Hi all, 
I just noticed that the order I placed on the 12th, with a delivery date of the 21st , is now stating a delivery date of the 28th!! I called CS and of course they are saying there is nothing they can do. Has anyone else had this happen? Any suggestions? 
It is quite disappointing, Verizon should of never promised delivery dates if they could not meet them.  Thanks!

Check your local stores and see if they have any in stock. If so, cancel your order and go pick  one  up in store. If you look at the Apple site to order you'll notice that (at last check) the shipping is 1-2 weeks out so that's a pretty good indicator that demand was high. This would explain why your order date was pushed back. It happens all of the time. It sucks but it's bound to happen when something is selling very well.

Similar Messages

  • Is anyone else having problems with an iPhone 6 delivery date changing on them?

    I sat up until 12:01am to pre order (2) iPhone 6's and (2) iPhone 6 +'s and they had a delivery date of 9/19 for both of the phones at the time I logged on to Verizon's preorder site. The system would not allow me to log in as an existing customer but it would allow me to order as a new customer. I kept trying to order new phones as an existing customer on two different computers and three different browsers without any luck. I finally decided to order them as a new customer and the order went right through the Verizon system without any problem. Two minutes later I received an email from Verizon requesting that I call them as soon as possible to complete the order. I called in and spoke to a rep that explained that I already was an existing customer and that I would need to use the "Existing Customer" preorder link. I explained the issues I was having and she said that I would still need to use that system when it was available. So I tried the existing customer link and it now let me through but the date for the iPhone 6 plus had slipped to 10/7 (It is now 1:30 am). I completed the transaction and it stated 9/19 delivery for iPhone 6 and 10/7 for the iPhone Plus. However once I received the email confirmation it stated that the delivery date for the phones was 10/7. I called Verizon customer service and stated my concern about the later delivery date for the iPhone 6 and they told me that the iPhone 6's would arrive on the 19th and the pluses would arrive on 10/7 so I did not change my order. This morning 9/19 8:00am I called in to inquire about my shipping confirmation numbers for the (2) iPhone 6's and the customer service rep (Robanya) told me that he would call me back at 1:00pm PST and give me the shipping confirmation numbers. He asked specifically which phone number he should call me back on and I gave him my cell number. After not receiving a call back from Robanya, I called Verizon customer service at 5:30pm and spoke Ryan James and he confirmed that the orders were placed on the 12th of Sept and that one system showed all of them due to be delivered 10/7. After insisting that Robanya that I spoke with earlier in the day said they were shipping today, Ryan got off the phone for 5-10 mins and then got back on and said that the iPhone 6's shipped yesterday on the 18th but he did not have a confirmation number. After pressing him that someone should have this confirmation number in Verizon he stated that the delivery dates were subject to change and that all the phones would probably ship on 10/7 and left it at that.
    So after loosing sleep to pre order phones on Verizon, speaking with (3) different Verizon reps, I am rewarded by having my delivery date changed to 10/7 on my iPhone 6's which is the same delivery date they were quoting yesterday 9/18.
    Did any one else have the same disappointing experience that I had?

    Yes, pre-ordered iPhone 6 with a guaranteed delivery date of 19 September; took screen shots after the order just to have record of it.
    Called Verizon 18 Sept because I hadn't received a tracking number yet, and was informed my phone would now ship 7 October.  When I expressed that was different than what was promised and had proof, a manager came on the phone and confirmed that I should have a 19 Sept delivery date based on their records.  She told me however she could not confirm when my order would ship.
    19 Sept came and went with no phone delivery.  I have tried calling Verizon, posting here, and posting on their FB page for customer service.  Every rep I talked to (except for the first manager on 18 Sept) has been unable to admit that they mislabeled their product sales page, and mislead the customer.  One rep told me the guaranteed delivery date was an "estimate"; when I asked her to show me on the website where it uses the term "estimate", she admitted it didn't communicate that, but still was unable to utter the words "we made a mistake".
    VZW needs to take a 101 class in customer service and crises management; rule #1 is if you screw up, admit it!  I know I am not going to get my iPhone as promised, but pretending like there is nothing wrong with that customer service experience is just making things worse. Not a single employee I have communicated with to date has attempted to do anything proactive to correct or mitigate the customer failure.  I am truly amazed at how poorly VZW has been handling this to date; again (removed) happens with supply/demand, website errors, etc, but the failure to acknowledge how the screw up shafted a lot of (formally) loyal long time customers is criminal.
    >> Edited to comply with the Verizon Wireless Terms of Service <<
    Edited by:  Verizon Moderator

  • Delivery date changed 4 times-called to ask what is going on and then best buy cancelled order

    I ordered a 55 inch aquos  with free ROKU stick for $599.00 on Sept. 22   (removed per forum guidlelines) and got a confirmed delivery of Sept. 26.  Unfortunately, I received a call in the morning of the Sept. 26 and was told that delivery was pushed to Tues, Sept. 30.
    On Monday, Sept. 29, I received an automated call informing me that the Tv will be delivered on Sept. 30 between 3:30 and 5:30. and I also received an email with the same information. Thirty minutes later I received another email stating that the delivery is again being pushed to Oct. 13. so I called customer service. I was told he can change the delivery date to Oct. 3 but call in the morning to confirm availability with warehouse.I called customer service on Sept. 30 to confirm availability and was assured that the Tv will be delivered on Oct. 3.
    On Thursday Oct. 2nd, I received another email stating the order will not be delivered until Oct. 16. I remained calm and called customer service and after a very long hold time I was able to speak with a representative and again after a long hold to check what is going on, she informed me that the order is now cancelled since the item is  discontinued. I told the representative that I already lost 3 days of work due to the delivery dates changing and since the TV has to be accepted by somebody 18 years or older I needed to be home. I asked if it is unreasonable to ask for the same exact TV but 1 size bigger since the 60 inch is available and in stock (but without the ROKU stick) but unfortunately I was told it is not possible. I asked to speak with a supervisor but they are all busy but she asked for my phone number so they can call me back in 20 min.. I waited but did not get a back from the supervisor the same day.
    I called again today,  Friday, Oct. 3 and I was assisted by a nice lady who after explaining my situation was sincere with her apology. She told me that she will call me back so she can speak with a supervisor about my situation. I asked her too if it is unreasonable to ask for the same exact TV but next size bigger since the one I was sold is no longer available and I lost 3 days of work due to the 3 changes in delivery dates. She affirmed that it is fair but have no authority to make decissions but will relay the history of the order to her superior so they can make a proper resolution. 
    After about 15 minutes I got a call  back and was told that since the bigger TV is priced at 799.00 they will give me a 50.00 dsicount for the trouble. I declined the offer since I feel that  $50.00 dollars for getting the run around and missing 3 days of work is not proper compensation and is an insult to any customer. I thanked her for trying and informed her that I am aware that it is not her fault and it is management who made this decission. 
    I sincerely feel  that I should have been given the next size TV for the same price of my original purchase and I should have been given a ROKU stick (which I did not ask for) for my unpleasant experience.
    We are  $150.00 apart from getting a resolution but management feels like it is the right thing to do for cases like these. Being a best buy customer for many years, spending many thousand of dollars,  I am  puzzled why best buy would treat any customer the way they treated me. Please explain the policy so I can have a better understanding. The $150.00 difference can easily be recopued from my next purchase. In my opinion, it is not a very smart business practice to lose a customer this way. Again, please explain the policy to me so I can understand better.

    Hello romcarlos1,
    While unforeseen complications can cause unexpected delays, it seems something went wrong at every turn. Misinformation and multiple missed appointments would frustrate me too, and I can only imagine this frustration turned into aggravation with the poor service you describe. After pulling up your account, I noticed that has been two weeks since your TV purchase, and I’m sorry for any inconvenience this may have caused. I appreciate you allowing me the opportunity to explain what should have happened.
    When your delivery day arrives, you should receive a call from us to narrow down the time frame to a 4-hour window.  This is done because our delivery agent’s schedule isn’t fully determined until the day of service as our customer’s needs may change prior to the delivery date. These routes are then best optimized to fit the appointments scheduled for the day. The particular television you wished to purchase is quite popular, however, and due to high demand, it’s currently on backorder in some areas of the country.  This may explain why your delivery date was continuously pushed back unexpectedly, and why we needed to reschedule multiple times.
    While in backordered status, however, an online order may be cancelled if you don’t wish to wait any longer and a different model may be purchase. Upon review of your order, I noticed that it was canceled upon your request. If you have since changed your mind and wish to wait for one to arrive, you may place a new order here. 
    It sounds like you wish to purchase a new TV entirely though, so I understand if you don’t wish to attempt a new order. While I cannot guarantee you a different outcome than the resolution already offered, I’d be glad to look into your case to see what other options may be available. Please know I have sent you a private message to collect further information from you. You may view this by logging into the forum and clicking on the envelope in the upper right-hand corner of the page.
    Respectfully,
    Alex|Social Media Specialist | Best Buy® Corporate
     Private Message

  • Change Delivery date in Sales Order

    Hi all
    I want to change Request Delivery Date in Sales Order. But when I changed Request Delivery Date system appear" The default date is not copied into existing schedule lines"
    And Delivery Date didn't change.Could you tell me how to change Delivery Date ?
    I setup Request Delivery Date - September 21th but Availability Date is September 19th. Could you tell me how to setup loading time, picking time, packing time ?
    Thank and Best regards,
    Thang

    Hi,
    When you change the Request Delivery Date, it automatically changes the schedule line date of all the materials, but by default does not change the schedule line date of the ordered material.
    So just check the ordered material schedule line date and change it manually in the order.
    Similarly maintain the same date in all the resp fieldsi in the delivery, wherever you see the date.
    Regards,
    Siddharth.

  • Changing proposed delivery date in sales order for one specific sales org

    Hi All,
    I want to change proposed delivery date in sales order automatically for one specific sales org only without changing lead time in VOV8.
    For that can I use MV45AFZZ. But it is asking access key to make changes. Is there any other user exit for the same. And how does exactly change it.
    Thanks in advanced.
    Points will be awarded.
    Regards,

    EXIT_SAPFV45E_001 has nothing to do with this - it is meant to update the purchase order from a sales order. It might not even be triggered if the sales order has no link to a purchase order.
    USEREXIT_SAVE_DOCUMENT is not really good for this either, because the delivery date has to be changed before that. If memory serves, it also influences the schedule lines and probably the ATP check and such. I would strongly advise against it. One of the other routines in MV45AFZZ should do just fine, USEREXIT_MOVE_FIELD_TO_VBAK for example.

  • Purchase Order Statistical Delivery Date changed automatically

    Hi,
    In the purchase order, when I go to change the delivery date, the statistical delivery date changed automatically.
    I do not want to change the statistical delivery date.
    Is there any User Exit or BADI to validate this?
    Please suggest the same.
    Regards
    Amol Khochare

    Hi
    Is the delivery date get copied to statistical delivery date ?
    For validation, please check BADI - ME_PROCESS_PO_CUST and Method - PROCESS_ITEM
    From the interface - IF_PURCHASE_ORDER_ITEM_MM use method GET_SCHEDULES and subsequently from the interface IF_PURCHASE_ORDER_SCHEDULE_MM use method - GET_DATA to get schedule line details.
    Let us know, if it helps.

  • Cant change delivery date on Sales Order posted in prior period

    Hello All,
    Scenario: A sales order which was processed in prior period but since then delivery date had changed due to request from our customer. When we try to go back and change the delivery date, we find it greyed out. To get around this, we have to open the period again, change date and then close the period. Problem is that not all dates get changed, so our late delivery report look bad, shows that 90% of our deliveries are late, when in fact they are on time, the new time which we could not record on the Sales Order. We have similar problem with our purchase Orders.
    Is there anything in Administration we can do to enable us to easily chnage delivery dates on Sales order and purchase orders?

    Hi,
    Welcome you to post on the forum. What is your B1 version and PL?
    Thanks,
    Gordon

  • Delivery Date in Sale Order

    Dear All
    Delivery date in sales order should automatically changed or by defalt it should be after 2 days of creating the sales order.
    I have tried with lead time period and the ways given in the forum, but the schedule line/delivery date is by default coming as the day of sale order creation.
    Please guide me how to do it.
    Regards
    SB

    Hi,
    Goto Tcode: VOV8
    select sales document types
    goto request delivery date tab
    remove tick mark or uncheck propose delivery date
    and maintain lead time 2 days.
    thanks.

  • Two Delivery dates in Sale Order against one item

    Dear All
    I need two delivery dates in sale order. one is default at the time of creation sale order. second i need actual delivery date which will be confirmed by production planning department after analysis the order whether material can be ready on that delivery date or it need to change. Actual delivery date may vary from original delivery date and both need to preserve in system. kindly provide solution. best regards.
    Manjit

    You need to select the Availability & Transfer of Req. check box in Schedule Line Configuration.It will transfer the req. to PP.So while creating the sale order , schedule Lines will be confirmed as per the Available Stock.
    System will give you the Default Delivery Date as the Date added after Lead Time in days in the Configuration.Else system will give the Current Date.
    Best regards,
    Ankur

  • How to execute availability check against delivery date in purchase order

    Hi all
    In MD04, I know that "available date = delivery date in purchase order + GR processing time" & "GR date = delivery date in purchase order". When I execute availability check in production order, I will get material's committed date = available date. But I hope to get material's committed date = GR date in purchase order.
    For example. delivery date in purchase order is 2012/02/06 and GR processing time is 2 days. After ATP in production order, I will get committed date 2012/02/08. But I hope it show 2012/02/06. How to customize it.
    (The GR processing time must be set 2 days for MRP calculation. it can be changed to 0.) Thanks!!

    Hi Rita,
    One Doubt, If you say that material commited has to be the GR date and you do not wish to wait for GR processing time, then why do you have the GR processing time in first place.
    For ex. My client, we get the stock as per GR in Quality inspection and so we have GR processing time considered for available time in MD04. But since the business considers the Inspection stock as avialble, The stock gets reflected in avialibility check the moment GR is done.
    So please explain your requirement in detail. There could some way to do so. If not the raise an issue with SAP.

  • How to block the Statistical delivery date in purchase order from updation

    Hello All,
        We have the following requirement from our client.
    The client wants to track the delay in delivery of purchase orders raised to vendors. Currently the users, change the delivery date and then process the PO if there are any delays. The client wants to STOP this and track any changes being made.
        We created a new screen layout for purchase orders and checked the Statistics relevant delivery date as DISPLAY
    However, when we tested the same, the statistical delivery date was changed along with delivery date, when the delivery date was changed in the Purchase order, though the option for statistical delivery date was seen a DISPLAY field only.
    Please provide us your suggestions on any other options available.
    R's
    Manoj.

    if your client wants to track the delay of a delivery from your vendor, then he has to give the vendor a chance that he can deliver on time. And the usual way to do this is by sending the PO to the vendor.
    if you cange the delivery date before output of messagem then your vendor could not even know the original delivery date, so it is not the vendors fault if he cannot meet this date.
    if you change the delivery date after output of message , then the statistical delivery date will stay with the old date.
    the field is always open to maintain because it is not always the vendor who is reponsible for a delivery date change.
    if you want to change the delivery date because you can take the quantity at that date, then it is not the vendors fault, in this case you have to change the statistical delviery date to evaluate the vendors delivery performance against the new date.
    And often forgotten in this evaluation process is the warehouse personell that finally posts the goods receipt. if they post it with delay and do not change the goods reeipt date, then the vendor is as well evaluated to bad.

  • Delivery date and sales order creation date

    Dear all
    Can you please explain the relation between delivery date and sales order date. In my case i can create delivery with delivery date as before the sales order date... how it is possible that i can create delivery before the sales order date.??
    Please explain.........
    Warm Regards
    Inder Pal

    Hi,
    Sales order date: Date on which the customer officially places an order to your company.
    All the commitment and product allocation counting starts with reference to this date.
    e.g. customer says that the goods are required from 20 days of placing order, then from this date the calculation starts.
    Delivery date: Date on which after the system goes through material availability date, replenishment time, calculates the date on which physically the goods can be delivered to the customer.
    e.g. customer orders 100 qty of material X in 15 days, you will hve to check this delivery date through availability check which can be done in sales order and also delivery.
    payment date is based on this delivery date.
    regards,
    Siddharth.

  • User Exit for Requested Delivery Date in Sales Order

    Hi
    Which user exit can be used to change Requested Delivery Date in Sales Order.
    Scenario:  Sales Document Type: OR has Lead Time: 7 days.  System always proposes delivery date after 7 days.  We need to change this Lead Time based on plant.
    Thanks in advance for your support.
    Regards
    Uma

    Hello,
      try with USEREXIT_MOVE_FIELD_TO_VBEP or USEREXIT_SAVE_DOCUMENT_PREPARE, of program MV45AFZZ.
    Hope to be useful.
    Best regards,
    Andrea

  • Address data changed after invoice is created

    Hi,
    I've a problem to solve and it's related with data changed after invoice is created.
    The scenario is the follow:
    1º - create a complete and standard sales process - order => delivery => invoice, with the standard partner scheme and without edit the address data, for any kind of partner
    2ª after the invoice is created, I change the address data on Client Master Data, for the same client that I've used on previous process
    3º I'll go to the VF03 transaction and take a look at the partner data on header level. Here I can see that the changes on the Client Master Data ar updated to the invoice document wich is already created and printed when I maked the changes
    I think that could be a program error because, once the documento is created, you only can change texts and accounts if this document is not yet created.
    And, I can't edit this kind of data on invoice creation because it must be done at order level.
    So I don't understand why it happen, but it happen on more than one client.
    I'll hope that anyone can help me to solve this issue.
    Kind regards,
    Nuno Rodrigues

    Hi Nuno,
    the adresses of all Clients are stored in table adrc. If there are no changes in the order, the system takes the standard adress of the client. That is made for not having an extra adress for each order.
    If you change the adress - the system will create a new adressnumber ( 999........ - see in VBPA ).
    If you have different adressnumbers in your orders, you are not able th collect several orders into one delivery note - for the adressnumber ist normally a split-criteria.
    Ich you will have an extra Adress for each Order, change the adress - for example by an user exit.
    But if you have different adressnumbers - the delivery and the invoice will split the different orders - if you dont do something against in an user-exit.
    Hans

  • Source inspection before 365 days of delivery date of purchase order

    Hi Experts,
    Business wants to create source inspection lot well in advance before 365 days of delivery date of purchase order. this lot is required to record results.
    In SAP, transaction code QA51 allows only two digit characters for 'number of days for opening period' so system is not creating inspection lot for more than 99 days delivery date from current date.
    Please advise.

    Hi Patel, I really got interested on this particular issue because we have been using source inspection in our company for a while. After some investigation on ABAP code of report I will share with you my fact findings:
    1) System calculates the start date of source inspection (delivery date from PO - Leadtime from q-info record). For example, in my test case it was 14.08.2015 - 0 days. So field g_datum below will be 14.08.2015:
    2) System then checks if you are running the report in background (highlighted in yellow above). If so then it will check if the start date of inspection (g_datum) falls on opening horizon (g_datum_eroff). The opening horizon is calculated as per formula below (system login date + opening period). As an example: 14.08.2014 + 30 days = 13.09.2014.
    Default opening period (p_eroff) is 30 days:
    3) So all-in-all, when you are running QI07 online you´ll get a yellow traffic light on the long leadtime PO but you will be able to process it (on-line). However if you run the report in background (job scheduling) system will only create inspection lot to the relevant POs if the PO's delivery date falls on the 30 days window based upon the current date.

Maybe you are looking for