ECM- Plan&Review Total/Distributed/Remaining dollar amounts are wrong

Hello Experts- We have completed all of our prep steps in ECM and are ready to go in as managers to Plan and Review. On the Planning Overview screen for managers within the portal, the Merit Pool, Annual Bonus Pool and Discretionary Pool Available/Distributed/Remaining amounts are correct.
However, when we go in to plan as the manager, the amounts for Total/Distributed and Remaining are pulling last year's information. The amounts are not the current correct amounts. In addition, all of the employees' information appear to be pulling from last year. This is only the second time we have use ECM for our Merit and Bonus cyle.  Is this something we control with configuration? We've looked over the dates in config and everthing appears okay. Could this be a programming issue?
Thank you for your time
Kelsi Linnell

Hi David,
I would leave your query
"Am I doing something wrong and did I miss something that would prevent this problem?"
to the experts/ gurus out here on this forum.
From my end, you can follow
TOP 10 EXCEL TIPS FOR SUCCESS
https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/204c3259-edb2-2b10-4a84-a754c9e1aea8
Please follow the Xcelsius Best Practices at
https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/a084a11c-6564-2b10-79ac-cc1eb3f017ac
In order to reduce the size of xlf and swf files follow
http://myxcelsius.com/2009/03/18/reduce-the-size-of-your-xlf-and-swf-files/
Hope this helps to certain extent.
Regards
Nikhil

Similar Messages

  • PDF form column has dollar amount how can I line up numbers and have auto calculate?

    PDF file has columns that have dollar amounts.  I can not get it to line up or add up automatically.

    Line up: In Form Edit mode, select the fields, then right-click one of them and select Align, Distribute or Center and then one of the Align options.
    Auto-calculate: Again, in Form Edit mode, right-click a field and select Properties. Go to the Calculate tab and you'll see various options. The first one is the easiest to use for simple calculations. The other ones require more detailed instructions.

  • Where is a list of how many months each dollar amount gives you?

    What are the lengths of time that you get for each dollar amount? $15 gets you one month, but what about other amounts? I cannot find this anywhere on this site.

    scroll toward the bottom of this link and look under Payments and Account Management, item # 2; is that what you're looking for?
    Prepaid Smartphone Plans FAQs | Verizon Wireless

  • PLANNING ON TOTALS - AUTOMATIC DISAGGREGATION IN QUERY DESIGNER

    I've seen that in the Bex Analyzer on the planning tab of key figures we have a functionality called PLANNING ON TOTALS with several possible disaggregation tecniques.
    Next to it I have a warning message saying "NOT SUPPORTED BY SERVER".
    If the system was somehow able to distribute following some basic distribution rules it could save lots of time on function and level customization.
    Anyone knows what it's required to activate this functionality on the BW server.
    Regards,
    Alberto
    Points awarded to any useful answer

    Dear IP consultants,
    because it looks like to be a bigger problem in IP (in OSS or help is nothing documented), I would like to summarise. Maybe some can help:
    I have read Mary's answer after we have discussed this here and in other forums.
    Mary's answer was:
    "Totals level planning or top down planning is scheduled for release in a couple of weeks. ...I would guess using attributes for top down planning would not be available yet but maybe Gregor or Marc can shed some light on that..........It is SPS12 and SP13"
    Today morning I received the message from another consultant, he wrote:
    "Attached is the screen shot of query designer..... look on the right side under planning tab I have the planning on totals option enabled. I have hierarchy display on, on one of the characteristic."
    So it works in his system, he uses SAP_BW 700 0013 SAPKW70013 SAP NetWeaver BI 7.0 (we have SAP_BW 700 0014 SAPKW70014, which should be better than in his system)
    There was another reply above"...We have SPS12, but in Query designer, feature "planning on hierarchy nodes" not enabled. I see message "Not Supported by Server". Can you explain this problem? Where i can find any documentation about new features of BI-IP functionality like "disaggregation" and "planning on hierarchy nodes"?
    So the official explanation is: This functionality is available. But the practise and mails shows that it works in special cases only. What kind of special customising has to be done to activate it? Is there anyone, who has any idea, what the reason could be?
    regards
    Eckhard Lewin

  • What does the dollar amount in the top left corner in the iTunes store mean?

    What does the dollar amount in the top left corner in the iTunes store mean?

    My guess is remaining balance on a gift card. I've never seen my credit card balance show up in iTunes or the app store. I don't think Apple can show that legally.

  • I have a dollar amount balance on my itunes account... can i use this to purchase apps for my MacBook Pro?

    I have a dollar amount balance on my itunes account... can i use this to purchase apps for my MacBook Pro?

    You should be able to.  As long as you are signed in to the same AppleID that has an available balance.  The services are linked.

  • Scope of Planning for Total Planning

    Hi SAP Gurus,
    My Client Scenario is as follows
    They import Spare Part materials from abroad to a Main Warehouse (defined as Plant in SAP) and then do stock transfer to around 60+ warehouse in different states (each defined as Plant in SAP).
    At any time Stock exists in any of 60+ Plant and Main ware house Plant. However Purchase requirement and Purchase Order is created and placed from Only Main Warehouse Plant.
    Now I am implementing Consumption based Planning with MRP.  I am Planning to define a Scope of Planning for Total Planning.
    Clarification I request :
    1. Whether I need to define Only all 60+ Plants in Scope of Planning or can I include Main warehouse Plant also ?
    2. In which case if there is requirement in one individual Plant and there exists stock in another one Plant - whether system will automatically create stock transfer Planned order. What Special procurement type I need to define for this (If it is 40 , whether I need to define any Issuing Plant, since I have 60 + Plants)
    3. If I have to run Forecast and Planning run daily for 60+ Plants and weekly for Main warehouse Plant, Whether I need to create a Separate Scope of Planning for 60+ Plants and a Separate Variant for Main ware house Plant with different Schedules - Am I correct
    Thanks and Regards,
    R.Velmurugan.

    Hi Kumar,
    Thanks for your immediate response.
    If we define Special procurement type 40 for 60+ warehouse Plants materials with Supplying plant as Main Warehouse Plant, then if there exists stock in one of 60+ Plants and there is requirement in one of another 60+ plants how system will consider and create stock transfer between them.
    Whether stock transfer between 60+ as well as Main plant is Possible ? If possible how to define Special Procurement type ?
    Secondly what ever issued from 60+ Plants is the real Consumption of Material (as Material issued from Main ware house plant to 60+ Plants is only stock transfers and not real consumption).
    In which case how to go about for forecast and MRP run for 60+ Plants and Main plant ?
    Thanks,
    R.Velmurugan

  • No Planning happening with scope of Planning for total Planning

    Hi SAP Gurus,
    The Scenario is for Consumption based planning and MRP run.
    I have created a  New Entry under Scope of Planning for total Planning run and entered the required two plants under sequence of Plants.
    I have also entered manually consumption values for trial materials in those two Plants. I maintained MRP and Forecast View.
    I then ran MD01 using the Scope of Planning created. But when I check the MD04 results for trial materials, no Planning has happened.
    I shows a message  "Pl carry out Forecast for material xxx in Plant xxx "
    Then using T.Code- OMDO, I created a variant for each Plant and also Scheduled. But after then also with MD01, No planning is happening.
    When I check under T.Code - OMDU, the respective Plants were activated
    Pl guide me the steps for Creating of Scope of Planning and then how to set up planning file and what could be the reason materials are not getting Planned.
    thanks and regards,
    R.Velmurugan.

    Dear Mariano,
    MRP type VV (forecast based Planning) is used for these materials.
    I defined Scope of Planning for Total planning and included Plants in sequence.
    Then I created new Variants for Planning file entries for these Plants (T.Code - OMDO).
    Then I created new Variants for Planning file entry consistency for these Plants  (T.Code - MDRE)
    After then I executed Mass Forecast (T.Code - MP38) and then carried out total planning run using T.Code - MD01.
    Now the materials are getting planned.
    I missed Forecast run earlier.
    I found the reason for the problem, hence closing the thread.
    Thanks to Mariano and Daniele for your inputs.
    Regards,
    R.Velmurugan

  • F-48 -  Withholding tax amount exceeds total bank line item amounts.

    Dear all
    In F-48 i am getting following error msg,
    Withholding tax amount exceeds total bank line item amounts.
    Message no. 7Q320
    All Config settings or ok.
    Kindly suggest with suitable solution.
    With thanks
    Jai

    Dear,
    Select Relevant to cash flow field for Bank GL you are using for making down payment.
    Regards,
    Chintan Joshi
    Edited by: Chintan  Joshi on Jan 21, 2010 10:21 AM

  • Withholding tax amount exceeds total bank line item amounts

    Dear Sir,
    While I am trying to make down payment to the WHT vendor I have found the above error.  Can anybody help.  I am not giving any base amount in WHT information while down payment.   It is picking automatically tax code P9.  I am trying to post the down payment 10000/- and P9 tax code amount is 2.266%.
    BSR

    HI,
    If the Error is 7Q 320 'Withholding tax amount exceeds total bank line item amounts'
    then   follow
    Kindly check in the relevant bank GL account master whether you have
    activated the field "relevant to cash flow" in the create/bank/interest
    tab in the GL account master FS02. Also refer the SAP Note 198368.
    Reg
    Madhu M

  • How can I allow a "0.00" dollar amount in a required field?

    I'm creating an expense form that has several fields marked a required. I've also included a java base print button that checks the fields and will open the print dialogue box if all the fields are completed. I'm wanting to allow a zero dollar amount to be entered into some of the fields though, but Acrobat sees that amount as an incomplete field. I've tried changing the format of the field in numerous combinations but I've got nothing.
    Any solutions?
    All help is greatly appreciated.
    I'm using Acrobat XI Pro

    The script I'm using to check the form and block the print is as follows:
    var emptyFields = [];
    for (var i=0; i<this.numFields; i++) {
         var f= this.getField(this.getNthFieldName(i));
         if (f.type!="button" && f.required ) {
              if ((f.type=="text" && f.value=="") || (f.type=="checkbox" && f.value=="Off")) emptyFields.push(f.name);
    if (emptyFields.length>0) {
         app.alert("Error! You must fill in the following fields:\n" + emptyFields.join("\n"));
    else this.print()

  • Dollar Amounts not displaying correctly in JDeveloper Project

    I'm attempting to create an iProcurment extension and I'm have an issue running OA Pages from my project. All dollar amounts (USD) are displaying with 'PT' appended and the following error is displayed.
    validation failures:
    Value "100.00PT"; in "Amount" is not a number.
    Have I missed a setting during my project setup?
    Thanks,
    Scott
    JDeveloper version: 9.0.3.5
    OA Framework 11.5.10.6RUP
    Oracle Applications Extension 9.0.3.8.13 - build 1566
    Business Components 9.0.3.9
    UIX (Cabo) 2_2_24_2
    BiBeans Runtime 3.1.0.76 nondebug BI Beans 3.1.0.x
    MDS 9.0.5.4.89_560
    XML Oracle XDK Java 9.0.3.0.0 Production
    AOL/J Applications Object Library, Core Java Roll Up Patch J
    Servlet 2.3
    Java 1.4.2_04
    JDBC Driver 9.2.0.5.0
    Database Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi
    Operating System Windows XP 5.1
    Browser Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; InfoPath.2; .NET CLR 2.0.50727; .NET CLR 3.0.04506.648; .NET CLR 3.5.21022; .NET CLR 3.0.4506.2152; .NET CLR 3.5.30729)

    Please post the question inf [OA Forum|http://forums.oracle.com/forums/forum.jspa?forumID=210]
    Timo

  • Function Module for Dollar Amount

    Hi All,
    I have a requirement where a REFX contract once created has to go through a series of approvals. How do I get the dollar amount on the contract so that it can be routed to the proper level for approval? Is there a function module for this?
    Thanks a lot in advance.

    Hi Amlan,
    For the condition (amount) on contract you can get using..
    BAPI_RE_CN_GET_DETAIL or
    API_RE_CN_GET_DETAIL
    And if you doing currency conversion there are lot of FM.
    Thanks
    Veman

  • I need to find out dollar amount on iTunes "Give any amount" gift cards I purchased, store clerk did not write down the amounts

    I need to find out dollar amount on iTunes "Give any amount" gift cards I purchased at CVS, store clerk did not write down the amounts when I purchased.

    Without scratching them off to get the numbers and redeeming them there is no way for you to do so. You could go back to CVS and see if they can get the data from their computer or see if your receipt helps.

  • PO dollar amount versus invoice dollar amount report?

    Hello,
    Is there a report that shows the variance between the dollar amount on a purchase order and what was actually paid on the PO's invoice?
    Thx.
    Andy Jacobs

    Use ME2L, ME2M, ME2N and kind of MB5S

Maybe you are looking for

  • The picture that changes ever day when you open up firefox is gone how do I get it back

    How do I reset the home page to show the picture that changes ever day to a different picture when you open up firefox

  • Cleanly stop a process in an  XI adapter module

    Hi, I have a java adapter module that decides whether the process should carry on or not. When I want to stop the process I throw an UnsupportedOperationException that is reported in Runtime Workbench -> system monitoring. Are there any other means t

  • Import not showing up in event where I try to upload it.

    I have a video that I have been trying to import to iMovie. The video is 3.14 GB, an MP4, and the dimensions are 1280 by 720. Whenever I import the video iMovie acts like it is importing the video, but when it is done the video is no where to be foun

  • Autofill Applet Form

    I'm trying to fill out the form fields in an applet running in a browser from an independent external application. I have no control over the Applet as it is part of a separate application. I've tried screen hopping with the Robot API but this depend

  • Help CS6 won't load?????

    Hi I'm trying to run CS6 on a Mac Book Pro all has worked fine until recently, now it won't load! I have tried reinstalling but get the following error messages DW063 and DW050 help.