if master data is loading at same time while the attr/hier change run is occuring,it cause the change run to fail.
Usually u get error message like..user ALEREMOTE has locked the MD tables..
Wait for some time and then try attr change run manually by going to rsa1->tools->apply hier/attr change..
if it still shows locked..try to see in rsmo if a MD load has got stuck..
else..see in sm12 to find lock is on which tables..
last resort..delete lock forcefully from sm12..
first option is wait for some time and give a try again..
cheers,
Vishvesh

Similar Messages

  • Process chain best practice - attribute change runs

    When building attribute change runs into Process Chains I see that there are potentially two main options to consider:
    1. One to One mapping.  Incorporate a separate attribute change run object type after each InfoObject has been loaded.
    2. Many to One mapping.  Build the process chain so that one single attribute change run occurs after all the InfoObjects have been loaded. 
    I would be interested to see how other people have incorporated their attribute loading into Process Chains.
    any info appreciated.
    Mike

    We run the attribute change run twice in our daily process chain, here's our order:
    - Load all master data
    - Attrib change run
    - Load all tx data
    - Run ABAP programs that generate master data
    - Attrib change run
    I doubt there will be much of a performance difference if you do the change run after each master data load, but it makes the process chain a lot easier to read.

  • Attribute change run Failing in Process Chain

    Hi guys,
    Every day my process chains is failing due to Attribute change run and I am maually running attribute change run.
    And one more thing when the attr. change run is triggered automatically,then it is generating 2 change counters in RSATTR tcode instead of 1.
    One is successfully completes and one is still in schedule.After 2days days it is showing like completed change count id.
    Please help me.
    Regards,
    Tiragati.

    Hi,
    As you said Attribute change run step is failing every day.
    can you post the error message. is it failing because of Lock issue or some other issue.
    Mostly attribute change runs fails with lock issues. if its the same problem in your case. make sure that no master data objects runs at the time attribute change run runs.
    Try to put some delay in the process of the Attribute change run so that it will not get failed.
    Check if its the same ACR scheduled or diff objects?
    Regards
    KP

  • Regarding Attribute Change Run failure.

    Dear All,
    We have a process chain which contains many meta chains.
    Now in each chain i mean meta chain there are attribute change runs
    We have desegregated the attribute change run. is tere any method to place a check for attribute change run locks because at the last i have another attribute change run which is failing every day because of the attribute change run is still happenign in some chain.
    how do i implement it?
    Thanks in advance
    Janardhan Kumar.

    Hi Janardhan,
    In master data process chain where you have added process of attribute change, just insert a program before this process:
    The program is: RSDDS_CHANGERUN_MONITOR
    This program will check for any another attr change run running at that time and if there's any other attr change run runnning locking the object which your next attr change run requires then this program will not allow your attr change run to run.
    Once all the locks all cleared for attr change run it will trigger the next node.
    This program has a do loop which keeps on checking until unless locks are cleared.
    Regards,
    Vij

  • Attribute Change run failed due to the User Lock

    Hi Friends,
    attribute change run has failed due to the user lock.
    can any one tell me how to process and what is the main cause behind on this.
    thanks in advance

    if master data is loading at same time while the attr/hier change run is occuring,it cause the change run to fail.
    Usually u get error message like..user ALEREMOTE has locked the MD tables..
    Wait for some time and then try attr change run manually by going to rsa1->tools->apply hier/attr change..
    if it still shows locked..try to see in rsmo if a MD load has got stuck..
    else..see in sm12 to find lock is on which tables..
    last resort..delete lock forcefully from sm12..
    first option is wait for some time and give a try again..
    cheers,
    Vishvesh

  • Attribute change Run and Infocube Problem

    Hi SAP BW Experts ,
       I am getting the following problem
    2 days back our production system was down when Attribute change run is running in a process chain . After the system is up I triggered the Attribute change run manually for that specific master data Object. But the jobs was cancled automatically. When I checked the Job log I found the following messages
        <b>“InfoCube XXX is locked by a terminated change Run”</b>
      System error: <b>RSDU_TABLE_COPY_INI/DDIF_TABL_ACTIVATE /BIC/E200073 /BIC/E100073 0</b>
    Message no. DBMAN100
    When I verified manage screen in the Infocube XXX , one request is not rolled up . when I tried to rollup that particular request manually again I am getting the same message <b>“InfoCube XXX is locked by a terminated change Run”</b>
    When I tried to create Indexes on that Infocunbe XXX , Again I am getting the same message <b>“InfoCube XXX is locked by a terminated change Run”</b>
    When I tried to load data in to that Infocube I am getting the same message <b>“InfoCube XXX is locked by a terminated change Run”</b>
    The Steps Taken By Me:
      1. In SM12 , there are no lock entries for the Infocube XXX
      2. According to A.H.P reply I verified the Support package . We are having Import Support package 18 for 3.10( BW 3.10 patch 18 or SAPKW31018 )
      so I think there is no problem from patch side.
    So please let me know by doing which task , I can eliminate the error message “InfoCube XXX is locked by a terminated change Run”

    I got this reference from one of other site. Hope this solves issues of most of our ques on this topic.
    We faced this problem and reported to OSS. They solved our problem.Here is
    the answer from OSS
    I connected to your BWQ system. I checked the table RSDDAGGRMODSTATEand
    found an entrie for a change run "not yet" finished.
    CNSID CLOSEDFL TIMESTMP_START TIMESTMP_END TSTPNM
    207,851,300 20,030,910,141,500 0 SIDTLHG
    As you can see, the field CLOSEDFL is blank (should be 'X' for an ended
    change run) and the field TIMESTMP_END is also zero.
    You can also check with the function module RSDDS_CHANGERUN_MONITOR as
    in note 388069 that both objects you reported are the ones involved
    with thi change run error (Infocube ZINV and Infoobject ZELEM_PEP):
    E_CR_STATE C
    E_T_CHANM 1 Entry (IOBJNM = ZELEM_PEP)
    E_T_HIEID 0 Entries
    E_T_AGGRSTATE 1 Entry (AGGRID = 3QR79ZYB6VGSDS3C42HPXMA8S
    ICUBE = ZINV)
    E_T_MSG 1 Entry (IOBJNM = ZELEM_PEP)
    You have two choices to solve this problem. You cn either:
    1.- Restart the change run and let it finish with ok.
    The change run usually fails due to database errors, tablespace
    problems, and when some user manually cancel it (NEVER should be
    done!!)
    2.- Change manually the entry from table RSDDAGGRMODSTATE that isdescribed
    above. Set the field CLOSEDFL with a 'X' and also fill the field
    TIMESTMP_END with a value with the following format
    yy,yym,mdd,hhm,mss. Use, for example, '20,030,910,181,500'
    IMPORTANT!!!
    After this change on table RSDDAGGRMODSTATE, you have todeactivate
    all aggregates, activate again and refill them!!
    Hope this solves your error. If the issue is solved, please close this
    message with the [confirm] button.
    Best regards,
    David =C1lvarez
    SAP Active Global Support
    The answer refers to our problem.We chosed option 2. Here is the AbAPcode:
    REPORT ZLOCKED .
    tables: RSDDAGGRMODSTATE.
    select * from RSDDAGGRMODSTATE where CLOSEDFL = ' '.
    RSDDAGGRMODSTATE-CLOSEDFL = 'X'.
    RSDDAGGRMODSTATE-TIMESTMP_END = 20020912195015.
    MODIFY RSDDAGGRMODSTATE.
    ENDSELECT.

  • ERROR while running attribute change run.

    hi sap xperts,
    I got an error while running the attribute change run in a process chain.
    At first i got an error "The action is locked by a change run"
    SO I DID THE FOLLOWING STEPS.
    1.RUN ATTRIB CHANGE RUN MANUALLY  IT RUN SUCCESSFULLY,but the process chain is still red.
    Q1.Is there any way to link the manually run attrib chnage to process chain so that the process chain becomes Green?
    2.SM12 - realease the locks and right click the pc and repeat.It didn't work
    Q1.While removing the locks what should we remove,bcoz i removed all the locks?
    3.I again removed the lock and repeat the process but still i didn't work.Now its chowing "SQL ERROR OCCURED WHILE ACCESSING"
    So the Process chain got stuck,Can any body help me to run the attrib chnage run.
    If possible can anybody send the Process chain monitoring documents to my email id:
      <email ID removed>
    please.thanks in advance,i know how to say thanks in sdn.

    At any point in time only one attribute change run can run in the system. The other ACR's will fail due to locks. In your case, to set the process chain to green, try the following steps.
    Open the messages of a failed step by right clicking on it and selecting 'display messages'.
    In the opened popup click on the tab 'Chain'.
    In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
    1. copy the variant from the popup to the variante of table rspcprocesslog
    2. copy the instance from the popup to the instance of table rspcprocesslog
    3. copy the start date from the popup to the batchdate of table rspcprocesslog
    Press F8 to display the entries of table rspcprocesslog.
    Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
    Now copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:
    1. rspcprocesslog-log_id -> i_logid
    2. rspcprocesslog-type -> i_type
    3. rspcprocesslog-variante -> i_variant
    4. rspcprocesslog-instance -> i_instance
    5. enter 'G' for parameter i_state (sets the status to green).
    Now press F8 to run the fm.
    The above steps will help you continue with the rest of the process chain (thus avoiding manual runs) but the failed step might still remain red. Hope this helps.

  • Regarding attribute change runs in process chains

    Hi All,
    While creating process chain for master data objects. I am trying to incorporate attribute change run process type for an info object. But the system asks for the DTP of the attribute and when i choose the DTP then both DTP and then Attribute are being incorporated. This is not exactly a problem but i need to understand why it is happening as i am already using that DTP to load data. Will this affect the data in master data object?. Thanks in advance.
    regards
    satish

    Hi Bhagyarekha,
    The reason behind that error could be:
    An attempt is made to activate a characteristic whose compounding was replaced and whose navigation attributes were simultaneously deleted. The replacement of the compounding temporarily deletes the M view of the characteristic during internal activation. The process of deleting navigation attributes involves converting the attribute SID tables. However, the M-view of the characteristic, which has just been deleted, is needed for this conversion.
    Check this SAP Note:
    Note 684405 - Replacing the compounding and deleting navigation attr.
    Hope it helps.
    Veerendra.

  • Attribute Change Run taking very Long time.

    Hi Experts:
    We are daily loading Master data from one common process chain. There are 33 Infoobjects which are getting activated in Attribute Change Run Process. This process is taking almost 3 hours to run daily; due to this it is impacting our other data load process chains.
    Many times it happens that there is lock on cubes due to attribute change as attributes are getting aligned to same cube on which the roll up is running.
    There are local chains below the attribute change run, which are also important to run.
    Please help and suggest the workaround for the same.
    Cheers,
    Omkar

    33 info objects in one ACR(attribute change run) is not a good idea.
    Better to split the info objects and use multiple ACR.
    During your ACR if transaction data load was on then lock issues always occurs.
    Thats why we need to run master data loads first and later transaction data loads.
    Which info object change run was troubling, better to note the info objects which are causing and try to put them  in separate ACR and trigger it before start of your transaction data loads. so that it won't raise the same issue again.

  • Attribute Change Run in Process Chain failed with SQL 942 error

    Hi,
    Attribute change run in th eprocess chain failed with the message " SQL Error 942" and ran succesfully after repeating the step.Searched in Forums for similar error but the solutions were not apt.
    Any pointers would be of great help!!
    Thanks in advance,
    Bhagyarekha.

    Hi Bhagyarekha,
    The reason behind that error could be:
    An attempt is made to activate a characteristic whose compounding was replaced and whose navigation attributes were simultaneously deleted. The replacement of the compounding temporarily deletes the M view of the characteristic during internal activation. The process of deleting navigation attributes involves converting the attribute SID tables. However, the M-view of the characteristic, which has just been deleted, is needed for this conversion.
    Check this SAP Note:
    Note 684405 - Replacing the compounding and deleting navigation attr.
    Hope it helps.
    Veerendra.

  • Attribute change Run Failed/Scheduled

    Hello All,
    For a process Chain Attribute Change Run has failed in BW 3.5,and I Repeated the Change Run in Chain only
    where Repeat option is ,now the problem is in RSA1 it is now that change run is scheduled
    and sm37 it is showing that Canceled.
    Now there is Other Process Chain in BI7.0  which picks data from  3.5
    Should I repeat the Master data Chain in BW 3.5 followed by in BI 7.0
    Or any other way is possible as in BI7 the chain has run successfully..
    Thanks,
    Kiran

    Hi Kiran.......
    BI 7.0 and BW 3.5............totally two seperate systems..............here BW 3.5 is just act as a source system of BI 7.0.............if change run fails in BW3.5...............it is not going to effect BI 7.0.............
    As ajeet already said............it will effect the SID s in 3.5.............because attribute change run activates the master data...........and SID get generated during the activation of master data.......
    Also it will effect the aggregates............because aggregates also get adjusted during change run.......if any of the aggregates contains the master data.........which are getting activated in the change run....
    Now u r saying........that in SM37 it is showing that the job got cancelled............So it will not locked the master data..............terminated change runs generally lock the master data............then we hav to repeat the chain run to release the lock.........and u hav already repeated the change run............so no issue........
    Hope this helps..........
    Regards,
    Debjani........

  • Problem with Customer master Attribute change run

    Hello Experts
    Master data load process chain for 0Customer failed in system at attribute change run step.
    Because of that failed instance when ever we try to reload data get error message
    "Attributes of characteristic 0CUSTOMER are locked by terminated change run 468502640"
    "Lock NOT set for: Loading master data attributes"
    It seems that last attribute change run step had locked master data object and lock is not yet released.
    Kindly advice resoluiton to this problem.
    Thanks in advance
    Regards
    Sudeep

    Failed due to lock issue. check in SM12 you can find lock with respect to your change run 468502640.
    Looks like master data step is running.
    Wait till the masterdata for attributes of 0CUSTOMER completes and them repeat the attribute change run step.
    To repat the attribute change run
    Rsa1 --> Menu Tools -->Apply Hierarchy/change run or use transaction RSATTR
    Click on monitor and Start Terminated Changes Runs(monitoring of Change runs)
    Here you can check the failed Attribute change run object in red status.
    after completion fo the master data and check the locks and click on execute button over there.

  • Attribute change run problem

    Hello Gurus,
    I have deleted all the master data tables(P,S,X,T). Deleted the PSA table entries too.  I am loading data frm R/3.
    No data exists in 0VENDOR ,when i click manage master data.
    When the moment I load data in 0VENDOR_ATTR, without doing Attribute change run(ACR), the data is getting displayed in Maintain master data.
    Please let me know why this happens.
    Thanks,
    Sonu

    Hi
    According to my understanding of your issue, there is no master data in 0VENDOR, i.e., all the Dimension tables along with SID's are deleted.
    But SIDs of the 0VENDOR_ATTR(whcih is the attr of 0VENDOR and also acts as characteristic) exists.
    Sow hen you load data the master data is written into 0VENDOR and hence teh SID's of the attr are not deleted do teh master data will exists for 0VENDOR_ATTR.
    Please let me know incase i got your question wrong.
    Regards, Hyma

  • Attribute change run fails - "Error when deleting the data record /B05/X.."

    Hello,
    I get the error message "Error when deleting the data record /B05/X.." on doing the change run.
    I have already done RSRV on this objects and found no errors, but still the activation fails.
    please give your suggestions ASAP to fix the issue as it is on production system.
    Thanks.

    Attribute change run could fails due to 2 reasons-
    (1) attribute xchange run is already runnnig for any toher object(monitor lock) (check by thi prog-RSDDS_CHANGERUN_MONITOR)
    (2) data is loading deleting from the object on which attribut changerun is running.(go in a manage tab and check)
    check this two conditions and rerun the attribute changrun again from program - RSDDS_AGGREGATES_MAINTAIN and give the master data name in the selection.
    Hope it helps you.

  • Can we apply attribute change run for datatarget (Master data )

    hi,
    can we apply attribute change run for datatarget like masterdata where for example i am loading 0pm_order_attr to 0pm_order data target (master data). after successful loading of data, do i have to apply attribute change run for <i>info object</i> 0pm_order or apply attribute change run for 0pm_order in <i>info providers</i> because after successful loading of pm order data, i am trying to load transactional data and it is showing error "No SID value found for xxx record"
    pls advice how not to make the error repeat even after successful loading of master data.
    Thanks in advance, quick responce is greatly appreciated.

    Hi all,
    i am in production server and cannot activate the master data 0pm_order which is in info providers directly, is there any chance of activating it with any other option.
    coming to attribute change run, i understand that we can apply for master data objects which are there in info providers, am i correct?
    i ran attribute change run yesterday for the info object 0pm_order but even after doing that i tried to load transactional data but it was failure with the same error "No SID value found", why i am getting when i found master data loading successful and ran attribute change run for infoobject.

Maybe you are looking for

  • KVM with mini and out of box problem

    #1 Just bought a refurbed mini, want to share kvm as I have in the past with a wintel laptop. Anyone using a kvm controller with their mini? I've got a iogear with my existing wireless k/m and the mini doesn't like it very much. Sporadic mouse moveme

  • Install OS X on replacement macbook air HD from Lion

    Hi, My Macbook air hard drive recently gave up after 4 years (therefore out of warranty) so I bought a replacement hard drive for it. At the time I was running snow leopard on my imac and understood I could use it's optical drive to install snow leop

  • How to transfer photos from laptop to iPad

    How do I transfer photos from my laptop to my IPad?

  • Saving completed file for opening in another program

    I have been using Pinnacle Studio 10.7 because it allows me to produce HD-DVD on regular DVDs. (The drawback is the approximate 20-minute time max on each DVD.) I'd like to start doing work in Premiere, then save my work to a file that I can simply o

  • Problem in Proxy call from an application deployed in J2EE engine

    Hi, I am trying Java Sender Proxy --> XI --> DB. I have generated o/b proxies using integration builder. <b>Following is the code that i am using for proxy call and it runs absolutely fine when runnning stand alone</b> <code Controller.java> Properti