Depo- material upload

We have certain materials (finished goods) which has been imported after paying customs duty, CVD, Add duty etc...this materials do not have purchase orders created in the system. These materials are stored in our depo which has to be uploaded into SAP as stock and then do depo sales whenever we get the requirment from the customer, I have the following queries regarding this process:
1.How can I upload these materials as stock with assessable value and excise duty value in SAP?
2.If purchase order exisit then during GRN the assessable value and excise duty for  a material will be stored in SAP, since I dont have GRN then against which document these values will get stored.
Please revert
thomas

In J1IG,
You need to maintain reference document (101/501 or 561)
With vendor details.
Then after entering, select the line item & maintain duties, assessable value etc.
Make sure that your field 'Vendor should be maintained during 501 or 561.
Regards,
Piyush

Similar Messages

  • Shopping cart created for a MDM material uploaded from MARA

    Hello,
    I need to create an interfase from ECC6 material master (MARA) to MDM1.0
    I can not test the creation of a shopping cart for a catalogue material at the moment.
    My question is.
    Someone know can confirm me if is possible
    . to upload to MDM the "MARA" table
    . and the SRM shopping cart will be created for a catalogue material (uploaded from MARA, ECC6.0.
    AND the purchase requisition created in the back-end (ECC6) will take the MARA material number not a free text.
    I think that this is possible, but what do I have to define in MDM? How MDM will reconize the material number to transfer that information from the shopping cart to the purchase requisition?
    Thank for your help.
    Cheers,
    Marta
    Message was edited by:
            Marta Canabal Mazorra

    Hi Marta,
    Check for details under "Loading Master Data"
    <u>http://help.sap.com/saphelp_mdmgds55/helpdata/en/ae/82b24265e8b211e10000000a155106/frameset.htm</u>
    Regards
    Rehman

  • IDOC for material upload

    hi friends,
    if we use idoc or bapi for material upload.will it create internal material number by itself has it does in bdc
    and also plz suggest me which is best method for data upload.
    regards
    raj

    its beteer to go uploading with LSMW
    for uploading
    and in LSME with direct input pethod its the easiest way to upload the data

  • Error in material upload LSMW

    Hi experts
       When I run the LSMW for materials upload I am getting this error
    "Idoc included in idoc packet containing an error : transfer it separately"
    But when I run the LSMW for each material separately it works fine.
    Please help me to sort this out.
    Thanks
    Regards

    what I usually do is run lsmw steps up to  'Display Converted Data', then use sxda to schedule and run a background job, If in ECC 6.0 system, see logs in MM90

  • LSMW -  RMDATIND - Material Upload

    Dear Experts,
    I am trying to us Direct Input Method - 'RMDATIND' for article data uploading but stuck with below error message.
    Error Message :
    The activity category is not defined
        Message no. MG036
    Please share your experience to deal with above error.
    Thks,

    Sapahd,
    No, this is part of the update function, it is internal to SAP MMprograms.  It would generally mean that your data cannot perform the 'change' transaction that you have specified.  To give an example, if you were trying to change a material, but the material did not exist, it might give this type of error.
    Again, with very little experience, i have a hard time helping.  Generically, you should be able to take the data from your file, and manually execute one transaction, with no errors, and no warnings.
    Lets wait for the other experts to weigh in.
    Best Regards,
    DB49

  • Material upload LSMW..etc??

    Hii experts
    Can somebody explain me about the material stocks upload ..etc like cut over strategies with technical module help.
    Like earlier LSMW , now its got changed .. what is that like BAPI , BADI..? what it mean , how it will work . what adavantages are there if we compare with LSMW.
    Some body explain me about that ???
    Thanks

    Step-by-Step Guide for using BAPI in LSMW
    Note! The screen prints in this article are from ECC 5.0. They may differ slightly in other versions.
    Introduction:
    This document details the usage of BAPI in LSMW. We have used the example of migration of the purchase order data into SAP.
    Pre-requisites:
    It is assumed that the reader of this article has the minimum knowledge required on the Business Object, BAPI, Message Types and IDoc Types.
    Step-by-Step Procedure:
    Details of the BAPI used in this scenario:
    Business Object: BUS2012
    Method: CreateFromData
    Details of Message Type and Basic IDoc Type:
    Message Type: PORDCR
    Basic IDoc Type: PORDCR02
    Letu2019s have a look at the BAPI first, before proceeding to the LSMW:
    1. Go to Transaction BAPI
    2. Click on Search Button
    3. Enter the value u201CBUS2012u201D and select u201CObj.type(Technical Object Nameu201D
    4. Press ENTER
    5. Following screen appears:
    6. On the left side of the screen, Expand the u201CPurchaseOrderu201D.
    7. Select u201CPurchaseOrderu201D and double-click on the same for details.
    Building LSMW using BAPI:
    1. Go to Transaction LSMW.
    2. Enter the Project, Subproject and Object information and click on CREATE.
    3. Enter the descriptions for Project, Subproject and Object as prompted.
    4. Now select Settings à IDoc Inbound Processing
    5. u201CIDoc Inbound Processingu201D screen appears. Enter the required details as shown below:
    6. Click on u201CActivate IDoc Inbound Processingu201D.
    7. Click on u201CYesu201D when prompted for u201CActivate IDoc Inbound?u201D
    8. Hit on u201CBacku201D to return to the main screen.
    9. Click on Continue (F8). Following Screen appears:
    10. Select the Step 1 u201CMaintain Object Attributesu201D and select u201CExecuteu201D.
    11. Select the radio button u201CBusiness Object Methodu201D and enter the following details:
    Business Object: BUS2012
    Method: CreateFromData
    Hit ENTER
    12. Save and click on BACK button. Following information message is displayed.
    13. Now select step 2 u201CMaintain Source Structuresu201D and click u201CExecuteu201D.
    14. In this step, we need to maintain the source structure. In our example, lets consider the example of a file with 2 structures Head and Item data as shown below:
    Click on Create and name the source structure as HEADERDATA. Now select HEADERDATA and click on u201CCreateu201D again to create the child structure. Following popup appears:
    Select u201CLower Levelu201D and click on Continue. Enter the Item data structure name.
    Click Save and hit BACK button to go to the main screen.
    15. Select step 3 u201CMaintain Source Fieldsu201D and hit execute.
    16. Enter the fields as shown below:
    17. Click SAVE and return to main screen.
    18. Select step 4 u201CMaintain Structure Relationsu201D and click Execute.
    Select E1PORDCR and click on CREATE RelationShip. Following screen appears:
    Select HEADERDATA and hit ENTER
    Similarly do the same for the structure E1BPEKKOA, E1BPEKPOC and E1BPPEKET.
    Click Save and return to main screen.
    19. Select the step u201CMaintain Field Mapping and Conversion Rulesu201D and click on execute. Maintain the Field Mapping as seen below:
    20. Select step 7 u201CMaintain Source Filesu201D and provide the link for the test file created. (Create a test file with the same structure as defined earlier).
    Save and return to main screen.
    21. Select the step u201CAssign Filesu201D and click on Execute.
    Assign the file provided to the source structure. Here the same file is provided for both the structures.
    Save and return to the main screen.
    22. Select the step u201CRead Datau201D and click on Execute.
    Click on Execute.
    Return to the main screen.
    23. Select the step u201CDisplay read datau201D and click on execute.
    Click on the structure name to get the field level values.
    24. Return to main screen and now select u201CConvert Datau201D.
    25. Return to the main screen and select u201CDisplay Converted datau201D.
    26. Return to main screen and select u201CStart IDoc generationu201D.
    27. Now select the step u201CStart IDoc Processingu201D on the main screen.
    28. Return to main screen and click on u201CCreate IDoc overviewu201D. Here the data record and status records of the IDoc could be viewed:

  • Reg material uploading

    Dear Gurus,
                       we are havng two plants A & B. We have already uploaded all the datas for plant A and by mistake we changed the materials type. i.e. For ROH we hve uploaded as semifinished material..and the whole process is finished..
    Now we are tryng to upload datas for plant B. while uploadng the material, it is not acceptng ROH material. It is telling that roh is semifinished material laso n plant B...now how to change it to roh...? si there any link b/w the 2 plants...kindly suggest?

    HI,
    Obviouly the system will display this error message, Usually what we do is that once the material codes are created in one plant we extend these material codes to another plant through MM01 itself to other plant keeping in mind the material codes will be the same.
    Now you have changed the material type for the material codes generated through the upload. now if you use the same material codes then the system will tell this is not ROH material type.
    You have to create a new set of material codes for second plant, or you have extend the same material codes in plant one to plant two with the same material types as well.
    Thanks & Regards,
    Kiran

  • Material uploading

    Hi all,
    I am facing one Problem while i am uploading the material master, system does not allow the decimal conversion. For an example KG steel rod is equal to 1.2 meters. When i give the conversion like this its not allow. so i give it 10 KG is equal to 12 meters in the Excel sheet. Any other option is there?
    Regards,
    Venkatesh
    MM consultant

    Hi,
    It is not as easy to solve problems like this, you say "Do onething u check and give the solution" but do you really mean this? I am not sure what you are trying to say?
    Go to the material master record and then click on the additional data and for the conversion  of KG to metre enter 12 to 10 instead of 1.2 to 1 (or similar)
    Don'tr enter decimal places in this conversion, you don't have to, it is a mathematical conversion and so multiply both factors by 10 and the conversion is the same.
    Surely this is the solution, you don't need decimal places.
    Steve B

  • LSMW Material Upload

    Hi everyone,
    In LSMW to create material master, we got another .txt file to create alternate unit of measures. In our example we want to create just one alternate unit of measure, so there are two lines. First line is for base unit of measure, second is for the alternate unit.
    The problem is about gross weight of alternate unit of measure. When the gross weights in the first line and in the second line are different, LSMW doesn't read the second line and doesn't create the alternate unit of measure record.
    Best regards,
    Kaan Özdöker

    Text content 1:
    154490008     ADT     1     1     3,5     KG
    154490008     KL     3     1     3,5     KG
    When i "display read data", there exists two BMMH6 structures.
    Text content 2:
    154490008     ADT     1     1     3,5     KG
    154490008     KL     3     1     12     KG
    When i "display read data", there exists one BMMH6 structure.
    Thanks.
    Kaan

  • Material upload: alternate unit of measure problem

    Hello,
    I'm uploading materials using LSMW (BAPI nethod: BUS1001006). I have a problem for the records with alternate units of measure. I put the units in a separate file and map the ISO code and the Numerator. However, I receive an error M3333 for the materials with 2 rows (one basic UoM and other alternate), which says that I have to maintain conversion factors for the alternate UoM. I thought, I'm doing so by providing Numerator (E1BP_MARM-NUMERATOR), but somehow it's not enough.
    Any assistance will be highly appreciated
    Thanks in advance,
    Eli

    Wrong definition in MARMX structure.

  • Demo Material

    hi..
    My client wants to control the receive and issue of demo material...like if has demo material and he has give to  customer for demo...
    then client return it back when the demo is done...
    so could you please tell me what is the steps to be followed...any report by which i can see these demo materail status that how many of quantity is being given and how many is returned back..
    And for this cycle what are the steps to be follow...
    Thanks in advance..
    Regards,
    Andy

    before posting, search the sdn.......
    sap-sd
    Material send for demo
    and this also.........
    Depo- material upload
    thanks
    Note : Do not post links simply,give your ideas or suggestions.
    Edited by: Jeyakanthan A on Jul 26, 2011 10:32 AM

  • Uploading Material Master data from legacy system

    Hi all,
    do we have any sap defined bdc for material master data ,if no ho to do that can anybody explain me step by step procedure how to do that
    Thanks in advance
    Santosh R

    Santosh,
    Use BAPI as we already have pre-defined BAPI for material upload given by SAP.
    <b>BAPI_MATERIAL_SAVEDATA</b>
    Also check this BAPI in MM01 uploading for the complete code I have written.
    Regards
    Aneesh.

  • Upload material and contract data from file in CCM 2.0

    Hi guys,
    This might be a difficult one!
    We have the following situation in a Client:
    We are upgrading a Requisitite catalog (working with BBP 2.0)
    to a CCM 2.0 catalog.
    In Requisite, one can upload material- and contract data from a file (it is standard funcionality) into the database.
    We need to have the same kind of funcionality in CCM 2.0 because our client does not prefer to work with XI (which is the standard SAP solution in these cases).
    How can we accomplish this? maybe with some additional ABAP coding!
    Our client is not working with Vendor Catalogs but I´m trying to see if we can use a dummy vendor catalog to accomplish material upload in CCM2 form a CSV file.
    Anyone had to face this situation before?
    If so, please provide some clues how to do it?
    Thanks in advance,
    Aart

    SAP CATALOG CSV 2.0 <;>
    Defaults;EN
    Model
    Catalog;All;;All Catalog
    DataType;DATE;DATE;Date
    Characteristic;Z_ACTION;/CCM/NAME;false;Action
    Characteristic;/CCM/PRODUCT_ID;/CCM/ID;false;Part Number
    Characteristic;/CCM/SHORT_DESCRIPTION;/CCM/DESCRIPTION;false;Description
    Characteristic;Z_MATERIAL_TYPE;/CCM/ID;false;Material Type
    Characteristic;/CCM/MINIMUM_QUANTITY;/CCM/MINIMUM_QUANTITY;false;Order Unit
    Characteristic;Z_CONTENT;/CCM/MINIMUM_QUANTITY;false;Content
    Characteristic;/CCM/LEAD_TIME;/CCM/LEAD_TIME;false;Lead Time
    Characteristic;Z_SUPPLIER_ID;/CCM/ID;false;Supplier Number
    Characteristic;Z_SUPPLIER_NAME;/CCM/NAME;false;Sup Name
    Characteristic;Z_P_GROUP;/CCM/ID;false;Purchasing Group
    Characteristic;Z_P_ORG;/CCM/ID;false;Purchasing Org
    Characteristic;/CCM/CONTRACT_ID;/CCM/ID;false;Contract Number
    Characteristic;/CCM/CONTRACT_ITEM_ID;/CCM/ID;false;Contract Item
    Characteristic;/CCM/PRODUCT_GROUP;/CCM/ID;false;Product Category
    Characteristic;/CCM/PRICE;/CCM/PRICE;true;Price
    Characteristic;Z_DATE;DATE;false;Date
    Characteristic;/CCM/LONG_DESCRIPTION;/CCM/LONG_DESCRIPTION;false;Long Description
    Characteristic;/CCM/PICTURE;/CCM/ATTACHMENT;false;Picture
    Schema;All;Z_ACTION;Z_MATERIAL_TYPE;Z_CONTENT;Z_SUPPLIER_ID;Z_SUPPLIER_NAME;Z_P_GROUP;Z_P_ORG;Z_DATE;All Schema
    Category;10000300;;;ABC
    Category;10000400;;;DEF

  • WEB ADI INTEGRATOR FOR Bill of Material

    I am developing a WEB ADI integrator for Bill of material upload. The integrator will populate the data in a temporary table, validate it & write the error messages back to the table . On succesful validation the data will be sent to interface tables & then to base table.
    The integrator uses a procedure & sends data to the procedure. Procedure then loads data in temporary table & does the rest of work.
    To do this i need to know the following thinngs:
    1. How i can track the line no of Excel?
    2. How do I know that all data are loaded in temporaray table because the validation & rest of work will be done once all the rows of excel are transfered to temporaray table. i.e. How do i determine the End of File in Excel?
    3. How do i write error messages from the table to the excel in web adi?
    Any help will be appreciated. Please send me the sample scripts & web adi developer guide at [email protected],[email protected]

    If you check the XML that Web ADI generates to upload a document you will note that each row gets a row number. It would be a matter of being able to keep track of that number in your table so that when you are reporting the error back you can include that number in the message so the code in the Excel spreadsheet can assign it to the correct row.
    I would suggest trying to use even some of the basic validation mechanisms provided within Web ADI, as these will automatically return the error messages for bad data to the correct row in the spreadsheet.
    Web ADI will take the uploaded data, perform any validation check defined within meta-data then push the data to your Interface table. There are plenty of examples in th shipped code of product teams then using the Import phase of the upload to perform additional checks and then push the data further. But if you can utilize the existing Web ADI functionality. The data never ends up in the table in the first place to require any clean up on your part.

  • Material Master - Client to client copy (Same System)

    Hi,
    The requirement is to copy a list of Material Master available in a specific client to a different client within the same system.
    How to perform this activity with minimal manual intervention. Please give the solution in Detail.
    (The Business scenerio is that, So for certain list of materials were procured & handled in specific Client. Now the same materials are now going to be handled in different client within the same System.)
    Regards,
    Baskar

    Hi,
    Use LSMW or BDC with MMZ1 t.code for material ( old material or used material) uploading to new client.
    Regards,
    Biju K

Maybe you are looking for

  • Find table column pattern in a variable

    I have a variable @a.  There is a table B with column A,C.  I need to find out those values of column A where column C values are a subset of @a.  For example @a='123456abcd'table Table B A     C 1      abcd 2      xyzt In the above case I need to ge

  • Seeburger AS2 Authentication

    Hello, Wanted to know in Seeburger AS2 Recv Adapter : while authneticating : what is realm field? Realm signifies ? Thank You

  • IMac G5 education without optical drive, what can I do?

    I've just bought on ebay an iMac G5 1,6 Ghz (without isight) with the motherboard dead. It is very easy to open. What was my surprise to see that there was no optical drive...In fact, it could receive one : the slot is there, the IDE cable too, the s

  • Difference in file size in photoshop and bridge

    when I save an image in photoshop (file size 26mb) it  shows as a 70.7 mb in bridge or window explorer. Why?

  • Processing Dimension Members

    hi to all experts here in SDN Community, I just want to ask for help regarding in processing the dimension members, My problem is whenever i try to process a dimension i get an error like this: "public member 'GetOnlyFormulaValidate' on type 'frmMemb