Date Based Calculations

We have the following requirements:
1.     In terms of minutes provide the difference between the expected time and actual time of arrival
2.     With a tolerance level of 5 minutes compare expected and actual time dates providing an On time value
Are these date based calculations straight forward as part of the data model (not at query level) in BW and if so how is this done?  Thanks
We will create Key Figure DAT InfoObjects

Thanks for that.  I have had a look at the FM and the input values are:
Date 1
Time 1
Date 2
Time 2
I am aware that I can get say right set of numbers.  However is the time part stored in BW?
Thanks very much guys have checked.  Oscar TIMS is available in BW.  Have awarded points
Message was edited by:
        Niten Shah

Similar Messages

  • Calculation of due date based on Business Days for FICA documents

    Hi All,
    I am working on project where SD - FICA integration is in picture. We post some charges through SD and FICA document gets posted on relevant Contract Account.
    Normally we create Sales Order using transaction VA01 and then we do Billing for this Sales Order through VF01. After billng is done, FICA document automatically gets generated.
    We have following requirement to be fulfilled.
    For the SD bills posted as above, I want to calculate due date of these bills based on Business Days for FICA document generated (SAP Standard calculate due date based on Calander days). We can use factory calander for calculating business days in relevant function module.
    I have checked in the system and it seems that event 1330 ( FM - ISU_DUE_DATE_DETERMINE) is not working in this scenario. Is there any other FM which I can use?
    Can anyone help me on this?
    Regards,
    Pradeep

    Hello Praeva ,
    The event 1330 has a sample FM FKK_SAMPLE_1330. It doesnt even have a Standard Function Module.
    You need to create a Installation-Specific FM and put your code to determine the Due Date based on the logic.
    Rgds
    Ram Kumar.

  • Out of memory Error while querying SQL Script based Calculation View

    Hi All,
    I wanted to test the performance of Graphical and SQL Script based Calculation views.
    Created Graphical (CA_GRPH) and SQL Script (CA_SQL) Calculation views.
    Analytic View (AN_GRPH) for both Calculation views are the same which is Graphical based (90 Attributes and 5 Measures)
    In Analytic View data foundation I have a Fact table which has 1.5 Billion records and 9 Dimension Tables –collectively 500 million records (7 Attribute Views). 9 Referential joins with cardinality N:1 and 1 Referential join with cardinality N:N.
    I wanted to keep (CA_GRPH) and (CA_SQL) as a base Calculation views and leverage those to create various calculation views (Will be creating different Calc views for respective Business segments)
    In order to test this I have created below calc views on top of base calc views.
    Graphical Based: Created (CA_GRAPH_XYZ) by having CA_GRPH in projection with 30 Calculated Columns. – This retrieves data in 13 secs
    SQL Script Based: Created (CA_GRPH_ABC) by having CA_SQL in projection view with 30 calculated columns – This errors out after 1.50 mins.
    Could not execute 'SELECT "COLUMN_A","COLUMN _B"," COLUMN _C"," COLUMN _D", SUM("COLUMN _REVENUE") AS ...' in 1:50.480 minutes .
    SAP DBTech JDBC: [2048]: column store error:  [2048] column store error: search table error: [1000002] Error executing physical plan: exception 1000002:
    ltt/impl/memory.cpp:63
    Out of memory ; $size$=1507711; $name$=ihm; $type$=pool; $inuse_count$=170104; $allocated_size$=219215007925
    exception 1000002:
    Any suggestion / help in fixing this issue will be greatly appreciated.
    Regards,
    Av

    Hi Raj,
    Thanks for your time, please find edited snap hot of Analytic View (AN_GRPH) below,
    Calculation view(CA_SQL)
            /********* Begin Procedure Script ************/
    BEGIN
           var_out =
         SELECT
                "COLUMN_1"
                "COLUMN_2",
                "COLUMN_84",
                "COLUMN_85;",
                SUM("REVN") AS "REVN",
                SUM("MGN") AS "MGN",
                SUM("ORD_QTY") AS "ORD_QTY",
                SUM("SYS_QTY1") AS "SYS_QTY1",
                SUM("SYS_QTY") AS "SYS_QTY"
    FROM
          "_SYS_BIC"."XYZ/AN_GRPH"
    GROUP BY
                "COLUMN_1"
                "COLUMN_2",
                "COLUMN_84",
                "COLUMN_85";
    END
    /********* End Procedure Script ************/
    Later i have built one more Calculation view(CA_GRPH_ABC) using (CA_SQL)in projection. i have 30 calculated measures in this final calc view. this final calc view is throwing above mentioned error.
    Not sure if i can use SQL script based calc view in graphical based calc views?
    Regards,
    AV

  • How to calculate Goods issue date based on the time of delivery

    Hi SAP Gurus,
    I seek your help/suggestion for the given scenario.
    The user requires calculating the GI date based on time of delivery.
    Based on the delivery priority (like Priority 1= Day 1, Priority 2= Day 2) maintained in customer master, the need is something like below-
    1st case= If Retail Customeru2019s delivery orders received before midday (Noon cut off) require to be dispatched on same working day (Day 1)
    Wholesaler customer delivery orders received before midday require to be dispatched by the next
    Working day (Day 2 Including day of receipt)
    2nd case= Retail customeru2019s delivery orders received after midday require to be dispatched by the next working day
    Wholesaler customer delivery orders received after midday require to be dispatched by on day 3
    Kindly suggest , how to proceed in this. I am new to SAP world so need ur help to tackle this.
    Thanks a lot in advance for the valuable inputs.

    What I proposed to do was,
    a. Create routes like 0 day route, 1 Day route, 2 day route etc.
    b. Route determination is based on the Shipping condition of the customer. Put in the shipping condition for the customer as 00 - immediate delivery. 01 - By Truck, 02 - By Rail, 03 - Ship etc
    c. Now, put in your route determination in such a way that routes change in the sales order with shipping condition (SC). Like, if the shipping condition is set to 00, then 0 day route comes up. Meaning immediate delivery, if SC is 01, then your normal route by truck picks up. etc.
    When the sales order is manually created, you know the time of creation. As route is one of the criteria, the material confirmation happens based on number of days you put in the route to reach the destination. Now that you have the material available for today's delivery, the delivery program can be run to create it, or it can be manually created.
    Now, when you configure the route you have to specify 'Transit duration in calendar days'.
    When you have the sales order created electronically (say thru EDI), then, you may have to ask them to send in shipping condition. Else, you have to modify the function module Idoc_input_orders in such a way that if the sales order creation time is < 12 PM, then put shipping condition as 00, else copy what ever is there in the customer.
    If you do not want to check the time manually when the user creates the sales order, then you may have to use the user exit MV45AFZZ (and I think you can use Save_order_prepare) to check the time and change the shipping condition. By this you will avoid extra coding in Idoc_input_orders and also need not bother if the user changed the route or not.
    Hope my explanation helps.
    Regards,
    Mukund S

  • Updation of SO Confirmed Delivery date based on GR date for BANC parts

    Dear All,
    Would appreciate an answer on the following issue:
    For Back to back/Indiv Purchase Order parts(BANC) the confirmed delivery date in the SO is updated based on the Order Acknowledgement date sent by the vendor for the corresponding PO generated for the SO. If the the vendor happens to deliver the parts in advance of the OA date(it happens quite often), the parts wait in stores till the confirmed delivery date is reached on the SO even thugh the original requested date on the Sales order is long past. If there is an order acknowledgement date in the system, at the time of GR, a warning message comes, but as our system is a high volume systme it is not possible to update the date in SO manually. Is there a way we can update the confirmed delivery date in the SO based on the Goods receipt date automaticall through config or a batch job?
    Thanks
    Suman

    Dspsac,
    Delivery date can be any date.  For instance, if your customer insisted on a Sunday delivery, you would accommodate him, regardless of any calendar.
    From the delivery date, the system counts backwards USING THE FACTORY CALENDAR ASSIGNED TO THE ROUTE by the number of days in the route.  You have to consult the FC assigned to your Route to determine if the GI date has been properly calculated.
    From the GI date, the system counts backward Pick/pack time, using the shipping point calendar, to arrive at Material availability date.
    Calculations are explained in SAP online help
    [Transportation and Delivery Scheduling|http://help.sap.com/erp2005_ehp_04/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm]
    Regards,
    DB49

  • Using Dimension Formulas to sum data based on different criteria

    Hi all,
    I am trying to use a u201CDimension Formulau201D to perform the following calculation:
    We have an account dimension which has 2 important properties:
    1.     CRITERIUMTYPE: This property can have 3 different values: u201CWERKu201D, u201CINVu201D OR u201CLIQu201D
    2.     ACCTYPE: This property can have 2 different values: u201CEXPu201D or u201CINCu201D
    The client wants to have a report that sums data based on these 2 properties. An example will help to clarify this:
    ACCOUNTS     CRITERIUMTYPE     ACCTYPE     VALUE
    ACCOUNT A         WERK                          EXP               100 u20AC
    ACCOUNT B         WERK                          INC               150 u20AC
    ACCOUNT C         WERK                          EXP               200 u20AC
    ACCOUNT D         WERK                          INC               300 u20AC
    ACCOUNT E         INV                          EXP               50 u20AC
    ACCOUNT F         INV                          INC               100 u20AC
    ACCOUNT G         INV                          EXP               200 u20AC
    ACCOUNT H         INV                          INC               500 u20AC
    The clients wishes to see this data in the following way:
    CRITERIUMTYPE     ACCTYPE     VALUE
       WERK                         EXP              300 u20AC
                                        INC              450 u20AC
       INV                         EXP              250 u20AC
                                     INC              600 u20AC
    In order to achieve this I have created several new accounts, one for each combination e.g.: Account WERKEXP is used to sum the data on the combination CRITERIUMTYPE=WERK and ACCTYPE=EXP. I have created a dimension formula in my account dimension but this is where I am stuck. I have created the following formula to calculate the account WERKEXP:
    IIF([BUDGETPOSITIE].CURRENTMEMBER.PROPERTIES("ACCTYPE")="EXP",IIF([BUDGETPOSITIE].CURRENTMEMBER.PROPERTIES("CRITERIUMTYPE")="WERK",[BUDGETPOSITIE].CURRENTMEMBER,0),0)
    The problem with this formula is the following:
    The formula will add all amounts that meet the 2 criteria mentioned in the formula, EXP and WERK, but as soon as it finds an accounts that does not match the 2 criteria it will set the account WERKEXP back to 0. I need to know if there is a way, using dimension formulas, of adding these values together without the new account being set to 0 as soon as one of the accounts it needs to check does not meet 1 of the 2 criteria.
    We are working on SAP BPC 7.5 for NW with SP04
    All help is very much appreciated!
    Kind regards,
    Stefano

    Hi,
    You can also use ParentHn property to have different grouping of accounts within the dimension.
    So in your case rather using the member formula you can have four accounts and add them in the Parenthn property for grouping it.
    1. The Solution proposed by Nilanjan is specific for a Report/IS and Performance will be good
    2. My solution will be global something similar to MDX formula, but performance may be slightly lesser than using excel function.
    Hope this helps,
    Regards,
    G.Vijaya Kumar

  • Delivery Date Re-Calculation in Stock Transfer Order PO

    Hi All,
    We have Transportation scheduling activated and maintain 'Transit Duration Times' in our Routes (Populated 'TransitDur' field in Route <0VTC>) R/3 46c
    When we create a stock transfer order the 'Delivery Date' in the STO PO is determined by the 'TransitDur' (Transit Duration) value maintained in the route between the 'Supplying and 'Receiving' plants.
    After creating the STO PO, if the delivery is delayed and we need to reflect this change in the STO, when we attempt to change the delivery date - the system re-calculates the delivery date using the date on which the changes are made as the starting point and extending out the full length of time based on the value in the 'TransitDur' field in the Route.
    This means we are not able to change the delivery date in the STO PO to a date that is later than the original delivery date but still earlier than the date re-calculated by the system using the date on which the changes are made as the starting point.
    Is anyone aware of any functionality/config which allows you to manually change the delivery date in the STO PO - but not be restricted to changing the date by the value in the 'TransitDur' field of the Route, when it is a subsequent change to the PO and greater than the original date determined by the system?
    Thanks,
    Ravelle

    A solution has not been identified for this issue...query closed.

  • How assignmnt finish date is calculated in project plan

    We enable Single Entry Mode, protect acutals in our environments, and during our testing, we found that the Finish date of the task is auto re-calculated while the hours input is diffferently from the planned hours. And we have tested with different scenarios:
    Fixed Work, Fixed Duration, Fixed Units etc, but we still do not understand the exact calculation logic of the new Finish date.
    Does Microsoft have any document descrbing this logic?
    Thanks.
    Kevin Li

    Hi Kevin,
    It is normal that the finish date is recalculated by Project. When the team member enter actual work starting later from the start date, after the task update is approved and the project published, Project pushes the actual work, updates the actual start
    date then recalculate the finish date based. 
    This is actually why you do use a project planning software as Microsoft Project: you want the application to help you forecasting your project dates. If you do not want Project to recalculate, then you miht consider using a simpler tool like Excel.
    Basically the process is that the team member gives the information that the task started later than planned, the project manager approves the start date and the actual work. Project calculates the planned finish date. But the last step is very important:
    the project manager should review how did MS Project do the recalculation and update the project plan with the remaining work and eventually add or move resources on assignments to adjust the capacity and delivery dates based on priority.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • FM to get the previous sunday date based on current date(sy-datum)

    hi all,
    Is there any function module to get the previous sunday date based on current date(sy-datum)?
    Regards,
    Kapil Sharma
    Moderator Message: Basic date related questions are not allowed
    Edited by: Suhas Saha on Sep 19, 2011 11:39 AM

    Hi,
    There are function modules to find out the current day of the week depending on sy-datum. These are as below:
    1. DATE_COMPUTE_DAY - Returns a number indicating what day of the week the date falls on. e.g. Monday is returned as a 1, Tuesday as 2,...., Sunday as 7.
    2. RH_GET_DATE_DAYNAME  - Returns the day based on the date provided, e.g. Monday, Tuesday,..., Sunday.
    Using any of the above, if you can find out the current day, then you can calculate and compute the date of the previous Sunday.
    My observation is that using the first FM might make the calculation simpler.
    Hope this is of help to you.
    Regards,
    Shayeree

  • Not able to Retrieve Transaction Data based on the property of master data

    Hi,
    I am trying to retrieve transaction data based on property of Master Data for ACCOUNT (property  ACCTYPE = ‘EXP’)
    in BPC 10 version for netweaver.
    Transaction data is present at backend, But I am not getting data in Internal table after running RSDRI Query.
    I am using this code.
    DATA: lt_sel TYPE uj0_t_sel,
    ls_sel TYPE uj0_s_sel.
    ls_sel-dimension = 'ACCOUNT'.
    ls_sel-attribute = 'ACCTYPE'.
    ls_sel-sign = 'I'.
    ls_sel-option = 'EQ'.
    ls_sel-low = 'EXP'.
    APPEND ls_sel TO lt_sel.
    lo_query = cl_ujo_query_factory=>get_query_adapter(
    i_appset_id = lv_environment_id
    i_appl_id = lv_application_id ).
    lo_query->run_rsdri_query(
    EXPORTING
    it_dim_name = lt_dim_list " BPC: Dimension List
    it_range = lt_sel" BPC: Selection condition
    if_check_security = ABAP_FALSE " BPC: Generic indicator
        IMPORTING
    et_data = <lt_query_result>
        et_message = lt_message
    Data is coming if i use ID of ACCOUNT directly, for e.g.
    ls_sel-dimension = 'ACCOUNT'.
    ls_sel-attribute = 'ID'.
    ls_sel-sign = 'I'.
    ls_sel-option = 'EQ'.
    ls_sel-low = 'PL110.
    APPEND ls_sel TO lt_sel.
    so in this case data is coming , but it is not coming for property.
    So Please can you help me on this.
    Thanks,
    Rishi

    Hi Rishi,
    There are 2 steps you need to do,.
    1. read all the master data with the property you required into a internal table.  in your case use ACCTYPE' = EXP
    2. read transaction data with the masterdata you just selected.
    Then you will get all your results.
    Andy

  • SSRS report with tabular model - MDX query to filter parameter data based on Tuple value.

    Hello Everyone,
    I am working on SSRS report in which a tabular model is being used as a backend.
    I want to filter the report parameters which are dependent to other parameters. Like, country, state, and cities drop downs.
    All are multi-select parameters. I am using MDX queries to filter the parameters data.
    Based on selected one or more countries, the data of states needs to be filtered.
    The point is the text which is being displayed in state dropdown for each state name is combination of 3 different members.
    So, I created the following Tuple for the same and can see the expected display names in states dropdown.
    "("+
    [Location].[Code 1].CURRENTMEMBER.UNIQUENAME +","+
    [Location].[Code 2].CURRENTMEMBER.UNIQUENAME +","+
    [Location].[Descr].CURRENTMEMBER.UNIQUENAME +")"
    Now, when I would like filter the cities data based on selected one or more states, I am unable to pass the multiple Tuples (more than one selected Tuples) as parameter for cities dropdown.
    The following is my query for City parameter. It is working well when I select only one State from the dropdown.
    However, when I select multiple states, it is unable to convert the Tuple into SET in ELSE part of IIF condition specified in following query.
    Can anybody help me how to resolve the error that I am getting about STRTOSET function?
    Or
    Are there any other alternatives to achieve this requirement?
    Any help would be much appreciated.
    Query:
    WITH MEMBER [Measures].[ParameterCaption] AS [City].[City Business].CURRENTMEMBER.MEMBER_CAPTION
    MEMBER [Measures].[ParameterValue] AS [City].[City Business].CURRENTMEMBER.UNIQUENAME
    MEMBER [Measures].[ParameterLevel] AS [City].[City Business].CURRENTMEMBER.LEVEL.ORDINAL
    SELECT {[Measures].[ParameterCaption], [Measures].[ParameterValue], [Measures].[ParameterLevel]} ON COLUMNS ,
    [City].[City Business].Children ON ROWS
    FROM (
    SELECT ( STRTOSET(@State, CONSTRAINED) ) ON COLUMNS FROM [Model])
    WHERE ( IIF( STRTOSET(@State).Count= 1,
    STRTOTUPLE(@State, CONSTRAINED),
    STRTOSET("{
    ("+
    [Location].[Code 1].CURRENTMEMBER.UNIQUENAME +","+
    [Location].[Code 2].CURRENTMEMBER.UNIQUENAME +","+
    [Location].[Descr].CURRENTMEMBER.UNIQUENAME
    + ")
    }",CONSTRAINED )) ) CELL PROPERTIES VALUE
    Thanks, Ankit Shah
    Inkey Solutions, India.
    Microsoft Certified Business Management Solutions Professionals
    http://www.inkeysolutions.com/MicrosoftDynamicsCRM.html

    Hi,
    I used following dynamic query in expression of dataset of parameter and it works like a charm.
    "WITH MEMBER [Measures].[ParameterCaption] AS [City].[City Business].CURRENTMEMBER.MEMBER_CAPTION "&
    "MEMBER [Measures].[ParameterValue] AS [City].[City Business].CURRENTMEMBER.UNIQUENAME "&
    "MEMBER [Measures].[ParameterLevel] AS [City].[City Business].CURRENTMEMBER.LEVEL.ORDINAL "&
    "SELECT {[Measures].[ParameterCaption], [Measures].[ParameterValue], [Measures].[ParameterLevel]} ON COLUMNS , " &
    "[City].[City Business].Children ON ROWS " &
    " FROM [Model] WHERE ({"& join(Parameters!Location.Value,",") &"}) CELL PROPERTIES VALUE"
    Thanks, Ankit Shah
    Inkey Solutions, India.
    Microsoft Certified Business Management Solutions Professionals
    http://www.inkeysolutions.com/MicrosoftDynamicsCRM.html

  • Filtering report data based on user login and Parameter fields

    Post Author: mronquillo
    CA Forum: General
    Hi,I am running a report that filters data based on the user login. To do this, I created a formula called @user that compares the login name (using the CurrentCEUserName field) and returns the user's name. If the user login is not a login specified in the if statements, it returns the parameter field "user_name":For example: if CurrentCEUserName = "loginname1" then "User's Name 1"else if CurrentCEUserName = "loginname2" then "User's Name 2" else if CurrentCEUserName = "loginname3" then "User's Name 3"  else if CurrentCEUserName = "loginname4" then "User's Name 4".. .else {?user_name}   In select expert, I have a condition which filters data based on the string returned from that formula:{Table.Name} = {@user}  This works fine and when the users run the report they only their own data. However, they are still prompted to choose a parameter field regardless if of the value returned by the @user formula. Oddly enough, regardless of what parameter field they choose, they will still only see their own data (i.e. if John chooses "Bob" from the parameter list, he will still only see John's data.)If I remove the "else {?user_name}" line from the @user formula, then the users are not prompted anymore. However, if they are not a "valid" user - that is, if any of the if statements in the formula are not true for their login name - then they will see no data. What I want to do is make the report ONLY prompt the user to choose a parameter field if their login name is not "valid". That is, if the @user formula is able to return a string value for their login name, then they will jump right into the report without being prompted to choose a parameter - otherwise, the user will be prompted to choose a name from the parameter list. I thought my formula would allow this (hence the "else" clause), but it seems that if a parameter field is present in any formula, then the report automatically prompts the user to choose a parameter. Is what I am trying to accomplish possible in CR (I'm using CR v10.0) or is there a better way to do what I am trying to do?Thanks in advance.

    Post Author: sharonmtowler
    CA Forum: General
    try, or something like that
    (if CurrentCEUserName ={?user_name} then true else ({Table.Name} = {@user}) )

  • I want to pick up Schedule line Delivery date based on Sales Order of Mater

    Hi Experts,
    I have one scenario like,
    I want to pick up Schedule line Delivery date based on Sales Order of Material.
    For example :
    Go to va03
    Give the order no
    Press the enter
    Double click on material.
    Go to Schedule line Tab
    Then we can find out the Delivery date .
    I want to pick up the that Delivery date. Could you please help on that.
    Thanks,
    Amjad.

    Hi,
    schedule line dates are available in VBEP.
    VBEP-VBELN = sales order number.
    VBEP-EDATU = schedule line date.
    REgards,
    Raghavendra

  • System does not propose the delivery date based on factory calendar

    Hi,
    I am creating a sales order for a delivery date for this sat which is (2/22/09)
    I have maintained 2 separate calendars for
    1) shipping point
    2) for the route
    The route has a transit time of 1 day and the calendar has sat and sunday as non working.
    the Shipping point has a pick/pack time of 1 day and the calendar has sat and sunday as non working
    The material is available in the warehouse
    Now when i create this sales order i enter the delivery date as 2/22/09, the system does not propose me the delivery date of monday (i.e 2/23/09) It accepts the 2/22/09 delivery date.
    In the schedule line i do see the date as 2/22/09 only.
    The delivery was created with the following dates
    Picking = 2/17/09
    Transportation Planning = 02/18/2009
    Loading =02/18/2009 
    Planned GI= 02/18/2009
    Delivery Date = 02/22/2009
    How can the system give me the delivery date of a sunday when the calendar doesnt allow sunday as working day.
    Also the route time is 1 day in transit so i am not sure why the system is proposing a 3 day transit time?
    Can any one explain the behaviour of SAP for the delivery date logic

    Dspsac,
    Delivery date can be any date.  For instance, if your customer insisted on a Sunday delivery, you would accommodate him, regardless of any calendar.
    From the delivery date, the system counts backwards USING THE FACTORY CALENDAR ASSIGNED TO THE ROUTE by the number of days in the route.  You have to consult the FC assigned to your Route to determine if the GI date has been properly calculated.
    From the GI date, the system counts backward Pick/pack time, using the shipping point calendar, to arrive at Material availability date.
    Calculations are explained in SAP online help
    [Transportation and Delivery Scheduling|http://help.sap.com/erp2005_ehp_04/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm]
    Regards,
    DB49

  • Getting aggregated data based on Date in Webi.

    Hi,
                  I have a requirement to display last 6 Months Receviables Month Wise in Webi. And i am getting data based on clearing Date in Bex query. And data from Bex query will be like
           Month             Measure
         01.01.2014       12
         06.01.2014       15
         15.01.2014       16
        02.02.2014        8
        05.02.2014       10
        12.03.2014        4
        14.03.2014        6
        18.03.2014       10
        21.03.2014        20
        30.03.2014       30
       03.04.2014        30
    And i want aggregated data as
    Month  Measure
    Jan      43
    Feb     18
    Mar     66
    Apr     30

    Hi Satish,
    Have you tried below:
    Create Month1 object as =Month([Month]) and [total]as =Sum([Measure])
    Then drag both Month1 and total objects in report block.
    Regards,
    Yuvraj