Hi all,
I have sub-process and a main process.
I create notes in the main process.
Then put them in the sub-process by re-creating them in the sub-process.
And then when I come out of the sub-process,I re-create the notes in the main process, so that the sub-process notes are added up with the main process notes.
The problem is that the main process notes are duplicated.
The reason being,
I have already transferred and re-created notes in the sub-process while entering it.
I also still have notes in my main process.
When I come out of the sub-process, I transfer and re-create notes in the main process too.
Now, this adds up to the notes already in the main process and so there is a duplication of notes in the main process.
So its
Notes created in Main Process --> Transferred to Sub-process and re-created them for sub-process --> Transferred to Main process and re-created them for merger of the main process notes with the sub-process notes.
(Notes in Main Process) ---> ( Notes in Main Process + Notes in Sub-Process) --> ( Notes in Main Process + Notes in Sub-Process + Previous Notes in Main Process)
Previous notes in Main Process = Notes in Main Process
Therefore the duplication.
notes ( in built) array has no option to clear it up.
How do I clean the notes then?
I need to re-create and transfer them everytime I move from main process to sub-process and back to main process for showing up in the notes section of the workspace?
Also the creator and the creation time of the notes is not reflected.
They seem to be constant variables.
How do I resolve these issues?

Anybody on this?

Similar Messages

  • How to pass the value from Sub report to main report

    I have un report(mainreport) within a subreport(subreport).
    With reporting services, how to pass the value from Sub report to main report?
    thanks

    Hi Alebet,
    With reporting services to pass values from sub report in to main report is not supported directly.
    But there are some workarounds through which you can get this .
    There are two ways to get this.
    1- Put your sub report query into some table. i mean to say through the subreport query get some temporary table.
    2- Using this temporary tables data write some Scala function in the data base.
    3- Now in your main report query return this scala function as a column.
    4- Extract the column value where ever you want in your main report which is getting calculated from the subreport query. so you will be getting the values returned from the subreport in the main report.
    This will definitely work fine as i have done some report in this way.
    Another way of doing is that
    1- prepare another data set with the same query as in sub report in the data tab.
    2- then refer this 2nd dataset in your main report .
    But better way will be the top one.
    Anyway please let me know if you get the solution.
    Thanks
    Mahasweta

  • How to transfer a string from sub sequence to main sequence

    Hi,
    How to transfer a string from sub sequence to main sequence, My main sequence has included a sub sequence, the sub sequence is return a string value after running done, I need to get this string value from sub sequence to main sequence, I check the defined that look like seem the two
    sequence have themself local variable,but I don't know how to defined a globe variable to cover main sequence and sub sequence like VC++'s Main App ,Please kindly help me,thanks in advance...

    Hi,
    I hope this small example will help you.
    Regards
    Ray Farmer
    Regards
    Ray Farmer
    Attachments:
    Sequence File1.seq ‏36 KB

  • Unable to start from sub process

    The scenario of our application is :
    We have multiple processes,each again having multiple activities inside them.
    There is one main processes and the others are all sub processes.
    The main process looks something like below :
    Start->Sub-process1->Sub-Process2->Sub-Process3->Sub-Process4->Sub-Process5->End
    My requirement is to start the main process from Sub-Process2,rather than the usual way of instantiating the main process.
    I tried configuring Sub-Process2 as an alternative Start (in the Work Flow Builder),but that doesnt seem to be working.
    I am using Java APIs to interact with Oracle Work Flow.
    Any ideas ??
    Amit.

    One possibility is to call WF_ENGINE.CompleteActivity() if you need to start a process with an activity node that is mid-stream in a process thread and not at the beginning of a process thread. The activity node you specify as the beginning of the process must be set to 'Start' in the Node tab of its property page.
    http://download-west.oracle.com/docs/cd/B10501_01/workflow.920/a95265/wfapi42.htm#comact

  • BPM 11g Workspace Audit Trail not showing Sub process inner activities

    Hi all,
    I have been developing some BPM Process in JDev 11.1.1.5 and have deployed them in BPM Suite 11.1.1.5 over Windows Server 2003. I've found the following and would like to hear your opinion:
    1- The Process audit trail in BPM 11g Workspace shows the activities of the process but the Sub-Process call activity appears as just a single activity and you can not see the inner activities of the sub-process... making impossible to track the sub-process.
    2- In the EM Instance trail you can track the subprocess activities, but they appear wrong; diffrent names, diferente types (ex: interactive activity shown as service call)..etc..
    Are these known issues? is this the expected behaviour? Is it just some configuration I missed?
    Thanks for your time.

    For anyone with the same question, I got this from Oracle support about both questions:
    1- I checked with our Engineering team and regarding the expanding of the subprocess activity , it is planned to be released in 12g. So right now , it is a work in progress feature being addressed by our developers.
    2- Thanks a lot. I have reported a bug 12909848 to our Engineering team. You can track the status of the bug from the SR.

  • Display message to user from sub vi to main vi

    Hi,
    I have got a question of which I am pretty sure it has come across before, but I could not find it via the search function nor with Google.
    On my main vi I have got a link to a sub vi, this sub vi checks something and then gives a message to the user. The next step in the sub vi depends on what the users input on the message is. But when I am running my main vi the display (of course) does not come up, because I haven't got a link between the two. 
    Is there any way to send the message to the main vi and send the action back to the sub vi?
    Thanks
    Solved!
    Go to Solution.

    Since everything is happening in the sub vi, why do you want to go back to the main vi?
    Do you use the "Prompt user for input" express vi to get an input from the user?
    Can you post your code or make some dummy vi's to visualize your problem?

  • On VA01 transfer an value from Condition type Z000 from sub-item to main it

    Hi,
    I want to create a sales order and I have one main item an one promotion  (sub-item) item without determination price. I want to transfer cost price from VPRS form sub-item to an Z000 contidion to main item for tranfer this value to CO_PA for a field value different from VPRS field value.
    How can i do this?
    Thanks in advance.
    Catarina Alves

    Hi,
    In copy controls of Del to Bill - VTFL .... in the item screen copy control.... u have a button called cumulate coast set this for the item u need to transfer i.e to item category of subitem u have.
    Reward if helpful
    Please find the help for this "Cumulate Cost" below -
    Cumulate cost
    This field is used in the main item to control whether the cost value (usually condition type VPRS) is to be copied from the relevant sub-items. The following cases are taken into account:
    Free of charge sub-items (free goods)
    Batch split items
    Bill of material components
    This function is needed especially if the sub-items involved are not relevant for billing. In this case the costs of these sub-items do not appear in CO-PA or the statistics.
    Reward if helpful
    Krishna

  • Menu Button from sub menu to main menu (transition movie in the way.)

    In the general tab of the disc menu I set the menu button to go to the main menu.
    When I click "menu" on my remote in simulation from a sub menu I expect it to return me to the the main menu.
    However, clicking menu from a sub menu automatically brings me up one connection.
    I have transition movies that are between the main menu and the sub menu.
    So effectively, the menu button is a loop if a viewer tries to navigate upward with the menu button from a sub menu. They see the transitional movie and return to the sub menu they were trying to navigate from.
    On page 609 of the manual it says...
    Menu: Supported by all elements that can set remote control settings (disc, track, story, marker, and slideshow) except menus. You should generally link this button to the last menu viewed.
    Is there a work around that will allow me to make the menu button link from a sub menu to the main menu, even if I have a transition movie in between?
    Thanks,
    Tom
    Power Mac Dual 1.0 GHz G4, Quick Silver   Mac OS X (10.4.3)   1.5 Gig Ram, 250 gig internal drive, 2 x G-Raid500, FW800 Sonnet Card, AJA IO
    Power Mac Dual 1.0 GHz G4, Quick Silver   Mac OS X (10.4.3)   1.5 Gig Ram, 250 gig internal drive, 2 x G-Raid500, FW800 Sonnet Card, AJA IO

    Hang on Tom - are you saying that you are in a sub menu, pressing the 'menu' button on your remote control, seeing the transition and ending back at the menu you started from?
    I would expect this if you used the menu button...
    What happens is the menu button acts as a resume function if you are in a menu. That is, it will play the last piece of footage - your transition. This is set to go back to the sub menu, so that's where you end up. Read those details again... the bit where it said 'except menus'.
    If you are in a menu and want to go up one level then you need to either use the Title button (if the title menu is the one you want to get to), or the return button (which won't work all that well). The best way, however, is to add a button on your menu screen which lets the viewer click it to go to the menu that you want.

  • Add indicator from sub vi to main vi

    Hello I am new to labview. My subvi has a progress bar (Indicator) and i want it to be also displayed in my Main VI. Is there any process to do this. 
    I am very new to lab view so step by step procedures are appreciated.
    Thank you in advance.

    Hi Promice,
    the easiest way to pass data in and out of a (sub)-VI is using the connector pane.
    When you create a (sub)-VI, you can choose a pattern and select which control or indicator (frontpanel elements) belongs to which terminal.
    The way Michael has supposed is more advanced an a very common way to change values of frontpanel elements of a main VI.
    There is no wrong way, it depends on the application. So thanks to Michael.
    For the first steps, I would suggest using the connector panel.
    I've attached a modified example.
    Kind Regards,
    Philipp K.
    Applications Engineer | NI Germany
    Attachments:
    mainvi.vi ‏14 KB
    subvi_2.vi ‏17 KB

  • Credit Note from Notification process

    Dear Gurus,
    After Customer Complaint process by notification, I want to sent the credit note to the customer from the notifcation screen itself .
    Is there any option for making credit note by configuring action box? or some other way?
    Please sent me the details how to do the same
    Thanks in advance
    Srinivasan

    We can assign the sales order type in the customization for the Notification Type

  • Calling BPM Sub Process from another BPM Process - Stuck at Sub Process

    Hi
    JDeveloper 11.1.1.6, BPM 11.1.1.6, WLS 10.3.6
    I am trying to Call a BPM Process from another BPM Process. Both the processes are defined in the same BPM Project.
    Both the Processes have 'None' Start and End activities.
    The 'Parent Process' has a 'Call Activity' which calls the 'Sub Process'.
    The Sub process takes a parameter of payload object as input and returns output (also same payload object)
    I have passed the payload object from parent to sub process in the 'Data Associations'.
    The Start and End activities in the sub process also have the data associations set where I am passing the payload object from parent process to child process.
    When I run the process and see the Enterprise Manager console - Audit Trail / Flow tabs,
    Flow Tab - The progress of the process is showing only till the Calling of the sub process in the Parent Process. It does not show the Sub Process.
    Audit Trail Tab - Shows that the Sub Process is called but has not reached to the End of the Sub process.
    The audit trail does not have links to the sub process activities.
    I cannot see any exceptions as well in the audit trail.
    How can I find out why the process is stuck? Or what is going on in the process?
    Please let me know if my explanation is not clear?
    Thanks for any help
    Regards
    Sameer

    Thanks for replying.
    I have another Sub Process with Start and End events as Message Events and used Send Task and Receive Task (Implementation : Process Call) in the Main process to invoke the sub process asynchronously.
    Then, the Sub Process is shown in the 'Flow Trace' as child of the main process.
    In this particular one, I used 'Call Activity' to call the sub process.
    So the Audit trail is showing the sub process as a child.
    But what I was trying to say is that the audit trail did not have links to the entries in the 'Event' column (in Enterprice manager - instance window). (like Instance entered activity, Instance left activity etc).
    I was intending to use these links to see the payload information and try to debug if there is any problem with the code.
    The actual problem I was trying to say in the post is that, even after the user responds to the activity (User Task - Approval) in the Sub process,
    the audit trail is not proceeding further.
    In the Sub process definition, after the user task, there is End with none implementation.
    Hope it is clear now.
    Thanks and Regards
    Sameer

  • Find a Sub Process Executed as part of a Main Process

    Hi Experts,
    My Requirement is to Create a .Net Application which constantly monitors if a POPUP Window of a Third Party Application is Open or Closed. As Soon as the Popup window is closed (There is an OK Button in the POPUP Window on click the window gets closed).
    I would like to run a Batch File which would do some maintenance activities.(I have already created the batch file) But I don't know how to Monitor if a POPUP Window of Third Party Application is Closed
    I Don't have access to the Third Party code.
    From the Task manager(of Windows Server 2012) i can see that the POP UP Window is displayed as a Sub Process under the main Process.
    Can you please suggest if this is possible, if so how to go forward with it.
    Joji

    Hello Joji,
    It seems that you are trying to hook a the windows close event from a .NET based application, as far as I know, there is not such a api available in .NET, you could have a try with windows api as SetWindowsHookEx function:
    https://msdn.microsoft.com/en-us/library/windows/desktop/ms644990(v=vs.85).aspx to intercept WM_CLOSE, WM_QUIT and WM_DESTROY. And check this link for an example of its usage in C#:
    http://www.pinvoke.net/default.aspx/user32.setwindowshookex
    Regards.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Killing a sub process from it's parent process

    does any one know if ther's a way of killing a sub process from it's parent process?

    There are a few ways to do this depending on how the subprocess was invoked and if you are inside the parent work item instance or if you are using PAPI.
    If you are not using PAPI, here's how you could abort the child work item instances spawned by a parent process's work item instance.
    Asynchronously Spawned Children
    If a child process was invoked using an asynchronous Process Creation activity, the work item instance in the parent has a predefined hash table variable called "children". Downstream of the parent's Process Creation activity (called "SpawnChildren" in the PBL logic below), you can get the child's instance id using the children hash table and use this to send a notification to a Message Wait activty in the spawned child process instance using logic like this:
    send Notification
            using instanceId = children["SpawnChildren"],
                  activityName = "TerminateChild",
                  parameters = nullThe Message Wait activity needs to have its "Allows Interrupt" property checked in the child process. As you add this Message Wait activity (called "terminateChild" in the example above) make it an orphan with no transitions in or out initially. Once notified by the parent process, it still needs to be aborted so add a new Automatic activity in the child with this logic:
    action = ABORTFinally, add a transition from the Message Wait activity in the child subprocess to the Automatic activity.
    Synchronously Spawned Children
    If all you know is the parent work item instance's id and the child subprocess was invoked using a synchronous SubFlow activity, you could send a notification to a Message Wait activity that has it's "Allows Interrupt" property checked in the parent. If the Message Wait activity flows to an Automatic activity, you could use logic like this to kill the child subprocess work item instances synchrously spawned by the parent:
    for each ch in ProcessInstance.children do
        send Notification
            using instanceId = ch,
                  activityName = "TerminateChild",
                  parameters = null
    end
    action = SKIPSince the parent's instance was stuck in the Subflow activity, you'd need to send a notification to the parent's Message Wait activity in the parent process.

  • Sub-Process Main Process Web-Service

    Hi,
    I have a main Process and a sub-process inside this main process.
    I have a Wait activity inside this sub-process, which waits for an external call from another system to call my Web-Service at this Wait activity. This Web-Service is built as Process As a Web-Service Call.
    But I fail to get any information back from this Wait Activity which keeps waiting for the call from the external system which calls my Web-Service at this Wait Activity.
    But the external system is calling my Web-Service and it gets a error notification from BPM..
    Why is that so?
    Is it because its a sub-process inside a main process or something else?

    Did you use PAPI code inside your web service or did u just use PAPI Web Services ( like did u just pressed the button Launch PAPI Web Services ) and it created the WSDL for you and u used it to create the client?
    I am using the latest version of OBPM..
    Oracle 10.3.10
    Can you let me know what do u mean by PAPI interface.. Is it the PAPI code of is the PAPI Web Service which is built by BPM automatically and could be used?
    Edited by: user8707382 on Sep 10, 2009 9:00 AM

  • Ttrigger Event Sub-Process from Java code.

    Hi All,
    Is there any way to trigger Event Sub-Process from Java code.
    My requirement is to trigger an Event SubProcess when a Approver clicks on REJECT button in HUMAN TASK.
    One way of achieving this is by placing a gateway after the human task and by validating the human task outcome and there by triggering a call to Event SubProcess.
    But we dont want to put a gateway after the human task. But instead we would like to trigger the Event SubProcess from the ADF task forms itself. ie, by calling a JavaCode.
    Please give me some pointers on achieving this task.
    Thanks
    Parker.

    Hi  jtahlborn, mohan
    yes the process is created from my java code. 
    in my code iam creating a process like below and if it is running for a long i need to kill it from java.
    For that " Runtime.getRuntime().exec("taskkill /F /PID " +  7408); " is working fine.
    7408 is my process id in taskmgr created from java and iam manually passing the PID it to kill it.
    But i need to get the PID from java code.
    Thanks for your suggestions.
    Sample Code:
    public static void main(String args[])
            try {
              Process process = Runtime.getRuntime().exec(new String[]{"cmd.exe","/c","start"});        
              Field f = process.getClass().getDeclaredField( "handle");
              f.setAccessible( true);         
              long procHandle = f.getLong( process);
              System.out.println( "prochandle: " + procHandle );
              //Runtime.getRuntime().exec("taskkill /F /PID " +  procHandle);
            } catch( Exception e) {
              e.printStackTrace();

Maybe you are looking for

  • Components are not visible in the beginning..

    Hai .. The contents(TextFields Labels and Buttons) of my application are displayed only after i resize the frame manually.. Why is it so.. Is there any way to make them visible as soon as i run the application.. This happens only for the first time(i

  • How do I get my JList selection to Display after changing

    Granted there are probably 1,000,000,000 ways to write this code. The intent is to have a list of items that are assigned into catagories and when an item is selected the catagories that the item are in are highlighted in the list. This part works OK

  • How do I fix Embedded links in my email not opening

    I've deleted the email acct on my iPhone and then added it but the same problem exsits.  Links in the emails do not open

  • Viewing in Finder

    I am going to reformat to install 10.5 and want to make sure my pictures are backed up. In the past iPhoto would create the folders for my photos under the Pictures folder. Now when I go there I only see one file called iPhoto Library Volumn 1. Have

  • New software for OS X v. 10.4 needs Classic?

    I have an eMac 1.42 GHz PowerPC G4 with 256 MB DDR SDRAM running Mac OS X 10.4 When I try to install software for my kids, sometimes it works great. Other times it tries to tell me I need Classic 9.0. My eMac doesn't appear to have anything in this f