Display Dept. amount in Std cost estimate cost component view

Dears,
During implementation of Repetitive manufacturing, my customer Requirement is to have 4 activity types:
1- Utilities : (Elect-water-GAS ... Etc)
2- Labor : (salary - bonus ..Etc)
3- Depreciation : (Depreciation exp)
4- other : like (maintenance .. Etc)
he wants that so he can know this classification of the above costs liek depreciation per material in the standard cost estimate so my question is:
Is it applicable to display the above requirement and using only 2 activity types
Labour and machine
and use the cost component structure to display the above req ?
as an example:
in CK11N : if i switch to cost component view to display the depreciation amount and Etc
Thanks and best Regards,
Ahmed Samir

Salaam Ahmad
You have both choices.
You can go with 4 act types or go with 2 and use costing sheet for the other costs
I will prefer 4 act types
Br. Ajay M

Similar Messages

  • Material cost estimate- Cost componenet structure

    Hi,
       when i run the cost estimate it does not show me any amts on the machine and labot , i hav set up the activtiy type for labor, machine, setup , did kp26 , assigned the act, types to work center for that cost center, routing is defined for that work center too, the cost comopnnet str for direct labor and machine has the sec cost element defined too,
    i am wondering how it's not calcualting and showing the amts for dieret labor and machine , on the other hand if i assign the act types directly in the routing then it shows up in the cost estimate by picking up the time from the routing , but do we really need to assign in the rouing usually it picks up from the
    kinldy let me know
    thanks

    Hi,
    just check the below:
    You planned activity dependent costs in KP06 for the Activity type & Cost Centre comination and run KSPI.
    You have specified the Activity duration in the Rate routing .
    Regards,
    R.Rajaraman

  • Cost estimate/costing run

    Hi
    What is the difference between cost estimate and costing run?
    Thanks,
    Nivi

    Hello Ram,
    There are 3 steps in Costing Procedure. They are
    1. Creation of cost estimate
    2. Marking of cost estimate
    3. Release  of cost estimate
    Once you release cost estimate, then only system will update the required fields in the database and can be used for transactions.
    Hence, cost estimate means, it is just estimated total cost of the product and Costing Run means which inclusive of all the above three steps to complete the total process.
    Please let me know if you require any further clarifications.
    Thank you,
    Regards,
    Santosh
    Reward points if helpful.

  • Std. cost estimate:costing sheet

    Dear experts,
    I have configured costing sheet as per my client'requirents in new valution variant.
    Now I want same valuation variant to be used in newly created costing variant as ZPC1.
    Right now Costing variant ZPC1 is using standard valuation variant "001"
    So please guide me how to realise this configuration.
    Also throw some light on how to link this costing variant to cost component structure.
    Regards,
    Sameer

    Hi Sameer,
    As regards, having two costing variants referring to a single valuation variant, note the following from SAP help.
    Although it is technically possible to have two costing variants with the same costing type and valuation variant, this should be avoided to prevent data from being overwritten.
    The reason for this is that the key structure for the costing results in the database uses the costing type and the valuation variant, rather than the costing variant.
    You can always, create another valuation variant by copying the existing one and assign it to new costing variant.
    We can discuss, if you face any challenges in following SAP recommendation.
    Hope this helps.

  • Latest Cost estimate itemization Table

    Dear All,
    Could some one tell the table name where I can fine the particular material's latest released cost estimate date by each item number and item category.
    I use the CKIS table , but the Costing date field (KADKY)  of  CKIS  is not matching with my latest cost release date in my cost estimate (Cost date from : KADAT)
    For example :
    Material master  R1234
    Costing Date from  :  01/01/2014   ( Latest cost  released date)
    Item Number : 1
    Item Category  : L
    Value :   100
    Thanks,
    Ram

    Hi Ram
    CKIS table is the itemization table.
    Cost is always released from 1st of the month and this might be different than the Costing Date From. You need to find the Cost estimate number from keko and then retrieve from CKIS
    Also if you are intending to make a Z program, use the Bapis. I have answered it many times, you can search it
    Those bapis start as Bapi*cost*estimate*. You can search in SE37
    Br. Ajay M

  • How SAP use transfer control or material cost estimate

    Hello!
    I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
    I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
    Product AAA produced from component BBB.
    Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
    I run cost estimate for product AAA with costing date from 06.03.2014.
    Cost estimate not use existing cost estimate for component and create new cost estimate.
    In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
    why my system does not use the existing cost estimate for component?
    Thanks for attention.

    Thanks, Szymon!
    I use russian interface and read russian help. Where stragegy 3 has name "Прошедшая плановая калькуляция" which means "The last planned cost estimate".
    This led me astray.
    In english help i read next:
    Previous standard cost estimates
    The system searches for an existing previous standard cost estimate.
    You are completely right!
    two more questions:
    - We can not use strategy 3 if we not realesed cost estimate as standard price?
    - What strategy we should use for transfer material cost estimate with status KA?
    Thanks

  • CK11N, release new costing estimate

    Hello all experts,
    Please help me on the following question, thank you!!
    For example: Product A, it has a standard cost estimate which is released on 01.01.2010, it's costing date from is 01.01.2010 and costing end date is 31.12.2010. In the middle of the year, for example in May, the exchage rate was change a lot, so we want to release a new cost estimate for it. The costing start date is 01.05.2010 and costing end date is 31.12.2010.
    My question is: Is it possible for me to do so directly in CK11N and then mark and release it in CK24?
    Thank you very much!!!
    Mavis

    Dear,
    The Standard Cost Estimate/Costing  Run will be executed only in Company Code Currency i.e., Local Currency. Exchange rate differences will happen only during execution of Actual Postings.
    For example : Goods Receipt of 100 units @ $ value of Rs. 45.
    Finished Goods Account   DR      4500
    GR/IR Clearing Account    CR       4500
    Invoice Receipt/Invoice Verification -MIRO:
    Invoice Receipt 100 units @ $ Value of Rs.48
    If the stock is available, the Inventory/Stock Value will be revaluated with the new price. If the stock is not available the Exchange difference will be posted to Exchange Gain/Loss Account based on OBYC settings,  like this.
    Exchange Gain/Loss A/c     DR     300
    GR/IR clearing A/c               DR   4500
    Vendor A/c                            CR   4800
    If you want to update the Material Master with new Standard Price, you need to Reorganize existing Cost Estimate through t-code CKR1 and re-run t-codes CK11N and CK24 for Mark and Release the new price.
    Regards
    appalas
    Edited by: appalas on Jan 27, 2010 7:07 AM

  • Product Costing - CK11N BOM component wrong quantity

    Hi,
    I have a question regarding Material Cost Estimates. I have a material (Product A) which has a BOM header Qty of 524. One of the Components (Product B) has a Qty of 560. When I run the Cost Estimate for Product A, the component costing list doubles the quantity of Product B, and therefore doubles the cost (this is when I change the report Qty to 524).
    The Costing Lot Size on the product A is 1. When I change this Costing Lot Size on the material master to 100 and rerun the CK11N, the Component Qty and Cost are correct.
    Is there some rule that I should be following when it comes to Costing Lot Sizes?
    Thanks for any help.
    Daniel.

    TO MY KNOWLEDGE,
    COSTING LOT SIZE IN MATERIAL MASTER, FOR WHICH YOU ARE DOING STD COST ESTIMATE,
    COSTING LOT SIZE IN MATERIAL MASTERS, OF BOM COMPONENTS,
    BASE QUANTITY IN BOM,
    BASE QUANTITY IN ROUTING ,
    ALL THE ABOVE SHOULD BE IDENTICAL.

  • Diff between Planned Cost - Target Cost

    Hi all of you,
    Could you please explain me the difference between Planned Cost and Target Cost. Why do we go for the settlement of Variance (Diff between Actual cost and Target Cost).
    Please give me your valuable suggestions regarding.
    Thanks & Regards
    Ramki

    HI,
    Let us say, for the product X, my planned cost through standard cost estimate is 100 Rs. This has been found through executing the t code Ck40n or Ck11n.
    One more assumption is, We have created production order with quanity 10. Did Goods receipt 10 nos.
    Now ,,
    Planned cost is = Std cost estimate cost x Qunaity=100 x 10= 1000
    Target cost: This is being used for comparison purpose. You can have many versions of cost using target cost. let us say, I want to have target version price should be equal to priliminary cost estimate instead of std cost estimate. This can be achived through customizing in t code OKV6. And production order will pick up the target cost value as per the target cost version. 
    This target cost field in Prod. order gets updated once you run variance calculation.
    Actual cost:
    Standard cost * actual qty= 100*10=1000
    Settlement:
    While doing GR/GI to order, the cost is captured under the production order. if there is a difference between actual and plan, that should be posted to Price diffference account.That activiry is being done at the time of settlement. 
    vijay

  • Display amount from Base Planning Object or Cost Estimate W/O Qt St in COPA

    Dear all,
    Can we display the amount we calculated in Base Planning Object or in Cost Estimate w/o Quantity Structure?
    if Yes, How?
    Many thanks,
    EW

    Try with
    <b>OPEN DATASET p_pfile FOR APPENDING IN BINARY MODE.</b>
    Regds
    Manohar

  • Std Cost Estimate-Processwise

    I have a requirement and seek your clarification:
    Here we are in the process of settings of Product Costing.  The client wants to have a display of cost estimate as follows:
    Here the production process has 3 stages.  Once the Standard Costing is run, it should be able to view the cost estimate as follows:
    Process-I : Raw Material Cost  xx
                       Direct Labour Cost  xx
                       Overheads              xx
    Process-II : Raw Material Cost  xx
                       Direct Labour Cost  xx
                       Overheads              xx
    Process-III : Raw Material Cost  xx
                       Direct Labour Cost  xx
                       Overheads              xx
    What is the best way out ?  Do I have to have different cost elements for same item process-wise ?
    Please give your inputs.

    Hi Nikitha
    I am not able to understand where your issue is...
    This requirement is pretty standard and is addressed with in std SAP itself....
    For each of these process,I am sure, you would be having a separate material code.... i.e. say, raw mat 1 is inputted... After passing through Process 1, It is termed as SFG A... Then A passes through Process 2 and the outcome is termed as SFG B and similarly FG C
    Each Material A, B and C has its own BOM and routing.... BOM for B, will have A as component and BOM for C will have B as component....
    When you execute CK11N for each one of these, cost for each A B and C is stored separately because each material is a separate entity in itself.. There is no reason why you would define separate GL accounts for them...
    In CK13N, each one of them will show you its own cost...
    You can await inputs from other members also...
    Regards
    Ajay M

  • Cost estimate display is confusing

    I have a cost estimate scenario as under:
    Finished product Y gets received at distribution plant N after external processing after leaving manufacturing plant M as a semi-finished product X.
    Finished product  (at the distribution center) costed on Day 1 = $ 90 (cost of X pulled from plant M's last cost estimate)
    Semi-finished product X gets recosted again in plant M on Day 2 and gives cost $95
    But finished product Y not recosted in plant N after that to reflect $95 instead of $90.
    But when you do a CK13N on finished product Y in plant N.
    It shows $90 in the multi-level costed BOM at the top total but underneath it, the semi-finished product displays the Day 2 cost of $95. Should it not be showing the cost of $90 as on the date of the Day 1 cost estimate which is what was used for the Day 1 cost estimate for the finished product?
    Attached document contains screenshot

    Hello Rajaram,
    The report can be a confusing report. 
    One thing to understand is that the report is reading saved data and values in tables KEKO and CKIS.   The report you see in CK13n is not doing any totaling, just displaying saved data.
    If FP in DC was saved at 90
    and SFP recosted and saved at 95
    and this new cost was not rolled into DistCenter and saved,  there is no way the report will reflect 95.
    It is not like an EXCEL sheet totaling columns of numbers, it only reports what was saved.
    hope this helps,  please ask if you have another question about it
    Althea

  • How to include ED in Std.cost estimate

    Dear all
    My client want to add ED to Std. cost estimate in receiving plant(Depot). I have acheived this by way of additive cost estimate manually. but my client wants that system could pick up the Ed from SD where ED is maintained SKU wise.
    At recieving plant(Depot) the std.cost estimate is like this
    Std cost from production Plant
    ED from SD
    Freight ( certain % on ( St.cost+ED)
    Std cost at depot
    Is it possible to get above scenerio?
    Pl help me out
    Regards
    SPSankaram

    HI
    Standard formula for workcenter costing is SAP008 , you have to specify in the costing and capacity tab , whereas for scheduling specify SAP004
    then try creating the order
    regards
    thyagarajan

  • Cost Estimate Currency Display

    Hi,
    When I run cost estimate with 2 different currency settings in the system, how do I permanently make the display to always show cost estimate in USD (controlling area currency ) and not EURO (company code currency)?

    Hi,
       See the help
    http://help.sap.com/saphelp_47x200/helpdata/en/08/51430943b511d182b30000e829fbfe/frameset.htm
    Regards
    Kiran Sure

  • We cannot do std cost estimate every month in ML

    HI
    Can we do std cost estimate whenever required with changed price,
    can i change the price in material master -how
    regards
    sowmya

    Hi,
    We can do std cost estimate once in a month. If we want to do multiple times in a month we should reorganise the material cost estimate using CKR1.
    We can change the material master price for a material with out standard cost estimate using MR21.
    If standard cost estimate exist, use CKR1, the use MR21.
    Regards,
    Rijo Paul

Maybe you are looking for

  • Mod_osso behavior differences with 10gR3 Oracle HTTP Server 2

    We have an install of standalone 10gR3 Oracle HTTP Server 2 (i.e. the Apache 2 version), and have noticed that the behavior of mod_osso is different than the regular 10gR3 Oracle HTTP Server (i.e. the Apache 1 version). We use the following in our mo

  • Low quality when importing from camcorder

    Hello, I have an older camcorder (Sony TRV260, Digital8), and I noticed that when I import the footage into iMovie the quality is lower than when I watch it on my TV directly from the camera. Initially I thought that it's because the resolution of my

  • How can I restore my bookmarks with old Firefox Sync?

    I have key sync and password from old Firefox Sync. And I want to restore my bookmarks. Three years ago I use Firefox sync, but since i don,t use it.

  • Find out who catches exception from within exception

    Hi, I am writing some generic Exception for our project. The aim is to simplify exception handling by making the exceptions log the necessary information with Log4J. It seems pretty easy to find out which class actually threw the exception (top of st

  • Export --duties not gettin picked

    Hello friends.........I am working on an export scenario with  BED,SED and AED along with price in the pricing procedure......  I think I have done most of the settings correctly ..........when I create an Excise invoice  with reference to a billing