FI Consultant part for configuring in CIN
Hi all,
now we are going to implmnt CIN in Version 4.6C, i have some config. about it, but i think it is not sufficient & its not covering some parts eg. creation of registers, series groups etc., what are the configuration for CIN in the part of FI Consultant? can anybody having the configuration about CIN (for FI Consultant), please provide & help.
Raghav
Dear Raghav,
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/erplo/cin+configuration&
Regards,
Naveen.
Similar Messages
-
AS2 ID for the involved parties while configuring Receiver AS2 channel
Hi
I am testing AS2 receiver channel by by having a file sender channel to pick up the EDI file and send it to the receiver which is AS2. I configured all the necessary things like the sender agreement, receiver agreemet, certificates for receiver agreement. also configured MDN report channel and i am using the following in my AS2 channel
server name: XXXXX
Port: 50000
url: /SeeburgerAS2/AS2Server
under AS2
Sign is enabled
algorithm type : SHA-1
encryption is enabled
MDN mode: Synchronous
Handle received MDN: No action.
but i am getting the folllowing error
Message processing failed. Cause: javax.resource.ResourceException: Fatal exception: javax.resource.ResourceException: SEEBURGER AS2: 403 Forbidden # , SEEBURGER AS2: 403 Forbidden #
I have configured the parties for the 2 systems that i am connecting in both the systems and i am using them in either systems for AS2ID. still i am getting the above error.mostly this error can come for following reasons
incorrect AS2 ID for involved parties,valid sender agreement is missing or can be possible that more then one AS2 sender agreements with the same sende and rec party has been created.
Try to check all these
Regards,
Vikrant -
Availability check for configurable material.
Hi,
We are implementing SAP ECC-6 & facing
issue during availability check for
configurable materials.
I'd like to take an example of
computer for better understanding.
Will consider Computer as super BOM and
following 2 as BOM:-
BOM-1. a)Monitor b) Cpu c)Key
Board d)Scroll Mouse e)With
Mouse Pad.
BOM_2. a)Monitor b) Cpu c)Key
Board d)Optical Mouse e)With
out Mouse Pad.
But Customer wants A)Monitor B)Cpu c)
Key Board D)Optical Mouse e) With
Mouse Pad.
In the above case System will not show
%age of Configurable materials
available & Vice-versa but rather it
creates requirement for computer and
it gives availability as the lead time
maintained in the Material Master of
the Super Bom.
Here the busines requirement is that
it should show %age of configurable
materials
available.
Plz find the attachment for your kind
reference.
Kindly guide me to sort out this issue.
Thanks & Regards,
ChandruDear Sir,
Thanks for the guidance/ reply . Still we have some doubts in this:
As per your instructions, I have created sales order and did the MRP run for the same.
I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
No. of components checked: 641
Missing parts: 640
Overall confirmation date could not be determined
But where I can see the Percentage of Avaialble and percentage of to be produced.
Please guide me.
Thanking you
Regards
Chandru -
Document for configuration of the spend management in SAP E-Sourcing
Hi All
Is there any document for configuration of the spend management in SAP E-Sourcing 5.1
I have checked the RG section of the application and also all the documentation delivered as a part of the ESO software download
Unable to locate this, request you to redirect me to the link on the service marketplace from where I can download this, as far as I know, its not available there.
Currently I get the following error mentioned below for every menu option clicked under the spend and Compliance Tab
Error: The spend analysis environment is not ready to provide spend data
Request feedback
Regards
TridipHi Kamalakar
This is great piece of information, I checked the same place i found the following
Module Name
Auctions License
BOM License
Contracts License
Demand Aggregation License
Frictionless SRM Product License
Optimization License
Projects License
RFQuick License
RFx License
SRM Explorer License
XPress Print License
Do you think am missing the spend license, whats that called, request you to let me know
Regards
Tridip
Edited by: Tridip Chakraborthy on Apr 15, 2009 8:48 PM -
Export Billing Configuration with CIN and Foreign Trade Data
Hi,
I need detail configuration of Export billing with CIN and foreign trade data for my understnading the configuration process for export billing process.
Thanks in advanceDear Tarun
I feel you need detailed configuration of CIN.
Two diffrent CIN configurations supported bySAP
TAXINJ & TAXINN. First is formula based & second is conditions based
Search in SDN you will get many threads.
Regards
Deepu Pilla -
How to insatll "EMEA Consulting Localizations for Japanese" ) to Orcle Supp
Hi,
SR: 6857178.992
Customer: Oracle Corporation Japan
As per the Oracle consultant:
The Report "AR Customer Balance Statement Letter" will be part of the
Standard Product.But the RTF layout is owned and supported by OSSI.
If we are running the Program "AR Customer Balance Statement Letter"
and want to view the output in the RTF then the respective Template Definition patch (6319005) needs to be applied in the Instance.
This patch needs the product CLE but it isn't installed on the customer's instance.
We would like to know whether the patch 6319005 is relevant for the customers who are not using EMEA Localizations.
Also we could not find the document like "introduces EMEA Consulting Localizations for Japanese" on MetaLink.Could you please provide that.
Thanks,
Rasheed
[email protected]Hi,
OK... if this warning can be ignored, then why did we install the patch 10164748 (replacement of 9034879) for "EMEA Consulting Localizations" Name change To "EMEA Add-on Localizations" in the previous step?Did you check the following file versions
cle patch/115/import/US clenamechange.ldt 120.0.12010000.1 +
cle patch/115/import/US cleoraclechange.ldt 120.0.12010000.1
Also where is this description used?
I mean, does this give any impact on the functionality if the warning is ignored???Description is stored in many tables and its checked before applying patches.
AFAIK, This should not give any impact on functionality. Please raise SR to confirm this.
Thanks -
Routing data for configurable products (Sales order costing)
Hi
I am runnign sales order cost estimate for configurable product. here I want to confirm the activity quantity with cost estimate.
Pls let me know where can I check the activity quantity information . Pls help
Thanks
SnehaHi Sneha
I am bit confused with the terms you used..
you cannot confirm activity qty while doing cost estimate... Activity confirmation happens during Production Confirmation
Are you talking about missing activity qty/cost in sales order cost estimate?? Contact your PP consultant... You should have a routing attached while creating the sales order.. If that is there, then Activity cost would show up in the sales order cost estimate
Br, Ajay M -
Steps for configuring LDAP in Portal
hi all,
i need step by step configuration for the LDAP Server in portal
so can u please help me in that.
thanks,
sriram.Hi Sriram,
Following are few documents for configuring LDAP in portal. Have a look.
Check this to Configuring EP UME with LDAP Data Source, in the below link check the left navigation child nodes:
http://help.sap.com/saphelp_nw70/helpdata/EN/42/d7b4f47ea91635e10000000a1553f7/frameset.htm
http://help.sap.com/saphelp_nw70/helpdata/EN/48/d1d13f7fb44c21e10000000a1550b0/frameset.htm
Have a look at these BLOGS which tells you step step by approach to integrate LDAP with SAP EP.
Novell eDirectory 8.8 as UME Data Source for EP : Part I
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/2937. [original link is broken]
UME Data Source: LDAP
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/ep/setting%2bup%2ban%2bldap%2bfor%2bthe%2bportal
Windows Integrated Authentication via Kerberos on an LDAP data source
Check these
http://wiki.sdn.sap.com/wiki/display/EP/Setting%2bUp%2ban%2bLDAP%2bfor%2bthe%2bPortal
https://wiki.sdn.sap.com/wiki/display/HOME/ConfigureLDAPand+EP
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e1959b90-0201-0010-849c-d2b1d574768b
I hope these links will help you.
Regards,
Gopal. -
FWSM system space does not replicate part of configuration
Hi
I have FWSM failover pair, Active/Active configuration, admin and another 4 context, few context active on first FWSM, other on second FWSM.
I needed to add VLANs 51 and 52 to FWSM
I created VLANs on both Cat6500, created firewall vlan-group 3 a and put "firewall module1 vlan-group 3" on both cat6500
Then I log in in system space on primary FWSM and created interface VLAN.
Created VLANs automatically occured in system space on Secondary FWSM.
Then I wanted allocate VLAN 51 and 52 to context XY, so I went to part of configuration for context XY and "allocate-interface Vlan51" and "allocate-interface Vlan52".
But this part did not replicate to system space on Secondary FWSM, i do not know why.
I tried for expample shutdown inteface101 in system space on Primary FWSM. This action was replicated.
pnfkepolsa17# sh failover state
====My State===
Primary | Active |
====Other State===
Secondary | Standby |
====Configuration State===
Interface config Syncing - STANDBY
Sync Done - STANDBY
====Communication State===
Mac set
=========Failed Reason==============
My Fail Reason:
Other Fail Reason:
pnfkepolsa17#
pnfkepolsa17# sh failover state
====My State===
Secondary | Standby |
====Other State===
Primary | Active |
====Configuration State===
Interface config Syncing - STANDBY
Sync Done
Sync Done - STANDBY
====Communication State===
Mac set
=========Failed Reason==============
My Fail Reason:
Other Fail Reason:
Comm Failure
pnfkepolsa17#
I found this message in logg of Cat6500
000160: Jun 11 20:34:22.405: %SVCLC-5-SVCLCMULTI: Group 3 being tied to more than one module
Why is this problem?
PeterI found explanation:
Error Message %SVCLC-5-SVCLCMULTI: Group [dec] being tied to more than one module
Explanation The specified group is tied to multiple service modules. A group should not be associated with more than one service module unless a failover configuration is being used.
Recommended Action If a failover configuration is in use, no action is required. Otherwise enter the show svclc module command to find out which group is being tied to more than one module. Then remove multiple associations by entering the no svclc module mod vlan-group group command.
I want to use vlan-group 3 for FWSM and for ACE module too.
which kind of failover was mentioned?
Peter -
The maximum number of Web Parts for all zones on this page has been exceeded.
Hi All,
I am getting following error message when making a new view for SharePoint Form Library
The maximum number of Web Parts for all zones on this page has been exceeded.
Any help in this regard will be greatly appreciated...When you are looking at the page append the following at the end of your URL: ?contents=1
Your URL should look something like this:
http://contoso/site/default.aspx?contents=1
This will open the web part maintenance page. How many web parts are listed? You might have a large number of closed web parts that aren't showing on the page but are actually still there.
John
SharePoint911: SharePoint Consulting
Blog: http://www.rossonmoss.com
Twitter: JohnRossJr
MOSS Explained: An Information Workers Deep Dive into Microsoft Office SharePoint Server 2007 -
Manual Pricing for configured materials in Sales Order
We use variant config for our goods produced and the pricing results from what is configured. Thsi works fine.
However, occasionally there is a need to replace this pricing with a manual price entered into the Amount column on the order line. The PR00 condition comes in OK but we find that if changes are made then the configured prices are re-applied as well so the order line ends up with 2 types of pricing in effect.
How can I stop this happening i.e. to get SAP to use <b><i>only</i></b> the manual pricing if a price is entered into the Amount field?
Thanks
JimJim
Are you sure that you are using PR00 for configurable mat, Ideally it should be VA00
Leaving that aside, if you keep the condition type as Manual entry as priority or No restrictions, in the Manual entries, then when the automatic entries are overwritten by manual entries, only one record will exist and the automatically updated record will no more be in the screen. Please try it.
There is also a OSS note for this, though I dont knwo the number. You can try for it. -
Creation of Sale Order for configurable material with availability check.
Hi,
We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
1. While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
2. While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
Regards,
UmeshHi Umesh,
1.Create material master for configurable material and variants in mm01.
2.Maintain BOM for the configurable material in CS01
3. Configur the variant configuration steps
a. Create charecteristics T.code CT04
b. Create values and assign classes
c. assign the values to charecteristics
d . Maitain dependence T.code CU01
e.create configuration profile t.code CU41
f.stimulate the configuration profile.
4. Do the availability check configuration through this path
IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
I hope it will help you
Regards,
Murali. -
Make to Order for Configurable Material & Error in Confirmation
Hello, PP Gurus,
I am doing one MTO for Fabric business but during the confirmation I am getting error that
SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
*is it necessary to run MRP in this scenario?*
Please see the all Details of Business so that U can give answer properly.
One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
is it possible to maintain raw fabric and Colored fabric with same mat.code?
I have configured the material as well all pricing BOM, Recipe its working properly.
How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
My configuration is given below.
MRP Type : PD
BOM item Category: L Stock Item.
In dependency & Profile I have set radio Button as Single level Bom explosion.
Order Bom selection in profile.
Strategy : 25 make to order for configure material.
How can I do ? please suggest any changes
I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
thanks to all SAP gurus..
THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
Regards,
Bhavik dangi.Hi,
You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
Then the stocks will be reserved to the specific sales orders.
Thanks and regards
Murugesan -
Does anyone know the power cord part for HP A532 printer? I need a replacement cord. THANKS!
Here's the steps to follow if your printer isn't turning on.
If you've gone through all those steps and you still don't have power, there are a lot of places that sell a replacement cord and supply for that printer.
I am an HP employee. -
Material variant replacement in sales order for Configurable Material
HI
I am using variant configuration. In this i have created material A as configurable material and have Preconfigured Material B as its variant by assigning configurable material in MRP 3 view.
Now when i am creating Order for material A i.e. Configurable material and the characteristics values are same as that of Preconfigured material system is not replacing Configurable material with Preconfigured material.
Please help me out.
Regards,
Anand.Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
The setting in item category for configuration is.
Config. Strategy 01(Sales Order Strategy (TAC, TAM))
Mat. Variant Action 4 (Replace configurable material (Append and change))
ATP material variant 2 (Do not substitute if not completely available)
Structure scope D (Configuration, poss. with BOM explosion)
I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
Please suggest if missing something.
Maybe you are looking for
-
How to create Event Handler in OIM11g
Hi all, How can I create an event handler in OIM11g Thank You in advance.
-
Just replaced my laptop how do I transfer all my itunes, apps to the new laptop?
Just bought a new laptop. How do I transfer itunes music, apps, etc onto the new laptop?
-
Af:Quick Query to af:query
Hi!! I am using jdeveloper 11.1.1.5 I had created a my viewCriteria GlHdViewCriteria in my VO I had dragged and dropped it as a af:queryPanel. I had also dragged and dropped a af:quickQuery Panel to my jspx page and enabled the advance button such th
-
Deadline branch don`t work
Hi everybody, I am facing the following problem: I have developed several scenarios in XI which use BPM. Within the BPMs there are a deadline branch. It was working properly for a time and suddenly it no long work. None error is displayed, simply the
-
Adding routes not on the Global Zone
Is it possible to add a route to a non global zone? if not, is there a way to manipulate the route coming from non global zone?