Distribution of cost over periods in detailed planning in CCA KP06

Good Day everyone
Please advice how to control distribution of cost over periods in Detailed planning in Cost center accounting. KP06.
When detailed planning is carried out which is integrated with MM, distribution of cost over periods is automatically set (02 distribution as before) and i cannot manually set the distribution key to 0 or 1
We are using ECC6
How can i control manual distribution of plan cost while remaining in Detailed planning.

Hi,
You can distribute your planned costs at activity level based on the distributionkey you specified. The distribution is done for the entire duration of activity depending on the Dist key you select. If you do not put any Dist key, then the costs would be distributed equally across the entire duration of activity. If you want to have equal distribution of costs, you can use DK- SAP020 which distributes on earliest dates of activity using Factory calender. If you want you can also define your own DK in SPRO under: Production->capacity requirements planning->operations->capacity requirements->distribution.
Hope this clarifies..
Best regards..

Similar Messages

  • Copy Detailed planning for cost elements in CJ9BS

    hi PS gurus,
    What is the purpose of selecting this option (Copy Detailed planning for cost elements)? What does it do?
    Many ThanKs
    MM

    Hi,
    In case you have done detailed planning for your project you can specify whether you want to copy the detailed planning data using this check box.Planning done using cost elements is called detailed planning in PS. CJR2 is the transaction to do that. For more details you can hit F1 on the field and check.
    Regards,
    Gokul

  • Tablesstoring the cost planning quantities distributed over periods in CJ40

    Hello experts,
                        Can u tell me the tables in which the cost planning quatities distributed over periods in CJ40 transaction are stored

    Hi
    RPSCO is table where you can see the cost& revenue.
    Use PROJ get object no. and then enter this object no. in rpsco.
    hope this is useful.
    Regards,
    KP.

  • Personnel Cost Planning - Detail Planning

    I would like to ask you if some user in R3 system can handle the detail planning functionality of personnel cost planning component for all the plans-scenarios for all existing organizational units;
    how is it possible and through wich connection between the user and this role.
    (For example this user must be able to add or to increase cost items to the total sum of the company)
    thanks a lot

    Hello Andreas,
    Please review the note 736170 and make sure that the suggested support package is implemented in your system.
    And also please check if your cost plan has the 'Detail Planning Possible' date filled in, because it should be maintained.
    If Badi HRHCP00_RESP_OBJECTS activated, then did you try to regenerate the Badi definition for checking the
    resposible objects? (Se18)
    Is any other Badi activ instead of this one?
    In IMG - Cost Plan Runs - Badi Specify Authorizations & Objects in Area of Responsibility if badi is activated, see if you get this error if you deactivate it.
    Please check further the configuration for the BSP application. Is transaction PHCPDETLC called properly?
    See also the note 592085.
    Best Regards,
    Shree

  • All cost items not reflecting in Detailed Planning PCP

    Hi All.
    When i am executing the PHCPDETL - Detail Planning .I am able to process the other functions.But when i am trying to access the insert cost items then I can see only one cost item but i have more than 10 which are not coming when i try to increase or add other cost items.
    What is that I am missing.
    Help appreciated

    Hi! I'm also having the same problem with the cost items.  When I try to insert the cost items, I canonly see two cost items.  I would appreciate your help regarding this. Thanks!

  • Personnel Cost Planning and Simulation - Detail Planning

    Hi,
    I am trying to access the PCP Detail Planning  (t-code PHCPDETL) and for any of the Plan I choose it gives me the following error:
    No Object exist in your area of responsibility
    No data exists for the objects you are responsible for
    We are on SAP ECC 6.0 EHP 4.
    Many Thanks
    Asim Khan

    Hi Asim,
    First of all check note 736170 and see if you have sugeested SP implemented in your system.
    Also check if your cost plan has the 'Detail Planning Possible' date filled in.
    Then check if Badi HRHCP00_RESP_OBJECTS is activated in your system. If it is, then make
    sure you regenerate the Badi definition for checking the resposible objects in SE18. The problem
    might be another Badi active here instead of the one I mentioned.
    Also check IMG - Cost Plan Runs - Badi Specify Authorizations & Objects in Area
    of Responsibility if badi is activated. Do a test - see if you get this error if you deactivate it.
    Make sure configuration for the BSP application is OK and if PHCPDETLC is called properly?
    Note 592085 can be also handy.
    Kind regards,
    Andrzej

  • How to recalculate the capacity distribution over periods

    Hi All,
        I'm working on cProject (release 4.5). In a custom report, I need to recalculate the "Req. Capacity Distribution over Periods" for a given project role, simulating the "Distribution Functions", but I'm not able to find out the ABAP object / FM or similar that split the required capacity.
    Can anyone help me ?
    Thanks in advance,
        Gianluca

    Sorry, I need to redefine the distribution for a given Project role / Resource.
    Thanks again,
        Gianluca

  • General Discussion - Why to choose APO over R/3 for planning?

    Hi All,
    Why do we choose APO over R/3 for planning? What are the inputs or other factors that make APO a better planning tool?
    Are the factors which make APO a better tool not available foe R/3 planning?
    Thanks in advance
    Changed subject suitably.
    Message was edited by:
            Somnath Manna

    I do aggree what other have mentioned .Here are specific inputs on newly desined process in APO in comparisosn with R/3
    1. Existing Processes in SAP R/3
    <b>Forecasting</b>
    Forecasting enables companies to run statistical forecasting model, aggregate and disaggregate forecasts, as well as the capability to modify forecasting numbers manually
    Newly-Designed Processes
    Demand Planning DP (SAP APO)
    Demand Planning adds to forecasting capabilities to manage promotions, product introductions and phase outs, as well as the impact o causal factors, like weather or macro economic data.
    Additional forecasting techniques are available like Linear Regression (Causal Factors), Croston Method (Slow Moving Items) and Weighted Average
    Consensus based Planning enables Marketing, Sales, Logistics to share and collaborate on their forecast and create a final consensus forecast
    Forecasting based on characteristics instead of SKU for configured products
    2. Existing Processes in SAP R/3
    <b>Sales & Operations Planning</b>
    SOP allows to consolidate forecast based on supply capabilities, through reporting and interactive planning capabilities.
    Newly-Designed Processes
    Supply Network Planning SNP (SAP APO)
    Demand and Supply Plans can be intelligently balanced leveraging cost or/and revenue based optimization techniques
    Trade-off Analysis to determine product-mix, inventory build ups for seasonal demand, capacity allocations for alternative manufacturing locations etc.
    Web based information sharing and collaborative interactive planning environment
    KPI Reporting
    3. Existing Processes in SAP R/3
    <b>Distribution Requirements Planning</b>
    Traditional DRP logic allows to calculate requirements for a single stage distribution network
    Newly-Designed Processes
    Supply Network Planning SNP (SAP APO)
    Supply Network Heuristic enables to run DRP across the complete supply network generating requirements (production and purchasing) at each node.
    The planner can easily navigate through the network to view and modify demands and supply‘s in their different categories
    Demand Planning Units and Stock Keeping Units mapping can be done on quotations.
    4. Existing Processes in SAP R/3
    Not available
    Newly-Designed Processes
    <b>Deployment SNP (SAP APO)</b>
    The ability to deploy products through the supply network based on pull or push concepts. Different heuristics like fair share logics are supported.
    Transport Load Building allows to combine different products to a single load, interactive, as well as via heuristic to create full truck loads.
    5. Existing Processes in SAP R/3
    <b>Master Planning</b>
    Master Planning allows to plan production at an aggregated level including rough cut capacity planning.
    Newly-Designed Processes
    Supply Network Planning SNP (SAP APO)
    Supply Network Planning allows to consider distribution, production and transportation constraints concurrently.
    In addition to a generic SNP Optimizer based on Linear Programming and capacity leveling algorithms, industry specific optimization is available for
    Campaign Optimization
    Capable to Match
    6. Existing Processes in SAP R/3
    <b>Material Requirements Planning</b>
    MRP calculates material requirements based on BOM structures, lead times, lot sizes etc.
    Capacity Planning
    CRP in a second step looks at the capacity requirements
    Newly-Designed Processes
    Production Planning PP/DS  (SAP APO)
    Production Planning allows to consider material and capacity constraints simultaneously to derive material, capacity requirements and dynamic lead times. BOMs and lot sizing will be also considered
    Pegging relationships between customer order, production orders, purchase orders will be stored and enable bi-directional propagation if changes occur on the demand or supply side
    7. Existing Processes in SAP R/3
    <b>Transportation Planning</b>
    Manual Planning of shipments, including predefined master routes.
    Newly-Designed Processes
    Transportation Planning TP/VS (SAP APO)
    Transportation Planning enables companies to determine the right shipment mode and route based on demand and supply situation, considering transportation constraints and costs.
    8. Existing Processes in SAP R/3
    <b>Shop Floor Scheduling and Assembly Processing</b>
    Planning Table to view in a Gant Chart the schedule.
    Heuristics like forward/backward scheduling (infinite)
    Manual scheduling
    Newly-Designed Processes
    Detailed Scheduling PP/DS  (SAP APO)
    Finite and infinite scheduling, considering material, capacity, time and market constraints.
    Manual scheduling
    Scheduling optimization via optimization algorithms, like
    Genetic Algorithm
    Constraint based Propagation
    Kiran Kute

  • CJ40 Detailed Planning options not active

    Hi Experts
    I wish to do Detailed Cost Planning for my WBS elements, but when I go to transaction CJ40 >> Extras >> Detailed Planning, the options are grayed out (inactive). So I am not able to do detailed Planning through CJ40.
    Can sombody have an idea how it can be rectified.
    Thanks
    JOHRI

    I think you are trying to access detailed planning from CJ40 in overall value screen. Detailed planning is available for fiscal year wise. Change the period from overall to any current or any fiscal year and now check again, detailed planning will be active now

  • Report to Check material attach in CJR2 (detail planning)

    Hi All,
    Is there any report to show which material that i already input in CJr2 (detail planning)
    Step 1. CjR2
           2. choose layout 1-701 CE planning
           3. Input WBS and CE
           4. Go to edit and detail planning
           5. Input material no dan plant , quantity, when it save it goes to the total value. But i could not find report to show material that was assigned.
    Plz advice.
    Cheers,
    Nies

    Hi Sreenivas,
    I go to CJR2
    Then I put WBS element : let say ABCD
    Cost element : 630600
    Then I select august and go to Edit - detail planning
    I choose item category M and put material number and qty
    then save it and post
    After that i try to use standard report S_ALR_87013532 ..its only show the plan cost.
    I wish there is standard report to check which material has been assigned in the WBS and CE.
    Cheers,
    Nies

  • Product cost by period process

    Hello
    Gurus,
    Can anybody please explain the process of product cost by period, eventhough i searched but i did'nt get clear picture.
    Please help in this because i have interview
    Thanks

    Dear Kavya,
    1.Product cost by period is used in a REM scenario - Repetitive Manufacturing.
    2.Here a product cost collector is created for the material + each production version combination.
    3.All the costs(activity posting,Goods issue,goods receipt) are captured in the product cost collector of the respetive material.
    4.Each product cost collector has an order number and based on this variance calcualtion and settlement can be done according
    to the business scenario.
    5.This type of costing can be used for a continous production like cement industry,steel manufacturing(dealing with furnace).
    6.Here along with the costing part there are certain other shop floor control parameters to choose or select this scenario or a
    Discrete scenario(where Production order's are used).
    7.In a REM scenario confirmation will be made against a planned order or even with out any planned order.
    Regards
    S Mangalraj

  • Cost Center and Profit Center Planning

    Hi,
    I have one  Co issue.  Pls Suggest me the wiseful solution.
    Cost Center and Profit Center Planning.
    For F-2008 Planning  data they have updated in the month of Aug, 07 for Profit and Loss Items and they have revised the plan data of some cost elements in the month of oct, 2007 (say 5% Increas).  when comparing the cost center report to profit center report, both are not matching.  the reason when i see and reconcile the document nos and values in between cost center and profit center reports  i found out that there are some documents are missing in the profit center report. 
    wherever plan data had revised e.g for cost element Salaries they have updated 100000 Planning cost in the month of Aug, 07.  In the month of Oct, 07 increased 5% i.e.5000. In cost center line items details i found 2 documents for Rs.100000/- and Rs.5000/-  But in Profit Center Line Items i am getting only Rs.5000/- Value Document.
    Note.  As and when KP06 Plan data has been updated Profit Center line items are generating.  It is not necessary to run any programme inorder to transfer Plan Data from cost center to profit center.
    Observations From My Side:-
    I tried to run the transaction code 1ke0. i have selected the cost object is Cost Center, version and had given Cost Center Parameter in development and quality clients and executed the same.By this time already existing data either deleting/ riversing and creating new documents fully except manually changed data in profit center through 7ke1.
    My Question is
    1.Upto what extent it will work.
    2.will it be possible to transfer data from cost center to profit center only missing documents which are available in cost center, without disturbing of existing data in profit center.
    3.suppose if i done this activity, there are some data which was already transferred from other cost objects like internatl orders & wbs elements to Profit Center. will the data get disturbed (deleted/riversed).
    Pls suggest me the wiseful way to solve the

    Hi
    Try This
    BAPI_COSTCENTER_CREATEMULTIPLE
    BAPI_COSTCENTERGROUP_CREATE
    BAPI_PROFITCENTER_CREATE
    BAPI_PROFITCENTERGRP_CREATE.
    Regards,
    V.balaji
    Reward if usefull

  • Error detailed planning has been reset

    PS Gurus,
    user is trying to copy planning through CJ9BS
    Gave project definition & versions & month & year
    In setting button user selected copy detailed planning for Cost elements
    User is getting error (detailed planning has been reset) Message no. KPT3017
    Thanks
    MM

    We would appreciate if you post the solution for this.
    Regards
    Madhusekhar Gupta

  • The performance of Distribution of Cost Object Hierarchy Costs.

    Dear SAP Gurus.
    I am checking the function and the performance about Cost Object Hierarchies distribution with Control Through Variance Key.
    The number of production orders assigned to COH is about 100,000 per month.
    All orders will be closed at current month and new 100,000 production order will be assigned to COH at next month.
    My concern is about performance of Distribution of Cost Object Hierarchy Costs
    because a huge number of orders will be accumulatedly assigned to the Cost Object Hierarchies.
    I think that the COH will be distributed with not bad performance.
    (Actually I want that to be OK.)
    What's your opinion about that?
    Sincerely.
    Mahnkwi.

    Hi Mahnkwi,
    Sender-/receiver-relations should definitely be below 1:1000 or even below 1:500. This depends on other factors like general size of the hierarchy and data to be processed as well. This hierarchy needs to be restructured. In case you do this the
    distribution needs to be reversed first.
    Below are some other hints on performance in KKPX
    - Parallel processing should be used.(note [386508|https://css.wdf.sap.corp/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0000386508])
    - Switch off detail lists since the consume lots of memory.
    - Old orders should be archived.
    Note [77718|https://css.wdf.sap.corp/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0000077718] also explains tips to avoid the memory error for transaction KKPX or KKPY. As note explains, you should consider
    whether a distribution of the cost elements according to their origin is required; if not, the corresponding indicator should not be set in the costing view of the materials.
    If many error message is issued in the error log, this may have bad effect on the memory of your server. In this case, you should make these error message "not to be displayed" by message control in IMG.
    Regards,
    Declan

  • PCP - Detail Planning

    Hi Experts,
    In the detail planning screen I’m not able to get any Plans or Cost units in the drop down to edit the cost plan details. Can anyone please suggest on how to get this data displayed to edit the cost plan details. I understand that in IMG we set the evaluation path to PERSCM2 - Compensation Manager of Org. Unit for D_OPA. But as a consultant how will I be able to accesss and modify the Cost plan  info.
    HCP00    D_OPA    PERSCM2   Eval. Path: Pers. Resp. Cost Planning in Org. Unit
    Urgent please
    T-code - PHCPDETL - Personnel Cost Planning -> Cost Plans -> Detail Planning

    Hello Everyone,
    I've found the solution to the issue and wanted to update the message just so that the answer is available just incase
    I was missing a date  in the "DetailPlanning Poss.Until" field while creating the Cost Plan Attributes while Creating a cost plan Run. As soon as I have entered a future dated date in that field I am able to get the Detailed Planning screen with all the appropriate values.
    Thank you,
    Archie

Maybe you are looking for

  • Internal table in adobe print forms

    hi there, in my WDA-application i use adobe print forms for output. i use a table for displaying an internal abap-table. in the formular-hierarchy it looks like this: table2 --> line1   --> cell1   --> cell2   --> cell3 my problem is that i am a comp

  • How to get the data in servlet if the request encryption type is multipart/

    I am uploading files to the server. at that time,before upload ,I need to validate the upload file names. so,i am trying to get the value of those files names using request.getParameter("jobsheet"); in servlet. its giving null insted of file path. ho

  • Calculated Field formula not appearing in Power View Field List panel

    Hi, On Power View1 sheet of this workbook, the two PowerPivot calculated Field formulas (First Visit and First date of FY) are not appearing in the Power View Fields panel on the right hand side. I want to drag client and First Visit (calculated Fiel

  • Selection background color in 452 vs 447

    I am using a TextFlow with a SelectionManager.  I have not been able to track this down, but since switching from build 447 to 460 today, my selection background color does not change during a selection.  The selection works fine and it copies fine,

  • Cant install flash

    Hey all. Read some of the topics here, seems like this version has some problems. But any way. I went to youtube only to see they have totally blocked all flash content. Said I had to update. Only when I follow the link to adobe, I can get to the dow