DTT 2500 Control Module
I have a DTT 2500 and it has been very good over the years, but now it's is showing it's age with scratchy controls. If anyone has worked on one of these how much trouble is it to open it up and clean all the contacts, particularly the Master, Center, Subwoofer, and Surround contacts.
Well I found out how to get inside the control module. The screws were under the 4 rubber feet. Took them out then had to remove 4 nuts to move another circuit board to get to the rear of the controls and put contact cleaner in them.
Just an aside I think Creative is devolving. The DTT2500 system is much better than the Inspire 5500 I purchased. The speakers with the 5500 look terrible, the control box is much too light (have to hold it with one hand while pushing the power button or it slides away from you). Having connections on the SubWoofer instead of having all the connections on a control box like the DTT2500 is very inconvenient. All in all the Inspire 5500 is not very good. I believe they should go back to something with a bit more quality like the DTT 3500 or the Inspire 5700.
Similar Messages
-
Inserting rows in table control(Module pool)!!
Hi,
Pls provide me with some code sample for inserting rows in a table control (module pool)...
Regards
GunjanHI
Y dont u create a TABLE CONTROL using wizard and copy the coding-
TRY THIS-
WHEN 'INSR'. "insert row
PERFORM FCODE_INSERT_ROW USING P_TC_NAME
P_TABLE_NAME.
FORM fcode_insert_row
USING P_TC_NAME TYPE DYNFNAM
P_TABLE_NAME .
&SPWIZARD: BEGIN OF LOCAL DATA----
DATA L_LINES_NAME LIKE FELD-NAME.
DATA L_SELLINE LIKE SY-STEPL.
DATA L_LASTLINE TYPE I.
DATA L_LINE TYPE I.
DATA L_TABLE_NAME LIKE FELD-NAME.
FIELD-SYMBOLS <TC> TYPE CXTAB_CONTROL.
FIELD-SYMBOLS <TABLE> TYPE STANDARD TABLE.
FIELD-SYMBOLS <LINES> TYPE I.
&SPWIZARD: END OF LOCAL DATA----
ASSIGN (P_TC_NAME) TO <TC>.
*&SPWIZARD: get the table, which belongs to the tc *
CONCATENATE P_TABLE_NAME '[]' INTO L_TABLE_NAME. "table body
ASSIGN (L_TABLE_NAME) TO <TABLE>. "not headerline
*&SPWIZARD: get looplines of TableControl *
CONCATENATE 'G_' P_TC_NAME '_LINES' INTO L_LINES_NAME.
ASSIGN (L_LINES_NAME) TO <LINES>.
*&SPWIZARD: get current line *
GET CURSOR LINE L_SELLINE.
IF SY-SUBRC <> 0. " append line to table
L_SELLINE = <TC>-LINES + 1.
*&SPWIZARD: set top line *
IF L_SELLINE > <LINES>.
<TC>-TOP_LINE = L_SELLINE - <LINES> + 1 .
ELSE.
<TC>-TOP_LINE = 1.
ENDIF.
ELSE. " insert line into table
L_SELLINE = <TC>-TOP_LINE + L_SELLINE - 1.
L_LASTLINE = <TC>-TOP_LINE + <LINES> - 1.
ENDIF.
*&SPWIZARD: set new cursor line *
L_LINE = L_SELLINE - <TC>-TOP_LINE + 1.
*&SPWIZARD: insert initial line *
INSERT INITIAL LINE INTO <TABLE> INDEX L_SELLINE.
<TC>-LINES = <TC>-LINES + 1.
*&SPWIZARD: set cursor *
SET CURSOR LINE L_LINE.
ENDFORM. " FCODE_INSERT_ROW
HOpe this helps u
Regds,
Seema. -
With out Controlling module configurations, can we Configure PP module dire
< MODERATOR: Message locked. Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. Use an appropriate title. >
Hi Experts,
With out Controlling module configurations, can we Configure PP module directly?
Thanks
ChandraHi,
Yes you can configure PP with out CO but you will not get Product Costing results for the materials used.
You will not be able to link Activities, Cost Centers, Over Heads which are production activities.
Cost Analyisis for the Order will not be possible.
To say in brief Cost related entries or break up is not possible if CO is not implemented.
Regards
Balaji -
For Professional level certification aspirants in SAP Controlling module
Dear all Professional level Certification aspirants in SAP CO module,
I have recently passed the Certification test on SAP Management Accounting (CO) module in version ERP 6.0 EHP4. I have more than 4 years experience in SAP Controlling module.The following are some of my suggestions regarding preparation for the exam.
1. All the questions were scenario based. The exam tests expert level knowledge and real time scenarios in the module. The theoritical knowledge is not sufficient to clear the exam. Unless you have atleast 5 to 6 implementations in Controlling module, it is not advisable to give it a try.
2. Detailed knowledge of the system configuration settings about the various courses mentioned in the syllabus is required. One needs a clear understanding of Special costing functions, ERP integration, Transfer Pricing, Material ledger, New GL Parallel valuation, Planning and Budgeting fuctions in various components etc.
3. The exam tests in-depth knowledge about various integration aspects of Controlling module with other modules. The advanced master data functionalities of other logistical modules like MM, SD, PP, PM, QM, PS, CS, HCM is tested in detail.
4. Several methods of process and performance optimization of the system are also tested.
3. Some reporting aspects of BW and BI are also tested. The cross application aspects of the system are also tested.
4. The exam also tests the real time skills in preparing Blueprints, Business Process design and trouble shooting the system. Being knowledgeable about some of the processing errors and message classes will be of great help.
Hope this information helps you in preparing for the certification.
Should you need any clarifications, please post a reply to this thread and I will post answers.
All the Best!!
VS.Hi Vikrant,
the pass mark for the exam is 58%. However it may be different. The passing mark shown on your screen on the day will be the correct passing mark.
All the questions were scenario based which would involve high analytical skills and through understanding of the system integration. It would be difficult to tell any specific question. The questions carry different weightage. If you answer the questions with less weightage correctly than the questions with more weightage, you end up scoring less though you answer more number of questions correctly. and it is vice versa. Go through your syllabus and cources and try to concentrate on the topic areas which contain more weightage.
Moreover, the exam is not completely technical in nature. It tests a lot of analytical and problem solving skills required on the job.
Note:Please do not ask the questions or contents of the exam as they are confidential.
Hope this information helps you.
All the best for your exam!
Regards,
Vishnu. -
Dynamic rows increment according to user input in Table Control Module Pool
HI All,
I'm doing a Table Control module pool Program. Now suppose there are two fields - MATNR & MAKTX.
Our requirement is while weu2019ll give the material No (MATNR field), material desc. will be populated in corresponding field (MAKTX field),
Now the problem is, while we are entering Material No. in 1st row it is Material Desc. coming in to corresponding field but while the data is given to next row it replaces the 1st rows data .
eg - ............................... ........ MATNR.............................MAKTX
1st entry in 1st row ..................... 23................................... XXX --after pressing 'ENTER' mat desc XXX comes. now 2nd entry in 2nd row 24 .............................. YYY --after pressing 'ENTER'
1st row details like MATERIAL NO(23) & Desc(XXX) got deleted & that is replaced by 24 YYY
We can not extend that no. of rows of Table Control Table more than one row.
If you kindly help me how it is possible to increase the no. of rows of that table dynamically without replacing the previous row it will be very helpful for me.
Thanks & Regards,
BiswajitHi Biswajit,
This probably means that the table control PAI is modifying the first line always in the internal table instead of current line
eg: we wite the code
loop at screen and then modify the internal table with current line
table_control => name of table control as given on screen
in PAI of the screen
loop at internaltable.
modify internaltable index table_control-current_line .
put a break point here and see*
it will always be updating the first record because of some reason - logic error or coding error*
endloop.
Also in PBO we can see that the internal table will be having just one record after the action mentioned above....it is a case of overwrite
To simply increment the number of lines
table_control-lines = table_control-lines + 1. in PAI
Pls check and revert
Hope it helps
Regards
Byju -
Position budgeting and control module
Hi Expert,
I need configuration steps for the Position budgeting and control module.
I have search a lot but i didn't get it.
If any have work on this module, please share some documents with me or give me idea how i will do it.
Many thanks
Urvashi ChaudhariHi, I have lots of written information about Position Budgeting and Control, one of them a nice white paper mhich may give you an understanding of the principles. We evaluated it at a customer and decided "only" to implement PCP. As I understood PBC uses PCP as a motor for collecting plan data, but you will not be able to do detail planning f.ex, as in Personnel cost planning. So as I understood it is amongst others a way of collecting HR financial data from a data basis and integrate it with Financial, a bridge between HR and FI. The commitment processor is the engine for this integration, if I've understood it correct. I can't say that I fully understood the principles either, but if you like I may provide you with some documentation. Do not know how to reach you, though. I also have a comment from a PBC-expert, maybe this will enlighten you (FYI: this is taken out of a context):
"...PBC is not intended to do detailed budgeting. PBC main feature is the possibility to create commitments / encumbrances and reserve this budget based on salary expenses. Customers usually spend a big part of their budget in salaries, so this tool offers them the chance to monitor and control this effectively by reserving the budget they will need for a certain period of time (usually the fiscal year) and being able to monitor if there are budget deficiencies in case of salary adjustments or new hires. PBC only uses the budget from FM to post agains it, but in no way pretends to offer a tool to manipulate this budget, plan or make decisions against the whole budget..."
Regards -
Hi Gurus,
Please tell me what else i should be comfortable in, in controlling module, except following topics:-
1.Creation of Cost Elements and Groups
2.Creation of Cost Centers and Groups
3.Creation of Activity Types and Groups
4.Creation of Profit Centers and Groups
5.Cost Center Planning
6.Activity Type Planning
7.Creation of Assessment Cycle
8.Calculate and Post Planned Activity Rate
Please tell me what are the topics i am still missing, including COPA as well.
Please revert asap
Thank YOuHello
Good begining, these are the basics.
My approach:
- Ensure you could do basic config in all sub modules of controlling.
- Ensure you could create master data in all
- Prepare a chart where you would understand individual transactions in FI, SD,MM,PP,PS,CS and where the cost object assignment is needed to be set. This would make you understand how the data is flowing into CO.
- Perform individual transactions in these modules to check if the data is flowing to CO
- Check to execute reports in CO, what needs to be maintained.
- Execute all reports in CO
- Make cost transfers, distributions, maintain parameters, variants to check the output
- Concentrate on data flow from SD,MM and PP
- Concentrate on costing sheets, cost estimates and characterstics and value derivation.
- Execute all reports effected after all integration transactions are posted
Overall, CO is a module for management reporting, it is module where data is collected, and organised to report in the desired fashion for best possible decision making.
Ensure this is complied.
Reg
assign points if useful -
Please offer recommendations to replace DTTS 2500 Desktop Theatre 5.1 system
Howdy, all.
After suffering a recent lightning strike to my home, my DTTS 2500s no longer function properly. Because of their age, I doubt the practicality of having them repaired (not that I know how to go about doing so if it's even possible), so I'm looking for recommendations on which current product to replace them with.
I used the speakers for PC gaming, listening to music (audio CDs and digital music), and DVD audio from my Yahama player to my Audigy Platinum's optical in connection on the expansion drive.
Here are a few possibilities that have caught my eye:
GigaWorks ProGamer G500
Creative Inspire 5.1 Digital 5500
Creative Inspire GD580
Now that I think about it, I'm pretty sure I can eliminate the G500 since there's no receiver, though I suppose I could purchase the DDTS-100 in addition, but that's a bit more than what I was hoping to spend all told.
The tripod stands for the DTTS2500s were very convenient since I have my computer set up in my bedroom. Are they compatible with any current offerings? From the pictures I've seen online and the demo models I've seen in stores, it doesn't appear that way, but I figured I'd ask.
I greatly appreciate any input anyone can offer.
Thanks.The Inspire GD580 and Inspire 5500 are essentially designed for use on standalone DVD players and gameconsoles (like the XBox, PS2). If you are connecting to a PC, your options are limited. The sets have a stereo input (which will only give you stere sound), or digital input (coaxial or optical SPDIF).
While the digital inputs would be perfect to connect to a DVD player, or to even play DVDs on the PC, they would not be suitable for gaming or music. The connection itself can only pass over either a stereo PCM signal, or an encoded AC3 stream (so DVDs). Music and games may be in surround on the PC, and with analog connections (or Digital DIN), but over coaxial or optical SPDIF it'll only be able to pass over a stereo signal. This knowledgebase article has a bit more detail. The decoders do have a ProLogic upmix option, but you won't get the true positional sound from games.
For use on the PC and other devices, the DDTS-100 decoder is a much better option, as it has a lot more connectivity, including multiple analog inputs, especially for use on the PC. You could combine the decoder with any of our analog speakers.
Cat -
SAP Enterprise Controlling module
Hi guys,
Please any one tell me what is the SAP Enterprise Controlling moduleHi!
Enter prise controling module is a part of SAP ECC, and it consists of Profit Center Accounting (EC-PCA),Consolidation (EC-CS), Executive Information System and Business Planning
regards
ashwin -
When will the Controlling module will be updated in Purchasing flow.
Hi,
i want to know when will the controlling module get updated in the Purchasing flow as follows
1.creation of Purchasing order.
2.creating the Goods receipt-GR
3.creating the invoice
4. vendor payment
Please help me.hi
kindly note the date flow to the CO module is based on the account assignmed you use in each of the above transaction.
For example if you use the Account Assignment as 'F' in the PO ME21n, then you need to specify the internal order in the PO.
thus the data in the PO shall move to the Internal Order (a CO object).
Cost assignment objects like Cost Center,profit Center , Internal Orders can be assigned in Line items for each FI document which will result in flow of data to the CO objects.
During vendor payment, the FI entry would be Dr Expense & Cr, Vendor.
If controlling is active and you have assigned the Company code to a controlling area, then you will need to specify the cost center in the expense line item.
this will ensure that data moves to the controlling objects.
hope this helps.
regards
eashwar -
Cambridge soundworks dtt 2500 digital 5.1 on audigy 2
Hello,I hope you can help me...Here is my problem:I have the speaker-system:cambridge soundworks desktop theatre 5. dtt 2500 digitaland now a Audigy 2 ZS.Everything is ok but the centre-speaker won't talk to me... I've connected the card with the spdif but I have to set the dtt decoder to 4 point surround to hear something from the rear speaker. Without setting to 4 point I can only hear the front speaker (stereo).Now I have deactivated the intern decoder of the audigy 2 zs. Now it is possible to hear dvd in dolby digital 5.!
But only dvd!
In the system management I can check the channels seperately but when I see the acoustic waves (symbolic on screen) from the centre speaker but I can't hear anything!
Please help me...Fixed. If anyone has the same problem, not sure what caused it as everything was working before, but a driver update fixed things up.
-
Checkbox in custom control(module pool)
Hi Experts,
In my module pool i have used function module 'set_table_for_first_display'.
I am displaying internal table having field for checkbox in custom control .
When user clicks any checkbox value 'X' is not getting populated in checkbox field in internal table for that particular row.
Please suggest,
Regards,
Kaustubh.Hi,
Just check the Field Catalog you have maintained for the List and check for the Options.
also in the Grid Layout that you are maintaining just try these:
data: g_layout TYPE lvc_s_layo, " Grid Layout
constants: c_flag(4) TYPE c VALUE 'FLAG', " FLAG field
c_a TYPE c VALUE 'A', " Value 'A'
In building layout:
g_layout-sel_mode = c_a.
g_layout-excp_fname = c_flag.
Edited by: Neha Shukla on Nov 17, 2008 6:48 AM -
Period End closing in controlling module.
Hi Gurus,
In our project, we have implemented FI, CO , MM, SD, PP, PM, and HR modules with payrolls. Our project has gone live this month(05.02.2007).
Can anybody explain what are the steps to be taken for period closing in controlling.
Some Production orders which are in process do not have standard cost estimates, what is the impact in WIP Calculation.
Please also give info on how to transfer the Personnel Cost from HR Cost Centers to deferent production orders.
Thanks in Advance
Ganeshhere is the list for FI/CO year end closing check list:
1 Execute Report for InterCompany Activity & Journal Entries
2 Open posting period for next yr
3 Run Business Area's Assignment report.
4 Review list of recurring journal entries
5 Execute Recurring Entries for A/R, A/P, G/L
6 Process Parked A/R, A/P, G/L accounting documents
7 Final Cutoff for the Maintenance of Fixed Asset- Add Transfer and Retire
8 Run Depreciation in Test Run and post
9 Verify Display Log for Depreciation Test Run
10 Capitalize AUC Assets if needed
11 Enter Payroll Data to SAP
12 Verify Depreciation Balances with GL balances
13 Post Depreciation
14 Execute Asset History Report, and retire assets if needed
15 Adjust specific depreciation areas if necessary
16 Reconcile AM subledger with GL
17 Check Bank Data
18 Review AR Open Items
19 Review AP Open Items
20 Execute Pending Invoices
21 Clear Open Item for GRIR, freight
22 Reconciliation of Financial Documents and transactional figures
23 Open new CO Posting Period
24 Compare current (cost estimates) with last current price (Moving Avg)
25 Update current cost price to material master price field.
26 Process Freight charges, Match SD freight to actual
27 Review Internal Order Postings
28 Settle All Orders
29 Verify All Post Goods Issue have been Invoiced (Billing Due List)
30 Review SD Billng Doc from prior mth that have not yet been released to accounting
31 Reconciliation of MM movements in Transit Intra-SAP to NonSAP
32 Reconcile PI Inventory with SAP
33 Perform Manual Adjustment if needed
34 Verify balance of the GR/IR account
35 Post Accruals and Deferrals
36 Clearing of Cancelled Documents
37 Check Profitability Segment Adjustment
38 Aging Report-Reconcile GL balances with subledger balances AP
39 Check the check run numbers
40 Bank reconciliation Data
41 Enter Tax Journal Entry
42 Reconcile GL balances with subledger balances AR/MM/AP
43 Display Balance Sheet Adjustments
44 Post Balance Sheet Adjustments
45 Post Foreign Currency Valuation (foreign exchange)
46 Check generic cost centers for posting with wrong accounts
47 Correct wrong postings on generic cost centers
48 Check Validation dates for Cost Centers, Cost Elements, CO area
49 Check COGI--for both month end and year end
50 Doubtful receiviables
51 Verify In-transist Inventory
52 Reconcile PA to G/L
53 Post Cost Centre Assessments and Distributions
54 Run CO-FI Reconciliation to balance
55 Run BW reports P&L and Balance Sheet
56 Maintain CO yr variant
57 Fiscal Yr Balance carryforward AP/AR/AM
58 Fiscal Yr Balance carryforward CO
59 Fiscal Yr balance carryforward FI
60 Fiscal Yr balance carryforward PCA
61 Set Document number ranges - FI - new year
62 Set Document number ranges AP/AR - new year
63 Generate Financial statement Reports
64 Change Fiscal Year For Assets
65 Year end Closing-- Asset Accounting--final for year end
66 Close CO Posting Period
67 Close Prior A/R Posting Period
68 Close Prior A/P Posting Period
69 Close Prior MM Posting Period
70 Reverse accruals and deferrals for the new month
71 Reconciliation of Financial Documents from old fiscal year and new fiscal year
72 Load Balances, Budget Data for Cost centers, sales
73 Update Retained Earning Account , balance carry fwd
please reward points if useful. -
Controlling Module and Product Costing
Hi,
Anyone got study notes and Configuration notes for CO module? Kindly sent to my email - [email protected]
I appreciate any kind soul who willing to send to me. Thanks in advance. Anyone got SAP CO exams study notes also? For ECC 6.0No one can send me??
-
Problem with list box in table control (Module pool) .
Hi,
I'm facing a problem while populating values in List Box..
While I'm clicking a value from the list box it is not being hold in that box...box got blanked.
Please help me to solve this.process before output.
module pop_drop_down.
module pop_drop_down output.
name1 = 'IO5'.
REFRESH list1.
LOOP AT it_zpoitshead INTO wa_zpoitshead.
value1-key = wa_zpoitshead-createdt.
value1-key = wa_zpoitshead-its_ebeln.
APPEND value1 to list1.
ENDLOOP.
CLEAR value1.
CALL FUNCTION 'VRM_SET_VALUES'
EXPORTING
id = name1
values = list1
EXCEPTIONS
ID_ILLEGAL_NAME = 1
OTHERS = 2
IF sy-subrc <> 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
endmodule. " pop_drop_down OUTPUT
Maybe you are looking for
-
I've been thinking about getting the Alu/Glass 24" iMac (waiting until at least Leopard's arrival) but after having read a number of threads here I thought I'd better go and check for myself... I still use a PowerBook G4 15" at home and use a second
-
Problem in starting Managed weblogic server
Hi, I have Weblogic 8.1 with SP4 in production mode with admin server(port :7001) & managed server(port:7004) configured as a Windows services. so when ever i Restarted the windows service of the managed server. The ear previously got deployed is not
-
Oracle ODBC version error on windows server 2008 64 bit
We had installed oracle 10g standard edition on windows server 2008 64 bit. After one hour use of ODBC connection, we are getting a error message like 'Oracle client and networking components were not found. These components are supplied by Oracle Co
-
Two Incoterms for One Mtrl.
Hi, Can we maintain 2 incoterms for the same vendor/mtrl in the Info record. If it cannot be maintained, Then is there anyother way.? Please help asap. Regards. Venk@
-
WiFi working But Time Capsule cannot backup
Not Time Capsule backuo for 10 days but router still working as WiFi network still intact . No ethernet connection to desktop which is Mac Pro