DEDUCTIVE WORKS/ REDUCTION IN PR/PO QUANTITY

hi,
i have scenario wherein i have PR for service..
however due to changes the amount of work is reduced..
for example instead of 100 m3 of concrete, only 85 m3 is to be made by subcon...
so i need to reduce qty in PO..
how can i capture the difference/change in order?
is it possible to create a PO with negative quantity?
thanks in advance..

Hi Ramesh ,
As such you cannot capture the difference of reduced quantity or work , but one way to analyse the difference is to look into the report ME5J or ME2J ( Purchse requisitions for project and Purchase orders for project).
In this report you can see that originally P.R. was of 100 m3 and P.O. made for 85 m3 only , so it will show you 15 m3 of service still to be delivered.
By this we can track the difference as for what quantity of service , the PO has been raised to the vendor and for what quantity the PR was made originally.
Thanks,
Dhruv Kumar Malhotra

Similar Messages

  • FM : For reduction of PIR forecast quantity

    Hi.
    Is there any FM for reduction of PIR <Forecast> quantity for consumption mode forward/backward>

    Dear,
    Please note that with stg 70, PIR will get reduced when you get dependent requirementa nd not on issue of material.
    I hope you must have changed the std setting.
    example
    PIR for 100 for assembly
    After running MRP
    PIR -100
    Planned order +100
    Now you have run MRP for final product, which gave the dependent requirement to assembly of say 75.
    Then in MD04 you will see following entry
    PIR    -25
    Dep req from final assembly -75
    Planned order +100
    This is nothing to do with consumption with 261/201.
    pl simulate the above scenario and come back

  • Create work flow for date and quantity change in Purchase order

    Hi SAP Guru's,
           Kindly share abt how to create a workflow in SAP for purchase order date and quantity change and link it with SAP PS.
    Scenerio : If someone change the Date n Quantiy of PO , the system should trigger a mail to the person responsible.
    Thanks a Lot
    Regards
    Janani

    I did create a Workflow in SWDD for PO date n quantity change , but am not sure how to map the same with the project . Kindly explain step by step.
    Thanks
    Janani A

  • How to deduct working days according to factory calender

    Hi All,
          I have one date and and I want to calculate the exact date before 'N' working days according to the factory calender.
    e.g. Suppose the date is 13.07.2010 and N = 10 then generally we would get date as 03.07.2010.
            But my requirement is that, it should give me the exact date 10 working days back according to the   
            factory calender. i.e. 28.06.2010 .
            Could anybody suggest me a FM or an alternate soln for the same.
    Thanks in anticipation.
    Ubhaka

    Hi Ubhaka,
    have a look at FM
    BUSINESS_DATE_CREATE
    you enter the following:
    - a date (DATUM_EIN), from which you start
    - the number of business days (GESCHAEFTSTAGE)
    - the calendar ID (KALENDER)
    - the direction (RICHTUNG): "-" for subtracting ode "+" for adding the business day based on the calendar
    I suggest you make a copy of the FM and adapt it for your needs.
    Regards,
    Peter

  • How to incorporate the quantity formula in work centre

    I have to incorporate the quantity in work center. if i m using a formula of operation quantity but it is giving me the error that u can only use the formula which has been defined as origin 2. can any one guide me how to incorporate the quantity formula in work center,
    The situation is this my client asked me to incorporate the GR quantity as activity type, is there any provision in the system to incorporate the activity as standard value of workcentre i hav used the standard parameter provided for GR quantity but it has the dimension of time while every thing produced at my client location is either is KG or in Carton..
    kindly guide me to resolve the issue.........

    Hi,
    Create a Parameter "ZQUN" with Dimesion as "Mass" and standard value init "KG" and assign this parameter to a formula and assign the formula in the work center, define the standard quantity initially, at the time of final confirmation enter the actual GR quanitity.
    Pls get back for any clarification

  • Min Quantity vs Free good quantity

    Hello Folks,
    The following are definitions of Min Quantity and Free Goods quantity.
    1. Min Qty: When this quantity is exceeded, condition kicks in.
    2. Free goods qty : Basis for calculation of number of free goods i.e the discount  aka additional quantity.
    Are'nt they the same?
    What i mean is, in order to derive the additional quantity, the condition has to kick in which is when there is a minimum quantity ordered.  Lets say Qty of 10.
    When there is at least 10, there should be some discount determined right? Lets say Qty of 1.
    So, the basis for this is a Free Good quantity of 10 to get a  discount of 1 piece right?
    Kindly provide clarification, thanks.
    Cheers
    John

    Dear John,
    I think you are quite clear about free goods but
    Discount is different and Additional  Quantity is different.
    Discount is deducted in cash where as additional quantity will be delivered in the form of goods only.
    In Free goods determination condition record(VBN1) we can give Minimum quantity as a basis for condition to execute
    for ex. Suppose I want to give 10 + 1 free but the condition for this offer is on minimum purchase of 100Pcs.
    So my minimum quantity is 100pcs and on purchase of 100pcs 10pc will be free.
    you can also select if you want to give 101free=11 (Exclusive) or 91free=10 (Inclusive).
    There are also different calculation types available in standard for calculation of free goods.
    Similarly we can maintain different scales also.
    i hope I made it clear.
    Regards
    Mayank

  • Transfer Order auto create for Posting Change not working

    Hello Gurus -
    When we release an inspection lot from "Q" status, it creates a posting change notice, and we have it configured to create a TO in the background to the same bin, and auto confirm.  The desired and intended result is to take something from "Q" status to unrestricted status, while keeping it in the same bin - and avoiding the user having to deal with the transfer orders.  Essentially it is seamless and all in the background, the user just sees that he has changed something from quality status to unrestricted.
    It works fine when the entire quantity is selected for the usage decision, but when a partial usage decision is made, the transfer order does not create - and requires processing in LU04 for the posting change.
    Why would this work for an entire qty, but not work for a partial qty - and simply require someone to go in to LU04 and hit "create transfer order" - with no additional information?
    Any help would be most appreciated.  Does it have something to do with a setting of quants?

    Hi,
    In case of a usage decision for a partial quantity, it is not possible to create the Transfer Order for the generated posting change notice automatically. This is only possible when the full quantity is released. The same happens if you release a partial quantity and post the rest to blocked stock or scrap. The reason is, there needs to be a user decision, which part of the quantity has to be posted, this is necessary for example when the quantity is distributed in the warehouse over many storage bins. But even if the full quantity is on one storage bin, there is no automatic TO creation. You can see this also in the online
    processing (LT05), in case of partial quantities you have to enter the selected quantity in the quant list, for a full posting this is not necessary.
    Hope this helps,
    Sinéad Curran

  • FM : For reduction of  PIR /Consumption

    Hi.
    Is there any FM for reduction of PIR <Forecast> quantity for consumption mode forward/backward> .

    Hi ALL experts,
    I can send my screenshot to you guys, but I cannot upload them via picasaweb.
    Is there any chance that SAP made some "upgrade" and make it happen by using "consumption 3+Mix MRP 1".
    I use a customized strategy and I compare it with 40, here is the defferences:
                     Reqmts type (indep./customer)    Reqmts class (indep./customer)
    40                        VSF/KSV                                       101/050
    ZZ                      VSFB/KSV                                      105/050
    default values for consumption type per reqmts class, VSF(101) is 1; VSFB(105) is 3.
    Thank you.
    BR!
    ROCVEL

  • Quantity Depreciation in GTS License Management

    Hello Friends,
    We want to define License management in GTS with quantity depreciation functionality.
    We have set up all the relevant configuration and master data for License determination and it works fine.
    But the quantity depreciation is not happening.
    Below configurations are made in GTS for quantity depreciation.
    1. License type is marked for "Quantity Update" , Basis for quantity update is defined as "QUAITM Document Item Quantity" and value assignment level is "A"
    2. Item Category is assigned to Depreciation Group and Quantity Depreciation is "-".
    3. License is maintained with a highest quantity and UOM.
    When we create document license gets determined successfully and the log shows message "Quantities were written off completely". In license at Assigned Document level we can see the document assigned to license and Quantity Depreciated column shows correct quantity. But we check at the quantities level in license and quantity depreciated column shows zero quantity and Remaining Quantity = Highest Quantity of the license.
    And also If I create the next document with quantity more than the highest quantity of the license it does not get blocked in GTS.
    Can you anyone help me resolve this issue.
    With Regards,
    Siba Pradhan.

    Hi Siba
    I am also facing the same issue, did the solution provided by Ashish worked for you ?
    Also if any body has any more insight for this issue, please add here.
    Thanks
    Akhil..
    siba pradhan wrote:
    Hello Friends,
    We want to define License management in GTS with quantity depreciation functionality.
    We have set up all the relevant configuration and master data for License determination and it works fine.
    But the quantity depreciation is not happening.
    Below configurations are made in GTS for quantity depreciation.
    1. License type is marked for "Quantity Update" , Basis for quantity update is defined as "QUAITM Document Item Quantity" and value assignment level is "A"
    2. Item Category is assigned to Depreciation Group and Quantity Depreciation is "-".
    3. License is maintained with a highest quantity and UOM.
    When we create document license gets determined successfully and the log shows message "Quantities were written off completely". In license at Assigned Document level we can see the document assigned to license and Quantity Depreciated column shows correct quantity. But we check at the quantities level in license and quantity depreciated column shows zero quantity and Remaining Quantity = Highest Quantity of the license.
    And also If I create the next document with quantity more than the highest quantity of the license it does not get blocked in GTS.
    Can you anyone help me resolve this issue.
    With Regards,
    Siba Pradhan.

  • Work centre wise total running time and production

    Hello,
    I have a requirement to show total running hours for work centres and total production quantity produced by work centres.
    Is there any cube for this in PP?
    Please respond.
    Best Regards,
    AI

    Well cube 0pp_c04 provides work centre wise GR quantity. The key field is 0GR_QTY. But i need workcentre (machine) hours used to produce the material.
    Got it?

  • Query: Cannot extract resource working hours&price at phase level together

    Dear PP Guru,
    I am working on a query to satisfy business requirement: resource working hours - meaning "activity type quantity" (PLPO table field VGW01, 02, 03 ...) together with activity type price at phase level.
    I combined following tables together:
    PLPO --> CRCO --> CSSL --> COST
    Now the issue is: resource hours - meaning "activity type quantity" at phase level cannot be extracted. The reason is that "Object ID" - PLPO table ARBID field is only assigned to Operation level, not Phase level.
    My question are:
    1. I have to go for ABAP development to do such modification to extract resource hours at phase level?
    2. What is the reason that "Object ID" is not assigned at phase level but operation level in PLPO table? Shall I raise a question to SAP to get further detail?
    Many thanks in advance for your prompt feedback!
    Mengyu

    My guess is that the German Locale interfere with the English .Net3.5
    Some info on .net3.5 http://www.microsoft.com/en-us/download/details.aspx?id=22
    ---Additional
    information
    The following information may be relevant for administrators performing deployments of the .NET Framework on to operating systems using non-English locales. This package does not contain localized resources for non-English locales. By default, itdownloads and installs the
    language pack that matches the language of the customer’s operating system. This may not be desired behavior when managing deployments of the .NET Framework. To avoid the automatic download use the following command:
    dotnetfx35setup.exe /lang:enu
    Have you tried to switch to english locale and then install?
    This posting is provided "AS IS" with no warranties or guarantees and confers no rights. Whenever you see a helpful reply, click on Vote As Helpful & click on Proposed As Answer if a post answers your question.

  • Upgration Issue of Quantity data type

    This is upgradation issue and it is working fine in 4.6 and not working in 6.0
    Data:quantity TYPE labst.
    write:/ quantity.
    SHIFT quantity  LEFT DELETING LEADING '0'.
    The issue
    Quanitity must be a character-type data object(data type C,N,D,T or string

    Hi
    I worked on 4.6C many years ago, but it's strange a typical statament to elaborate a string like SHIFT worked for a not char field (like  labst is a QUAN).
    Anyway SHIFT can elaborate a string only
    Max

  • CAN SOMEONE TELL ME HOW MC88 FORECAST WORKS!!!?

    I have a situation where the Mc88 forecast is deleting some of the planed indipandent requirments created and creatinf it a later date at the end of the forecast period...is this expected when you use planning type VSF

    Rough-cut planning profiles are used in resource leveling. In a rough-cut planning profile, you plan the requirements of one or more of the following resources:
    ·        Work center capacities
    ·        Materials (typically, raw materials)
    ·        Production resources/tools
    ·        Costs
    These are the resources you will require to meet a sales target, production target, purchasing target, or any other logistic target you have set for a material, product group, or characteristic value combination.
    Rough-cut planning profiles are designed to give you an aggregate view on your resources; that is, you look at workdays rather than hours or minutes, and work center groups and product groups rather than individual work center or products. They are therefore an ideal tool for medium- and long-term planning or for the planning of hierarchies.
    You enter your resource data in a few easy steps: The system guides you through a series of dialog boxes. The results of your entries are shown in a resources table which is laid out along the time axis.
    The resources table displays a lot of information at a glance, that is, the resources required not just for the final assembly but for the entire production process, starting with the lowest-level components and ending with the finished product. Planned resources are displayed in the periods to which they relate.
    In a rough-cut planning profile, you define the following:
    ·        The material, product group, or (in the case of an information structure) combination of characteristic values requiring the resources.
    ·        The key figure causing the resource load (if the rough-cut planning profile is defined for an information structure).
    ·        The time span of one planning period in the resources table, expressed in workdays.
    ·        The status of the rough-cut planning profile (as in a routing).
    ·        The planner group of the rough-cut planning profile (as in a routing).
    ·        The usage of the rough-cut planning profile (as in a routing).
    ·        How much of which resource is required for the base quantity. For example, if the base quantity is 1 piece, the amounts you enter on one line of the resources table are the amounts required to produce 1 piece. Moreover, if you enter amounts in four columns, each column representing a timespan of one workday, then you are saying that it will take four workdays to produce 1 piece using this resource. The amounts you enter for the resource “work center” apply to each capacity category at the work center.
    ·        The base quantity; that is, the number of units for which the resource is required. You cannot change the base quantity once you have saved the rough-cut planning profile.
    ·        The lot size range if the quantity of the resources required depends on lot size. Different lot sizes can have different base quantities. For example, a lot size of 1-10 may have a resource requirement of 1, and a lot size of 11-100 a resource requirement of 10.

  • Table required for GRN tax amount before invoice

    Dear guru's
    In which tabels we can split of basic value & taxes separately after GR is done for a Purachse order.
    I can see the total value in the material document in amount in Lc, but i need the split of total value into basic price & tax for preparing a report.
    Regards
    Praveen

    So now you only tell us that based on the GR can we find any table where these value will automatically get distributed....here i think you have to go for some indirect logic like for VAT or CST from the table KONV you can get the non-deductable tax amount for each po line item...now from MSEG you can get the PO and its line item & gr quantity..for the same PO & line item you can find out the original ordered quantity from EKPO as well as the non-deductable tax from KONV...so in the report in one column you can fetch the total amount from MSEG-DMBTR...in the tax column you enter a formula that (non-deductable tax from KONV / original ordered quantity from EKPO) * gr quantity...the last column for the amount without tax can be (Column1 - column 2)
    For service related you have to check each service line quantity & price from ESLL table
    I am not sure whether this will work or not but you can check & discuss the same with your ABAP person...also check for some expert comments
    Regards,
    Indranil

  • Help to resize at a file size threshold

    I feel as though there must be a simple solution to this issue but I just can't break through.  I am attempting to resize an image so that it will be uploadable in a media building program.  This program does not allow me to import images greater than 200K and so I went to the image resize function in Photoshop CC.  There I found under Image>Image Size, as always, the window which includes the size and dimension attributes of the image (which, incidentally, is a single layer psd as "Background").  As I change the dimensions of the image, I can get the Image Size in the window to reduce to under 200K by changing the resolution, width, and height as needed.  When I save the image as a jpg, it does not allow the image to be saved as anything smaller than 1.1M.  In the jpeg options window, the file size when saved at a quality of 12 is 1.2M but is 1.1M at a quality setting of 0.  I must be missing something.  Can anyone shed some light on this for me, please?  Thanks!

    That worked. For the sake of the discussion, do you suppose that there was something about this image (like metadata) that would simply not allow it to be compressed any further than the minimum size I described?  It would make sense given that the image quality was progressively worse as I experimented with reopening the newly saved and slightly smaller file each time.  Even then, I could only get a small reduction in total data quantity but the images became poorer and poorer, as you would expect, as the jpeg options window told me I was getting smaller and smaller.  The image started to look like it was capped from somebody's Minecraft screen but the size was still up around a meg.

Maybe you are looking for