Exchange variant context menu option in Process Chains

Hello Masters,
I would like to know about the context menu option Exchange variant in Process Chains. Could you please educate me on this.
Thanks and best wishes,
i-bi

Hi,
Every process step is associated with a variant (process step actually <b>is</b> a variant). To exchange the variant would mean removing the existing one and replacing it with another.
After exchanging it click "check". The interface is somewhat buggy...

Similar Messages

  • Add "make unique symbol" button and context menu option

    I often want to make a variation of an existing symbol that is already positioned on the page. Unless I'm missing something, the steps are to duplicate existing symbol in the symbols palette, then replace the selected symbol instance, using the "replace symbol instance" in the Control Bar. Why not have a context menu option "make unique symbol" that automatically replaces the instance with new, unique symbol? I'd also like to see "Edit Symbol" added to the context menu. I'm hovering over the symbol, why should I have to go find the "edit symbol" button? I realize I can double-click the instance, but this does not work in all cases, such as when the direct select tool is active.
    If you've used SketchUp, you know where this idea comes from.
    Thanks,
    Ray

    No, I want to make a new, unique symbol of an existing symbol instance. If I choose "break link" from the context menu or symbols palette, the artwork is no longer a symbol and after editing, must converted to a symbol using the symbols palette. This requires several, unnecessary steps. At the very least, I'd like to see "Make new symbol" added to the context menu. If you're a SketchUp user you'll know exactly what I'm talking about. Seems incidental, but AI's method is inefficient.

  • Error when using the report context menu option Goto - Documents

    Hi gurus,
    I'm doing some report tests via Analyzer and when a try to use de context menu option "Goto -> Documents" and try to create a new document, the following errors occur:
    "CANNOT GET THE FOLDER FOR ASSIGNMENT"
    "ERROR WHILE LAUNCHING NEW DOCUMENT DIALOG"
    I'm using the nw2004s version. Could someone help me out?
    Thanks in advance.

    Hi Thaigo,
    We are also having the same problem with 2004s SP9 and SP10.
    1. All the 0TCA* are active.
    2. Super admin role is assigned.
    But still getting the above three errors. Somebody who have overcome this problem please share the corresponding changes to be made in KM Configuration
    Thanks and Regards
    Giri Nath

  • Blank labels in the context menu in the process designer window

    Hi,
    I am using Windows 7 and  a livecycle workbench version:
    Adobe LiveCycle Workbench ES2
    Version: 9.5.0.0.20100908.1.247189
    The context menu is blank in the  process designer window . I can see that there should be menu items but without  text labels, so I can't work with a process because I don't know which is which. I added "-Dosgi.nl=en" to workbench.ini and set local regional setting (from control Panel) to English but it didn't help. There are no exceptions in the .metadata/.log.
    Any ideas?

    I know that this issue is connected to non-English version of Windows 7. I added en-US as my first language in my browser(Internet options).
    There are also correct values in the Workbench's Configuration Details:
    osgi.nl=en
    osgi.nl.user=en
    Does anyone have similar problem? On the LiveCycle Start Page I can see that Adobe Flash Player's Settings are still non-English.

  • Toggle Option in Process Chain not working

    Hello SDNers,
    I am experiencing the below scenario with one of my process chain.
    Process Chain FLow
    Start
    |
    |
    Local Chain (To delete the already existing file from Application Server(ZFTP))
    |
    Local chain to rename the file
    |
    |
    Local chain (Load data to cube)
    |
    |
    Local chain to backup a file from Appl. Server
    In the above flow, the step 2 has been set to proceed further even if there are no files to delete in the application server. To achieve this I am using a toggle option between the step 2 and 3.
    At times, the chain progress further when there are no files to delete as expected but not all the times.
    I am trying to figure why the step which is supposed to progress further is not progressing some times even though it has been set to move further.
    Any advice would be helpful.
    Regards,
    Vinoth

    Hello Venkatesh,
    Thank You for your Patience.
    I have BW systems both running in the SAP_BW Versions 730 & 701.
    I have checked the folders " Other BW Processes " & "Other" and below are the process types.
    Other BW Processes
    Attribute Change Run
    Adjustment of Time-Dependent Aggregates
    Deletion of Requests from PSA
    Deletion of Requests from the Change Log
    Execute Planning Sequence
    Switch Realtime InfoCube to Plan Mode
    Switch Realtime InfoCube to Load Mode
    Reorganize Attributes and Texts for Master Data
    Execute Analysis Process
    Update Explorer Properties of BW Objects
    Other
    Event in SAP CPS
    Job in SAP CPS
    Last Customer Contact Update (Retraction)
    Regards,
    Vinoth V

  • Adding a new context menu option to KM

    I want to add a new menu option to KM that appears when a user clicks the context menu of an xmlform generated xml file.
    From reading the forums it appears I need to edit an existing UI Command Group, adding a newly created Command that points to a Java class containing a handler class that implements ICommand?
    -How do I know which command group to add my command to?
    -Can I make the new command appear only for xml files generated by xmlforms?
    Cheers,
    Steve

    Hi Steve,
    <b>-How do I know which command group to add my command to?</b>
    You have to know what layout set is used in the navigation iView. If you do not know this, you have can add your user to the Debugging Settings list (KM Configuration -> Content Management -> User Interface -> Debugging Settings) and click on the Rendering Information link in the iView.
    After that you can go to the Layout Set settings ((KM Configuration -> Content Management -> User Interface -> Settings -> Layout Set) and check the settings of the Resource Renderer in use. For example if use the AdminExplorer LayoutSet you'll have to take a look at AdminResourceRenderer configuration. There you can see the Command Group used for Resources (Resource Command Group).
    This is the group you have to edit.
    <b>-Can I make the new command appear only for xml files generated by xmlforms?</b>
    Unfortunately you can only use different groups for Resources, Folders and Links but not for different type of Resources.
    Hope this helps,
    Robert

  • Delete Indexes  Variant ended with errors in Process chain

    Hi experts,
    I have a process chain which executes dialy to load data Info Cube we create the index and finally  we delete the index after that we have few variants..
    Remaining all variants are executed with out errors except delete index variant I checked the error message it shows that <b>" The system has not finished loading request APO_R46PWZHRIA7JS9NOM8X879QEZJ into data target ZUP_CARF1"</b>
    It  is so happened weekly twice or trice not every day.  one day it was running with out any errors and one day this process chan was ended with errors.
    I need to know the  reason why this variant was executed with errors.?
    I need your valule sugestions regarding this issue.
    Regards
    sailekha

    hi sailekha,
    therevare some functional constraint of processes.
    while deleting indexes
    it is not possible to:
                                  loading
                                  indexes are being built
                                  stastics are being built
                                  during rollup
                                  while compressing
                                  while updating.
    my be u can check which is the other process chain that does all above oprations in concerned infoprovider.
    bye

  • Default context menu options in Multisim 11

    Below is the right click context menu that I get when clicking in the blank area of a sheet in Multisim 11.  The Properties option is not listed so it appears that another option is selected somewhere in settings.  I have tried to do a repair on the installation as well as an uninstall/re-install procedure without luck.  How can I restore the default right click context menu?
    Thanks,
    Thomas Meiswinkel

    I'm having the same issues, but I tried deleting all the files in the Config folder (Options<Global Preference) but it still hasn't fixed anything. Here's my right-click on any component as well:
    Attachments:
    Right Click.jpg ‏14 KB

  • Information Broadcast - how to get options for process chains?

    Hi,
    I try to find out why I do not get the options to trigger the information broadcast through the process chain.
    Every time I try to schedule an information broadcast, I only see the option to schedule the broadcast by time only.
    I tried by creating/activating a process chain and many more ways - with no success in seeing the desired options.
    Who could help and tell how I get the option "Scheduling Set" / "Execution with Data Change in the InfoProvider"? Do I need some add. piece of software?
    Thanks!

    hi ,
    Check these links regarding information broadcast through the process chain.
    1. [http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/296edc90-0201-0010-7982-c6dc0b288296?quicklink=events&overridelayout=true]
    2. /thread/450654 [original link is broken]
    3. broadcasting through process chains
    Regards ,
    Lokesh

  • Hiding Context Menu Options in easyDMS

    Hi,
    I tried to hide context menu items on EasyDMS 7 SP06 according to note  983648 but with no success.
    I've added the registry entry but the items are still being shown in the context menu.
    Any Idea why?

    The registry entry should happen in HKLM instead of HKCU. The note for 7.0 is 1367514 . In 7.0 we have concept of centrally controlled registries. Hope this helps.
    Jomerce

  • Process chain variants suspended

    Hi Friends
    We have daily loads through process chains and every running properly and we are on BW3.5 version.
    However last night all our daily loads start variant just started and cancelled the jobs, the following variants delete index ,data load from R/3 variants not schedulled.
    It's not for only one process chainl,it's happened for all process chains.Just start variant started then the next variant could not started.It's on production system.
    What could be the problem?
    Points will be awarded for the right answers.
    Regards,
    Chama.

    Hi,
    I am not sure about the cause. But we faced a similar situation. I will explain the procedure we peformed to resolve it.
    Symptom: The chain is hanging in yellow state at start variant itself without going further (when it is not getting triggered / process is in yellow for a long time). If that is the case try this.
    Go to Chain in Planning view.
    then go to variant maintenance for the start process. (Where we schedule the chain)
    Select "Start Using Metachain or API" option and save.
    Come back to planning view and Trigger/Schedule the chain.
    Go to Log View.
    Then go to tab "view" and select "Merge active version".
    Come back to Log view and right clic k(context menu) on the process which is in yellow/incorrect process. you will see a message called "Stop process again".
    Click it and then refresh.
    The chain should start running from where it was hanging.
    Procedure for System Administration (Once the chain is over)
    Steps added to put change the Process Chain back to the original stage:
    1. Re-select "Direct Scheduling"
    2. Re-activate and schedule the Process chain.
    Thanks,
    JituK

  • What are process types in process chain

    hi any one tell me what are process types in Process chains

    Hi,
    In the Plan View of the process chain maintenance screen.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
    Use the drag-and-drop function to add the relevant processes into your process chain.
    You use the Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate InfoSources and Data Targets navigation trees.
    If you insert into the chain a process that is linked to additional processes, the respective process variants are generated and inserted into the process chain automatically. These variants are suggestions and can be changed, replaced or removed from the chain if required.
    Only if the attribute realignment run is inserted automatically, do you also arrive at the variant maintenance screen.
    If you want to specify yourself the processes that are to be included in a chain, choose Settings ® Default Chains, and select the Do Not Suggest Processes option. As a result, the system does not suggest, generate, or insert automatically any processes into the chain. This setting is user-specific.
    If the chain that you create does not correspond to the standard, the system displays a warning. You can ignore these warnings if you are sure that you are creating a chain that meets your requirements. Warnings do not affect how the chain operates during runtime.
    Your chain is checked in the checking view and during activation. The system tells you if it discovers any errors.
    Creating a Process Chain Using the Maintenance Dialog for a Process
    You are in the maintenance dialog of a process that you want to include in a process chain.
    1. Choose the Process Chain Maintenance pushbutton and create a process variant.
    2. Save the variant and go back to the previous screen.
    A dialog window appears in which you enter a technical name and a description of the chain that you want to create.
    3. Confirm your entries.
    The Add Start Process dialog window appears.
    4. Create a variant for a start process.
    1. a. On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    2. b. If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    3. c. Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the Plan View of the process chain maintenance screen.
    The various process categories, the application processes, and collection processes are displayed in the left-hand area of the screen. In the right-hand area of the screen, the process chain is displayed.
    If the process that you used to create a chain is linked to additional processes, the respective process variants are generated and inserted into the process chain automatically. These variants are suggestions and can be changed, replaced or removed from the chain if required.
    Only if the attribute realignment run is inserted automatically, do you also arrive at the variant maintenance screen.
    If you want to specify yourself the processes that are to be included in a chain, choose Settings ® Default Chains, and select the Do Not Suggest Processes option. As a result, the system does not suggest, generate, or insert automatically any processes into the chain. This setting is user-specific.
    If the chain that you create does not correspond to the standard, the system displays a warning. You can ignore these warnings if you are sure that you are creating a chain that meets your requirements. Warnings do not affect how the chain operates during runtime.
    Your chain is checked in the checking view and during activation. The system tells you if it discovers any errors.
    5. Use the drag-and-drop function to insert any additional relevant processes into your process chain.
    You use the Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate InfoSources and Data Targets navigation trees.
    Additional Steps to Creating a Process Chain
    6. When you add a process, you need to select a process variant or create a new variant. For collection processes, the system determines the variants.
    Various functions for working with the process are available from the context menu:
    Context Menu Entry for a Process Function Information
    Maintain Variants With the exception of the variants in the collection process, you can use this function to change all process variants.
    Exchange Variants You can swap the variants for an existing variant or a new variant.
    Display Scheduled Jobs Once the process chain is active, you can use this function to display the jobs that have been scheduled.
    Display All Jobs After at least one run of the process chain, you can display, for a specific process, all of the scheduled jobs for this process and all of the jobs with which this process was run. You arrive at the job overview from where you call up the relevant job log.
    Create Message You can also send messages to an application process of the chain, depending on the success or failure of the process.
    1. 1. From the context menu of a process, create an additional process variant of the Send Message type.
    2. 2. If you maintain a message, first specify whether you want the message to be sent when the process has been completed successfully or unsuccessfully. Then choose Next.
    3. 3. You arrive at a window, in which you can select an existing process variant or create a new one.
    4. 4. If you create a new process variant, edit the document that is going to be sent, and maintain a list of recipients.
    5. 5. Save your process variant and go back a step.
    The message process variant is now assigned to your application process. When the message is sent, the status information and the process log can also be sent.
    Wait Time
    You use this function only to debug a process run.
    Specify how long (in seconds) you want the delay to be between one event being triggered and the next process starting.
    You can capture the process by using transaction SM37 (Job Overview) or SM50 (Process Overview).
    Remove Process You use this function to remove a process from a process chain.
    Manage Data Target You use this function in connection with the following types of process variants
    1. • constructing indexes
    2. • deleting indexes
    3. • constructing database statistics
    4. • rolling up filled aggregates
    5. • compressing InfoCubes
    6. • activating ODS object data
    to call up the administration for each of the data targets.
    7. Hold down the left mouse button to connect the processes through events.
    Before you do this, select the process underneath the process type row, and position the cursor over the required process. When you select the process type row, the whole process is moved into the plan view.
    From the context menu of a link, you can display the event or remove the link again. To do this, highlight the link and right-click with the mouse.
    8. If necessary, specify whether you want the event to be triggered after the previous process has been completed successfully or unsuccessfully or whether you want the event to be triggered independently of the outcome of the process that precedes it.
    9. Under Attributes ®Display Components assign a display component to the process chain.
    10. Maintain additional process chain attributes if necessary.
    11. Check your process chain in the Check View and make any necessary corrections.
    The Legend explains the meaning of the different colors used to display the processes and links.
    From the context menu for a process, you can display the messages resulting from the check.
    12. Save your process chain if it does not contain any errors.
    Result
    Your process chain can be activated. After activation, the chain starts in accordance with the start process selections. For example, if you scheduled the start process directly and chose Immediately as the start date value, the chain run starts immediately after activation. In the Log View, you can display the reports for the chain runs.
    Hope it helps.
    Regards,
    Amith

  • Steps for Creating Process chain!

    Hi All,
    I want to create process chain which can schedule IP and run the concern job to fill infocubes/ODS?Can someone please guide me stepwise how to proceed.Some sort of doc will eb appreciated.

    Hi,
       You can either create a process chain directly in the process chain maintenance screen, or by using a maintenance dialog for a process
    Creating a Process Chain Directly in the Process Chain Maintenance Screen
    In the BW Administrator Workbench
      1.      Choose the  Process Chain Maintenance icon from the AWB toolbar.
      2.      Choose Create.
      3.      Enter the technical name and a description of the chain, and confirm your entry.
       4.      Create a variant for a start process.
           On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
           If you choose to schedule the chain directly, enter the start date value for a chain under Change Selections and save your entries.
           Save your entries, go back to the previous screen and confirm your entries in the Add Start Process dialog box.
    The  Plan View of the process chain maintenance screen appears.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
           5.      Use Drag&Drop or double-click to add the relevant processes to your process chain.
    Choose  Process Types to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate  InfoSources and  Data Targets navigation trees.
                   If you insert a process into the chain that is linked to additional processes by default, the respective process variants are generated and automatically inserted into the process chain. These variants are suggestions and can be changed, replaced or removed from the chain as required. Variant maintenance is called when the change run performs automatic insert.
    a.       On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    b.       If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    c.       Save your entries, go back to the previous screen and confirm your entries in the Add Start Process dialog box.
    The  Plan View of the process chain maintenance screen appears.
                   The various process categories, the application processes, and collection processes are displayed in the left-hand area of the screen. In the right-hand area of the screen, the process chain is displayed.
                      If the process that you used to create a chain is linked to additional processes by default, the respective process variants are generated and inserted into the process chain automatically. These variants are suggestions and can be changed, replaced or removed from the chain as required. Variant maintenance is called when the change run performs automatic insert.
                      Choose  Process Types to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate  InfoSources and   Data Targets navigation trees.
            When you add a process, you need to select a process variant or create a new variant. For collection processes, the system uniquely determines the variants.
            Various functions for editing the process are available from the context menu
    Maintain variants  With the exception of the variants in the collection processes OR and EXOR, you can use this function to change all process variants.
    Exchange variants
    You can exchange the variants for an existing variant or a variant that is to be created.
        You can use this function to link a process to a successor process. You can choose from the processes that are not yet linked to the current process. They are grouped according to process type in submenus.
          Display scheduled jobs
    Once the process chain is active, you can use this function to display the jobs that have been scheduled.
           After at least one process chain run, you can display all of the scheduled jobs for a specific process and all of the jobs with which this process was run. The Job Overview appears and you can call the relevant job log.
    Create message
        You can also send messages to an application process of the chain, depending on the success or failure of the process.
    1.       To do this, using the context menu for a process, create another process variant of type Send Message.
    2.       If you maintain a message, first specify whether you want the message to be sent when the process has been completed successfully or unsuccessfully. Then choose Next.
    3.       A dialog box appears, in which you can select an existing process variant or create a new one.
    4.       If you create a new process variant, edit the document that is going to be sent and maintain a list of recipients.
    5.       Save your process variant and go back.
    The message process variant is now assigned to your application process. When the message is sent, the status information and the process log are also sent.
    Only use this function to debug a process run.
    Specify how long (in seconds) you want the delay to be between one event being triggered and the next process starting.
    You can capture the process in the debugger by using transaction SM37 (Job Overview) or SM50 (Process Overview).
    Remove process
    You use this function to remove a process from a process chain.
    Manage data target
    You use this function to call the data target administration for the following types of process variants:
             Construct index
             Delete index
             Construct database statistics
             Roll up filled aggregates
             Compress InfoCube
             Activate DataStore object data
           7.      Hold down the left mouse button to connect the processes with events.
    Before you do this, select the process underneath the process type row, and position the cursor over the required process. When you select the process type row, the whole process is moved into the plan view.
    From the context menu of a link, you can display the event or remove the link. To do this, select the link and right-click with the mouse.
           8.      If necessary, specify whether you want the event to be triggered after the previous process has been completed successfully or unsuccessfully, or whether you want the event to be triggered independently of the outcome of the process that precedes it. If the process that triggers the event has more than one option, choose the option after which the successor process is to be run
           9.      Assign a display component to the process chain using Attributes
         10.      Maintain additional process chain attributes if necessary.
         11.      Check your process chain in the  Check View and make any necessary corrections.
    The  Legend explains the meaning of the different colors used to display the processes and links.
    From the context menu for a process, you can display the messages resulting from the check.
    During the check, the system calculates the number of parallel processes according to the structure of the chain . The result is compared with the number of background processes on the chosen server (or the total of all available servers if no server is specified in the attributes of the process chain). If the number of parallel processes is greater than the number of available background processes, the system highlights every level of the process chain where the number of processes is too high. The system produces a warning for these levels.
       12.      Save your process chain if it does not contain any errors.
    You can activate and schedule your process chain. After scheduling, the chain starts in accordance with the start process selections. For example, if you scheduled the start process directly and chose Immediately as the start date value, the chain run starts immediately after scheduling.  In the  Log View, you can display the reports for the chain runs.
    If ie helps assign points

  • Details about Process chain

    Details about Process chain

    Hi Vijay,
                Well the major components of Process chain is mentioned as under:-
    A process Chain is a sequence of processes in BI system that executes in the Background.
    Commonly Used Process Types
    1.  Start
    2.  Execute InfoPackage
    3.  DTP
    4.  Attribute Change Run
    5.  Save Hierarchy
    6.  Delete Index
    7.  Generate Index
    8.  Activate DSO data
    9.  Update DSO data
    10. Complete Deletion of Data Target Content
    11. Delete Entire Content of Linked Transactional DSO/ODS
    12. Initial Fill of New Aggregates
    13. Roll up of Filled Aggregates/BIA indexes
    14. Compression of InfoCubes
    15. Read PSA and Update Data Target
    16. AND
    17. OR
    18. XOR
    If you want to include a load process in the process chain, you need to have already created an InfoPackage.
    You cannot load flat file data from a client workstation in the background. For this reason, you have stored your data on an application server.
    Creating Process Chains
    You have the option of creating a process chain in the process chain maintenance screen directly or by using a maintenance dialog for a process:
    Creating a Process Chain Directly in the Process Chain Maintenance Screen
    You are in the BW Administrator Workbench.
           1.      Click on the  Process Chain Maintenance icon in the AWB toolbar.
    The Process Chain Selection dialog window appears.
           2.      Choose Create.
           3.      Enter the technical name and a description of the chain, and confirm your entry.
    The Add Start Process dialog window appears.
           4.      Create a variant for a start process.
    a.       On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    b.       If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    c.       Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the  Plan View of the process chain maintenance screen.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
           5.      Use the drag-and-drop function to add the relevant processes into your process chain.
    You use the  Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate  InfoSources and  Data Targets navigation trees.
    If you insert into the chain a process that is linked to additional processes, the respective process variants are generated and inserted into the process chain automatically. These variants are suggestions and can be changed, replaced or removed from the chain if required.
    Only if the attribute realignment run is inserted automatically, do you also arrive at the variant maintenance screen.
    If you want to specify yourself the processes that are to be included in a chain, choose Settings ® Default Chains, and select the Do Not Suggest Processes option. As a result, the system does not suggest, generate, or insert automatically any processes into the chain. This setting is user-specific.
    If the chain that you create does not correspond to the standard, the system displays a warning. You can ignore these warnings if you are sure that you are creating a chain that meets your requirements. Warnings do not affect how the chain operates during runtime.
    Your chain is checked in the checking view and during activation. The system tells you if it discovers any errors.
    Creating a Process Chain Using the Maintenance Dialog for a Process
    You are in the maintenance dialog of a process that you want to include in a process chain.
           1.      Choose the Process Chain Maintenance pushbutton and create a process variant.
           2.      Save the variant and go back to the previous screen.
    A dialog window appears in which you enter a technical name and a description of the chain that you want to create.
           3.      Confirm your entries.
    The Add Start Process dialog window appears.
           4.      Create a variant for a start process.
    a.       On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    b.       If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    c.       Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the  Plan View of the process chain maintenance screen.
    The various process categories, the application processes, and collection processes are displayed in the left-hand area of the screen. In the right-hand area of the screen, the process chain is displayed.
    If the process that you used to create a chain is linked to additional processes, the respective process variants are generated and inserted into the process chain automatically. These variants are suggestions and can be changed, replaced or removed from the chain if required.
    Only if the attribute realignment run is inserted automatically, do you also arrive at the variant maintenance screen.
    If you want to specify yourself the processes that are to be included in a chain, choose Settings ® Default Chains, and select the Do Not Suggest Processes option. As a result, the system does not suggest, generate, or insert automatically any processes into the chain. This setting is user-specific.
    If the chain that you create does not correspond to the standard, the system displays a warning. You can ignore these warnings if you are sure that you are creating a chain that meets your requirements. Warnings do not affect how the chain operates during runtime.
    Your chain is checked in the checking view and during activation. The system tells you if it discovers any errors.
           5.      Use the drag-and-drop function to insert any additional relevant processes into your process chain.
    You use the  Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate  InfoSources and  Data Targets navigation trees.
    Additional Steps to Creating a Process Chain
           6.      When you add a process, you need to select a process variant or create a new variant. For collection processes, the system determines the variants.
    Various functions for working with the process are available from the context menu:
    Context Menu Entry for a Process
    Function Information
    Maintain Variants
    With the exception of the variants in the collection process, you can use this function to change all process variants.
    Exchange Variants
    You can swap the variants for an existing variant or a new variant.
    Display Scheduled Jobs
    Once the process chain is active, you can use this function to display the jobs that have been scheduled.
    Display All Jobs
    After at least one run of the process chain, you can display, for a specific process, all of the scheduled jobs for this process and all of the jobs with which this process was run. You arrive at the job overview from where you call up the relevant job log.
    Create Message
    You can also send messages to an application process of the chain, depending on the success or failure of the process.
    1.       From the context menu of a process, create an additional process variant of the Send Message type.
    2.       If you maintain a message, first specify whether you want the message to be sent when the process has been completed successfully or unsuccessfully. Then choose Next.
    3.       You arrive at a window, in which you can select an existing process variant or create a new one.
    4.       If you create a new process variant, edit the document that is going to be sent, and maintain a list of recipients.
    5.       Save your process variant and go back a step.
    The message process variant is now assigned to your application process. When the message is sent, the status information and the process log can also be sent.
    Wait Time
    You use this function only to debug a process run.
    Specify how long (in seconds) you want the delay to be between one event being triggered and the next process starting.
    You can capture the process by using transaction SM37 (Job Overview) or SM50 (Process Overview).
    Remove Process
    You use this function to remove a process from a process chain.
    Manage Data Target
    You use this function in connection with the following types of process variants
    ·         constructing indexes
    ·         deleting indexes
    ·         constructing database statistics
    ·         rolling up filled aggregates
    ·         compressing InfoCubes
    ·         activating ODS object data
    to call up the administration for each of the data targets.
           7.      Hold down the left mouse button to connect the processes through events.
    Before you do this, select the process underneath the process type row, and position the cursor over the required process. When you select the process type row, the whole process is moved into the plan view.
    From the context menu of a link, you can display the event or remove the link again. To do this, highlight the link and right-click with the mouse.
           8.      If necessary, specify whether you want the event to be triggered after the previous process has been completed successfully or unsuccessfully or whether you want the event to be triggered independently of the outcome of the process that precedes it.
           9.      Under Attributes ®Display Components assign a display component to the process chain.
       10.      Maintain additional process chain attributes if necessary.
       11.      Check your process chain in the  Check View and make any necessary corrections.
    The  Legend explains the meaning of the different colors used to display the processes and links.
    From the context menu for a process, you can display the messages resulting from the check.
       12.      Save your process chain if it does not contain any errors.
    Result
    Your process chain can be activated. After activation, the chain starts in accordance with the start process selections. For example, if you scheduled the start process directly and chose Immediately as the start date value, the chain run starts immediately after activation.  In the  Log View, you can display the reports for the chain runs.

  • How to create messages in process chains?

    Dear Gurus,
    I want to use the alert system in the process chains.  like when one process fails i have to receive the message on my mail or as an SMS on my mobile. 
    I tried the same thing with one of my process chain.  When i right click one of my process in my process chain i will get the create message option.  But my problem is i dont know how to use that option.  If u have any solutions or any material please try to send me to the following ID <b>[email protected]</b>
    Thanks in advance
    Mohan Kumar

    Hi,
    You can also send messages to an application process of the chain, depending on the success or failure of the process.
    1.       From the context menu of a process, create an additional process variant of the Send Message type.
    2.       If you maintain a message, first specify whether you want the message to be sent when the process has been completed successfully or unsuccessfully. Then choose Next.
    3.       You arrive at a window, in which you can select an existing process variant or create a new one.
    4.       If you create a new process variant, edit the document that is going to be sent, and maintain a list of recipients.
    5.       Save your process variant and go back a step.
    The message process variant is now assigned to your application process. When the message is sent, the status information and the process log can also be sent.
    Hareesh

Maybe you are looking for

  • Same apple id can locate iphone but not ipod touch

    I have find my iphone installed on both devices, location services are on, wifi is on, icloud is on and find my iphone is on within icloud in settings, but I cannot locate the ipod touch only the iphone. Any ideas??

  • Using a Verizon Lte phone in Europe with local SIM

    I have a Verizon iPhone 4S and travel to France frequently. I am able to use my phone with a local French SIM, and it works fine. I am planning to get an iPhone 6, which will be 4G Lte. Will I be able to use that phone in France the same way I can us

  • Error Install SAP Netweaver ABAP Trial Version 7.01

    Hello everyone,   I'm trying to install SAP Netweaver ABAP Trial Version 7.01.   My operating system is Windows XP Professional.   I have 3 GB of RAM and 80 GB of free space.    Unfortunately, the installation process is stuck in:    Phase 18 of 27  

  • How do I uninstall and stop using AirPort?

    Hi All, I've been running AirPort for a year or so to get internet while I had two computers in my home, but I no longer need it as now I only have one. I basically want to stop using the AirPort (uninstall and disconnect it) and just go back to havi

  • How do I reply to an answer in this forum???

    This is forum specific, admin type question.  I would like to know how to use the reply function on an answer to a post I've made? Thanks. This question was solved. View Solution.