Edit Text from one screen to another screen
Hi Experts,
Here I am having two doubts in doing functionality on SMP 2.3,The below mentioned are the doubts,
1. In SMP 2.3 Version,When i am doing Hybrid App Designer in that Edit Text functionality to pass the values from one screen to another screen,we want to type any text or digits in edit text keypad options is not opening in that field.If any one knows to handle that issue please let me know experts.
2. In SMP 2.3 Version,When i am doing Hybrid App Designer we are taking some labels or buttons or edit box etc....,first time i am generating the hybrid app it is displaying in the mobile device what ever i give in that screen.Afterwards when i am updating second time in that screen with extra functionality labels or buttons or edit box etc...,and generating hybrid app,these time it is not displaying in mobile device which i gave not updating.If any one knows to handle that issue please let me know experts.
For these both isssues if anybody gets solutions to handle these data please let me know and if links are there please provide it .
Thanks & Regards,
Lokesh Reddy G,
9700414490.
Hi Lokesh,
Regarding your queries:
1. What kind of device/simulator and OS you are testing your app? What is its version?
Can you share the snapshots as well?
2. What extra functionality you have added 2nd time? When you generating hybrid app 2nd time is it uploading in HWC container successfully?
Meanwhile you can check this blog
A workflow Application to Release A Purchase Order...
Rgrds,
Jitendra
Similar Messages
-
I have never used PhotoShop and do not have time at the present. Please help me to move a section of text from one column to another in a brochure.
Here are 3 options for future reference:
1. With the setup you've described, apply a Match Move behavior to the text and make the rectangle the source. Change the Transform parameter to Mimic source. This way you can still adjust the text postion as needed, but the rectangle will drive the animation.
2. Use a group to do the animation. Put both your rectangle and text in the same group and animate the group's postion.
3. Use the Link behavior.
Each of these has it's advantages depending on what you need. -
How can I copy text from one card to another while creating cards using Iphoto?
I created two cards with different pictures using Iphoto on Macnotebook.
I want to use the same text message.
How can I copy text from one card to another?select the text and copy (edit menu ==> copy) tehn gpo to the next card and paste
LN -
How do I copy text from one layer to another?
I have Googled this but not a single answer seems to work.
I am using Photoshop CS4 on OS X 10.6.7.
OK, so I have a layer that has some text in it. I would like to be able to simply copy that text from one layer to another, but this seems to be impossible as the Edit Paste menu item is grayed out after I have copied it in to the clipboard. I can paste it into the SAME layer, but not into another layer.
This is how I am trying to do this.
In the layer with the text, click on the "T" icon to the left.
Click on the text, in the layer that I want to copy.
I select the text (either by clicking and dragging or pressing Command-A).
Next I press Command-C.
Then I click on the layer In the Layer Panel) where I want to paste the text.
Pressing Command-V is impossible because the Edit-Paste menu option is grayed out!!!!
WHY??????
Perhaps more importantly, HOW do I copy text from one layer to another?First thing you can simply right click on the Text Layer and choose Duplicate Layer. But that will create a new Text Lay
er identical to the one you have.
To answer your question in your case.... Create the Text Layer. Make a New Layer. Or have the layer you want to paste into visible.
Highlight the text layer in the Layer Palette and Ctrl+Click (Win) Cmd+Click(Mac) so that you see marching ants walking around your text.
Edit>Copy.
Then highlight your Layer you want to paste into and hit Edit>Paste or Cmd+V / Ctrl+V. -
Move text from one artboard to another
Hi I have 3 artboards open and am trying to move text from one artboard to another, each piece of text is on a different layer, but when I use the selection tool and just drag it across to the next artboard, nothing shows up. How do I move text from one artboard to another? Thanks
Dont worry I now have it sussed. I just needed to move the layers up in the stacking order.
-
Can I Copy and Paste text from one Contact to Another on iPhone 3G?
Can I Copy and Paste text from one Contact to Another on iPhone 3G?
Or even better while the iPhone is connected to my PC can I view the address book on the iPhone and make changes using my PC keyboard?
I had a challenge importing from my outlook as it created dual entries for people I had with multiple email addresses or telephone numbers so I need to copy and paste contact info from one to antoher.
Can anyone help?MCWEB wrote:
Can I Copy and Paste text from one Contact to Another on iPhone 3G?
You will be able to do copy & paste when 3.0 comes out this summer.
Or even better while the iPhone is connected to my PC can I view the address book on the iPhone and make changes using my PC keyboard?
No. You would make changes to the address book on your PC and then sync via iTunes. -
Can Pages copy text from one page to another automatically?
Can Pages automatically copy text from one page to another?
For example recurring text in a document e.g. addressee details or a date (not today's date).
I want to type the topic title of one letter and have it automatically filled into the correct field in the next page which will be a letter to a different recipient.
The letter text will be different for each recipient so mail merge probably won't work.
Thanks
AndyThanks that worked great!!!(for the first line)
Now why wont it populate more than the one other text field?
F.Lic.Table1.Row1.agt_ssn_lic.rawValue = xfa.event.newText;
F.PAGE3.agt_ssn_1.rawValue = xfa.event.newText;
F.PAGE4.agt_ssn_2.rawValue = xfa.event.newText; -
Copy Text from one quote to another
Hi
I need to copy text/notes related to one quotation to another.. I tried FM SAVE_TEXT and CRM_TEXT_MAINTAIN_OW but neither of it worked...
Can anyone help me with this ?Hi Ashwineee,
U can copy text from one quote to another by customizing also
Just Check the settings of your text type in the text determination procedure.
Select ur text type and click on details u will find the text id description sequence and
Transfer field u have various options u select the option "B" for ur text type .
U can take reference of the Standard Text determination Procedure "ORDER001" for doing the same
for your text determination Procedure
Menu Path--
Crm-Basic Functions- Text Management-Define Text Determination Procedure - select the Object --
example for CRM_ORDERH and click on Procedure and select ur text determination procedure --
Select Definition of Procedure that gives u details of your text type and its options
Hope it will Resolve ur problem
Regards
Pavan.A -
Inserting text from one JTextpane to another
How do i insert text from one jTextpane to another with the attributes i used in the first. Please help.
i'm using a defaultstyleddocument. Also.....if u know
how i can transfer this data through a
DataOutputStream to another computer.Hi again,
DefaultstyledDocument uses a tree-structure with classes in it, that implements the Element-Interface to hold the styles. It is very easy to get the plain text, but what you need to transfer a part of text from one JTextPane with DefaultStyledDocument in it to another with the same document-style in it, is a sequence of (string, AttributSet) - pairs, so you are able to insert them in the destination document by the insertString(...)-method.
It is easy to get the Element by postion from the document and retrieve the Attributset from it that it uses in that position. I guess, an approach would be, to do the following:
get the Attributset at the start of the text = AttributSet of the pair
scan the document until the set changes
extract the string from start to the position right before the set changes = string of the pair
store the (String,AttributSet)-pair in a Vector
do this in the same way, but this time the "start" will be the position of the start of the new Attributset that causes the end of the scan above.
When this is done for the hole text, that is to be transferred, you have a Vector with the String-AttributSet-pairs that you can use to insert them in the other JTextPane by calling the
insertString(...)-method with this values.
Tell me, what you are thinking about that - I don't know another method for this and had to create a solution on the fly for you, so that is perhaps not the best way to do it.
greetings Marsian -
How can I copy/paste text from one page to another?
I feel like I am taking crazy pills... is there really no way to copy a text box (or group) from one page to another while creating books in Aperture 3? Lets say I have my entire book laid out and I want to add one paragraph at the end on one page which will push text and photos down a half page or so... in most programs for the last decade or so they added really cool functionality... cut/paste... It seems like the apple developers are aware of it because they are in the context menus but they don't work on text, only photo boxes. Additionally, you can copy/paste text but it erases all formatting.
Seriously, am I missing something? I have trouble believing that they can't include this function.
Anyone else have this issue?Update... it seems to only happen with text boxes which I create. So when I try an existing theme I can cut/copy/paste just fine, but in that same theme if you edit the layout and add a new text box, I can't copy paste it anywhere... the options are in the menu but nothing happens.
Thoughts? Solutions?
I am running 3.4.3 on a MacBook Pro OS X 10.8.3 -
Loading text from one app to another
If we are using text members and we want to transfer comments from one app to another.
our steps are as follows.
1) Export indicators in Essbase
2) LCM text members out of one app to import into the other.
3) load indicators in new app
4) load LCM file to new app.
The wrinkle is the following
App 2 already has the exact same member for text and there is already text in separate spots (no overlap - think 2 different versions). But what about the number system when we bring it back in.
Has anyone done this where you have to reallign the indicators in the relational database and essbase so that nothing gets crushed?
We are thinking of editing the files and create new numbers. Will that work?
This is version 11.1.2.2Hi,
Mode of updation is delta.
ZCUBE_2 already contains data from Aug. to March
My problem is m not able to move March onwards data.
Till today my delta was working fine.But i had to delete April data. Now i want to reaload it.
Before deleting i tried to load 10 daya data all together, it reloaded successfully. Now i have to reload 48 days data, its not loading.
I also to restict period in filter option, then also no data availabe is coming. -
How do I transfer EDITED clips from one IMovie to another
I have tried to transfer edited clips (with original sound) from one IMovie to another. However, the system transfered the original clips instead of the edited clips.
Does anyone have any tips on how to transfer the edited clips only and not the original clips.
osx 10.3.9 and Imovie 5.0.2That will copy the original, imported material, not
the edited version. I.e. if I trim an imported clip,
the .mov file will still be the un-trimmed,
full-length clip.
Not the movie Lennart means. The movie Lennart refers to — called the Timeline Movie.mov and located in the Cache folder inside the project — plays the edited Timeline of Project A. (It's a reference movie containing pointers to the audio and video files in the Media folder.) When that Timeline Movie is imported to Project B, it delivers all the edited video and audio of Project A as a single clip to Project B. (He's not referring to the video and audio files in the Media folder, which I think you mean.)
taronger, if all you want is a single clip, another way is to select the clip in the iMovie Timeline and export it to a Full Quality movie. Be sure to turn on the checkbox "Share selected clips only" in the export dialog window. Later, import that exported movie to another project.
I did some trials and found out that transfering edited clips (not original clips) can be done by selecting several consecutive clips in the original movie, and using the copy command. It is then possible to go to the new movie and use the paste command to transfer the edited clips.
Yes, that delivers the clips, but it doesn't deliver shortened clips. It delivers the entire source file of the clip. So if Clip 2 is 5 seconds long but its source file is 3 minutes long you get the entire 3 minute source file.
It's sometimes easiest to export the clips you want from Project A back to the camera, then re-import them to Project B. That accomplishes everything you want, delivering the edited material trimmed to the shortest length possible.
Note that the clips must stand shoulder-to-shoulder on the Timeline and the "Share selected clips only" checkbox must be checked. (Some versions of iMovie fail to stop the export to the camera at the end of the last clip. You may have to stop it manually.)
Karl -
Transfering text from one class to another
Hi, I'm having a lot of trouble with getting the text from a textArea in a frame to transfer from one class to another.
I could really use any help given.
Thanks
Here's where the text should come from
import javax.swing.*;
import BreezySwing.*;
import java.util.*;
public class UserFrame extends GBFrame {
//String Design = null;
private
JTextArea InputArea = addTextArea
("...",1,1,1,1);
JButton drawButton = addButton
("Draw" ,3,1,1,1);
// UserPanel dPanel = new UserPanel();
GraphicsInputPanel dPanel = new GraphicsInputPanel();
GBPanel panel = addPanel(dPanel, 1, 2, 1, 1);
public void buttonClicked (JButton buttonObj){
GraphicsInputPanel.setdesign(InputArea.getText());
// rbPanel setDesign(graphicCodeArea.getText());
public static void main(String[] args) {
UserFrame tpo = new UserFrame();
tpo.setSize(400, 300);
tpo.setVisible(true);
and here's where it should be going
import BreezySwing.*;
import java.awt.*;
import java.util.*;
public class GraphicsInputPanel extends GBPanel{
String design;
public void setdesign (String d){
design = d;
public void paintComponent (Graphics g){
super.paintComponent(g);
StringTokenizer lines = new StringTokenizer(design, "\n");
while (lines.hasMoreTokens()){
String line = lines.nextToken();
if (design.equals ("Blue")){
g.setColor(Color.blue);
}else if (design.equals("Green")){
g.setColor(Color.green);
g.fillRect(0,0,100,100);
public void setDesign(String d){
design = d;
repaint();
}Hello Saqib,
The requirement to transfer asset with value date in the past year contradict the objective of audit trail established in the system although it is technically possible to do. Perhaps you should convince your client to adopt the standard approach, i.e. value date as at the date of asset transfer.
Kind regards,
John Chin -
Editing audio from one project to another
I'm trying to build a DVD project of different musical performances in Final Cut Pro X. The Mac I'm working with crashes every 30 minutes regardless of what I'm doing so, instead of building a monstrous timeline with two hours worth of performances on it (which will never save given the crash issues), I'm trying to build it by each song (4-6 minutes each).
The format is: opening billboard (with performer and song listed) --> fade into performance --> performance --> fade out of performance. If I were fading the audio out after each song, it would be simple but I'm trying to keep some of the audience track going under the next billboard so it blends better. I can't seem to cut the audio at the end of the fade out and apply it to the next song without continuing to build onto the same timeline which, due to the crash issues, doesn't help me.
Is there an audio work around that I'm missing? All I want to do is fade the audio a little past the fade effect, copy it and apply it to the beginning of the next song. Anyone?Just ran into the same problem myself... while I get you CAN export the audio, then import it and use anyway you like I don't think that is the point of the original poster's question.
The voice-over clip has unique properties and as such I (and it looks like other users) would like to be able to "copy & paste" a voice-over clip from one project to another. Alternatively if I could drag and drop the voice-over clip into my Event that would be great too. Doesn't seem like an unreasonable request. Right now the famed Apple ease-of-use is missing for those of us who have recorded voice over elements we want to use in more than one project.
Had I known iMove would not allow sharing of voice over clips within iMovie I would have recorded my voice-over clips in another application and imported them all as audio-clips. Which certainly defeats the point of the inclusion of voice-over in iMovie.
Any solutions that work within the app without an export/import required? -
Use VZ Messages+ to get text from one phone on another??
Here is my situation. I have 2 phones, an IPhone 5c from work and a Casio Commando 4g. I only want to carry one of them and would prefer it to be the Commando. I am trying to use VZ Messages to get my work texts on the Commando. No matter how many times I clear the setting, uninstall, reinstall the app, etc whenever I start the app on my android phone, it just says "Starting Service" and then displays the texts from that account. When I install the app on my android tablet or even on the IPhone, it 1st asks what number I want to link the app to, I receive a text on that phone with the pin and everything works fine.. So in other words, I have been able to install the Messages app on my IPhone, link it to my android phone, and get the android phone texts on the IPhone with no problem. What I need to be able to do now is install the app on my android phone, link it to the IPhone and and receive texts sent to the IPhone num,ber on my Android phone. Any help would be appreciated.
Hi tgoggin - We certainly want technology to work to make life convenient! I can confirm at this time anytime you have VZMessages on an actual phone line with Android it will register to that lines number. I apologize as we are unable to adjust this setting.
Thank you,
YaleK_VZW
Follow us on Twitter @VZWsupport
Maybe you are looking for
-
Error while refreshing the BO WebI report
Dear Friends, I have created BO report on top of BICS Query in BO 4.0(have used aroung 15 BICS queries in to the report) and able to see the correct data. I have used hierarchies and also selected levels in to webI report. Last week I am able to refr
-
Repairing permissions for “MacIntosh HD” Determining correct file permissions. Permissions differ on ./Library/Widgets, should be drwxr-xr-x , they are drwxrwxr-x Owner and group corrected on ./Library/Widgets Permissions corrected on ./Library/Widge
-
How to create placeholders in Pages
How do I create Placeholders in my document, that allow for images to be dragged from iPhoto or from a Finder window into the Placeholder. I am running the latest version of Yosemite as well as the latest version of Pages. In the old version of Pages
-
I've just upgraded to LR 1.1- when I edit in CS3, the saved PSD file cannot open in LR1.1 (corrupted file)No problem before upgrade.
-
I am trying to import my PG XML files into the database. I have already moved them to the $JAVA_TOP directory on our application server. When I try to run the command - java oracle.jrad.tools.xml.importer.XMLImporter AuditDetailPG.xml -rootdir $JAVA_