DEMAND MANAGEMENT STANDARD CONFIGURATION

Hi Gurus
pl share the Demand Management standard configuration to be done
Plants are available and copied from 0001
thanks
K.Prabakaran

Hi
Demand Management does not need any extra configuration unless u want to make any changes to the standard configuration. You have to choose the right strategy to be used for your process and apply the same to the material in the MRP3 view of the material master.
Availability check also has to be selected according to the requirement.
If you can specify your requirements, I can help u further in selecting the paramenters.
Regards
Chandra

Similar Messages

  • Solution manager charm configure

    hello everyone
    i want to configure the charM scope with our R3 and BW at  two  domain .
    R3 landscape
                        DEV(101sandbox,201-develop,301-customizing ,800unit testing)
                        QAS(800- testing)
                        PRD(800-prduct)
      tranport   from DEV TO QAS and delivery to PRD ,also you can export the object from  QAS to PRD for special .
    domain controller is PRD
    BW landscape BWD(client 100)--BWQ(client 880)BWP(client 880)
    domain controller is BWP
    if we use the charM for manager the change requst ,how we configure  in all system for prepare the charM like the stms configure .
    we notice our test system and prd system have same client number ,so it is ok for configure ?
    expect your help!
    thanks a lot!                                                                               
    frank

    Hi,
    1 QAS client and PRD client can be the same(need not to be different).
    2. Make sure that the system landscape you mention under system landscape tab of SOLAR_PROJECT_ADMIN should match with TMS configuration of Solution Manager.(This is very important).
      You should create a maintenance project with system landscape DEV-201->QAS-200->PRD-200 using SOLAR_PROJECT_ADMIN. Repeat this step for BW also.
       You need to configure TMS of Solution Manager in Client 000 as follows:
        SLM->DEV-201->(Consolidation Route)QAS-200->(Delivery Route)PRD-200
        SLM->BW-100->(Consolidation Route)BW-880->(Delivery Route)BW-880
    No more document is required better than SPRO. Just follow this SPRO path to configure TMS:
    SPRO->SAP Solution Manager->Configuration->Scenario-Specific Settings->Change Management
    ->Change Request Management->Standard Configuration->Transport Management System(Read IMG activity of each step).
    Let me know if you have aby issues.
    Regards,
    Sanjai

  • The URL in Solution Manager for SRM Standard Configuration

    Hi Experts,
    We all know that after SRM 5.0, all standard configuration guid are presented as URL in SAP Solution Manager like below:
    http://help.sap.com/SCENARIOS_BUS2005/helpdata/EN/ac/136341acd3001de10000000a155106/frameset.htm
    My question is: is there any other way to find these configuration url? If I don't have solution manager enviroment, how can I find these urls? Many thanks.

    Hi Dinesh,
    Thank you for your reply.  I checked this site before(maybe one year ago). At that time, there was no configuration guide for 5.0. Now it's great...
    My question is there any place contained those urls in solution manager. I can't find those urls in any configuration guide. SAP make such a configuration online help, why it doesn't open for those peopel who don't use solution manager. It confused me...
    Anyway, thank you very much for your reply.

  • What is demand management .

    What is demand management , can any body send me configuration document for Demand Management

    Rakesh,
    I guess you must have overlooked the rules of engagement for this forum. It is customary for questioners to first perform basic research before posting any questions.
    First, search in the forums (search box in the upper right of this page). FYI The question you raised has been discussed dozens of times. In addition to forum postings, there are numerous articles available for free in the SAP community network.
    Next, check online help. This help is generic, and not generally specific to a particular industry:
    http://help.sap.com
    Demand Management in the Supply Chain:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f93ad43b711d189410000e829fbbd/frameset.htm
    Next, look for generic solutions solutions in Best Practices. Basic index at
    http://help.sap.com/saap/sap_bp/BL_IN/html/Content_Library_BL_EN_IN.htm
    Next look for industry specific solutions in Best Practices:
    http://help.sap.com/content/bestpractices/industry/index.htm
    If you are experiencing a problem, or you believe that SAP is not working per the online help, you can then search OSS notes.
    http://service.sap.com/notes
    Next search in one of the standard online search engines (such as Google).
    Only after you have performed all of these tasks, and studied all of the online help that is supplied for free by SAP, then consider posting a question to these forums.
    If you are unwilling or unable to perform such research, then you should probably engage a consultant to assist you. All consultants use searches to assist them in designing and executing solutions. If you intend to one day become a consultant, you would be wise to cultivate this skill.
    Best Regards & Good luck,
    DB49

  • SOP to Demand Management - Mass Transfer -RMCA0766 - Program does not exist

    Dear Experts,
    I am configuring the mass transfer from SOP to Demand Management.  I want to maintain the variant for the program RMCA0766 so that I can create the Mass transfer job.
    But I get the message RMCA0766 does not exist.  So, How do I generate this program in the client?
    Any help would be greatly appreciated.
    Reagrds
    Tom

    Hi,
    Please refer the below document. It speaks about the mass processing on SOP.
    http://help.sap.com/bestpractices/BBLibrary/documentation/M06_BPP_22_EN_NO.doc
    Hope you will get the answer you needed.
    Regards,
    Manimaran M.
    Edited by: M Manimaran on Aug 9, 2011 8:01 AM

  • Demand management planning strategy

    Hi there,
    I am trying to set up demand management for simple make to stock. I am using standard requirements type LSF which is linked to requirements class 100.(OMP1) The requirements class has a planning indicator (PLNKZ) set to "1" (net requirements planning) in OMPO. This is what I want as we want the warehouse stock to be taken into account when procurement proposals are generated. The planning strategy assigned to the material master has the "1" setting (net requirements planning). However when I run MRP after entering planned independent requirements for LSF (MD61), the purchasing requisitions proposed are just for the independent requirements and ignore warehouse stock. There is a line in the Stock / Requirements list that says "Gross Requirements Planning" Does anyone know where it is picking up "Gross Requirements Planning" instead of Net Requirements Planning (i.e. check what is in stock before creating procurement proposals)
    Any assistance is appreciated.
    thanks
    D

    Hi Suhas,
    I don't want mixed MRP as such but when I cannot get any procurement proposals (requisitions) when the setting is blank. It may be elsewhere that the procurement proposal is - I am still checking.
    However, when I choose "2" for mixed MRP, it does generate requsitions (but gives me the other problem where warehouse stock is not taken into account)
    The requirements class 100 has an entry "1" for planning indicator and "1" for requirements category. All other columns are blank at the moment. I am in the process of experimenting with these next.
    thanks for your help so far.
    Donal

  • Tranfser from demand management to SOP

    Hello All,
    is it possible to send  data from demand management (eg.MD61) to SOP - standard information structure S076 or flexible planning ?
    The idea is to put values directly to MD61 and use them later in flexible planning
    thanks a lot
    KS

    Dear,
    It is not possible. In sap, the planning cycle will be SOP -> Demand management -> MRP
    SOPu2019 is a forecasting tool enabling you to set up sales, production, and other supply chain targets based on existing, future, or historical data. SOP is most suitable for planning finished goods. SOP plans are passed on to Demand Management in the form of independent requirements (MD61), which in turn is fed in to MRP (Material Requirements Planning).
    Hope it clear your doubt
    Regards / US

  • Demand Management Through SOP

    Hello Everyone,
    I have a scenario where I receive an 8 week rolling forecast from marketing. This is transferred to production. 2 weeks before actual production the plan is firmed.
    I was hoping to implement this using SOP transfer to demand management. I was also planning to use an MRP type with a planning time fence. But am not exactly sure of the best practice to transfer Rough cut plann data to demand management. Do I directly transfer the Rough cut plan to a "requirements plan" version?
    If not what would be the best possible solution to run SOP?
    Also Please suggest as to any specific configuration settings to be maintained for SOP.
    Any help in this regard would be greatly appreciated.
    Sincerely,
    Aji Kurian Mani

    Hi
    It depends on at which aggregation level you are receiving the Forecast.
    if you are receiving at Plant -Material level. I would advice you to directly upload in to MD61.
    SOP is required, if you need to do any forecasting in SAP.
    or if you need to publish , analsyse the Historical and Forecasting Values at diffrent Org Levels(Plant, cutomer, Material,Sales org....etc)
    using the planning tables you can maintain the Figures at one Level, which gets aggregated automatically.
    Regards
    Ratan

  • Demand Management: single Supplying Plant to multiple Demand Plant

    Dear All,
    I have following scenario to mapp:
    There is one supplying plant (Plant A) and 3 demand plants (Plant B,C,D). Out of 3 demand plant, two plants (Plant C and D) are assigned to different company code then supplying plant while one demand plant (Plant B) is assigned to same company code as of supplying plant (Plant A).
    Material M1 produced at plant will be consumed at plant A to produce material M2 as well as will be supplied to plant B.
    Material M2 produced at plant A will be supplied to all three demand plant B, C and D.
    As plant A and plant are assigned to same company code and are in same campus, materials will be transferred using Transfer Posting (material movement 301).
    Material from plant A will be supplied to transfer to Plant C and plant D using Stock Transfer (movement type 351) or using standard sales cycle.
    Plant A will use total SAP but plant B,C and D don't want to use any planning functionalities of SAP (no MRP run) as they are using i2 product for planning.
    As except plant A no other plant wants to use SAP for planning run, it was suggested to enter demand at Plant A directly for all plants using Demand Management functionalities using different planning versions. But now the issues are:
    A) As demand from each plant (plant C and D) will be entered at Demand Level using different planning version for each demand plant, how to reduce PIR of corresponding demand version for delivery against sales order of corresponding plant.
    B) As materials will be transferred from plant A to plant B using transfer posting and not stock transfer, how to reduce PIR. As PIR is not reduced but stock reduces then system will create new planned order for PIR which already supplied to plant B.
    Any help will be appreciated.
    Thanks and regards,

    Dear Mario,
    Thanks for your reply.
    Can you explain in bit detail what is option 2 and how can I do same in system....
    I tried using Special Procurement Key 40 in demand plant and maintained PIR in demand plant with MD61 which results into Stock Transfer Order created in demand plant. Now the problem is when I issued material from supply plant to demand plant against stock transfer order, system also reduced the PIR for external sources I maintained in supplying plant. Hence there was two reduction in Supply Plant, one for Stock Transfer Order reservation and second for PIR maintained for external demands (other than demand plants).
    How can I stop reduction of PIR maintained for external sources while delivering against stock transfer order?
    Thanks in advance.
    Regards.........

  • SolMan 7.1 SP10: Managed Systems Configuration: client 000 OK, client 100 error

    Hello,
    after installing SolMan 7.1 SP10 successfully I also completed the steps "System Preparation" and "Basic Configuration".
    Now I'm connecting the managed ABAP systems to the Solution Manager by performing step "Managed Systems Configuration".
    After several other ABAP systems I'm now connecting our productive CRM 7.0 EHP1 system "CM3" (SAP_BASIS 702).
    I also connected the CRM development and CRM quality assurance system without a problem.
    For client 000 everything worked fine, the RFC destinations were created and a green light is shown.
    Now the problem is to connect the productive client 100:
    The log for Activity RFC Connection says:
    The corresponding dev_rfc tracefile says:
    **** Trace file opened at 20140326 164911 W. Europe Standard Time, by disp+work
    **** Versions SAP-REL 720,0,523 RFC-VER U 3 1468763 MT-SL
    ======> Name oder Kennwort ist nicht korrekt (Wiederholen Sie die Anmeldung)
    ABAP Programm: SAPLSM_SETUP_API (Transaction: )
    Called function module: FUNCTION_EXISTS
    User: SOLMAN_ADMIN (Client: 001)
    Destination: 0050568713C71ED3AD9FC4F78AC9D9EB (Handle: 16, DtConId: 27FEB4E356BCF14F99EB0050568713C7, DtConCnt: 1, ConvId: 64734943,{27FEB4E3-56BC-F14F-99EB-0050568713C7})
    EPP RootContextId: 0050568713C71ED3AD9FB7AD4C4859EB, ConnectionId: 0050568713C71ED3AD9FB784232C59EB, ConnectionCnt: 1
    EPP TransactionId: BDFDB4E3626AF14899EB0050568713C7
    But both users taken to execute this step (SAP Solution Manager Administrator "SOLMAN_ADMIN" and Managed System Configuration User "SM_ADMIN_SM3") exist and have the correct provided password.
    Does anyone have a clue?
    Kind regards
    Rüdiger Höckel

    Hello Ranjith,
    thanks for your quick response.
    The ST-A/PI software component is the same on all systems: 01Q_700 #2.
    SolMan system: SM3
    CRM systems: CM0 (ok), CM1 (ok), CM3 (problem with client 100, client 000 OK).
    I also tried the recommendation found in the SAP Community Network
    (http://scn.sap.com/thread/3483642) but this didn't help either:
    1.Delete system from LMDB.
    2.Delete system from SLD of solman.
    3.Re- register the system to SLD of solman(rz70 for AS ABAP)
    [the LMDB synchronizes with the SLD every 10 minutes, system CM3 is visible again in the LMDB]
    4.Now follow the steps in managed system configuration.
    The wizard worked fine for client 000 but throws this error for client 100.
    I use all the latest installation and configuration guides.
    For this step I'm using the guide "Managed System Configuration" that is available in the SOLMAN_SETUP wiki.
    https://websmp206.sap-ag.de/~sapidb/011000358700001120342013E.pdf
    Kind regards
    Rüdiger
    P.S. In total I have already connected eight systems (SAP_BASIS 700 to 731) but this is the first system that gives an error.

  • Management network configuration

    Hi,
    Oracle configuration worksheets suggest two option under table 5 : Management Network Configuration Worksheet :
    Select which network is used for the database server host name. The options are :
    admin network
    or
    client network.
    1) Regarding best practice which network i should choose ?
    2) If i choose "admin network" , is that mean that i will not have the option to run exadata/cluster/database command directly from the database host ?
    Thanks
    Edited by: Yoav on 07:02 13/05/2012

    robinsc wrote:
    Whenr they installed our system it took the admin host names by default. I did n't know there was a choice. So if you want to change the names at a later pointof time is there any standard way to do this or you have to live with what was there before...
    Or do you just edit /etc/hosts and /etc/sysconfig/network ?
    ThanksThis is a fairly recent change in the configuration worksheets. I wouldn't want to change the hostnames in a cluster, as it could lead to problems inside of grid infrastructure. When changing hostnames or IPs on an Exadata rack, you want to use the ipconf utility, not just change the values in /etc/sysconfig/...
    If you change the IP on a cell without ipconf, then you could run in to trouble when patching. We've seen cells that reset to the previous IP after patching when a customer changed the IP without using ipconf.

  • Workflow Start "Failed But Not Blocking Correlation" - Project Server workflow for Demand Management

    Hi,
    I'm trying to "Create a Project Server workflow for Demand Management" with project server 2013 just like is explained
    here.
    But when I try to create a new project the implemented workflow failed to start with the follow state message in the job queue: Failed But Not Blocking Correlation.
    The detailed error display the follow message:
    Exception Starting Workflow: The scope _/SharePoint/default/139e833f-7a85-4ccf-b7a2-b3fea9ce50b9/6799b7e5-e519-40f4-9371-0b3bc3d5c208_ has no workflows under it. HTTP headers received from the server - ActivityId: 52fef415-409b-4545-a9f6-ed75519b425c.
    NodeId: My-Computer-Name. Scope: /SharePoint/default/139e833f-7a85-4ccf-b7a2-b3fea9ce50b9/6799b7e5-e519-40f4-9371-0b3bc3d5c208. Client ActivityId : 9ded4d9c-7733-7004-2661-c8977270af98.. Trace:    at Microsoft.Workflow.Client.ClientHelpers.SendRequest[T](HttpWebRequest
    request, T content)   at Microsoft.Workflow.Client.WorkflowManager.StartInternal(String workflowName, WorkflowStartParameters startParameters)   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowManagementClient.StartInstance(String
    serviceGroupName, String workflowName, String monitoringParam, String activationKey, IDictionary`2 payload)   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowInstanceProvider.StartWorkflow(WorkflowSubscription subscription, IDictionary`2 payload)  
    at Microsoft.Office.Project.Server.BusinessLayer.Workflow.StartWorkflow(Guid projectGuid, Guid enterpriseProjectTypeUid, Boolean isNewProject, Guid previousEntepriseProjectTypeUid, Boolean skipStage, Guid stageToSkipTo):
    WorkflowExceptionStartingWorkflow (35115). Details: id='35115' name='WorkflowExceptionStartingWorkflow' uid='e3bbb06b-1d38-e311-940a-001cc094718e'.
    Error:
    WorkflowCannotStartWorkflow (35100). Details: id='35100' name='WorkflowCannotStartWorkflow' uid='e4bbb06b-1d38-e311-940a-001cc094718e'.
    Queue:
    GeneralQueueJobFailed (26000) - WorkflowStartWorkflow.WorkflowStartWorkflowMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='e5bbb06b-1d38-e311-940a-001cc094718e' JobUID='68ee1040-1d38-e311-940a-001cc094718e'
    ComputerName='90f7432c-fbc8-4ebd-86f3-0236ce62661c' GroupType='WorkflowStartWorkflow' MessageType='WorkflowStartWorkflowMessage' MessageId='1' Stage='' CorrelationUID='9ded4d9c-7733-7004-2661-c8977270af98'. For more details, check the ULS logs on machine
    90f7432c-fbc8-4ebd-86f3-0236ce62661c for entries with JobUID
    68ee1040-1d38-e311-940a-001cc094718e.
    with this detailed entries in the log file
    10/18/2013 13:47:57.38  Microsoft.Office.Project.Server (0x0948) 0x14F0 Project Server                 Queue                        
     ad3fy Critical Standard Information:PSI Entry Point: <unknown>  Project User: <unknown>  Correlation Id: <unknown>  PWA Site URL:   SA Name: <unknown>  PSError: <unknown> A queue job
    has failed. This is a general error logged by the Project Server Queue everytime a job fails - for effective troubleshooting use this error message with other more specific error messages (if any), the Operations guide (which documents more details about queued
    jobs) and the trace log (which could provide more detailed context). More information about the failed job follows. GUID of the failed job: 68ee1040-1d38-e311-940a-001cc094718e. Name of the computer that processed this job: 90f7432c-fbc8-4ebd-86f3-0236ce62661c
    (to debug further, you need to look at the trace log from this computer). Failed job type: WorkflowStartWorkf... 9ded4d9c-7733-7004-2661-c8977270af98
    10/18/2013 13:47:57.38* Microsoft.Office.Project.Server (0x0948) 0x14F0 Project Server                 Queue                        
     ad3fy Critical ...low. Failed sub-job type: WorkflowStartWorkflowMessage. Failed sub-job ID: 1. Stage where sub-job failed:  (this is useful when one sub-job has more than one logical processing stages). 9ded4d9c-7733-7004-2661-c8977270af98
    10/18/2013 13:47:57.38  Microsoft.Office.Project.Server (0x0948) 0x14F0 Project Server                 Queue Jobs                   
     ad3fy Medium   Error is: GeneralQueueJobFailed. Details: Queue Attributes:  68ee1040-1d38-e311-940a-001cc094718e  90f7432c-fbc8-4ebd-86f3-0236ce62661c  WorkflowStartWorkflow  WorkflowStartWorkflowMessage  1   
    9ded4d9c-7733-7004-2661-c8977270af98  . Standard Information: , LogLevelManager Warning-ulsID:0x000DD158 has no entities explicitly specified. 9ded4d9c-7733-7004-2661-c8977270af98
    Any idea?
    Thanks in advance,
    Alexander.

    Hi Alexander,I have seen that error when the workflow manager has not been registered correctly with the PowerShell command - that should be in the docs referenced - or
    http://technet.microsoft.com/en-us/library/jj663115.aspx.  Let me know if that doesn't appear to be the issue here and I can dig deeper.  Best regards,  Brian
    Blog |
    Facebook | Twitter | Posting is provided "AS IS" with no warranties, and confers no rights.
    Project Server TechCenter |
    Project Developer Center |
    Project Server Help | Project Product Page

  • Sales Planning  vs Demand management

    Can any body explain how to process the sales planning vs Demand management !

    Hi,
    Demand Management  : The function of Demand Management is to determine requirement quantities and delivery dates for finished products assemblies. Customer requirements are created in sales order management. To create a demand program, Demand Management uses planned independent requirements and customer requirements.
    To create the demand program, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product.
    Using these strategies, you can decide if production is triggered by sales orders (make-to-order production), or if it is not triggered by sales orders (make-to-stock production).You can have sales orders and stock orders in the demand program. If the production time is long in relation to the standard market delivery time, you can produce the product or certain assemblies before there are sales orders. In this case, sales quantities are planned, for example, with the aid of a sales forecast.
    Sales & Operations Planning (SOP) is a flexible forecasting and planning tool with which sales, production, and other supply chain targets can be set on the basis of historical, existing, and estimated future data. Rough-cut planning can also be carried out to determine the amounts of the capacities and other resources required to meet these targets.
    Use SOP to streamline and consolidate your company’s sales and production operations.
    SOP is particularly suitable for long- and medium-term planning
    SOP constitutes the planning functionality of the LIS information systems.
    You pass on SOP plans to Demand Management (PP-MP-DEM) in the form of independent requirements. In turn, this data is fed to Master Production Scheduling (PP-MP-MPS) and Material Requirements Planning (PP-MRP).
    An interface with Profitability Analysis (CO-PA) allows you to use CO-PA data as the basis for sales planning in SOP.
    You can also pass on the results of SOP to Profitability Analysis (CO-PA), Cost Center Accounting (CO-OM-CCA), and Activity-Based Costing (CO-OM-CCA).
    Application Link Enabling (CA-BFA-ALE) supports the distribution of data to different operating units in your enterprise
    I hope this information will help you.
    kiran.

  • SOP - Flexible Planning u2013 Demand Management.

    Hello Gurus
    Can any one guide me  SOP - Long term plannng  / Flexible Planning  - Transfer to demand managment Process
    Thanks
    JJ
    Edited by: JJ_SAP_S on Jul 28, 2008 12:24 AM

    Hi,
    Transferring SOP  to Demand Management :
    Use:
    You can pass on data planned in Flexible Planning or Standard SOP to Demand Management.
    Demand Management determines the requirement dates and requirement quantities for important assemblies and specifies the strategies for planning and producing/procuring finished products. The result of Demand Management is the demand program. The demand program differentiates planned independent requirements and customer independent requirements. It gives the information needed in MPS and MRP for planning at SKU level. The placing of sales orders eventually consumes planned requirements and triggers updating to the Sales Information System. This actual data can then be used as input for future sales planning. For more information, see PP Demand Management.
    Prerequisites:
    The system distributes the data to the appropriate plants in Demand Management on the basis of the quotas you set in Customizing (in Define proportional distribution across plants). You can also make these settings in the Flexible Planning or Standard SOP menu by choosing Settings ® Plant distribution. Plant distribution works as follows:
    If a plant or plants can be found for the material in the planning hierarchy, data is transferred to Demand Management for these plants.
    If no plant can be found in the planning hierarchy, the system checks to see which plants have been maintained for the material in the material master record. It then checks to see whether distribution quotas have been maintained for the material. If quotas have been maintained, the transfer to Demand Management is based on these quotas.
    If no distribution quotas are found for the material, the system checks to see whether you have set generic distribution quotas; that is, distribution quotas that apply to all materials. If so, the transfer to Demand Management is based on these quotas. If generic quotas exist for some but not all plants maintained in the material master record, the system assumes that the distribution quotas of plants without generic quotas are 0.
    If no distribution quotas are found at allu2014neither material-specific nor generic onesu2014, the system splits the data equally among all the plants in the material master record.
    See also:
    Plant Distribution Quotas
    Features
    Independent requirements are created in Demand Management for all materials whose data has been transferred. These independent requirements are created in the base unit of measure of the material. The base unit of measure of the material is not necessarily the same as the base unit of measure of the information structure or the unit in which you planned the material. See also Switching Units in the Planning Table.
    You can transfer SOP data to Demand Management in the following ways:
    Transferring Online, Synchronously and Automatically:
    You set the following information structure parameters in Customizing for Sales & Operations Planning (in Set parameters of info structures and key figures).
    Field name of the key figure whose values are to be transferred
    Planning version from which the data is to be transferred
    Demand version to which the data is to be transferred
    The system creates or overwrites independent requirements in Demand Management every time you save this planning version of the information structure in Flexible Planning.
    Transferring Online, Asynchronously and Manually
    You choose between the following options:
    Transfer of the planning data of all members of a single-level product group from standard SOP (a single-level product group is a product group whose members are materials)
    Transfer of the planning data created for one material from standard SOP
    Transfer of key figure values from an information structure
    You make the following general settings:
    The material or product group whose data you want to be transferred
    The plant of this material or product group
    The planning version of the information structure in which the data is stored
    The dates for which you want the data to be transferred
    Whether you want to check what the data looks like as independent requirements before you transfer it
    The requirements type
    If you do not make an entry, the system sets the requirements type via the MRP group which is maintained in the material master record.
    The version of the demand program to which you want the data to be transferred
    Whether this version of the demand program is active and therefore relevant to MRP
    Depending on the option you chose in step 1, you set one of the following strategies.
    Transferring Planning Data from a Single-Level Product Group:
    You transfer the sales plans of the materials direct.
    You transfer the sales plans of the materials as proportions of their owner product group (using the proportional factors defined in the product group master record).
    You transfer the production plans of the materials direct.
    You transfer the production plans of the materials as proportions of their owner product group (using the proportional factors defined in the product group master record).
    Transferring Planning Data of One Material from Standard SOP:
    You transfer the sales plan of the material direct
    You transfer the sales plan of the material as a proportion of the product group of which it is a member (using the proportional factor defined in the product group master record)
    You transfer the production plan of the material direct
    You transfer the production plan of the material as a proportion of the product group of which it is a member (using the proportional factor defined in the product group master record)
    Transferring Key Figure Data of One Material from Flexible Planning
    The information structure from which you want the key figure data to be transferred
    The key figure whose values you want to be transferred
    This key figure must be a quantity key figure.
    For more details go to the following link :
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/a5/63238b43a211d189410000e829fbbd/frameset.htm
    Hope this helps.
    Reward if useful.
    Regards,
    Tejas
    Hope this helps.

  • Demand Management System Administrator Responsibilities.

    Dear Gurus,
    We are trying to integrate EBS 11.5.10.2 and Demantra 7.3.1. Both EBS and Demantra are on different instances.
    Not able to view "Demand Management System Administrator" responsiblities on EBS instance. We need this responsibilites to run standard collection to load in demantra.
    Kindly suggest.

    Responsibilites are
    1)Demand Analyst
    2) Demand managment system administator --- collections--- oracle system-- standard Collections..
    these are the required responsibility and navigation steps to run Collections
    Kuldeep

Maybe you are looking for

  • The Document Type "" will not be added because it uses a file extension that is already associated with a prior Document Type.

    I've removed the MMDocumentTypes.xml file from the folder Adobe Dreamweaver CC 2014 -> Configuration -> DocumentTypes and put it on the desktop. Also, I moved the Extensions.txt file the same way. After a restart, I get the same error message. I unin

  • Completely Wipe My MacBook Pro

    I bought my MacBook Pro in September of 2010. Since then I have only downloaded OS X Mountain Lion & now OS X Mavericks. I would like to completley wipe my my MacBook Pro clean to return it to right out of the box settings! How would I go about doing

  • How do i get my messages to my mac

    I don't know how to get my messages to connect from my iPhone to my MacBook pro.. and I tried to get OS maverick and it won't download or update. help!

  • Oracle Desinger: How to install and login

    Hi, I installed Oracle 10g Express Edition Database software on my Windows XP and after that i installed 10g Designer software under same Oracle home. Then i tried to launch the Oracle Desinger by giving login details and Service Name or hostname as

  • Export while still Working?

    Is there a way to export (maybe, like using Compressor) and not tie up FCP, so exporting can occur while you still work in FCP?