : HQDB01
Servers : {HQMB01, HQMB02}
ActivationPreference : {[HQMB01, 1], [HQMB02, 2]}
ReplayLagTimes : {[HQMB01, 00:00:00], [HQMB02, 00:00:00]}
TruncationLagTimes : {[HQMB01, 00:00:00], [HQMB02, 00:00:00]}
Name : HQDB02
Servers : {HQMB02, HQMB01}
ActivationPreference : {[HQMB02, 1], [HQMB01, 2]}
ReplayLagTimes : {[HQMB02, 00:00:00], [HQMB01, 00:00:00]}
TruncationLagTimes : {[HQMB02, 00:00:00], [HQMB01, 00:00:00]}
Name : SSDB01
Servers : {SSMB01, SSMB02, HQMB01, HQMB02}
ActivationPreference : {[SSMB01, 1], [SSMB02, 2], [HQMB01, 3], [HQMB02, 4]}
ReplayLagTimes : {[SSMB01, 00:00:00], [SSMB02, 00:00:00], [HQMB01, 00:00:00], [HQMB02, 00:00:00]}
TruncationLagTimes : {[SSMB01, 00:00:00], [SSMB02, 00:00:00], [HQMB01, 00:00:00], [HQMB02, 00:00:00]}
Name : SSDB02
Servers : {SSMB02, SSMB01, HQMB01, HQMB02}
ActivationPreference : {[SSMB02, 1], [SSMB01, 2], [HQMB01, 3], [HQMB02, 4]}
ReplayLagTimes : {[SSMB02, 00:00:00], [SSMB01, 00:00:00], [HQMB01, 00:00:00], [HQMB02, 00:00:00]}
TruncationLagTimes : {[SSMB02, 00:00:00], [SSMB01, 00:00:00], [HQMB01, 00:00:00], [HQMB02, 00:00:00]}Hi Exchange Guru,
thanks so much for the prompt response..i have few queries to ask following your guidelines above:
1. from the show result above, I am still confuse which server that I should go to remove as this is involving 4 database copies. from what I understand from the truncation or replay lag times of SSDB01 and SSDB02, I can see that HQMB01 and HQMB02 are on
the third and fourth preference, which means that SSDB01 and SSDB02 will be able to failover to each of them when there is a failure and it cause the passive copies of both of SSDB01 and SSDB02 to be stored in the HQMB01 and HQMB02. what my purpose
is to remove both SSDB01 and SSDB02 passive copies in HQMB01 and HQMB02. in this case, should I login to SSDB01 or SSDB02 mailbox servers to perform the removal with your guidelines above?
2. is the command as below:
Remove-MailboxDatabaseCopy -Identity SSDB01\HQMB01 -Confirm:$False
Remove-MailboxDatabaseCopy -Identity SSDB01HQMB02 -Confirm:$False
Remove-MailboxDatabaseCopy -Identity SSDB02\HQMB01 -Confirm:$False
Remove-MailboxDatabaseCopy -Identity SSDB02\HQMB02 -Confirm:$False
will this cause the risk either of my HQDB01, HQDB02, SSDB01, and SSDB02 active copies accidentally being removed? I am sorry that I am a bit naggy and always want a confirmation as this is very critical and I must be super careful.
3. If after the removal successful, when is the best time to go to the drive where the passive copies stored and remove them so I can clear some space on my disk? and is it just as simple by going to the drive and do a folder file deletion manually?
because I just worry when I delete the file and the server is still replicating between each other, which will cause even corruption to the active database.
4. From point 3, you mention about when the server is empty. what do you mean by that? do you mean that when the passive copies are no more there? and what command that I used to check?
5. From point 4, is removing the server from DAG the last step to be performed? yes, I want to remove them from DAG, thus will left only HQMB01 and HQMB02 as one DAG and SSMB01 and SSMB02 as one DAG.
Thank so so much for your patient and attention.
Regards,
Henry -
Moving the mailbox database copy from one exchange server to another exchange server 2010 DAG
Hello Team
is it possible to the move the passive copy of database and logs from one server to another exchange server in the same DAG with out removing and deleting the mailbox database copies in exchange 2010
normaly procedure is
Remove the mailbox database copies and manually delete the .edb files and logs from the physical location and re-add the mailbox database copy to the new server in the DAG.
is that any way to achieve to move the passive database copy to another exchange 2010 server in the same DAG ?From your note, you appear to have a two-member DAG (with a server hosting your active database, and a second hosting the passive copy), and you want to move your passive database copy from the current passive server to another. Your note
about what "the normal procedure is" isn't 100% correct - there are many ways to handle this task, and all can be considered "normal". Why not just add the third server to the DAG and
add a database copy on that third server? Once it is fully seeded, you can remove the current passive copy. This way, you never lose your redundancy.
Yes i can add the third and fourth serve in DAG , but i cannot add the mailbox database copies to the 3rd and 4th mailbox server in DAG as am using RTM version of exchange 2010 which is allowing to have only 5 database inclding mailbox datbase copies
and also currently my lab setup is two member dag (with a server hosting your active database,
and a second hosting the passive copy) in the same site named SITE A
and recently i have created new SITE B and included the 3rd and 4th DAG members in the same DAG
i want the mailbox database copies from the mailbox server database in SITE A to
Mailbox server database in SITE B as passive copy
That is why i want to move the mailbox database without deleting / removing it manually
Hope you understand my situation! -
JDEV 11G TP4 [BUG]: Offline Database / Copying from another workspace
see JDEV 11G TP4 [BUG]: Offline Database / Copying project from workspace
Message was edited by:
micwicI completely reinstall JDev and set it to use subversion ... that resolve the problem and i'm no more in a position to reproduce it.
-
SWL Database copy from 2005 to 2008
Hello,
I'm moving my ECC6.0 from a SQL2005 based system to a new cluster running Windows2008 and SQL 2008. I already copied the system using the modified NW70 master installation DVD with using option
-> Software Life-Cycle Options
-> System copy
->MS SQL Server
-> Target System Installation
-> High-Availability System
-> Based on AS ABAP
After tunning and testing my system in the last days, I plan to go live next weekend. I will backup my PRD database and restore it in the new system. Then I will put it in production.
My question is: After restoring the database, how do I complete the system copy? Using "Sap tools for SQL server" as described in OSS note 683447, or using the sapinst in the modified NW70 master installation DVD using option
-> Software Life-Cycle Options
-> System copy
->MS SQL Server
-> Target System Installation
-> High-Availability System
-> Based on AS ABAP
-> Database Instance
MNy source is a 2005 cluster, and my destination is a 2008 cluster.
Thank you
Best regards
PauloHello Paulo
Sorry for the late reply!
This Note 683447 - SAP Tools for MS SQL Server is not relevant with the Basis 7 as you inquired about the SAP Tools.
This applies only to SAP basis versions 6.40 or earlier.
You have successfully installed the Clustered which need to restore the data from the old cluster without any repeating the installation steps.
As i disscused above that if you have DB and SAP has same instances then you can restore the data to the newly server.
If not then you have to use the System copy option with database dependent to prepare your cluster again!
Regards
Anwer Waseem -
Oracle DB copy from PRD system 10g to TEST system 11g
Hi All,
I have recently upgraded Oracle in the test system from 10.2.0.4 to 11.2.0.2. My Production system ran still with the old oracle version 10.2.0.4.
Now I need to refresh the test system.
Is that possible to be made at all, a database copy from production system (with old oracle version 10g) into test system (with the new version 11g) ?
Thanks in advance for your reply.
Regards
LatifWe must have taken the
When you upgraded 10.2.0.X.X to 11.2.0.2.0 on TST System
You would have defintiely taken the 10.2.0.X.X. ( Oracle Home Backup)
I Strongly feel..
Resotre home folder in Qty System
Change the Environment Variables of s<sid>adm & ora<sid> users to oracle 10.2.0.X.X home directory
Change listener file entires.
Restore backup of Production of 10.2.0.X.X
recover system as you have not done any upgrade on QTY and release.
...The rest all approaches may consume your extensive .
You are the best judge...
How you want to build TST System ....want to make easy ...want to make hard your self.
Business wants data ..The rest all yours decission i think
Rgds -
Differences between client copy with sap_all and database copy
What's the difference between client copy with sap_all and doing a database copy.
I know if I do a database copy from Production to our Quality system.
I need to install the license key
restore the production library to the quality library
Initialize TMS and so on.
I know if I want to copy to our Development system. I would need to run either a remote client copy or and export/import since I cannot do a database copy because I would loose all my other clients in Development.
My question is, if the quality systems and the production systems are on the same support packs, same kernel.
What does a database copy give you (besides being faser) that a remote client copy or export/import of a client copy does.
Any differences
Thanks
JoeHello Joe,
If there is inconsistent Z tables between QAS and PRD, remote client copy could fail, especially when the table on PRD has longer length or more fields than the one on QAS.
Also the source client should has no-activity during the client copy, otherwise the application data could be inconsistent. For example, some material documents are copied, but not the corresponding financial documents. (For PRD client, it could be hours between the times those tables are copied.) For database restore, it is rarely an issue.
Best regards,
Victor -
Hello All,
How can I copy my PRODUCTION server data to DEVELOPMENT server.
Prd Server System Information.
Database: Maxdb 7.5
Operating system: Win 2k3 SP2
Database size : 57GB
Development server has same configuration of PRD server
should i directly restore PRD offline backup to Dev server. Will it work?
Please guide me...
Best regards
AmolHi Amol,
Ideally I shall not recommend you to make database copy from PRD to DEV since all the version management in the development system will be lost by doing this.
For your question:
Development server has same configuration of PRD server
should i directly restore PRD offline backup to Dev server. Will it work?
Yes. It will work.
Alternate solution
As you are interested in copying PRD data to development, I would suggest you to create a new client in Development system and perform client copy from PRD to Development (new client) with SAP_ALL profile.
Regards,
Deepak Kori -
Hi,
I am trying to add a mailbox database copy from server1 to server2. Every time after seeding the status of the second copy is shown as 'Failed'. In the event log i can see one error message as given below :
The required log file 374413 for BInew\EX02 is missing on the active copy. If you removed the log file, please replace it. If the log file is lost, the database copy will need to be reseeded using Update-MailboxDatabaseCopy.
I have tried reseeding many times both from console and shell.
Update-MailboxDatabaseCopy -Identity "Binew\EX02" -DeleteExistingFiles
Is this the reason for the replication getting failed.I have never deleted any log file from server1.
Please help!Hello,
You may run the following cmdlets one by one:
Suspend-MailboxDatabaseCopy <databaseName>\<ReplicaServerName>
Update-MailboxDatabaseCopy <databaseName>\<ReplicaServerName> -SourceServer <ActiveServerName> -DeleteExistingFiles:$True
Resume-MailboxDatabaseCopy <databaseName\<ReplicaServerName>
Regards from ExchangeOnline.in|Windows Administrator Area | Skype:[email protected] -
License key problems with database copy
Hi all - we are refreshing ECC 6.0 QA/Test system with a database copy from our DR system that is replicated from production with MIMIX. Problem with license key is that in SLICENSE the system number is from the DR system, but the QA system should have a different system number. When I go out to OSS, the existing license doesn't work because system number doesn't match what is in system data for QA system. We recently upgraded to ECC 6.0 from 4.6C and didn't have this problem before.
TIA,
-MargieHi again - finally figured it out, it's the difference between Old License and New License. We got an old license to install.
Regards,
-Margie -
Logical system on QAS after remote client copy from PRD to QAS
I wander after remote client copy from PRD to QAS do I have to change Logical system on QAS. Do I have to run some postprocessing program?
Thank you in advanceHi Branko,
After the system copy, go to transaction SALE -> Sending and receiving Systems -> Logical systems -> Define Logical System , click New Entries and create a new logical system for your QAS; then go to SALE -> Sending and receiving Systems -> Logical systems -> Assign Client to Logical System, click on the client, click change and assign the new Logical system.
Other activities, check Jobs, RFC's, etc...
Regards
Juan
Please reward with points if helpful -
System copy from PRD to QAS based ABAP system EHP4.
Hi guys,
I have to perform homogenous system copy from PRD to QAS.
My PRD is ECC6.0 EHP4 release 701 sp 103( SAP_basis) with oracle ver 10.2.0.4.0.
Is there any specific procedure for EHP4 or i can follow the below mentioned guide.
https://websmp204.sap-ag.de/~sapidb/011000358700000514722009E.pdf.
What pre-requisite i need to take care before doing the system copy?
Regards
AbhishekHi,
All pre-requisite is there in system copy guide.Apart from that take user master backup of quality system and after system copy, import the user master data back so that you have same users in quality system.
Also, take RFC's backup also.
Thanks
Sunny -
BW System copy from PRD to DEV - Reduce database size
Hi All
We are in the process of copying our existing Production BW system (3.5) to become a new Development & test system. We want to reduce the database size significantly from 1.4 Tb to about 150 - 200 Gb. We have deleted all cube and ODS data as well as much of the master data but still have much tablespace tied up in monitor entries (eg table RSMONMESS) and IDOCs. All of the notes I read say that we cannot delete from RSMONMESS in a "Prodcution" environment, however we are creating a new DEV system and really need to get rid of monitor entries anyway. So there are two questions:
1. Any idea how we can clear up table RSMONMESS or delete unwanted monitor entries ?
2. How can we delete IDOCs copied from our production system without archiving them ? (They are of no use in our new test system.)
Please help.
Many thanks in anticipation.
Paul Sullivan
Orica ITHi Paul,
See SAP Note 694895 - Performance and tables RSMON, RSDONE
Note Language: English Version: 5 Validity: Valid Since 29.11.2005
Summary
Symptom
Tables RSMON* (for example, table RSMONMESS) and tables RS*DONE (for
example, table RSSELDONE) continuously increase in size in the BW system
with each request that is created.
Currently there is no option to reduce these tables.
Do not delete any entries from these tables. If you did, this would have
the following consequences:
When you carry out the next check for the requests for which you have
deleted records from these tables, the check will not run properly.
The status of the relevant requests turns RED in the monitor, and also in
all affected data targets that contain the request.
The affected request and all subsequent requests are no longer visible in
the reporting - all queries on the affected data targets then only display
old data.
Numerous dumps will occur in various situations.
You will not be able to repair the errors caused by the deletion.
More Terms
RSMONMESS; RSSELDONE; Performance; RSMON; RSDONE;
Cause and Prerequisites
This is caused by a program error.
Solution
In the next BW release (BI in SAP NetWeaver 2004s - that is BW 7.0), you
will be able to archive entries from the RSMON* and RS*DONE tables using a
request archiving process that archives the administrative information for
requests.
After archiving, these tables are then considerably reduced in size.
Until then, there is unfortunately no option for reducing the tables.
Rgds,
Colum -
When creating system copy of PRD sistem to QAS system how to create transpo
when creating system copy of PRD sistem to QAS system how to create transport request queue on QAS with:
everything transported to QAS previously but
not transported to PRD.
We have an approval procedure with delete form queue on QAS after import.
Basically all tr.req from import queue(there I do not have delete from import queue) should be entered in same sequence to QAS.
I know how to add technically one transport request to queue but how to do that for many(all)Jan
Check the import history of both QAS and PRD from a date which is just after your previous system copy.
Use the V-lookup function of MS Excel. You can determine those request which were there in QAS but have not been moved to PRD yet.
Now, if you want to add multiple request in the import queue , I would recommend to do it from OS level but writing a script.
You will find multiple threads in SDN for how to add request in import queue from OS level. Below one might be helpful
Link: [Re: need TP command for Add Transport Request to import Queue all at a time;
Regards
Anindya
Edited by: Anindya Bose on Feb 22, 2010 10:02 AM -
BW on HANA : Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.
We are trying to copy database from SAP BW7.0 to SAP BW on HANA 7.4 SPS6 so we are in search for list of steps or activities during database copy both pre and post steps.
Along with the above we are in search of Pre and post migration steps ones database is transferred successfully from oracle to HANA on 7.4 SPS6.
Kindly help us in getting the exact course of action as requested.
Thanks and Regards,
Lavina JoshiHi Lavina,
try this link for starters: Upgrade and Migration - BW on HANA | SAP HANA
Points to remember are:
Preparation:
-- Hardware Sizing
-- Preparation of Data Centres
-- HANA Hardware preparation
-- System Landscape Readiness (upgrade software downloads, system readiness checks, etc)
-- House Keeping activities on BW system (data clean up, etc)
Post Installation:
-- Sanity checks / Preparation and License checks
-- JAVA Configurations
-- Infoprovider conversions
Overall Stages are described below:
# Environmental setup (HANA box)
-- Initial system checks and Building Activities (system copy, Appln server setups, etc)
# System readiness
- ZBW_HANA_COCKPIT Tool
- ZBW_HANA_CHECKLIST Tool
- ZBW_ABAP_ANALYZER Tool
- ZBW_TRANSFORM_FINDER Tool
- SIZING Report
- System Clean up Activities
- Impact of 7.4 on source system checks
- Java Upgrade for portal
# DMO Stages
- Preparation & Pre Migration checks
- Execution / Migration
- Post Migration Activities
# Testing Phase
- Source system checks/Activities
- System and Integration Testing
- End to End Testing
- Performance testing
- Reports
- BO reports / Interfaces
Do let me know if you require any further information.
Regards,
Naren
Maybe you are looking for
-
I just updated my Note 3 to 4.4.2. Since then when I listen to music or make a call on my Bluetooth my music and calls 'studders' and has some type of 'drop-outs' during the music and calls. This was not the case prior to the update. Yes, I have powe
-
How to create a watermark in Pages?
I seem to remember there was a process by which an image could be use to create a watermark in pages but there is no longer anything in Help. Is this still available?
-
Respect, I have to implement copy-paste feature for HTML content (from JEditorPane). In my onButtonClick method I used something like this: JEditorPane doc = contentPanel.getActiveEditorPane( ) ; //my html content TextTransfer textTransfer = new Text
-
Crazy looking cyrillic type font all over my address book.
The fields in my address book are mostly an incomprehensible either Russian or cyrillic font and I've gone through all the character setting everywhere in my OS and in address book but nothing changes. Is there a way I can trash the app and download
-
Install Adobe Flash Pro on laptop (was: Adobe Flash Pro)
i am using the trial version on my desk top, how do I get it to my laptop?