Discontinuation of Repro

Dear Experts,
We have repeatitive manufacturing Scenario & during backflushing REPRO is allowed.
Now we want to stop REPRO  so that booking (MFBF) can not be dode if any component is in error (Non REPRO Allowed).
What necessary steps/precautions has to be taken?
Should be create new REM profile
OR
We should use existing REM profile by removing the tick from Error correctionfor backflushing (create cumulative post processing record & also create individul post processing record) from existing REM profile.
What else to be done for costing/product cost controller which has already been done with existing Repro allowed profile?
Abhishek Dwivedi

Hi,
It is always better to create new REM Profile.
Apart from removing the Tick for Error correctionfor backflushing (create cumulative post processing record & also create individul post processing record), you need to set the tick for
Execute correction in Dialog Mode  - Mandatory.
Now when ever there is a component missing system will pop up a message, if you process that message then ok otherwise system will not allow you to proceed further..
This is enough to restrict reprocessing/post processing.
I hope you are executing the Program: CORUPROC as a backhround job.
If not start executing thi program, every 30min or every 1 hr, with the setting error in goods movements.
Hope this helps..
Regards,
Siva

Similar Messages

  • Possible to re-add discontinued app (.ipa) to iTunes?

    This requires some introductory info:
    Many months ago, an iPad app that I use regularly was removed from the App Store. It continues to function perfectly well, but yesterday, it had trouble connecting to its servers.
    Last week, after installing iOS 7, I'd had a similar problem with the YouTube app: It would launch, but never connect. I solved that problem by deleting and re-downloading the YouTube app. So, yesterday, I did the same with the aforementioned app -- forgetting that it had been removed from the App Store and couldn't be downloaded again.
    The developer of said app also has an iphone version, which I run on my iphone. But they've never replaced the iPad app that was removed from the store, which is why I've been running the old version.
    Finally, in an attempt to manage the 1,100+ apps that sit in iTunes, I routinely go through and delete apps I don't need (or don't think I need). Since the icons of the aforementioned iPhone and (discontinued) iPad app were identical, at some point I deleted the iPad app from iTunes, not remembering, at the time. my reason for keeping the older one.
    The good news:
    Using Time Machine, I was able to roll back, retrieve the deleted iPad app, and restore it to iTunes' Mobile Apps Folder.
    The bad news:
    I thought restarting iTunes would cause it to "see" the previously purchased app that was reintroduced to the folder, but it does not. It appears that once you delete an app from iTunes (and move it to the trash, versus choosing the "keep in my library" option), iTunes completely severs all ties to that app -- even though you purchased it legitimately. I thought apps would be "discovered" at launch, just as songs you add to the iTunes folder are "discovered."
    Short of using Time Machine to replace the entire iTunes folder (which would be an epic nightmare) is there any way to get iTunes to "see" the app I retrieved? Is there one document, perhaps, that iTunes uses as it's app "registry" that I could restore via Time Machine, in order to "bless" that app again? Of course by rolling that document back, I'd be rolling back to a point that's *before* current apps were purchased. Many, many current apps. So, this is quite a conundrum. But I really need that app back, so I'm willing to try anything. I'm running iTunes 11.1.
    Suggestions?

    pluggedin2 wrote:
    Syncopator, how did you retrieve the app from Time Machine? I thought it would be fairly easy to do but I'm not finding the app I need. Thanks for any light you can shine on this!
    Actually, it is easy.  :-)
    You have to start by viewing the folder that contained the item you want to restore. (Or navigate to that folder in Time Machine.)
    That folder is:
    ~/Music/iTunes/iTunes Media/Mobile Applications
    (The symbol "~" is shorthand for your home folder, which you can access from the sidebar in a Finder window.)
    I can't provide a full tutorial on Time Machine, but you might want to see the section "Restoring Data from Time-Machine backups" on Apple's support page, here:
    http://support.apple.com/kb/ht1427

  • How to Properly Protect a Virtualized Exchange Server - Log File Discontinuity When Performing Child Partition Snapshot

    I'm having problems backing up a Hyper-V virtualized Exchange 2007 server with DPM 2012. The guest has one VHD for the OS, and two pass-through volumes, one for logs and one for the databases. I have three protection groups:
    System State - protects only the system state of the mail server, runs at 4AM every morning
    Exchange Databases - protects the Exchange stores, 15 minute syncs with an express full at 6:30PM every day
    VM - Protecting the server hosting the Exchange VM. Does an child partition snapshot backup of the Exchange server guest with an express full at 9:30PM every day
    The problem I'm experiencing is that every time the VM express full completes I start receiving errors on the Exchange Database synchronizations stating that a log file discontinuity was detected. I did some poking around in the logs on the Exchange server
    and sure enough, it looks like the child partition snapshot backup is causing Exchange to truncate the log files even though the logs and databases are on pass-through disks and aren't covered by the child partition snapshot.
    What is the correct way to back up an entire virtualized Exchange server, system state, databases, OS drive and all?

    I just created a new protection group. I added "Backup Using Child Partition Snapshot\MailServer", short-term protection using disk, and automatically create the replica over the network immediately. This new protection group contains only the child partition
    snapshot backup. No Exchange backups of any kind.
    The replica creation begins. Soon after, the following events show up in the Application log:
    =================================
    Log Name:      Application
    Source:        MSExchangeIS
    Date:          10/23/2012 10:41:53 AM
    Event ID:      9818
    Task Category: Exchange VSS Writer
    Level:         Information
    Keywords:      Classic
    User:          N/A
    Computer:      PLYMAIL.mcquay.com
    Description:
    Exchange VSS Writer (instance 7d26282d-5dec-4a73-bf1c-f55d5c1d1ac7) has been called for "CVssIExchWriter::OnPrepareSnapshot".
    =================================
    Log Name:      Application
    Source:        ESE
    Date:          10/23/2012 10:41:53 AM
    Event ID:      2005
    Task Category: ShadowCopy
    Level:         Information
    Keywords:      Classic
    User:          N/A
    Computer:      PLYMAIL.mcquay.com
    Description:
    Information Store (3572) Shadow copy instance 2051 starting. This will be a Full shadow copy.
    =================================
    The events continue on, basically snapshotting all of Exchange. From the DPM side, the total amount of data transferred tells me that even though Exhange is trunctating its logs, nothing is actually being sent to the DPM server. So this snapshot operation
    seems to be superfluous. ~30 minutes later, when my regularly scheduled Exchange job runs, it fails because of a log file discontinuity.
    So, in this case at least, a Hyper-V snapshot backup is definitely causing Exchange to truncate the log files. What can I look at to figure out why this is happening?

  • Imessage is buggy, i can login to it but does discontinues to verify and goes back to the login page,

    The problem with imessage with me and same thing too for my facetime, i can login but discontinues to verify and goes back to the login page. This is the second time where imessage is not working, the first time was "Unable to verify email" error, but i manage to solve it by just restarting my ipod. The second time, restart doesn't solve the issue, i wonder the iMessage app is pretty buggy, or servers are busy etc. I need help on this, does anyone has the same problem?

    Restore in iTunes. See
    http://support.apple.com/kb/HT4623

  • I am a new mac user and I switch to mac due to the graphics that it brings. I do website in pc and I heard iweb is the best.NOW i heard that iweb will be discontinue. so what is the best application there for website using MAC OSX lion?

    I am a new mac user and I switch to mac due to the graphics that it brings. I do website in pc and I heard iweb is the best.NOW i heard that iweb will be discontinue. so what is the best application there for website using MAC OSX lion?

    It is now confirmed  that iWeb, and iDVD, has been discontinued by Apple. This is evidenced by the fact that new Macs are shipping with iLife 11 installed but without iWeb and iDVD.
    On June 30, 2012 MobileMe will be shutdown. However, iWeb will still continue to work but without the following:
    Features No Longer Available Once MobileMe is Discontinued:
    ◼ Password protection
    ◼ Blog and photo comments
    ◼ Blog search
    ◼ Hit counter
    ◼ MobileMe Gallery
    All of these features can be replaced with 3rd party options.
    I found that if I published my site to a folder on my hard drive and then uploaded with a 3rd party FTP client subscriptions to slideshows and the RSS feed were broken.  If I published directly from iWeb to the FPT server those two features continued to work correctly.
    There's another problem and that's with iWeb's popup slideshows.  Once the MMe servers are no longer online the popup slideshow buttons will not display their images.
    Click to view full size
    However, Roddy McKay and I have figured out a way to modify existing sites with those slideshows and iWeb itself so that those images will display as expected once MobileMe servers are gone.  How to is described in this tutorial: #26 - How to Modify iWeb So Popup Slideshows Will Work After MobileMe is Discontinued.
    It now appears that the iLife suite of applications offered on disc is now a discontinued product and the remaining supported iApps will only be available thru the App Store from now on. However, the iLife 11 boxed version that is still available at the online Apple Store (Store button at the top of the page) and those still on the shelves of retailers will include iWeb and iDVD. Those two apps were listed in small, gray text on the iLife 11 box that I bought.
    Personally, if I didn't already have a copy I would purchase one to have it for reinstallation purposes if ever needed.
    This might be of some interest to you at this time: Life After MobileMe.
    OT

  • I am trying to install Adobe Encore, but it has been discontinued. Can I install and activate a previous version using my Single App Premier Pro membership?

    I am trying to burn and author a Blu Ray DVD. I do not have a usable version of Encore , as it has been discontinued. I currently have a Single App membership for Premier Pro CC.
    I was advised to install Premier Pro CS6 as Encore comes with this package. I did this, and the software downloaded but an error message came up saying my membership had expired. I think this is because I do not have permission to run Preier Pro CS6 using my Premier Pro CC membership. How can I get the software using my current membership? Or do I need to upgrade my membership to a full Creative Cloud membership in order to use Encore?

    CS5-thru-CC PPro/Encore tutorial list http://forums.adobe.com/thread/1448923 will help
    The bottom section of the link above has several Adobe links, and other information, on downloading Premiere Pro CS6 and the bundled Encore CS6, and the TWO ADDED downloads for the Encore library content, to author a DVD or BluRay... and the tutorial list includes learning how to use Encore... pay particular attention to the picture in reply 3 at this link - https://forums.adobe.com/thread/1516173 (picture first posted by Ann Bens and reposted by Stan Jones)

  • Why do I get the "iwork discontinued" message when I click on the share feature in pages?

    Why do I get the "iwork discontinued" message when I click on the share feature in pages?

    If you are using an older version of iWorks, the sharing was, I understand discontinued in July 2012.
    New versions of the iWorks suite, Pages etc now have the sharing option, introduced earlier this year.

  • Trnsfr Rqmnt created via PP for discontinuation mateiral and follow up mat

    Hi,
    Production order was created and it has PN A which has been set for discontinuation (1) with follow up material B. The effective out date is in the future.
    When generating WM Picklist, TR was created for both parts and issued. On confirmation only the part marked with discontinuation was consumed.
    How can i not generated TR for the follow up part?
    Thanks
    Jithin

    In the production order components details, there is a column for Discontinuation of the components.
    If you do not want the TR to be generated for follow up material, then in the material master(MRP 4) view of the parent component remove the followup material first and then uncheck the Discontinuation column in the order.
    If you want to discontinue the parent component from now with a followup material put "5" into the column it.It also has a option of simple discontinuation as "1" where in TR for the followup material will not be generated.

  • Discontinuation Material in MRP run

    Hi,
    In our scenario, we are using Discontinued parts with (Discontinuation Ind - 1, Effectivity-out date - Nil) with follow-up material in MRP4 view of MM.
    It is observed that whenever there is no sufficient stock exist, dependant requirement is not transferred to the follow-up material during MRP run. However is the same is happening during Material Availability check.
    Is there any IMG setting for this to happen during MRP run also.
    Thanks in advance.
    Parthasarathy P

    Hi ,Parthasarathy,
    if an item to be disticontinued item , the following must be true.
    1. you have to define Discont ind= 1, and followup material  in MRP VIEW,
    2. Both Discont item and followup items should have same base unit of measure.
    3. When BOM of Header Material creation, discontinuation data is maintained for the discontinued item and follow-up data is maintained for the follow-up item -in CS01.
    4. Then you have to assign some value for Discontinuation Group  in "Discontinuation Data" for your Discot item in BOM. -in CS01
    5. Then create a followup group with same value of Discont Group for yourFollowup item -in CS01.
    During the MRP run the Dependent requirements of header material will be transferred to Followup item if it is not enough stock of Discont item.
    Please check your Discont data has defined in BOM. The value of Discont group and follow group should be same.
    please letus know for further doubts...
    regards
    pradeep

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • Discontinued parts - how include fixed receipts??

    In the MRP 4 view , we can set Discontinuation indicator for one material ,and defined the follow-up material.
    And the system will transfers the dependent requirements in materials planning to the follow-up material if they are no longer covered by warehouse stocks.
    In standard SAP system , When discontinuing parts, the system does not include fixed receipts such as order proposals or production orders if they are after the effective-out date. The system issues the "Please cancel and Receipt" after effective-out date exception messages in Stock/Requirement List  (MD04 View)
    But we now indeed need the system to include fixed receipts,that is affter the last fixed receipt ,the discontimuting parts begin to take effect!
    How to do this? How discontinuing parts include fixed receipts??
    Thaks for any replay!

    Hi Fei Liu,
    The thing is rather simple; the idea with discontinuation is that from a certain date on we don't want to procure material A anymore, but B instead. Nevertheless, if there's any stock left from A I want to use it first.
    In this situation, if somebody manually creates a fixed procurement element, like purchase or production order, the system will only create an exeption message for the planner, since by the normal course of the process this should not have happened.
    If you have this situation happening a lot, the question is then if you're using the right functionality for your business case.
    Regards,
    Mario

  • Discontinuation part management

    Dear all,
    I need to manage the following case.
    A material M1 is replaced with a follow-up material M2 only in one Bill of Material and we neet to transfer dependent requirements for a material component M1 that is no longer in stock (in sufficient quantities) to a follow-up material.
    Can you help me?
    Regards
    Flavia

    Hi,
    I think once you define the discont indicator and follow up matl in material master for component M1 in MRP4 view , then the component M1 will be discontinued in all the BOMs and  the dep reqmts will be transferred to follow up matl defined in either matl master or BOM depending on the priority, once the stock of M1 gets exhausted.
    By defining discont group for M1 and followup group for M2 in one BOM , your reqmt will be fulfilled.
    (Followup matl M2 will override the followup matl defined in Matl master , if its different from M2)
    But , in other BOMs also , the component M1 will be discontinued and the dep reqmts will be transferred to the follow up matl  defined in matl master.
    Sheik

  • Activate Discontinue Data in MRP4

    Hai Techies,
    Could you please advice me how to activate the discontinue data, Follow up material, effectivity out of date in MRP4 screen for MM.
    Does it have any MPR setting to be done in IMG Or is it available as default for all SAP ECC 6.0
    Thanking you in advance.
    Regards,
    Kris.S
    Edited by: krishu100 on Jun 23, 2011 3:11 PM

    krishu100 wrote:
    Hai Experts,
    >
    > I found out that using transaction we could find set the reference material field for the Material Master. In the transaction under the reference material list you could find that there is a selection allowed for follow-up materials.
    >
    > Can any one please check me that in case if i activate this, is there a relation for the discontinous data, Follow up material and eff date gets activated?
    >
    > I don have a SAP system so i feel so hard to check.
    >
    > Thanking you in advance.
    >
    > Regards,
    > Kris.S
    >
    > Edited by: krishu100 on Jun 24, 2011 5:28 PM
    in SAP standard without any change in feld references, these fields are visible in the MRP view.
    If they are invisible in your system, then you must have changed the settings yourself.
    about which transaction are you talking?

  • Using up all discontinued parts stock

    Hi all,
    How can i use up all discontinued parts stock before follow up material has been valid by using engineering change management when the change comes into effect on valid to date?
    thanks

    discontinued parts

  • Discontinuation data

    Hi,
    I have one error getting during setting discontinuation indicator and follow-up material in MM.
    I need to discontinue one material with other material as follow-up material. But when i am putting the other material as follow-up material it is giving me the error" The specified follow-up material results in recursiveness".
    When i have analysed then what i found is , the follow-up material is already discontinued in other plant. But does it make any sense that if the material is discontinued in one plant , I can not use the same materil as follow-up material in other plant?
    I hope that discontinuation of the material is at plant level not client level. Is it correct? if yes then why I am getting this error.
    I have checked the BOM also there is no recursiveness in the BOM.
    Please resolve my problem.
    Regards
    Deepak Sharma

    Hi,
    Thanks for response. But how can i resolve this issue as my one discontinued material in one plant can not be discontnued in the other plant. And follow-up material in one plant can be discontinued in other plant.
    Please advice.
    Regards
    Deepak Sharma

Maybe you are looking for