Document Attachment at task level

Hi all,
i am trying to attach a document to a task A belongs to some project A. I am able to do it but the document icon is not visible at the task level, it is visible only at the project level. Help me out .
Tahnk you
Soumya T | EPM Consultant

Hi Soumya,
Which Project Server version and SP are you using? How do you proceed step by step to attach the document to the task?
Please give us more information so we can help you.
Cheers.
Guillaume Rouyre - MBA, MCP, MCTS

Similar Messages

  • Document attached to Tasks in Notification

    Hi Everyone
    I have requirement to attach document to a task in a notification. I need to retrieve this document in another application.  Could anyone guide me on this.  I am looking for the table where the document (or its link) is stored and secondly function module to retireve it.
    Thanks in advance.
    Raman Taneja

    Hi Raman,
    I would create the document first with CV01N. You upload the originals there and store them in the system. Then you link them to the object. In that same transaction  go to the Object LInks tab and find Maintenance Notification.
    This will link it to the Notification , though, not to a task specifically.
    You can attach the document to an operation in a task list. Select the Operation, and click on the PRT button. When the menu pops up, click on the DOcument  icon, and then you should be able to see the list of documents created with CV01N.
    Note: Documents can only be used after they have gone to a series of steps to get them released.From CV01N or CV02N, select Extras from the top menu and then select Status Network. That will show a graph explaining the differen Statuses the document must go through. Depending on security settings, you should be able to take the document through this steps. Simply change the status, save, change again to the next status, save and so on until you get to the Rel status.
    I recommend the DMS forum for more info on this .
    Cheers
    Walter

  • Enforcing attachment to process level not working

    I am trying to attach attachments (doc, pdf etc) at process level from task form but it goes to task level some how. I was able to verify that by looking into WFATTACHMENT table.
    UI side
    <af:selectOneRadio value="#{bindings.attachmentScope.inputValue}"
    label="#{resources.UPLOAD_TO_PROCESS}"
    id="uploadToProcAttach"
    I am making sure attachmentscope is going as 'BPM' not 'TASK' by binding to my own managed bean and set scope to process level.
    This is working because if I do URL instead of desktop file then URL attaches to process level. I verified this too by looking into WFATTACHMENT table.
    So not sure why
    addAttachmentBean.uploadFile no matter what attaches pdf, doc etc attachment to task level and also notices that WFATTACHMENT table has row for this record with taskID as something like f76a60ad-53f2-40dc-ac75-af53d64854e4 instead of taskID as process instance Id like 4000001.
    I am using Oracle BPM 11.1.1.6.0 PS5.
    Attaching URL to process level from a task is working but from the same task attaching real doucment to process level goes to task level.
    I am not using UCM.
    I really appreciate any inside.

    Finally, I was able to solve this issue.
    Project was migrated from Oracle BPM PS4 to Oracle BPM PS5 so some how human tasks created in earlier version were not working in new version for new functionalities (adding attachment to process level). When I deleted these human tasks and recreated in newer version. Everything started working great.
    I am not sure it is Oracle bug issue or what....

  • New DMS document attachment to order header - can it also be done to a task list?

    With business function LOG_EAM_CI_6, you can now attach DMS documents to the order header or operation level in the 'Additional Data' tab.
    Since a lot of clients use documents to list complex preventive maintenance instructions, is it also possible to attach a DMS document to a task list header (or operation) and have it show up in the new 'Additional Data' screen area of the resulting order (using a maintenance item/plan to generate the order)?  Or do we still have to use the task list operation PRT functionality and have it show up in the order's operation PRT?

    Hi Arthur,
    I have configured Task list as per the SAP note 1821916  & activated DOC_TL_GUI. This allowed me to attach documents to the Operation &/or Header of the Task Lists. The problem I am facing is when I assign the task list to the work order the documents are not transferred . You have stated that they have transferred to the work order so I am wondering if there is something I missed.
    Arthur Balajthy wrote:
    And I checked that by adding documents to a task list header or operation, the work order generated from a maintenance plan/item referencing that task list does have those documents attached also.
    I haven't tried from a Plan but will do that now.
    I assumed if they were attached to the Task List Operation they would transfer to the Work Order like everything else on the Task List
    Thanks in advance

  • Cannot attach documents at order operation level in PM order.

    Hi,
    We have recently upgraded to EHP6 and I have activated the EAM business functions including LOG_EAM_CI_6. In my PM work order, on the Additional Data tab, I can see the "Document Assignment" section at the bottom. Here I attach an existing document and choose Assign to Order. Then I attach another existing document and choose Assign to Operation (0010). After saving the order if I go back into it (IW32/IW33). the document assigned to order header is still there but the document attached to the operation disappears.
    I have defined the document type that I am assigning at header level and operation level in Customizing for Cross-Application Components under Document Management --> Control Data --> Define Document Types. I have also specified in Customizing that the assignment to objects PMAUFK (order) and/or PMAFVC (operation) is allowed for the document type of those documents.
    Can someone please advise what's wrong here ? I have to attach/assign docs to operations.
    Thanks,
    Sandy

    Hi Sandy
    Can you please make sure two things:
    1) IMG --> DMS --> Control Data --> Define Document Types --> Select Doc Type ---> Define Object Links. It must be something similar to this one. Without entering CREATE DOCUMENT settings, you may not be allowed to attach a document. That might be causing the issue. If you do not want from within IW31, someone is creating documents then make sure this setting has value =2.
    One more possible reason for this is 1:n field in this same setting. If 1:n is not selected, please read the help for that field and make sure the uniqueness of your document attachment to objects.
    2) IMG --> DMS --> Control Data --> Maintain Screen for Object Link
    For this one make sure that you have a screen entry for PMAUFK and PMAFVC.
    Now if attachment does not work, try creating a document and let us know what is the error message.
    And do you know that there is another way of attaching documents to the operation which is attaching them as PRT. Just select the operation, click on PRT button and select document and attach it.
    I hope this will help.
    Regards
    Savas
    Message was edited by: Savas Yazici

  • How to Attach Customer at Top Task Level?

    How to Attach Customer at Top Task Level?

    Hi
    If you are on Projects FP-M, you should see the setup.
    Using Forms
    Open the form - Projects, Templates and enter the project number.
    Go to Options > Billing information > Billing setup.
    Look for the left uper section called Revenue and Billing Information.
    First lise is Revenue Accrual Method
    Second line is Invoice Method
    Third line is a check box - Customer at Top Task
    Fourth line is a check box - Invoice Method as Top Task
    If you don't see those fields, you may be not on the right version of the system.
    Dina

  • How to read/get the document attached to PO line item

    Hi experts,
    I got a requirement wherein I need to read/get the document attached at PO line item and to send that document through mail as an attacment .
    please suggest me how to proceed on this.

    actually your are picking up the correct data from Table EKET (EKET-EINDT) but your are printing that in item data loop for EKET might have already executed in your script and the header of that internal table consist the last entry of the table so for that. Fetch the delivery date explicite from the Table EKET when your in item level processing and print that.
    For Example u can use this code.
    To print you have write the this code in Script item level printing window "MAIN" window
    Following perform is called to get the line item delivery date in PO
    {/: PERFORM GET_DEL_DATE IN PROGRAM ZPerform_prog
    /: USING &EKPO-EBELN&
    /: USING &EKPO-EBELP&
    /: CHANGING &DEL_DATE&
    /: ENDPERFORM}
    {* Dellivery date &DEL_DATE& }
    write the below code in the Z program "ZPerform_prog"
    { FORM get_del_date  TABLES in_par STRUCTURE itcsy
                             out_par STRUCTURE itcsy.
      READ TABLE in_par WITH KEY 'EKPO-EBELN'.
      CHECK sy-subrc = 0.
      $_po_no = in_par-value.
      READ TABLE in_par WITH KEY 'EKPO-EBELP'.
      CHECK sy-subrc = 0.
      $_po_line = in_par-value.
      SELECT *
      FROM eket UP TO 1 ROWS WHERE ebeln EQ $_po_no AND ebelp EQ $_po_line.
        $_del_date = eket-eindt.
        CALL FUNCTION 'CONVERT_DATE_TO_EXTERNAL'
          EXPORTING
            date_internal            = eket-eindt
          IMPORTING
            date_external            = $_del_date
          EXCEPTIONS
            date_internal_is_invalid = 1
            OTHERS                   = 2.
        READ TABLE out_par WITH KEY 'DEL_DATE'.
        CHECK sy-subrc EQ 0.
        out_par-value = $_del_date.
        MODIFY out_par
                    INDEX sy-tabix.
        CLEAR : $_po_no , $_po_line ,$_del_date.
      ENDSELECT.
    ENDFORM.                    "GET_DEL_DATE }

  • Document attachment multiple lines PO

    Hi there,
    Does anyone know if it is possible to see an indicator at item overview level on a PO to indicate that there is an attachment?
    Using the document management system, it is possible to attach documents at an item level. This is done by clicking on the "document" icon at item level. The icon is underneath the item overview and is a picture of a document with a paper clip.
    However, if I have several lines on a PO, I would like to be able to see on the item overview which ones have a document attached. Otherwise, I have to select each line individually, click on the "document" icon and see if there is a document.
    Has anyone seen how this can be done? (e.g. if a line is deleted on a multiple line PO, the "trash" icon appears next to each line in the overview)
    ANy thoughts appreciated. I have searched SAPfans, SDN and OSS and have found nothing so far.
    thanks
    Donal

    Hi
    I have activated DMS , but NOT able to attach Documents in PO , but i am able to attach at material master level . Can you help to resolve this .
    Rgds : Paresh

  • Oracle Projects 11.5.10.2 : Generate Invoice at the lowest task level...

    Oracle Projects: 11.5.10.2.
    We are trying to figure out if we can generate an Invoice at the lowest task level. When I looked at the invoice format there was no option to group by at lowest Invoice level However I looked at one of the documents of project partners vendor and created an Invoice format option of lowest task. However I can not fund the project at lowest taks. When I go to the agreement I only see top tasks in the list of values?
    Does any one know how to achieve /generate billing at lowest task level?
    When I looked at the project type setup there is a billing option called funding level: This only gives two options top task and project level or both but not at lowest task.
    any clue/help would be greatly appreciated.
    The reason we are trying to do this is we want to pass a tax code at the lowest task level.
    --Krishna                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

    Hi
    There is no way to fund the lowest tasks.
    You cannot generate invoice with invoice lines per lowest level tasks, using standard functionality.
    Assuming your billing is based on WORK, you could customize the Invoice Format to summarize RDL's by lowest task level.
    However, if you need hard limit control by lowest task level you will need to capture the allocation of fund to tasks. That could be done on a revenue budget you maintain by lowest level tasks. In addition, develop billing extension called during GDI that will perform the fund check for each task.
    Dina

  • I need to visualize a document attached on a pdf file on an iPad.  Is there any application  to do that ?

    I need to visualize a document attached on a pdf file on an iPad.  Is there any application  to do that ?

    Yes. Quite a few actually.
    Starting with Apple's own iBooks App, I also see many recomendations for Goodreader, and Adobe's own PDF Reader.  Just to name a few. Look for them in the App Store. iBooks and Adobe reade are free.  You can also search the App Store for other alternatives.
    Also for most PDF's the Mail App can open them directly.

  • Why can I not attach a document to an email? Every time I want to send an email with a document attached to it, an error notice pops out. It tell me that the file is being used even when  it is not. How can I fix this issue?

    Why can I not attach a document to an email? Every time I want to send an email with a document attached to it, an error notice pops out. It tells me that the file is being used even when  iall other programs are closed. How can I fix this issue?

    Thanks Jeff, I was not aware that a template could be multi-page.  (All the existing templates were 1 page)
    But it worked, saving me some steps.  When I was finished I renamed the document, and locked it.
    Then tried to save it but  could not because it was locked.  I closed it, went to my Spread Sheet Folder ,
    to find it, it was not there.  The Finder could not find it either.
    So I start over again.
    I opened up Numbers and it showed my personal Numbers template folder, it contained both my new 
    original 4 page template and the vanished saved document!
    I tried to delete the template containing these document data and could not - I had to go to the Library/Application Support/Numbers to physically remove it from this folder. Then I started over again.  I Finally found out how to make it work: I can now "save as", and then lock, and it will go to place where I want it to be saved and locked.
    The secret is: Click on the document title in the menu bar, and it opens up  "Save as...", which works the same as in OS 10.4.11, and you can pick the place you want for saving.  Once done that, you can then lock the document in the same pull down menu, and then close it.
    I also found later that I can delete a template from its folder, by letting Numbers open the templates,
    clicking on the one I want to remove, then go to the "Numbers Menu/File/Move to...", select "Desktop"
    and from there the selected template can then be thrown into the Trash from there.
    It appears now that the real fault of the Numbers software is that the "Save as" command is not available in the "Edit" or "File" pull-down menus, but hidden behind the title of the document.

  • Office 2007 Document Attaching in Solution Manager

    Dear Gurus,
    When document attaching in Solution Manager 7.01, the system does not support Microsoft Office 2007 formats. (docx, xlsx) Are there any customizing for this topic?
    Thank you,

    Hi,
    Thanks, in lieu with your detailed system message, please try with this
    The warning is because the file extension docx is not known for the
    system. All the known extension is defined in table SDOKMIME by standard
    . And customer can extend it in table SDOKMIME_C.
    Actually that is only a warning message, which will not block the
    following up processing. The docx file will be attached if you click on
    the green tick. And the file can be previewed and checked later on.
    If you would like to get rid of this warning anyway, you may extend the
    customer table using the following step:
    -spro->SAP Customizing Implementation Guide
    ->SAP NetWeaver->Knowledge Management
    ->Settings in the Knowledge Warehouse System
    ->Document Management Service
    ->Define MIME Type for File Name Extension
    -add an entry like
    File name extension = docx
    MIME type of a Web object = application/vnd.openxmlformats
    After everything has been done as above, please retry to attach, it should help.
    Cheers,
    sh

  • When I open a word document attachment in mail for IOS 7.1.1 the previous jpeg is showing on the first page. When I open the attachment from mail in mac OS X the jpeg does not appear. Can anyone help?

    When I open a word document attachment in mail for IOS 7.1.1 the previous jpeg is showing on the first page. When I open the attachment from mail in mac OS X the jpeg does not appear. Can anyone help?

    gonsa47 wrote:
    When I open it in pages or word the correct company logo appears.
    Does the mail app display whatever is in the document without the ability to differentiate between hidden or non hidden images?
    The mail app will not display fillable form fields in PDF files that can be seen in real PDF apps. I say real PDF apps because the form fields in PDF apps will not appear in the iBooks app either. IMO, iBooks is not a real PDF app.
    So, I would say that the mail app cannot differentiate between hidden and non hidden items

  • Project Server Enterprise Text1-40 task level fields in Database?

    Hello,
    There are some custom enterprise text fields available for each entity, such as Enterprise Text fields 1-40 for Tasks or Resource etc.
    documented here:
    http://office.microsoft.com/en-us/project-help/available-fields-reference-HA010370279.aspx#BM2
    more:
    http://office.microsoft.com/en-us/project-help/enterprise-text1-40-fields-HP001023958.aspx?CTT=5&origin=HA010370279
    Now user can easily insert these fields to Project views and insert/modify data of this field. however these fields are not available within reporting databases to be queried for custom reporting.
    understanding is that you can only use enterprise custom fields for reporting, but at the same time these fields are also available to be included in views and knows as Enterprise fields and not
    local fields. the only additional caption available for these fields is that "Project Professional only".
    but its for PP only, then why are they available within views? which means this data is also available somewhere in database.
    Now, based on this assumption, does any one knows that how to retrieve this task level Enterprise Text1 field using query?
    thanks.
    Khurram Jamshed - MBA, PMP, MCTS, MCITP (
    Blog, Twitter, Linkedin )
    If you found this post helpful, please “Vote as Helpful”. If it answered your question, please “Mark as Answer”.

    Hi , thanks James for pointing out to the rite source, i already reached to this table prior to ur reply though :)
    i agree that its not supported to read from published database, and i always stick with the recommendation to customers all the time. However you can understand that there are times when envrionmental factors are unavoidable :)
    on other note, what i do not really understand is that why these fields are even available to be used in views??
    may be someone able to shed light on this, for now i am marking ur reply as an answer closing this thread.
    thanks again, cheers mate.
    Khurram Jamshed - MBA, PMP, MCTS, MCITP (
    Blog, Twitter, Linkedin )
    If you found this post helpful, please “Vote as Helpful”. If it answered your question, please “Mark as Answer”.

  • Unable to Baseline fund at Task Level

    Hi All,
    We have a project P1 with two tasks T1 and T2. Funding is done at Task Level so initially T1 is funded for 100 USD.
    Set Of Books Currency is INR.
    When T1 was funded initially the USD-INR conversion rate was 40 Rs per USD.
    So the workings are:
    PO:      (exchangeRate 40Rs)     100 USD ~ 4000 INR
    Revenue1:      (exchangeRate 40Rs) 100 USD ~ 4000 INR
    Exchange rate changes to 35 INR = 1USD
    Now there is a situation where PRC: Revaluate Funding is run, and in the PO, there is a unbaselined amount of -500, because of exchange rate change.
    Now it does not allow me to baseline this -500
    It shows message: Total amount allocated cannot be less than amount accrued or billed.
    Surprise Part:
    I wanted to fund the next Task T2 for another 100 USD @ 35 ~ 3500 INR. Now the unbaselined amount becomes 3000 INR and the funding inquiry screen still does not
    allow me to fund Task T2. It gives me the same message "Total amount allocated cannot be less than amount accrued or billed"
    I have just given an example of one instance, but we have a huge quantum of such projects and the issue is getting added.
    Is this a bug?
    Regards,
    SA

    Hi
    The basic reasoning for funding revaluation may be described as follows.
    Billing is done over time in the funding currency (customer PO currency), however, the billing amounts are converted to functional currency as they are generated. Each invoice may be converted to functional currency by a different exchange rate. The billing amounts should be limited by the total customer PO amount in the funding currency. The amount in functional currency should not be limited, since this is a dependent result.
    Revenue is taken over time in the functional currency.
    The target is to get at project end the following - the total billing amount in functional currency will equal the total revenue amount if functional currency. That way the UBR and UER will balance to zero. The revenue amounts are generated in functional currency, and those should be limited by the resulting total functional currency amount of the billing.
    Each time you revaluate the fund the system calculates the total billed and paid amount in functional currency, add to that the due billed amount (unpaid) revaluated as of the revaluation date, and then add the backlog, which is the remaining unbilled fund revaluated as of the revaluation date. The summary of those three components represents the as of date value of all potential amount to be billed in the functional currency. The process ends up by adding a revaluation fund line that brings the total amount of funding in the functional currency to equal the calculated revaluated total amount.
    The above described logic was the reason for Oracle to develop the revaluation process, the way it was built.
    I'm not sure what is the reason your company want to revaluate the fund in the other way.
    Could you please explain the accounting reason.
    Oracle do offer a revaluation factor client extension which you may want to look at. However, this extension is used by the revaluation process to alter the factor for revaluating the remaining backlog (unbilled amount). It is not affecting the entire formula calculated with the billing components. I"ll be able to suggest a workaround using that extension, if I'll understand the business requirement.
    Dina