Expand in column for input schedule
Hi Guru:
We have 2 categories, Best Scenario, Normal Scenario.
In the input schedule, the users want to have it in the below format:
Best Scenario Normal Scenario
Account
So, I created a hierarchy for category, which called All Scenarios, then choose in in CV.
In use EVDRE to put the category in column, SELL ALL.
However, the system says the schedule is wrong.
I achieved it with 2 EVDRE, but I just do not understand, if I put time in the column with a hierarchy node value, 2009.Q1, it will give me 4 columns, why I could not put category in the column to do the same thing?
Thanks.
Eric
Hi Eric,
I am sure you would have done it properly, however, would like you to check once again. See in the member sheet that the heirarchy is perfect. Process the dimension and the application once again. In the EVDRE, select the memberset as BAS and in the CV, select all_scenarios.
You can definitely have a hierarchy. Tool will not stop you from doing it. However, I would suggest you not to follow this approach. Instead, you can the expansion only on rows and remove the expansion on columns. In the Column, specify the members you want, explicitly.
Having said these, please try the first approach. If its working fine, you can go ahead. You can think about the second one later, if required.
Hope this helps.
Similar Messages
-
How to Restrict Expand for Input Schedule
Dear Experts,
In Input Schedule, I am writing Formulas for some cells.
When I am trying to do u201CExpand Allu201D my formulas are not remaining in the cells.
Can any body suggest solution.
Can we restrict Expand for Input Schedule?
Please help,Hi,
Sorry, I didn't understood well your request and I give you wrong information.
GetOnlyRange is used you only wants only function to behave in read-only mode. All cells defined in this range will only retrieve values from the DB but no entered value will be sent.
If you want to keep your formula for some cells, you have to exclude those from the expansion range.
This means in your RowKeyRange section to define something like
=EVRNG(E14:E16,E18:E38, ...), not a continue range.
Hoe this cen help you,
Mihaela -
Building multi selection for input schedule
Hi Guru,
I woul like to build a query based on different selection for each colunm , could advice me how to build this input schedule.
the structure should be like this :
Drop down list for each field selection , the user can do different selection for each column .
Field selection 1 Field selection 1 Field selection 1 Field selection 1
Field selection 2 Field selection 2 Field selection 2 Field selection 2
Field selection 3 Field selection 3 Field selection 3 Field selection 3
Field selection 4 Field selection 4 Field selection 4 Field selection 4
Field selection 5 Field selection 5 Field selection 5 Field selection 5
Field selection 6 Field selection 6 Field selection 6 Field selection 6
Field selection 7 Field selection 7 Field selection 7 Field selection 7
Field selection 8 Field selection 8 Field selection 8 Field selection 8
Key figure 1 1$ 2$ 1$ 2$
Key figure 2 1$ 2$ 1$ 2$
Key figure 3 1$ 2$ 1$ 2$
Key figure 4 1$ 2$ 1$ 2$
Key figure 5 1$ 2$ 1$ 2$
Key figure 6 1$ 2$ 1$ 2$
Key figure 7 1$ 2$ 1$ 2$
RegardsHi,
I dont think this can be done.
In the columns, you can use EVMBR function. The user can select the member. Accordingly, the data cell should fetch the value using EVGTS. However, you need to make sure that your column represents only one dimension. So, you need to use the other dimensions judisiously in the EVGTS function.
The problem comes now. You cant override the data cell with some other value, because that cell has a formula. If you write some value in that cell, the EVGTS function gets overwritten. And if you cant write value in the cell, then what will you send.
Hope you got my idea. -
Chars in columns for Input Ready query
Hi
Hope every body is just doing fine. I am puzzled with following doubt when compare BPS layout builder to IP input ready report. Please help me to clear some smoke here.
We have a simple input ready query to enter some values in the key figure for given combination of characteristics for 12 fiscal year periods in the year.
BPS >>> In BPS manual planning layout we would have selected the Key figure and Fiscal Year Period in data column and profit center and Plan Year in Header and Other characteristics like GL account,cost center in lead column so that we can hide the Fiscal year period by restricting the values of key figure for particular fiscal year period value while creating columns in Data columns like Jan 07. etc
IP>>> So in IP, I have fiscal year period in aggregation level with all other chars and key figure. In input ready report, I have used the structure to pull the key figure and fiscal year period value to come up with column and not included the key figure in rows or columns of report but when I was executing the query system is automatically including the fiscal year period as free char. I am puzzled on how this is going to work. Is fiscal year period not populated automatically based on column.
Your inputs are highly appreciated with point.
Thanks,
Raj.Hi Raj,
Experiencing similar problems. Which GUI are you on ?
thanks
Ian -
Max file size of input schedule
Hello experts,
We are using BPC 7.5 NW sp4
I've created input schedule and it's size about 6MB. I tried to save this input schedule, but system returns error.
Currently the biggest file I've managed to save is 2MB
Does anybody know max allowed size of file for input schedules and reports? And How we can change this parameter
Best regards,
Evgen ChadiukHi Evgen,
BPC doesn't handle upload of large files through the Excel interface very well. If you go into UJFS (in BW) and find the input schedules for your application, you should be able to upload the input schedule through that interface.
A good way to "compress" reports and input schedules is to delete all data from them before saving. I don't know if this will work in your case, but maybe it's another option.
Ethan -
BPC 7.5 Input Schedule in Excel 2010 - Expand time dimension dynamically
Hi BPC experts,
My project dimension has two properties, one for startdate and one for enddate of the underlying project. Example: Project XYZ, startdate: 2010.APR, enddate: 2011.JUN
In my input schedule I need the timespan to expand on month level from 2010.APR up until 2011.JUN. In this case it needs to expand 15 months where each month is displayed per column.
The issue is that all projects have different start and end dates and the expansion on month level needs to adjust accordingly. There is no maximum project time frame but if it helps I can live with a maximum expansion of for instance max 100 months.
I have another dimension for time with a hierarchy year - quarter - month (month being the basemember).
Every tipp highly appreciate!
Regards
SvenHi,
1) i use EvMBR for list values the CEBE necesaries.
2) Define ListBox by source list the EvMBR
Is necesary use Index() for get value the indice returned by Listbox when is selected the value.
3) Use EvGTS() linked to value getting by Index()
4) This is code in EvGTS:
=SI(EVGTS($N$11;1;"CEBE:CI1CA001";$N$14;"CUENTA:ZACB0001";$N$16;I28;"MONEDA_PPTO:USD";"PARAMETRO:NA";$N$20;$N$21;"SUCURSALES:NA";$M$27;$N$24)="#NODATA";"";EVGTS($N$11;1;"CEBE:CI1CA001";$N$14;"CUENTA:ZACB0001";$N$16;I28;"MONEDA_PPTO:USD";"PARAMETRO:NA";$N$20;$N$21;"SUCURSALES:NA";$M$27;$N$24)) -
Retrieve data from a report or database to an input schedule in BPC for exc
Hi,
I am using BPC for excel ( v 5.1).
I've created an Input Schedule(Input-1) using BPC for excel and sent data to the dB.
I need this (Input-1) data to use it in a new Input Schedule(Input-2), for further manipulation.
I need this data to be dumped in a sheet for further calculations in (Input-2).
How can i bring this data?
I created an input schedule(Input-2) and tried building an evdre in an excel macro to get it as a report of the 1st Input. But i was unsuccessful. I faced an error "ERR: Invaled KeyRange Header".
Am i thinking in the correct way? Do we 've any other options to retrieve this data?
Need your help to proceed....
(Pretty soon, the environment is going to be with version 7.0)The macro i use to run when my workbook opens is as follows:
Private Sub Workbook_Open()
ActiveWorkbook.Sheets.Add
Sheets(Sheets.Count).Name = "Dump_Sheet"
Sheets("Dump_Sheet").Range("a1") = "Application1"
Sheets("Dump_Sheet").Range("a2") = "=EvDRE($A$1,A14:B20)"
Application.Run ("MNU_eANALYZE_REFRESH")
End Sub
Also I 've tried this too:
Private Sub Workbook_Open()
ActiveWorkbook.Sheets.Add
Sheets(Sheets.Count).Name = "Dump_Sheet"
Sheets("Dump_Sheet").Range("a1") = "=EvDRE(""Application1"",A14:B20)"
Application.Run ("MNU_eANALYZE_REFRESH")
End Sub
Both of these gave me the same error code :
#ERR : Invalid KeyRange Header -
Hi
With Input Schedules in BPC for Excel, is there an easy way to see which cells get uploaded ?, for example, if I open a report written by another person, how can I easily see which cells get upload when MNU_ESUBMIT_REFRESH runs ?.
Thanks in advance for your help.
Kind Regards
GavinHI,
There is no specific way (something like a menu command). You can define a specific colors or format for the cells(or some formulas which change the format of the cell), but this is related to the input schedule design.
Best regards,
Mihaela -
Input schedule: Derive key for key range from Dimension member properties
Hey guys,
I'm facing the problem within a input layout. There are three keys in the row key range.
The first row key is filled by the members of a dimension. The second and third row
should be filled by the dependencies shown in the dimension members.
Example:
Dimension:
- Order number
Properties:
- Client (also implemented as standalone dimension where all required characteristics are maintaned)
- Costcenter (also implemented as standalone dimension where all required characteristics are maintaned)
Entries in dimension members of Ordern number:
Order number, Client, Costcenter:
1000, 10, 511
2000, 10, 533
3000, 12, 511
4000, 15, 588
Entries in dimension Members of Client:
10,11,12,13,14,15,16,17,18,19,20
Entries in dimension Members of Costcenter:
511,533,555,588
My row key range is defined as follows: Exp1: Order number, Exp2: Client, Exp3: Costcenter
For Planning purposes i need a input schedule that schows only the valid combinations shown above
in master data of order number. Is this possible or do I have to leverage script logic to use dependencies shown in master data for reporting oder planning purposes !
Cheers,
MoritzHi Moritz,
As Nilanjan said, this is not really possible with a basic EVDRE at the moment. Your best bet is probably to either build your own solution using EVEXP, EVGET, and EVSND, or to use an EVDRE based on only the Order # to get the values and an EVSND based on the Order # and the properties of the Order # in the AfterRange of the EVDRE.
I actually like the second option a lot better (EVDRE with EVSND in the AfterRange) because for larger queries the read performance should be better and it will be more maintainable in the long run.
Ethan -
Drop down in the Input Schedule for Dimension
Hi Friends
In my input schedule, for the Dimension Entity ( I have 13 entities which i am presently chossing from Current View), i want to put separate Tab for each entity in my input schedule. So that instead of chossing from the current view, they will choose the TAB in the input Schedule.
And also, for another dimension members, i need to have a drop down ( as we do in excel validation). So instead of choosing the current view for that dimension, user will choose from the drop down from the excel sheet.
Looking forward to your suggestion .
Thanks
VivHi Shoba
Thanks for your reply.
See if we can use EVMBR function, which will Pop up the screen same as when we click the CV only thing is that the Current View will not change.
We can also use EVCVW is a particular cell same as the way EVMBR, but when we use this EVCVW, the Currrent View will also change fine
Exactly i am looking for a option where in a particular Input Schedule Cell, there will be a drop down as we do in normal excel validation, .
My Input Schedule is dynamic in Rows, which reflect the Material.
I am trying the EVLST, but efforts are in vain.
Looking forward
Reg
Viv -
BSP table column not opening for input
I know very little about BSP but have a problem to fix. We have a BSP which works in 4.6 but not in ECC6. The problem is that when a table line is selected one of the columns is supposed to open for input but is not doing so. In the View the table is defined as selectionmode = "singleselect" and onRowSelection = "MyEventRowSelection" - I'm not sure where to find that event and associated method. Can someone direct me to the likely area of this problem? Thanks.
Hi Mike,
To have an editable table, the fields of your table must be bound to a cell editor of type 'Input field'. Check if this is done.
Then, you should bind the read_only property of each input field to the context attribute. Not the read only of the table. This way, you can bind different columns to different attributes and make selected columns only as editable etc. For each field in your table, you will have a cell editor. Do the binding for each cell editor, i,e each column.
Regards,
Nithya -
Restrict Data Input in an Input Schedule for a particular number of days in a Month
Hi All,
I want to restrict data save in Input Schedule for any particular number of days in a month. BRAD will select number of days for the that particular month and data input for that duration should be disabled.
Duration will be dynamic and will be decided by BRAD.
Basically this is a requirement of BPF, but I have thought of doing in this manner.
Regards,
MayankHi Vadim
I saw your this solution:
Dim epm As New FPMXLClient.EPMAddInAutomation
Dim blnMySave As Boolean
Public Function BEFORE_SAVE() As Boolean
If blnMySave Then
BEFORE_SAVE = True
Else
MsgBox "Please use button on the worksheet!"
BEFORE_SAVE = False
End If
End Function
It seems as if this may help me, but can you please guide me how to trigger this function for a change of value in any particular cell, in an input form. -
BPC 7 MS: Which SQL statements are created for writing with input schedule?
Hi,
I wanted to know which SQL statements are created and executed if a user submits values using an Excel input schedule to an application.
When I check the correspoinding MS SQL server log files, I see that data is read from the three partitions belonging to the application and put into a temporary table, but I can't find anything about writing back to the application (presumably the WB partiton...) in the log.
There are some cryptic entries in the log file as well, but they are not human-readale... are there any BPC logfiles that could tell me which SQL statements are created and executed to write back the new values to the application? Thanks!Hi,
As far as i know, when a user send data entry from an excel schedule, it will be written in the WB table of the application (for each application, you have 3 Data tables : WB, Fact2 and Fact).
I presume that the SQL statement may be an INSERT or UPDATE statement.
Technically, the update is done by the send governor service (hosted on your BPC application server).
There is no log that will show you the SQL Statement besides a SQL trace that you have to setup in SQL Server 2005 Manager Studio.
btw, the data are written in the Relationnal database but are read from the OLAP cube. The olap Cube is split in 3 partitions (ROLAP on WB table / and MOLAP on fact and fat2). Wich mean that every new entry in WB will be automatically "updated" in the cube.
Some DM packages can directly write data in fact2 table. In this case you need to reprocess the cube to get it loaded. -
Steps for creating Input Schedules
Hi
Can any one provide the steps to create Input Schedules - any documentation available at sdn??
Thank you
RajuHello,
Please go though the following links.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/904c62fc-b3ad-2b10-e6b9-ea3a849c4335?quicklink=index&overridelayout=true
Thanks.
With regards,
Anand Kumar -
How to build dynamic input schedule from version
Hi experts,
I want to create an input schedule based on my category selection which will allow users to enter data to budget part but changing the actual part is prohibited.
For example I have category member which is 2010-09-1. This means I am working on 2010 Budget which has 9 periods of actual and 3 periods of forecast and 2011 Budget. In my input schedule I would have 24 months from 01.2010 to 12.2011 and I will copy actual to budget for the first 9 months but I do not want users to change first 9 months actual data from input schedule.
What solution can you propose for this in BPC NW ?
Regards,
erginHi Ergin,
From the description you have provided, I guess you will have the TIME dimension in the Column. The CATEGORY would be set to 2010-09-1, lets suppose. In this case, the first 9 columns should be locked for any changes. For this, you need to use the Data Validation technique, which is native to Excel.
select an empty cell, lets say D1. in this cell, you should fetch the value "2010-09" from the version "2010-09-1". If the version is changed to "2010-10-1", the cell D1 will be automatically updated and will show "2010-10". In the column, in the row just above the Time dimension, write a formula to fetch the year and monthnum property of the Time member. Lets say, the time dimension members are displayed in the cells E4 to AB4 (24 columns for 24 months). In the cell E2, you can write the formula, =EVPRO("application name",E$4,"YEAR")&"-"&EVPRO("application Name",E$4,"MonthNum"). This will return 2010-01 in the cell E2 for the member 2010.JAN. Similarly, for 2010.FEB, the cell should display "2010-02". We will keep the formula in E2 only. After the expansion, the formula also will be expanded for the other cells.
Select the first data cell of the EVDRE report. Open Data Validation. In the Settings Tab, in the Formula field, write =D1>E$2. Then go to the error alert tab and choose the style as stop and give some title and message. This would typically mean that if value of D1 (in this case 2010-09) is not greater than E2 (in this case 2010-01), then the error message will be displayed, when we try to enter values in these cells. And it will not allow to enter any value.
Once the EVDRE is expanded, this data validation will be copied into all the other data cells. So, in this way, the enter input schedule can be kept dynamic.
Hope this helps.
Maybe you are looking for
-
Can't figure out how to rename css style in mx
Hello, I can't figure out how to rename css style in mx. I have the style selected in the proprety inspector. Is there supposed to be a rename option at the bottom of the same dropdown box? There is option to edit style and a few others in same dropd
-
If i buy the IPod Touch Software Update for the 1st gen only. Also included is the app store? I'm sorry my english isn't good.
-
System Requirement for SAP Crystal Server in Linux Suse 11
have trouble installing CRS 2011 in linux suse 11, need help to share best system requirements to install it. the condition is that this server will be use for mirroring database that support oracle 10g.
-
Oracle Apps Profile Options for Disco 9iv2
What profile options and values need to be set for Oracle Apps, 11.5.9 using Discoverer 9iAS V2?
-
Coyotepoint E350 and OracleAs 10g Hardware Load Balancing SSL
Hi: Has anyone been successful using a CoyotePoint E350 with XCEL SSL accelerator card and OracleAS 10g with SSL to hardware load balance an HTTPS site?