Entry at material G/L acoount at MIRO...

there is one schedulling agrrement with item numner 20.
looking at its order history i found out some points:-
1) for initial accounting docs created during MIRO, there was no entry at raw material stock G/L account.
2) in between there were two documents in order history when there was some input at raw material stck G/L account.
3) the last GR and MIRO doc doesn't shows any entry for raw material l stck G/L acc.
I m not a MM guy, please tell me why and when there is an effect on Raw material stck G/L account....
Thanks...

The usual entries taking place at GR are
Gr/Ir - Credit
Material/Consumption - Debit
If the GR is non valuated, no entry takes place.
At time of MIRO entries are
Vendor - Credit
Gr/IR - Debit
If GR is non valuated, then MIRO entries are:
Vendr - Credit
Material/Consumption - Debit.
Hope the above entries will answer your question.

Similar Messages

  • Userexit for populate profit center entry without material in T.code CORO.

    Hi guru's
    we are running T.code. CORO.. we want to populate profit center entry without material. can any one tell me the exact user-exit used for this and . can you tell me the procedure how to find the specific userexit trigger at that point while we are running any T.code.
    Thanks in Advance..
    GSANA
    user exist in PP for transaction code CORO-process order without matl code to populate profit center entry, can u plz find out that & send it to me..

    Thank you all for your valuable input.
    Srinivasa, your suggestion is very good, especially when calculation of variances/WIP is required. But again as there is no cost relevant material where the WIP/Variances will be settled during settlement process?
    1) PP need to create process order without material because changeover cost should not be charged to either material and capacity hours are consumed during changeover. 2) CO need to identify the cost of changeover which should be charged to cost center. So far we have achieved both of these two objectives by the following activities:
    Creation of Process Order without material using CORO T.Code     say 3 hours of changeover occurred we create order with quantity of 3 Hours. And confirmation of activities quantity 3 using COR6N so cost center is credited by 3 x rate per hour. As there is a separate Process Order type for Changeover we can identify changeover quantity and cost in a given period.
    After contributors feedback in this thread I have come to conclusion that I don't need to assign Settlement Profile and PA Structure to Changeover Process Order type. So no need to run Process Order settlement. As there is no specific required for Changeover WIP/Variances as well.

  • Table for material doc reference with frieght miro

    Dear experts,
                  I WANT TO DEVELOP A REPORT FOR FREIGHT MIRO  WITH FOLLWING DETAIL :
    GRN NO OR MAT DOC NO,GRN DATE , PO NO, PO DATE,MATNO, VENDOR, MIRO DOC NO,MIRO ITEM NO, MIRO DATE, REFERENCE NO, QTY IN UNIT OF ENTRY,QTY IN DELIVERY NOTE , INVOICE AMT,GROSS INVOICE AMT .
    THEREFOR I NEED TO JOIN SOME TABLES . I HAVE TRIED REPORT WITH RSEG & MSEG BUT IN RSEG MAT DOCUMENT NO IS NOT AVAILABLE FOR FREIGHT . HOW & WHICH TABLE I HAVE TO JOIN FOR THE SAME ,SO THAT I GET ALL THE INFORMATION  IN MY REPORT.IF U HAVE ANY READYMADE CODING FOR ABOVE REPORT, PL. SEND IT IN MY ID - rajrathi1at gmail. com
    REGARDS
    RAJESH RATHI

    Hi,
    You have to use following tables;
    RBCO - Document Item, Incoming Invoice, Account Assignment
    RBDIFFKO - Invoice Verification - Conditions
    RBDIFFME - Batch Invoice Verification - Quantity Differences
    RBDRSEG - Batch IV: Invoice Document Items
    RBKP - Document Header: Invoice Receipt
    RBKP_BLOCKED - Logistics Invoice Verification: Blocked Invoices
    RBKPB - Invoice Document Header (Batch Invoice Verification)
    RBMA - Document Item: Incoming Invoice for Material
    RBSELBEST - Invoice Receipt, Purchasing Documents Selection
    RBSELDELI - Incoming Invoice: Delivery Selection
    RBSELERFB - Invoice Receipt, Service Entry Sheet Selection
    RBSELFRBR - Invoice Receipt, Bills of Lading Selection
    RBSELLBLN - Invoice Receipt, Bills of Lading Selection
    RBSELLIFS - Invoice Receipt, Delivery Notes Selection
    RBSELWERK - Invoice Receipt, Plants Selection
    RBTX - Taxes: Incoming Invoice
    RBVD - Invoice Document - Aggregation Data
    RBVDMAT - Invoice Verification - Aggregation Data, Material
    RBVS - Invoice Verification: Split Invoice Amount
    RBWS - Withholding Tax Data, Incoming Invoice
    RBWT - Withholding Tax Data, Incoming Invoice

  • Table where I have entry for material document and Accounting doc.(GR/IR)

    Hi all,
    When GR/IR clearing is done manually using MR11 t.code,a material document gets posted.
    Looking at the PO order history against the line item for which the GR/IR clearing is made,this material document appears. When clicked on material document and select the followon document, we get the accounting document.
    My question is:
    If we have to take a table entry download for all these together how do I do it.
    Usually based on the material document number from table EKBE, we are giving the same number in object key in BKPF table and obtaining the same. This is a cumbersome process.
    Do I have a table in SAP where if I enter the PO and the line item. I get the material document posted against it as well as the FI document(accounting document)
    Your inputs are highly appreciated.
    Regards
    Aravind

    Hi,
    I don't think there is a table which will have both MM and FI document numbers. The approach what you have adopted is right. If it is a regular requirement, you can develop an ABAP report for this.
    Thanks
    Murali.

  • Returning the material to Vendor after doing MIRO

    Hi Freinds,
                   I have a scenario. Please help me out.
    I have sent a PO to a vendor & accordingly the vendor has supplied the material. Then after doing MIGO & MIRO, I realised that some materials are defective.
                   So I have to return the material to the same vendor. How it can be done?
    Waiting for your response.
    With Regards
    Saeed Arif

    If Excisable Material and Complete quantity return -
                                    1) Cancelation of MIGO document(MBST)(MOV-102)
                                    2) Do Excise posting again with reference to Vendor Excise invoice(J1IEX)
                                    3) Cancel Excise Invoice (J1IEX)
                                    4) Cancel Invoice document(MR8M).
    If it is partial quantity
                                    1) MIGO (MOV-122)
                                    2) MIRO (Credit Memo).
    Regards,
    eswarmanu...
    Edited by: eswar manu on Oct 21, 2008 11:41 AM

  • Created batch material  and made po, migo,miro now change to non batch.

    Hi All.
    I have created Batch Material mm01 with  batch management check box.
    Created PO and donetransaction of  migo, miro.
    Now i want to change to non batch material.
    i like to remove batch management check box in mm02
    Regards.
    Parameshwar.
    Edited by: Csaba Szommer on Jul 7, 2011 9:23 PM

    Thanks Kunal.
    I will Click on display errors  for the list of open documents.
    Then i will clear all documents.
    Next I will change MM02 by removing Check box to normal material
    It should work for me.
    My Doubt is after this also i need to run the program to change to non batch material.
    Clarify me about program running.
    Regards.
    Parameshwar.
    Thanks MM dudes.

  • CST to load on material  through G/L account : Miro

    Hi Expert
    I am trying to load CST on material through  G/L account, but system not allowing to do that with Miro
    regard
    Nabil

    HI
    make condition setting as below
    Cond. class   A Discount or sur
    Calculat.type A Percentage
    Cond.category B Delivery costs
    don't assign +/-  ( Plus Minus)sigen in your condition
    mark accrual in condition
    then in  your pricing procedure
    assign account key and accrual for same condition and mark manual condition and statical check box there
    Regards
    Kailas Ugale

  • Post closing entry in Material Ledger

    During running og Material ledger last night, in CKMLCP, we ran post closing entry before we release the cost through CKME. When I tried to release tcode CKME and CK40N, the system gave error message as below:
    Price changes for material 200001  is not possible
    Message no. C+811
    Diagnosis
    You want to change the price or release planned prices for material 200001 with valuation type  in valuation area 2100. You have, however, already entered actual data or performed a single-level price determination in the period concerned. The status of the material in the period is Quantities and Values Entered.
    Price determination indicator 3 assumes that the standard price remains constant throughout the period, so that all movements can be valuated preliminarily with the same standard price.  Therefore, you can only change the standard price at the beginning of a period (i.e. as long as no actual data was entered).
    System Response
    The system does not allow the price changes or the release of planned prices for this material in this period.
    Procedure for System Administration
    In the future, to automatically release your planned prices upon creation of new actual data you can allow dynamic price release in Customizing for Actual Costing/Material Ledger.
    How I can release my standard cost for period 01.05.2010 to 31.05.2010. Please help
    Edited by: Ahmed EL Zain on May 1, 2010 10:49 AM

    Hey,
    What you described is the standard system behaviour.
    The price change or release of a cost estimate should always be the
    first transaction in a new period, when Material Ledger is active.
    Once period status = 30, the standard price cannot be release or
    changed. For more details please see note 190707.
    The only possible workarounds are as below:
    - postponing the costing release to next month
    - reversing transactions and usage of note 574930
    - using the option LTPC from note 555176
    Best Regards
    Young

  • Accounting Entry for Material has Standard Price

    Hi,
    If Material has standard price option, what is the accounting entry for the time of Direct Goods Receipt and from the production.
    Material Value is : Rs. 100/-
    Purchased value is : 90/-
    from production : 110/-
    Thanks in advance

    Hi,
    In STO, material posting with price valuated from issuing plant price. In your case, the transportation cost, you can capture to separate G/L account and pay to transport vendor.(In STO , one plant is vendor and another plant is customer, so a third party vendor involved for material transfer)
    OR else use separate own Custom Condition Type  with Special Condition Category instead of condition type P101 which have Condition Category "G", only responsible to pick  the internal price
    Regards,
    Biju K

  • GR COCKPIT Mulitble entries for material using  'BAPI_GOODSMVT_CREATE'.

    Dear Guru's
    In my  program first they given some input values to the selection screen include material number as parameter .
    Now the reqirement is they want multible enteries for material not in selection screen  after given inputs run the program and one more screen is appears (this is created my using screen painter) .
    In that screen I had 5 columns in that screen .But I needed one extra column that's why I added one extra column (ie, Material) through screen painter .I am using the 'BAPI_GOODSMVT_CREATE'. in that srceen 3 columns we have  to give the input manually,whereas before adding that particular column we had to give inputs for 2 columns.(using fields are ENTRY_QNT,ENTRY_UOM in the structure BAPI2017_GM_ITEM_CREATE)like that we have to give input for 3rd coulmns also that we just created.but the problem is there is no such field in that BAPI for multiple material numbers.But its works for multible entries with same material numbers
    My Screen Previously like:
    1.Farmer 2.FarmerName 3.Collection Pt 4.Quantity5.UoM
    After Adding one extra column the screen looks like:
    1.Farmer 2.FarmerName 3.Collection Pt 4.Material Number4.Quantity5.UoM
    But the probelm is BAPI is not running for different material numbers but its work for same material number with multible entries too.
    While i am trying to run the program i will get "Deficit of BA Unrestricted-use 28,000 KG : 40950020 BP01 2118 0000001526" but there is stock for this material .
    Please provide a solution for me.
    Thnaks
    Poorna
    Edited by: Purnaneelu on Mar 30, 2009 11:19 AM
    Edited by: Purnaneelu on Mar 30, 2009 11:35 AM
    Edited by: Purnaneelu on Mar 30, 2009 1:42 PM

    helpful

  • Storage Location required entry in Material Master

    Hi
    My client requirement is, at the time of creation of Material Master, System will ask for Storage Location.Without Storage Location, Icann't create Material Master.
    Even if I'll select Plant and Storage LOcation View & Warehouse View, System is not asking the storage Location.
    Can anybody suggest me where I'll set the setting so that system will ask for Storage Location mandatory in Material Master.
    Thanks & regards
    PKB

    Hi Raja,
    Thanks for your reply.Before Posting the thread, I've already checked these Views what you told.But system is not asking me to enter storage location.
    You can check in your system.
    System only asking for plant not storage location.Even if we select warehouse view, system is not asking for Storage Location view.
    Thanks & Regards
    PKB

  • Gate Pass Entry for material

    Dear Forum,
    At my client's place if any material like Alternator of Motor is going for repairing or Overhauling purpose they maintain the data in Gate pass format manually..But now they want to do it in SAP...
    The details are as follow--
    1. Vendors Name, Address
    2. Material, material description
    3. Returnable/Non-Returnable material
    4. Prepared by etc..
    Is this possible with Std SAP..?? or do we need to have any ABAP development...
    Please do the needful..
    Regards
    Nainesh

    For any type of material document printout you can follow the process:
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    Enter the local printer where you want to print your Goods posting document
    2. Ensure that in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for Goods Receipt/GI/Transfer Posting Documents
    Here for Particular mvt type 101,201,121,311 etcu2026 Maintain the Print item as 1--Material document printout
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the following--
    Select the particular Output type then goto Details
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Transmission medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Printer Determination by Plant/Str Loc, Maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE/WA, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately
    Now for the need of what are the data you want in the printout you have to sit with your ABAP er and decide.
    regards,
    Indranil

  • Link between Service Entry Sheet and Material Document

    Hi
    I am busy with developing a report where i am required to find the link between the Material Document and Service Entry Sheet. 
    I am aware that on the Purchase Order Data tab of the Material Document has the service entry sheet number and line item.  However the problem I have picked up here is in the event I create a Service Entry Sheet  with a service in line 1 and for some reason Delete that Line and then capture the service again, it is saved in table ESLL as line 2.  This is correct.  However when I have a look at the material document, it references it as line 1 of the service entry.  Is there any way to get this in sync?
    Thanks
    Vinesh

    Thanks
    This table does show the service entry sheet number and line item however the line item does not correspond with the line item on the service entry sheet.
    Eg.
    I create a service entry sheet where I capture a service in line 1.
    I delete Line 1
    I recapture on line 2.
    Post Service Entry
    The Material Doc reference document is the service entry however the line item for the reference is 1.
    I need to try and link the line items
    Thanks
    Vinesh

  • Miro-want to debit a material without using a purchase order reference

    Hi,
    I have activated direct posting to material account but when make MIRO, the system generates the accounting document on GL account not material account and dont update the material stock. Where to configure to make posting on material account.
    Regards,
    Ionel

    Hi
    Have you checked the settings in OMS2 t.code.
    If not pls check the following.
    Go to OMS2 select the material type which not creating the accounting document and double click on the qty/value updating folder . In that check the Qty updating check box is selected or not. You have to check the box then only it will update the qty it results the Material document creation.
    Thanks
    S.Murali

  • Is it possible to pass a auto credit entry in miro

    Is it possible to pass a auto credit entry in a seperate gl while doing  miro equal to a debit entry done in another gl in same MIro only
    expense 100         (from migo)
                 to suspense gl 100   (auto entry)

    hi
    check is there any BAPI available.

Maybe you are looking for

  • Help needed in Excel Exporting

    Hi, I got a database fieldcalled category. My report is grouped on category. Category can be Agriculture or MNO or Energy. So i am getting 3 groups thats fine and the data obtained is tested to be correct. Now wen i export the report into excel. Agri

  • Safari 7.1 hangs and crashes when any extension installed

    Hi after latest Safari upgrade (ver 7.1 seed 1), Safari hangs and crashes after I install any extensions. When I delete all extensions from extensions dir, the problem disappear. Thank's for any advice. Date/Time:       2014-07-12 10:14:58 +0200 OS V

  • Ago Function

    Hi all I upgraded from 10g to 11g and now my Ago function seems to not be working but i have no idea why. The data is basically coming from a table like so: AcctNbr EffDate Balance 12345 01/01/2010 $200 12345 01/02/2010 $205 12345 01/01/2011 $206 123

  • Silent Installation Assistance

    I have Acrobat 11.0 WIN ESD LRE OK, I downloaded the version form the LWS Site and I would like to deplioy the product Silently and have it enter the Serial number durning the install. I read an article that the Adobe Customization wizzard X was need

  • Approval request autoescalation

    The current scenario is like this. User Self Registration -------(Request No:1 is send to Group 1 Users for approval )---------> Group1-----------(atleast one user approves ,Request No:1 is passed to Group 2 users)-----> Group 2. I have achieved this