Error in scheduling aggr for GIT

Hello All,
We have a requirement wherein we need to uncheck the IR and give net price as 0 for scheduling agreement.We are doing a dummy GR(for Goods in Transition).For this the user wants to unchekc the IR indicator and give net price as 0 but the system is giving error
'No delivery costs allowed without invoice receipt'.This is more of CIN releated.please help me find a solution.
Thanks,
Rakesh.

Hi,
  This error will come if you have not maintained Define scheduling parameters for production orders.
Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
And in Define production scheduling profile - OPKP, link your order type in the page below.
In material master work scheduling view, input production sch profile or prod scheduler.
Regards,
Dharma

Similar Messages

  • Error while scheduling report for SAP users

    Hi All,
    We have SAP authentication enabled in our BO environment. (BO XI 3.1 sp2 FP 2.6 on windows 2003 server).
    There are some webi reports based on BW Bex queries that we are trying to run on behalf of certain SAP end users. This we are doing using "schedule for" option.
    Now what is happening here is if the end user has logged in once in BO system ,it runs fine. But in case user has not logged in to BO (using infoview etc.) ,it throws error saying "incomplete logon data" . Also if user changes or reset his password in BW and if he doesn't login to infoview after that ,system throws another error "Name or password incorrect (repeat logon)".
    Based on these observation, we are suspecting if BO system uses stored SAP users credentials while scheduling report for them based on their last login.
    Would like to mention here that we have checked option "automatically import users".
    Please advice if this behavior is normal or we are missing some setting.
    Thanks in advance,
    Chandra

    Hi All,
    Any pointers or suggestions for this issue ??
    Is there a setting/option avialable in CMC which could resolve these errors.
    Or, user has to login once to infoview in all circumstances to avoid these errors.
    Thanks,
    Chandra

  • Error in scheduling parameters for production orders

    Hi Guys,
    Greeting for the day u2026u2026u2026.
    I am trying to create production orders creation for own order  type ex MM01, but I am getting error message as u201C scheduling parameters are not defined for the order type u201C even though I have maintained following parameters as below,
    Production scheduler      -
    xxxxx,
    Detailed scheduling -
    check box of scheduling ticked,
    Rough cut scheduling    --- scheduling id u201301, scheduling and generate capa requi,, boxes     ticked,
    Adjust scheduling  -- requi to operation  date,
    Scheduling control for detailed scheduling ---backwards and check box of auto scheduling ticked
    Operation segment ---setup,
    All operation in order will be reduce
    Do not reduce,
    Could any one light on this issue,
    Thanks in advance,
    Mohan

    Hi,
      This error will come if you have not maintained Define scheduling parameters for production orders.
    Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
    And in Define production scheduling profile - OPKP, link your order type in the page below.
    In material master work scheduling view, input production sch profile or prod scheduler.
    Regards,
    Dharma

  • Error when scheduling job for Job Control LO

    Hi all,
    I tried to schedule the job for collective update after I set the job parameter in tcode LBWE for LO Data Extraction. But they said 'Error generating job' without any description why.
    Maybe you can help me about this since I still can't do the delta extraction for LO.
    Thanks and appreciate for your help.
    -Martin Darmawi-

    Hi!
    You have to pass two parameters for job control scheduling.In that you have traffic light for the respective parameters,defaulty those will appear in red.when you have specified parameters,both turns in to green.then you can say start.hope this will helps.....
    Best Regards
    Sunil.

  • Error when scheduling infopackage for PA_PA OEMPLOYEE

    hi all,
    when iam scheduling info package for OEMPLOYEE it is giving error like "0EMPLOYEE : Overlapping time intervals of data record 298 with 305 : '['20040831'/'20040324'] '[to/from]     RSDMD 190 ".
    iam unable to solve it.please help me in this issue.
    thanx
    Vamshi D Krishna

    Hi,
    This is a problem of time overlapping. As this is a master data, if for the same employee, the date overlaps then it will show you this error. Let me explain with example..
    EID      Valid from      Valid to
    1001    01.01.1000     10.01.2009
    1001    08.01.2009     31.12.9999
    In the above case, the dates for EID 1001 is overlapping. When you load this data, it will show you the dates are ovelapping.
    So, first correct the data into the saource i.e. record number 298 with 305 and then upload again..
    This will solve your problem...

  • Errors when scheduling scenarios for agents using load balancing

    Hi,
    I have set up my ODI environment and have successfully manged to:
    * run scenarios manually in development repository
    * schedule scenarios and run on execution repository with one agent.
    However when I try to set up a second agent to load balance the scenarios I get the following error below.
    It seems to be a load balancing problem because I can run the scenario's successfully in every other case.
    I am running an oracle RAC database. (2 servers, one oracle instance on each). I have set up one ODI agent on each server and I am trying to load balance between these 2 agents.
    In topology I have set up 1 logical agent. Physical agent 1 is linked to itself and also to Physical Agent 2 under the load balancing tab.
    For my scenario's I have 2 master scenarios (which are the ones scheduled) that call a number of other scenarios in the correct order.
    Could anyone assist me please?
    Thanks,
    Matthew
    Error:
    ====
    java.lang.NullPointerException
         at com.sunopsis.dwg.cmd.DwgCommandScenario.treatCommand(Unknown Source)
         at com.sunopsis.dwg.cmd.DwgCommandBase.execute(Unknown Source)
         at com.sunopsis.dwg.cmd.e.i(Unknown Source)
         at com.sunopsis.dwg.cmd.g.E(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpScen.a(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpScen.localExecuteSync(Unknown Source)
         at com.sunopsis.dwg.tools.StartScen.actionExecute(Unknown Source)
         at com.sunopsis.dwg.function.SnpsFunctionBaseRepositoryConnected.execute(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execIntegratedFunction(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTaskTrt(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpSessTaskSqlS.treatTaskTrt(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTask(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpSessStep.treatSessStep(Unknown Source)
         at com.sunopsis.dwg.dbobj.SnpSession.treatSession(Unknown Source)
         at com.sunopsis.dwg.cmd.DwgCommandScenario.treatCommand(Unknown Source)
         at com.sunopsis.dwg.cmd.DwgCommandBase.execute(Unknown Source)
         at com.sunopsis.dwg.cmd.e.i(Unknown Source)
         at com.sunopsis.dwg.cmd.g.y(Unknown Source)
         at com.sunopsis.dwg.cmd.e.run(Unknown Source)
         at java.lang.Thread.run(Unknown Source)

    Hi,
    I'm wondering whether there may be a design flaw in the way our scenario's have been created / are executed.
    Currently we have x number of scenarios executed by a x master scenario.
    There are also y number of scenarios executed by a y master scenario.
    These master scenarios are the ones scheduled against the agent and they call the "sub-scenarios".
    We experience the above error when one of the "sub-scenarios" of a master scenario is executed on a different agent to where the master scenario is executed.
    Any help greatly appreciated.
    Thanks,
    Matt

  • No Schedule Lines for Delivery upto selected date

    Hi,
    I have a scenario for Repairs order. Following are the steps of my scenario:
    1. Create a Repair Order.
    2. Create return delivery to recieve the faulty item.
    3. Create Outbound Delivery to send a loaner item to customer (This item would be returned once the returned item is repaired and sent to customer)
    4. Send the item after repairing.
    5. Receive the loaner item.
    When I am trying to create outbound delivery for Loaner item, i am getting an error "No Schedule Lines for Delivery upto selected date".
    I have checked and verified the schedule line date.
    I have checked for Confirmed Quantity.
    Below are the screenshots. Please let me know how can this issue be resolved.

    Hi,
    With reference of your screens,I can see there is no qty in the field loner hence you are getting issue.
    1.May I know ,why you have checked indicator -Repair?
    because ,you are not going to repair the goods.You are just sending loner items to customer.In this case what is the use of to indicate repair ?.
    Thanks,
    Naren

  • Production scheduling profile for production order type 10 does not exist

    Kindly suggest me how to resolve this error
    Production scheduling profile for production order type 10 does not exist

    Hi Archana,
    Go to material master-work scheduling view and check what is the production scheduling profile maintained for the same materisl -plant combination.
    then go to OPKP and check if production scheduliong profile is maintained for relevent order type 10 in custmizing. If not maintain one and it should resolve the error.

  • BAPI Error: No schedule lines due for delivery up to the selected date

    Hi,
    I have created a program to create delivery orders with reference to sales orders using BAPI - BAPI_OUTB_DELIVERY_CREATE_SLS.
    After execution I get the error: No schedule lines due for delivery up to the selected date
    Please help.
    Thanks in advance!!!
    Regards,
    Sriram

    hi,
    this is to inform you that,
    please check the schedule line date in the sales order because the date is not matching here for the BAPI to upload.
    here,  for example the schedule line is 4 days after and you are running BAPI today. that will mismatch no.
    the same thing is happening in uploading case also.
    so please check the date.
    because in teh sales order if teh schedule line date is today it will accept the uploading with out throwing any errors.
    regards,
    balajia

  • Error in Schedule Background Job for Deadline Monitoring of swu3

    While Auto Customization swu3 i am getting error message 'Output device "" not known' in 'Schedule Background Job for Deadline Monitoring'
    Please advice what could be cause of it

    the earlier problem of background job was solved by changing the  output device assigned to user wf-batch .
    regarding the transport request :
    when i was trying to execute the step : "Schedule bakgrd for missed deadlines " MANUEL it was giving me an option of SAVE AND SCHEDULE . which was creating the transport request . but when i executed it automatically it worked fine without asking a request to me ... i don't know why )-: ... probablly we can specify a different interval then the standard of three minutes and which will be transported (it's just a guess) . i have  executed it  automatically ...
    well thanks all for u r help

  • Background Processing? how schedule job for "System Error" Message .

    Hello everyone,
    in sap help i have read.
    http://help.sap.com/saphelp_nw04/helpdata/en/5a/f72040599a8f5ce10000000a155106/frameset.htm
    PCK> Monitoring>Message Monitoring-->Background Processing
    you can schedule jobs for various background processing:
    ●     Archiving of messages processed successfully
    ●     Deletion of messages that are not to be archived
    ●     Restarting of messages with errors
    ●     Rescheduling of lost messages
    can anyone understand this docu?
    give me some introduction, how can i define and schedule these jobs ?
    thx in advance!!
    best regards
    Yaning

    Background Processing
    Prerequisites
    You have started the message monitor on the initial screen of the PCK and are in Background Processing.
    Features
    Archiving
    You require two archiving sessions to archive messages:
    ●     One session to write the messages to the archive
    ●     One session to delete the persisted messages that have been archived
    To do this, you schedule an archiving job, which implicitly schedules the sessions to write to the archive and delete the archived messages.
    You can define one or more rules for each archiving job; these rules contain conditions that a message must meet in order to be archived by the job. At least one of the defined rules must be met for archiving to take place.
    All information that is displayed for a message in message monitoring is archived, in addition to the audit log for each message.
    Deleting
    A standard delete job is created automatically. It runs once a day. You can schedule additional delete jobs; however, you cannot define rules for them.
    Restarting
    Instead of restarting messages with errors manually with message monitoring, you can schedule a job to automatically restart these messages. This is possible for all messages for which the number of defined restart attempts has been exceeded (messages with the system error status).
    You can define one or more rules for each job to restart messages; these rules contain conditions that a message must meet in order to be restarted by the job. At least one of the defined rules must be met for archiving to take place.
    Rescheduling
    A standard job to reschedule messages is created automatically. The job runs once a day and ensures that messages lost as a result of database failure, for example, are rescheduled. You can schedule additional rescheduling jobs; however, you cannot define rules for them.
    Thx Aamir.
    But I mean the messages with errors in Adapter Engine , not in Intergrations Engine.
    the situation is like Naveen Pandrangi's WebLog
    II. Errors in Adapter Engine [XI :  How to Re-Process failed XI Messages Automatically|XI :  How to Re-Process failed XI Messages Automatically]
    I
    Till now we have seen how to resubmit/restart message that failed in Integration Engine.  One a message makes it from Integration Engine to Adapter Engine, the message is flagged as checked in Integration Engine. The status of the message in Adapter engine does not effect the processed state in Integration Engine. Now if this message was asynchronous, XI will by default try to restart the message 3 times at intervals of 5 minutes before the status of the message is changed from Waiting to System Error .
    *how can i schedule a job to automatically restart these messages with errors?
    best regards
    Yaning
    Edited by: Yaning Liu on Aug 18, 2008 1:43 PM

  • Error while doing  GR for scheduling aggrement

    Dear Experts,
    We are facing error while doing GR for scheduling aggrement.
    we have done the following steps.
    1) Scheduling aggreement in ME31L
    2) Released in ME35L
    3) Mainatined Sch.Agmt Schdule in ME38 for todays and date 200 qty and other line is 800 qty.
    When we are trying to do GR in MIGO system is giving the following message.
    Document 5500000152 does not contain any selectable items
    can I know what I have missed in the above steps.
    Please guide me to resolve this.
    Regards,
    Prasad

    Hi,
    Please check Please check if Gr is already done against this document.  Also please check whether you have attached SA in the source list with line items.
    T-code:ME01
    Enter Mat.code & Plant.
    In the next screen pl.do the following:
    Valid from - commencement date of the SA
    Valid to - End date of the SA
    Vendor - Vendor on whom the SA is released
    POrg - Your purchase organisation
    PPL - Leave it blank(This is only for interplant)
    OUn - Ordering unit
    Agreement - SA number
    Item - 1
    I hope this will resolve your issue. Thanking you

  • Error "No schedule line due for delivery upto the selected date"

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).It allows to create a OBD either I change the delivery date in sales order to 04.09.2008 or create a delivery with delivery date 18.09.208.
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

  • Libgit2 Error - Trying to checkout/clone a git repository with Visual Studio Tools for Git

    I'm trying to clone a branch from our git repository using Visual Studio Tools for Git. I'm doing the following:
    1. We have a local server that stores all our repositories and they are tracked using GIT+Stash
    2. I create a subbranch B1 from master in repository X using stash
    3. Stash will give me a URL in the form http://user@stash:7990/src/x/repository.git
    4. I go to Visual Studio (where I already installed Visual Studio Tools for Git) and follow the instructions to clone this branch to my local machine using the procedure as described in: Open and Clone a Git team project http://msdn.microsoft.com/en-us/library/hh850445.aspx#remote_3rd_party_connect_clone
    5. Visual studio shows the following error: An error occurred. Detailed message: An error was raised by libgit2. Category = Zlib (Error).
    Failed to inflate packfile
    What is libgit2? Is there anything I should change in my settings or paths? The only workaround I have found for this issue is to clone my branch through Source Tree (third party tool) and then open visual studio, then any other functionality will be fine
    (e.g. commits, push, sync, pull etc, all this I can do directly from Visual Studio)... but why can't I clone from Visual Studio?
    Notes:
    - We're not using TFS (i.e. we only use Git and I'm effectively trying to do the step found in this URL: http://msdn.microsoft.com/en-us/library/hh850445.aspx#remote_3rd_party_connect_clone)
    - We use Atlassian Stash (installed in our servers) to create the repositories and branches
    - I'm using Visual Studio 2012
    David

    Hi David,
    I am sorry that I can't reproduce your issue on my machine. I can't set the shared folder path (\\DEVELOPMENT) as local path, but I can set D:\folder which maps to the
    \\DEVELOPMENT path as the local path.
    Maybe you can submit one feedback on the Microsoft Connect site here above your issue:
    https://connect.microsoft.com/VisualStudio/feedback/CreateFeedbackForm.aspx?FeedbackFormConfigurationID=5303&FeedbackType=1
    Thanks.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Script to delete expired or errored scheduled workbooks for Discoverer

    Hi All,
    Can any one pont me to find a script to delete all expired and Errored workbooks in Database for discoverer?
    Appreciate all your assistance.
    Thankks
    -S

    Hi Asim,
    I don't think you can share the results of the scheduled workbook using Desktop. As for Plus, when you're signed on as the other user are you in the same database & eul and are you looking for "scheduled workbooks"?
    Brent

Maybe you are looking for

  • G/L account determination for movement type 702, 309

    All SAP Gurus, In our plant, for movement type 702 (inventory count), 309 (material to material transfer), some /L account assignment is wrong. I suppose these settings are in Keys GBB, AUM and PRD. Will cahnging the G/L accounts n these keys will gi

  • Can't open INDD files from Bridge or Windows Explorer

    I upgraded from CS2 to CS4 in Jan 2009, but didn't uninstall CS2 until yesterday because the program file sizes seemed weird: CS4 was listed as less than 6Mb in the Add/Remove Programs list, while CS2 was shown to be many times that size (gigabytes?)

  • Ignore fields in File Content Conversion

    Hi all, I need to read first 9 fields in Content conversion from text file and ignore all the others.The problem is I don't know exactly the number of fields(it varies from file to file). I try to use the following in my content conversion: item.fiel

  • Converting draft document to invoice document

    Hi everyone -- new SBO developer here, trying to come up to speed on the SDK.  I'm curious how you manage to "convert" an existing draft document (in my case, a draft A/R invoice) to an actual A/R invoice, and then add it at the same time.  Say, for

  • When will be released BS39SP1 ?

    Any body know - When will be released BS39SP1 ? Serg