EDI Order Confirmation requirements routine 002, fields COSTA & BESTK

Hi All,
Can someone help me understand what I can do to allow the Order Confirmation to be generated at the appropriate time?
The criteria seem simple enough:
order is complete
all materials are available
ignore the fact that the delivery may be delayed for a weekly consolidated shipment
Field COSTA: (both in VBUK and KOMKBV1) "Confirmation status for ALE"
Field BESTK: (both in VBUK and KOMKBV1) "Confirmation Status"
Does anyone have information on field COSTA? How it is triggered, etc? What configuration if any needs to be done to force it to become active?
I was assuming that when a sales order has a back-ordered product, the COSTA value would change. But this didn't happen in our system.
So . . . I copied and modified the output routine (002, include LV61B002), used BESTK instead of COSTA, but that didn't work either. BESTK is flagged AorB (not or partially confirmed) when the the delivery is held for a consolidated shipment on a later date -- even if the materials are available.
Any help would be appreciated.
Thanks,
Eddie

Hi,
I think if you will post this message in ABAP Section then you will get answer quite fast, as this is not related to PI/XI.
Thanks,
Hetal

Similar Messages

  • PM Order Confirmation create actual posting in Cost Center, with CE type 43

    Dear Expert,
    I would like to know the business flow of Plant Maintenance that impacts cost center reporting.
    During PM order confirmation, it will create an actual posting in Cost Center from Cost Center Reporting (No FI posting), say CC Operation, with Cost Element type: 43, which is attached with the activity type of Labor Cost assigned the the PM module.
    Example: Cost Center: CC Operation, Cost Element: 840001 (CE type: 43), Amount: USD 100- (negative sign)
    My Question:
    How does this posting (currently is in controlling only) in cost center Operation with Cost Element type: 43 be reflected in my FI reporting?
    Let say there is an FI posting of labor cost in CC Operation, amount USD 100, then from Cost Center Reporting, it actually offset both amounts, and this cost center become 0 in amount.
    Kindly advise the concept of Plant Maintenance.
    This seems like same with the concept of KB21N.
    Thanks.

    Hi Karthikeyan,
    My issue and concern is similar to the issue raised as follows:
    Secondary Cost Element Configuration for Plant Maintenance Order
    http://scn.sap.com/thread/3488730
    In this forum, it says that the posting in CO, during PM order confirmation is ...
    +10 for Order and -10 for cost center A
    After PM Order settlement:
    -10 for Order and +10 for cost center A
    From the cost center and PM Order CO report, they are 0 in value ...
    Is this the correct way?
    Thanks,
    -Chin

  • Posting EDI Order confirmation without message control

    Hi,
    I would like to post a EDI sales order confirmation without message control through z program.
    Please let me know how to do this???
    thanks in advance
    Mukund

    Hi
    This link may be useful
    Re: Re-open EDI - ORDCHG for outbound sales order

  • Without Production order confirmation How to settle the cost of prd order

    Dear all,
    How to settle the cost production order with out production order confirmation.Any setting is there Or program.
    Regards,
    Naresh Redddy.

    Dear Naresh,
    To settle the cost of production order, you need not to confirm it. But on the same time if you want to settle the order when its not confirmed then WIP amount will be posted. WIP value will be posted if your order does not have DLV or TECO status. In your case, if you not confirmed the order, only material cost if any issued for order will be calculated, no activity cost will be calculate. And if you want to post the variance then order status needs to be either DLV (Completely Delivered) or TECO (Technically Completed). Here also the cost of activity will not be considered as you didn't confirmed the order.
    So if you want to settled the order without confirmation, then Activity cost will not be added in your settled cost. So your product costing will not be accurate.
    Please revert if you have any other doubts.
    Regards,
    Hiren Ramani

  • EDI Order Confirmation Question : attach additional .PDF file

    Hello,
    Is it possible to attach to an Order confirmation (for customer standard order)  an additional  pdf.file automatically? If yes, what are the necessary steps needed?
    Hoping for reply.
    Many thanks !

    Hi,
    You can attach any document to Sales Order.
    First you need to enter that document through tcode CV01N in SAP.
    Then in Sales Order select one Item then go to Extras & then select document. You can browse the document here which you have enter through CV01N.
    Thanks

  • Shift wise process order confirmation

    Hi Guru's
    My client is asking about shift wise confirmation of process order.
    wht r the step will I follow to maintian the desire requirement.
    Please explain with example upto order confirmation, wht r the field to be check & wht should be the input I give the field.
    If any body sent me the doc related to the problem
    I'll be thankful to him.
    My ID:- [email protected]
    Parminder

    Parminder,
    Basically your shift definition is for capacity planning/scheduling in the desired way
    Create a process order ,Hope you would have also maintained your recipe with timings
    "<b>wheer the impact will be come of this configuration.either Process order creation or order confirmation</b> "
    The proces order will be scheduled(<b>at the time of order creation</b>) as per the timings mentioned in the recipe & the shift definition in the resource
    Then you do phase wise confirmation-Time ticket/Time event
    As per your reply what i understand is that in 3 shifts your process order will get over
    So your shift supervisor will confirm accordingly
    Hope this is useful
    Revert back if you have any further queries
    Reward points if useful
    Regards,
    SVP
    Message was edited by:
            SVP

  • BAPI For Process Order Confirmation

    Hi,
    For Process Order Confirmation we are using the following tcode. COR6N. in the t-code we are include a new field (Shift Field) with help of CONFPP07. and we made the field as mandatory also. in cor6n it is working fine.
    now we are using the bapi for same Process Order Confirmation. here the new field is not available. we want to include the new  ( Shift ) Field also. we are using the following
    BAPI Fm: BAPI_PROCORDCONF_CREATE_TT .
    Regards
    Sathis

    BAPI_PRODORDCONF_CREATE_TT to confirm a production Order
    Erwan

  • Field Cost Ctr is a required field for G/L account TEST 504004

    Dear Sir
    I create Purchase order and I try to make GRN then the following error occured. Please help me.
    " Field Cost Ctr is a required field for G/L account TEST 504004
    Message no. F5808
    Diagnosis
    The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "504004" in company code "TEST" linked to the field selection for posting key "96".
    System Response
    Error
    Procedure
    It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly."
    Thanks
    Rajakumar

    Hello,
    Please read the steps you have to follow. I have put some data for the example:
    1,FS05
    G/L account no. 151040
    Company code    0110
    Field status group           G022
    2,OBY6
    Company Code    0110  QCPL - 
    Field status variant           PCPL
    3,OB14
    Field status variant PCPL     Group G022
    Consolid.(TTY=Req Text=Opt Alloc=Opt)
    Cost Center   = required !! (probably the cause)   > change to optional
    Best Regards,
    Arminda Jack

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Output Control Routine for Order Confirmation

    Hi,
    I have a problem in sending out order confirmation when the customer have a credit block, no order confirmation is being sent.
    Checked on transaction NACE, the routine for Order Confirmation (Routine 2), returns a sy-subrc =4
    when  the credit block is set. What is the best way to correct this?
    Thanks,
    Catherine

    Create the new routine in VOFM->Requirement->Output Control. Make the required changes in routine source text and assign it to output procedure (NACE).
    Thank You,
    Ganesh

  • Activate the FIELD Cost Center while issuing the Material to Order by 261

    Dear All,
    How to activate the FIELD Cost Center while issuing the material againest Order IN MB1A?
    Thanks and regards,
    Satyajit

    Hi all,
    I'm having problems with activating the cost center field too. I've already checked OMBW and OMJJ. For OMJJ, cost center field was required. For OMBW, Cost Center field was Supressed. However, when I checked the Change Logs, no changes were performed since last year. The user who raised this issue had the cost center field activated until December 1, 2008 but now it's deactiavted. So I don't think it's OMBW responsible for this since there was no change since last year.
    Please share your knowledge on this.
    Thanks!

  • Costing data from Tables of Process Order Confirmation.

    Dear Friends,
    In which table is the Costing relevent data for process order confirmation stored.
    We are developing a report for which we require  material specific-
    Target quantity / Actual quantity
    Target costs / Actual costs
    Thanks in advance.
    Regards,
    Vikrant Sood

    Hi,
    Using the Table : AUFM you can get the data.
    VVR

  • Sales Order confirmation EDI

    Is there any Standard SAP Program which tracks the changes made Quantity , Schedule Date and Price  of  the Sales orders Posted through EDI .
    Can we have these Sales orders Changes tracked in Order Confirmation IDOC
    IDOC_OUTPUT_ORDRSP which sales generates the sales order confirmation 
    I see in the  the output type creation transaction code V/30
    there is a option under General data Tab where we can specify the
    Program / FORM routine      Specifying the Program and Form routine will it help us to Capture the changes made to the Sales order . If so what is the Program / Routine. Thanks for your support.

    Hi Balaji,
    This is your old friend damo(annamali university)!. Saw your question!. I will send you the answer.
    [email protected]
    Regards,
    Damo

  • Field Cost Ctr is a required field for G/L account

    HI SAP Guru,
    I have Created an Asset in Test server, once the Asset was created..
    I did a Depreciation Run in test server.I encounter this error message.
    the cost center was created in the asset master, and the GL account was also define in the GL master.
    Field Cost Ctr is a required field for G/L account  7xxxxx
    Message no. F5808
    Diagnosis
    The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "7xxxxx" in company code "168" linked to the field selection for posting key "40".
    System Response
    Error
    Procedure
    It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly.
    Please advise

    Hi
    Please Check  field status group assigned to the depreciation G/l account as well as G/L account of Asset   by using Transaction Code OBC4
    Make the cost center as optional instead of mandatory
    Check your settings in Transation code  ACSET
    Regards
    Praveen P C

Maybe you are looking for

  • Bridge CS4 HTML Gallery

    All of a sudden, the HTML Gallery option in Output/Web Gallery is gone! It's still available on my laptop, so I can still access it. But where did it go and how can I get it back? I made the mistake of updating the CS4 products...maybe that was it. A

  • Scrolling text in Dreamweaver CS4

    I need to be able to scroll through text without scrolling down the page. In other words, I have a need for a page to maintain a fixed height, regardless of how much text might be needed. Therefore, I need a scroll bar assigned to text in a table cel

  • IPC special scenario

    Hi Gurus, I have a scenario I need to design so please help me with. During in-process inspection I need to perform the following: I have a master recipe with 2 phases of quality inspections. At the 1st phase I'll have 3 samples with certain MICs, le

  • Are pictures still in Organizer available after a disk crash?

    I have pictures that show in Organizer but the file they were on was located on a disk that crashed and the data wasn't recoverable. Is there anyway to save the pictures in Organizer to a new file? Thanks so much, Rick

  • No e-mail via Microsoft Outlook

    Can't sync e-mail via my new computer. Opted for Microsoft Outlook for my AT&T Yahoo e-mail on this computer, rather than directly using Yahoo Mail. All Inbox mail transferred correctly to Microsoft Outlook from Yahoo Mail, but now can't see any mail