Error in Event manager(TermServDevices)(Event ID 1111.)

Hi,
I am getting this error every hour when ever i see the logs. i get the same error "TermServDevices" 1111. Under This its says
1) "Driver HP LaserJet P1008 required for printer HP LaserJet P1008 is unknown. Contact the administrator to install the driver before you log in again."
2) "Driver EPSON TM-U210D required for printer !!cbkit!cbkit is unknown. Contact the administrator to install the driver before you log in again."
How i resolve this
Please give me the solution please....
Thanks
Romil

For Bing and Google searchers who come across this topic.  Another possible solution is to log on to the remote server, go to Start > Administrative Tools > Terminal Services Configuration.  Select the Connections folder and double-click
the RDP-Tcp item.  From the new dialog box, click on the Client Settings tab and under the Disable the following section, check the box for Windows printer mapping.  Click Ok to the Terminal Services Properties box.  For all future remote sessions,
error 1111 should not reappear.  This worked for us when logging into a Windows 2003 Server system.

Similar Messages

  • Training & Event Management --Mutiple events to be scheduled for event type

    Hi Experts,
    I have an requirement  where we need to schedule  an course /event for a event type (D) for the entire year on weekly basis.
    Please advise.
    Regards,
    IFF

    Hi IFF,
    Please make use of PSVP - Enter demand 16 for each quarter and you'll have a weekly schedule.
    Regards,
    Dilek

  • Training and Event Management -- Business Event Follow Up

    Hi Experts,
    I have firmly booked the event in PV12 transaction.
    When I am doing follow up through transaction PV15, I am getting error message event not started yet.
    Please advise.
    Regards,
    IFF

    Hi ,
    You can only do follow-up of Business event on or after the date that the Business event has been scheduled to take place, and has been firmly booked.
    Such as if the Buseiness event is for 30 th Dec 2011, you can do follow-up on 30th Dec 2011 or after this date.
    Regards,
    Soomra

  • Training & Event Management - Business event appraisal

    Dear all,
    Wish you all a very Happy new year.
    I hve two questions.
    1. For e.g. there is one trainer who has conducted many training program in an org and business event appraisal has been performed where there is criteria to capture instructor information. Then how I can get a report for that trainer only. There is one selection criteria in the report of business event appraisal where I can select the instructor(appraisee) id. But it is not working.
    2. When there are more than one instructor in one business event, then how attendee appraisal and business event appraisal are done?
    3. In training & event mgt is it possible to perform periodic appraisal?
    Thanks,
    Have a happy weekend.
    Daniel

    Hi Daniel,
    There is no SAP standard report on Trainer wise attendance history for this purpose you have to define the Adhoc query.
    When there are more than one instructor in one business event it is a tough scenario to have attendee appraisal .
    In TEM it is possible to have periodic Appraisals.
    Warm Regards,
    Kapil Kaushal

  • Training and Event Management Business Events

    Hi Experts,
    I would like to know if there is any BAPI/ FM available to create a Business Event Under particular Busness Group and Type.
    I have Some more things to have a clarification on
    1. When we create Business Event in PV10, Where all the data is stored? is there any master table which holds the all values in that screen? or values are stored in separate tables? if they are in separate tables, may i now what are them and the associated infotypes also.
    I debugged the Tcode to find out which FM?BAPI is getting Called while saving the data, but could not find the exact one
    Please let me know the FM/BAPI to create a business Event
    Thanks in Advance

    Hi ,
    I am facing this issue in LSMW.
    Is there a way to capture the below BDC code in the LSMW recording itself?
    Tips,
      PERFORM bdc_dynpro      USING 'SAPLRHSV'  '1001'.
       PERFORM bdc_field       USING    'BDC_CURSOR'
                                                          'PLOG-PLVAR'.
       PERFORM bdc_field       USING    'BDC_OKCODE'
                                                          '=CONF'.
       PERFORM bdc_field       USING    'PLOG-PLVAR'
                                                          '01'.                               " Current plan

  • Training & Event Management -- Business Event Types

    Hi Experts,
    I have to group trainINgs Department wise.
    Like Power Plan Department has courses like Basic Course, Expert Course.
    In basic courses we have training programs & also under expert course we have we have training programs.
    And for induction all the employees have to go through some set of trainings initially before joining companny.
    Their are external training also in each department. How to cater internal and external training requirement.
    Thanks in Advance.
    Regards,
    IFF

    Hi KRC,
    Thanks for the prompt response.
    For External & Internal Trainings Should I create a Hirerachy that avbove power plant - L ,
    As external or internal courses.
    External
          Power Plant
               Basic
                 Basic Course External - 1
                 Basic Course External -2
             Expert
                Expert Course External - 1
                Expert Course  External -2
          Administration
            Basic
                 Basic Course External - 1
                 Basic Course External -2
             Expert
                Expert Course External - 1
                Expert Course  External -2
    Internal
          Power Plant
               Basic
                 Basic Course Internal - 1
                 Basic Course Internal -2
             Expert
                Expert Course Internal - 1
                Expert Course Internal -2
          Administration
            Basic
                 Basic Course Internal - 1
                 Basic Course Internal -2
             Expert
                Expert Course Internal - 1
                Expert Course Internal -2
    Thanks in Advance.
    Regards,
    IFF

  • Attendance Requested Status in Training & Event Management

    Hi Friends,
    In Training & Event Management, the  User goes to the u201CTraining Centeru201D in ESS to submit his nomination for a Business Event to the Immediate Superior. (Path : ESS, Training Center, Booking Offer, Add to Basket, To Basket, Proceed to Request, Request Attendance).
    Now for that User, the Status comes as u201CAttendance Requestedu201D  for that Business Event & a Workflow is triggered to his Immediate Superior for Approval.
    When the User refreshes the screen or logs in the ESS again the Status u201CAttendance Requestedu201D for that Business Event vanishes although the Immediate Superior has not approved his Attendance Request.
    It is desired that the Status u201CAttendance Requestedu201D should be displayed in the Users  u201CMy Bookingsu201D  till the Immediate Superior approves it.
    Also it is desired to have a report of how many such  u201CAttendance Requestedu201D nominations are pending for a specific Business Event.
    Pls advise.
    Warm Regards,
    Abhijeet

    1.  define factory calendar in the tcode SCAL and the same thing you have to assign in the img-training and event management-business event preparation-location-create location- there you have to assign factory calendar.
    2. if you want training schedule you have to go img-training and event management-business event preparation-define time schedule if you enteer into that you should in the first coloumn any number for ex 01 3 day schedule and you have to select this and click on day segment in day segment give normal again select normal and click day schedule there you should give start and end times of the schedules for morning,afternoon and evening and this time schedule you will assign to the business event type which comes under business event preparation
    also see:
    S_AHR_61011887 - Master Data Catalog
    check the tcode OOET OOEG----to create business groups and business events

  • Training Calendar in Training & Event Management.

    Hi Gurus,
    Do we have any option for Training Calendar in T&EM? Where can we create it?
    My client has a requirement that if he designs a training calendar for a year or a quarter, relevant employees at supervisory level has to get mail about the designed training calendar. I hope this is possible through workflows. Please correct me if I am wrong.
    Points assured!
    Thanks in advance.
    Nivedita.

    1.  define factory calendar in the tcode SCAL and the same thing you have to assign in the img-training and event management-business event preparation-location-create location- there you have to assign factory calendar.
    2. if you want training schedule you have to go img-training and event management-business event preparation-define time schedule if you enteer into that you should in the first coloumn any number for ex 01 3 day schedule and you have to select this and click on day segment in day segment give normal again select normal and click day schedule there you should give start and end times of the schedules for morning,afternoon and evening and this time schedule you will assign to the business event type which comes under business event preparation
    also see:
    S_AHR_61011887 - Master Data Catalog
    check the tcode OOET OOEG----to create business groups and business events

  • Training & Event Management - URGENT

    Dear Colleagues,
    Require a clarity on the Follow Up Event activity.
    Is it a part of Training & Event Management OR LSO?
    Regards,
    Garima

    Hi Garima,
    As I replied in previous post yes it is part of TEM as a basic process. Tcode is PV15.  
    Please find it SAP access menu under Training and Event Management > Business Events > PV15 - Follow Up  
    Regards,
    Omid

  • DVD Event Manager = question

    Hello,
    I have following question regarding the - DVD Event Manager
    (DVD Event
    Manager.dcr). Basiclly all tutorials I have seen, are
    refering to use - DVD
    Event Manager - with Shockwave. I would like to use the - DVD
    Event
    Manager.dcr - inside a projector.exe, which I would like to
    distribute on
    DVD together with DVD movie itself. Follwoing question
    regarding:
    Does the enduser have to install shockwave, when the project
    is delivered as
    projector.exe?
    Thank you in advance,
    Walter

    > Does the enduser have to install shockwave, when the
    project is delivered as
    > projector.exe?
    No.

  • TRAINING AND EVENT MANAGEMENT - ERROR

    Dear SAP Experts,
    I am working on the module TRAINING AND EVENT MANAGEMENT.
    While using transaction PSV2 - DYNAMIC BUSINESS EVENT MENU, when i click on BUSINESS EVENT TYPE in that create W/O RESOURCES, I get an error.
    PLANNING PERIOD IS NOT IN BUSINESS EVENT TYPE INTERVAL.
    Can you please guide me in this.
    Please tell me where i am going wrong
    Thanks in advance.
    Regards
    Aniruddha

    Hi all,
    PLANNING PERIOD IS NOT IN BUSINESS EVENT TYPE INTERVAL (on LSO_PSV2)
    I have the same error ...
    Does anyone know?
    thanks in advance, Sony

  • Error when activating update rules for R/3 training and event management

    hi all,
    when iam trying to activate update rules for training and event management cube it is giving fallowing error."IC=0PE_C01 IS=0HR_PE_1 error when checking the update rules
    Message no. RSAU461".
    please guide me how to solve this issue.
    thanks & regards
    Vamshi D Krishna

    Hi Vamsi,
    Have you followed the following document to implement HR ?
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/a0780530-bf03-2b10-d5ad-e9e8a53def23

  • Error in Training & event management

    Hello All,
    This is an issue regarding Trainings & event management.
    When trying to book attendee through PSV1, i am receiving error " Attendee cannot be booked,  attendee is not available for business event"
    I checked the emp details regarding his:
    - Org assignment details
    - hiring date
    - his work schedule pattern
    - if he has taken any absence on tha particular day. etc...
    All of the above seems fine.  Actually this problem occured for emp belonging Manufacturing dept (i.e per area) & not to other dept employees.
    Hence i want to askif it has something to do with entity?? ( i.e Per area specific)
    Is there any thing more needs to be chekced for this emp? Please help.....
    Points assured!
    Thanks & regds,
    Nithi

    Hello All,
    Thanks for your replies. I chekced the WS rule for the emp he is working from Mon -Fri (8:30 - 17:00)
    The trainig is conducted from Tuesday - Friday (32 HRS - 4 days a week from 9:00 am to 18:00pm)
    I checked all the settings but couldnt find anything specific.
    Actually the problem is arising for only specific Personnel area & comp codes employees. For rest of the empployees belonging to other per area & comp codes is working.
    Is there any comp codes & per areas specific settings for buss events?
    Please help
    Thanks & regds,
    Nithi

  • Cancellation Error during Internal Activity Allocation in Event Management

    Hi,
    we use Internel Activity Allocation in Event Management.
    The User wanted to cancel a document, so he did.
    But now the status is (red-lihted) "Error in doc. cancellation 1".
    Our systems, R/3 and HR, are located on the same server.
    How could I cancel the document now?
    Do I have to post the same negative worth in CO?
    Greetings,
    Philip Beilharz

    Hi,
    I have resolved the above error. it was due to master data maintainence.
    But now while posting i am getting an error that " Activity type XYZ can not be allocated to 2008"
    Can someone help with this?
    Regards
    TS

  • Training & Event Management - ERROR while creating a Business Event

    Dear All,
    My issue is - i have created my Business event groups n event types. when i right click on BET (or PV10) and create With/WIthout resources i am unable to save. i.e. i am unable to create a Business Event. when i click on save the screen doesnt get saved and the business event is not created under BET.
    But the icon pops at the Location. i have created few Locations via OOLC too
    Is there any setting iam missing?? Request your help to get this resolved.
    Thanks
    Priya R

    Hello Experts,
    Can you help me in creating a job in HR.
    I am trying to create job through Expert Mode, but I am
    getting an error as “object type C info type 1000 cannot maintained via basic transactions”
      Waiting for your valuable reply…

Maybe you are looking for

  • Manipulating fields in a view

    I have a table with a date and a time and I really need that data in a datetimestamp format.  I'm trying to avoid creating a custom table and a custom program to get this information that already exists in this table. If I put the data in a view, is

  • Power Mac G4 MDD won't wake from sleep mode

    I have a Power Mac G4 MDD 1.25GHz with a 15" Apple display and running 10.4. I can not wake the computer up from the sleep mode. It will not respond to the mouse moving, a mouse click, a keyboard key, the power button on the display or the power butt

  • Href links in slideshow not working

    hi, I have created a non-flash slideshow with WOW Slider which I find to be a very good program and is jquery based. the actual slideshow runs fine on iPad, my PC - and Android devices, but: the six slides have links embedded to other websites, that

  • CALL RFC DATA FROM TWO LINKED TABLES IN EXCEL VBA

    Hi, I am using Excel VBA to call information from tables in SAP. This is working correctly, however I now need to be able to call information from another table where the two tables are linked by a common data field. Example. The first table I have l

  • Problem deploying bpel process to oc4j_soa container on separate server