Fragents and Change Orders
I'm new to P3. I need to manage a large 2 year public
works building construction schedule in downtown Los
Angeles, with numerous and frequent changes to the
schedule due to change orders, RFI's etc. Of course, these
changes result in increases/decreases to cost and time,
which need to be monitored and dealt with as part of the
overall project. Some say that fragnets are the best way
to insert these changes into the schedule. Some say
fragnets are problematic. I have no experience with
fragnets and I want to get off on the right foot. What
have you project managers and project engineers found most
effective for inserting and managing change order and RFI
items?
Nat:
Thank you very much for
your response.
Your
explanation of fragnets was very useful. I will make a
point of saving and reusing repetitive groups of
activities. In my case, SOMD (slab-on-metal-deck) is
very repetitive. Also, exterior building finishes such
as plaster (exterior sheathing, lath, scratch coat,
brown coat, cure, finish coat, cleanup). Interior
finishes activities are also often identical from
floor to floor.
The issue with
RFI's is usually not so critical. I mentioned 1200
RFI's but relatively few impact the schedule and must
be coded in. But it is more than 48. In my case, the
most common reason for entering an RFI into the
schedule is when the
consultant/Architect/Engineer/State Agency exceeds the
contractually agreed upon time limit for response to a
design-related RFI, or his response is irrelevant
requiring a second round of RFI's to resolve the
problem (revise and resubmit for title-block
exceptions, for example, happens frequently). <br
/>
It is easy to ignore these delays,
and recording them in the schedule can really irritate
the consultant, but when they become a habit, the
cumulative impact on the schedule can be significant.
Therefore, I need to be able to track these RFI delays
effectively within the schedule. Of course, an RFI
always has a number that is tracked inside Expedition
as well.
The bigger problem is
Change Orders. As you know, when the Owner wants
something added to the work, or a problem in the
design results in an increase in the scope of work
(there are many other possible reasons of course) a CO
is requested. As a general rule, most change orders
contain both a cost increase as well as a time
extension. This time extension is the problem,
because, especially on public works projects, the
Owner/CM does not want to grant time an extension, and
even when they do, they will only grant it when it
impacts the critical path, and only after there is no
float remaining (you will see why this distinction is
important as you read further). The critical path
condition makes sense, but the idea that my float is
the Owner's to eat for his CO work is grating,
especially when facing potential LD's. <br
/>
To top it off, some Owners/CMs insist
that all time delays be dealt with at the end of the
project, when the actual time delay resulting from a
CO can be calculated, instead of simply estimated, as
is common practice (corresponding language is inserted
into the CO to that effect instead of a defined time
extension). My position is that if they refuse to
grant a time extension based on an estimate, then the
cost given in the CO, which is nothing more than an
estimate, should also be replaced with T&M, and
the budget be damned. Needless to say, that position
has not won me many friends in the trailer across the
way.
You might suggest that we
should refuse the extra work if a time extension is
not granted up front. If we did that, they would hit
our bond in a heartbeat. A contractor's lot in life
seems to be to make lawyers (Deo volente, may the burn
in hell) wealthy.
In the case
of the Owner/CM refusing to grant time for
non-critical path CO's, my position is that, while the
CO work may not be on the critical path this instant,
in many cases, the critical path can change
dramatically, sucking CO work into it that was
previously separated from it by weeks. That very thing
has happened on a school project located in a major
city we are doing.
The project
has extensive tubular secondary steel at the exterior
of the two buildings. This tube steel, ranging in size
from 4" diameter to 20" diameter curves around, and up
and down, the exterior of the structure. I do not
exaggerate when I say that it is more complicated than
a roller coaster. I will send pictures if you are
interested. It supports curvilinear LG framing, which
in turn supports a combination of plaster, brick
veneer and metal panels. Very phantasmagorical stuff.
Being a complicated 3-D arrangement of rigid steel,
the architect's drawings were incomplete, (we should
have expected that) and changed frequently (4 times)
during fabrication, resulting in detailing problems
and a two month delay in erection. Lots of unforeseen,
fit-scribe-cut-repeat of long, heavy, curved, twisting
pieces of long steel hanging from crane hooks has been
required.
We have recovered
most of that time, but only by doing a great deal of
out-of-sequence work.
As you
can imagine, this mess generated a ton of CO's, but
the Owner would not agree to grant time extensions
until the end of the project, and even then, only on
CO's that are provably on the critical path. When
combined with electrical changes impacting utility
buildings, cable pulls, elevators, manlift and even
exterior finishes, and then with added off-site work,
topped off by submittal-review delays by State
agencies, the critical path has flapped around like a
flag in the wind, with CO's going in and out of it. In
many cases, this means that a particular item of
ongoing CO work has delayed the critical path for a
period of time, but not for the entire duration of the
CO work. So calculating the exact impact of the CO
during the period it was on the critical path has not
been easy.
I anticipate there
will be huge disagreement about these calculations at
the end of the project when we have the "come to
Jesus" time/money resolution meeting with the
Owner/CM.
BTW, the CM always
insists that CO's be dealt with as fragnets, but that
doesn't always make sense because the nature of CO
work is often one-of-a kind, not repetitive stuff. But
he has fragnets on the brain, it seems, so we call
them fragnets to humor him.
<br
/>Anyway, as you can imagine, tracking the dynamic
(vs. static) effect of CO's on the schedule has been
difficult. I am almost tempted to try calculus methods
to calculate time consumed over time (if you get my
meaning). Any experience analyzing schedules using
differential equations? Someone must have done it
before....
Right now I am
using activity codes to track them, but I am wondering
if there is a better way.
<br
/>
I have other projects, without the
same delays, but similar Owner/CM mindset regarding
CO's
Now you know the long
story. Any suggestions?
<br
/>Stan
Similar Messages
-
SUS - Purchase Order and Change Order Response
Hi,
We have a requirement to display the Original PO and Changed PO in the list of PO's if the change PO is generated before the original PO has been confirmed. In other words, if there is a PO that was sent to Supplier and a change was made to the PO before the supplier responds to original PO, we need to have supplier respond to both original and changed purchase orders. Any idea on how this can be accomplished.
Currently, in SUS, when a purchase order has changes, the latest Change appears in the PO with Historical versions showing older versions. Our requirement is to have all changes and original PO versions acknowledged.
I appreciate your response on this question.
Thanks,
SurendraHi,
You can try to enable the "Process" button in the historical version of the SUS PO. As of now, the SUS PO historical version will only have "Print" and "Download" button. In this way, the vendor will be able to acknowledge both versions of the PO.
Best regards,
Krithika -
I created a book, printed it, but need to make a few changes.
I added a page, and then changed the order of four pages. Problem now is that I can't reprint a specific page. No matter what page(s) I choose to print in the print box, the page that will print will be one or two pages off from what I entered to print.
Is there a secret to getting a specific page to print??When printing pages of a book, you cannot rely on the numbers that you see on the actual pages. For example, the introduction does not have a page number, but is actually page 1 as far as your printer is concerned. So therefore your book page 1 is actually printer page 2, if you follow my thinking. You can use the pages view in your browser to allow you to count the pages yourself to determine what number to enter in your printer window. To double-check if you have it correct, look at the preview before clicking on Print.
-
Can't edit a specific playlist and change order of songs.
I set up a new playlist and am unable to move the songs around to the order I want. My other playlists are letting me edit/move around the order without a problem. How can I access the edit feature for my "blocked" playlist.
If you want to order your songs manually select your playlist and display your playlist in the browser,
then click on the header row - the small triangle in the leftmost column.
Then you should be able to drag your songs into the correct order. -
Change Request Vs Change Order
Hi,
What is the difference between change request and change orders. When to use Change request and when to use Change order. Both allow impacts on work & financial plans
Thanks
GovindChange requests are initiated to estimate possible changes to a project. Once approved, a change request can be converted into a change order.
Both can have independent approval work flow.
Also, you can combine multiple change requests into one change order.
For more details, see http://download.oracle.com/docs/cd/E18727_01/doc.121/e13623/T185673T185681.htm
Hope this helps,
Sandeep Gandhi -
Find the user exit while creation and change of sales order
Hi Team
Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
u2022 The logic for the user exit to explode should consider the following assumptions and validations
o Customer master to have the entry at KNVV-KVGR1
o Material master to have the entry at MVKE
o UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
o Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
for example :-->
Product A with Scales mentioned below
Product A Quantity / Scale UoM Price(£)
0-10 PAL/TES 20
11- 20 PAL/TES 10
21- 30 PAL/TES 5
31-40 PAL/TES 2.5
>41 PAL/TES
Product B with Scales mentioned below
Product B Quantity / Scale UoM Price(£)
0-15 PAL/TES 25
16-20 PAL/TES 20
21- 30 PAL/TES 15
31-40 PAL/TES 10
> 41 PAL/TES 5
u2022 Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
u2022 The expected results should be
o Product A qty 10 + B qty 15 added = 25Pal
o The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
Thanks in Advance.
Puneet.Hi Team
Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
u2022 The logic for the user exit to explode should consider the following assumptions and validations
o Customer master to have the entry at KNVV-KVGR1
o Material master to have the entry at MVKE
o UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
o Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
for example :-->
Product A with Scales mentioned below
Product A Quantity / Scale UoM Price(£)
0-10 PAL/TES 20
11- 20 PAL/TES 10
21- 30 PAL/TES 5
31-40 PAL/TES 2.5
>41 PAL/TES
Product B with Scales mentioned below
Product B Quantity / Scale UoM Price(£)
0-15 PAL/TES 25
16-20 PAL/TES 20
21- 30 PAL/TES 15
31-40 PAL/TES 10
41 PAL/TES 5
u2022 Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
u2022 The expected results should be
o Product A qty 10 + B qty 15 added = 25Pal
o The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
Thanks in Advance.
Puneet. -
How to trigger an Idoc from Sales order creation and change
We are trying to trigger Idoc from sales order creation and change we have done following setting mentioned below:
Follow the below steps:
1. Go to NACE transaction
2. Select V1 application and select OUTPUT TYPES
3. Select the required output type and double click on Processing routines.
4. Enter Medium as DISTRIBUTION ALE, Program as RSNASTED and Routine as ALE_PROCESSING.
5. Save it.
message type ORDERSP in the distribution model (BD64).
Follow the below steps to configure the condition records:
1. Go to NACE
2. Select V1 application and select CONDITION RECORDS
3. Select the requred output type and click on Condition records
4. Selection screen will be displayed.
5. Go for execution. In that screen enter the selection criteria. For eg Condition record is based on Sales document type. Then
Sales doc type = OR
Funt = SP
Partner = blank. It means there is no restriction on partner numbers.
Medium = A
date/time = 4
Lan = EN.
Note: partner is left blank means, the sales order of type OR can be send to all partners.
6. Save it.
We also done ALE configuration.
We are facing problem that from VA02 "No output has been selected for printing Message no. V1102"
Kindly suggest the solution.
Regards,
Sharad DixitHi ,
Please check the total error description and diagnosis as below :
InVa02 enter SO go to extras->output->Header->edit.You can find a table with all the triggered output types. Choose the output type BA00 with medium Distribution ALE and go for 'Processing log'. It will show you the error description.
Please paste the diagnosis .
Thanks and Regards,
P.Bharadwaj -
IDoc Configuration for Production Order Creation and Change
Hi All,
Please Help me out for IDoc Configuration for Production Order Creation and Change
I have found the IDoc for Production Order
Messgae Type : LOIPRO and IDoc type : LOIPRO01
Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
I have done following Configurations:
1. RFC Destination created for XI system
2. PORT was created for XI
3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
I need to know how to do the followning.
1. How do i configure the outbound Production order idocs when Production Order is created or changed.
2. in NACE (Output control) which is the Application for Production Order.
3. How can I set IDoc as output Type for Production Order Creation.
Thanks in advance
Dhanabal THi Michal,
I know that it is the old thread but still want to get clarified from you out of curiosity.
Unlike other IDOC, i actiavated change pointers for LOIPRO
1.message and idoc type is linked
2.function module , message type , idoc type is linked
function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
3.BD64, distribution model is created and distributed
4. port and partner profile is in place.
5. IDOC is not getting generated after creating the process order.
do we need to activate the change documents for the message type in BD52,
if yes can you please provide the object types for the same.
or i am missing something else. please guide me in this regards.
Thanks in advance for your time.
S.Janagar -
IDoc creation on save and change of production order
I am looking for a way to create, and send if possible (if not I'll send with a batch job), on the save (creation and change) of production orders. This will be a modified LOIPRO iDoc. Currently we have a customer exit on the save of the production order but because it is before the save we must predict the number of the prod order. This has worked but now we are creating one production order per line item in a sales order (automatically) so this is causing us to predict the same production order number twice. We need a way to automatically create and send an iDoc for all production orders for given plants. Right now the solution we are looking at is creating an output type and running through those output types a few times a day, sending them down to the Shop Floor system (proprietary system).
Is there anything setup in SAP that we can utilize?
Regards,
DavisHi Rick,
Follow the below sample steps for changing component quantity:
DATA:
l_methods TYPE bapi_alm_order_method,
it_boperations TYPE STANDARD TABLE OF bapi_alm_order_operation_e WITH HEADER LINE,
it_components TYPE STANDARD TABLE OF bapi_alm_order_component_e WITH HEADER LINE,
it_components1 TYPE STANDARD TABLE OF bapi_alm_order_component WITH HEADER LINE.
1. Call BAPI :BAPI_ALM_ORDER_GET_DETAIL , it will give existing order component details.
CALL FUNCTION 'BAPI_ALM_ORDER_GET_DETAIL'
EXPORTING
number = <production order number>
TABLES
et_operations = it_boperations
et_components = it_components
return = it_bapiret2.
2. Move it_components to components table compatibel to BAPI "BAPI_ALM_ORDER_MAINTAIN".
LOOP AT it_components.
MOVE-CORRESPONDING it_components TO it_components1.
_*"Note here while moving change the component quantity"*_
APPEND it_components1.
CLEAR it_components1.
ENDLOOP.
3. Build the methods table for change production order :
it_methods-refnumber = v_refnumber.
it_methods-objecttype = 'COMPONENT'.
it_methods-method = 'CHANGE'.
it_methods-objectkey = v_objectkey.
APPEND it_methods.
"Note v_refnumber has 1 to 1 relation ship with the components table, if you want to change First component in it_components1 then you have to enter value '1' here for v_refnumber.
it_methods-method = 'SAVE'.
APPEND it_methods.
4 . Call
CALL FUNCTION 'BAPI_ALM_ORDER_MAINTAIN'
TABLES
it_methods = it_methods
it_component = it_components1
return = it_bapiret2.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'. -
Please send me fm regarding to get purchase order and change purchase order
Hi,
Please send me fm regarding to get purchase order and change purchase order .
Regards,
Gurprit BhatiaHi,
Function module to get the purchase order details:
BAPI_PO_GETDETAIL.
data: po_items type table of bapiekpo with header line.
parameters: p_ebeln type ekko-ebeln.
call function 'BAPI_PO_GETDETAIL'
exporting
purchaseorder = p_ebeln
ITEMS = 'X'
ACCOUNT_ASSIGNMENT = ' '
SCHEDULES = ' '
HISTORY = ' '
ITEM_TEXTS = ' '
HEADER_TEXTS = ' '
SERVICES = ' '
CONFIRMATIONS = ' '
SERVICE_TEXTS = ' '
EXTENSIONS = ' '
IMPORTING
PO_HEADER =
PO_ADDRESS =
tables
PO_HEADER_TEXTS =
po_items = po_items
PO_ITEM_ACCOUNT_ASSIGNMENT =
PO_ITEM_SCHEDULES =
PO_ITEM_CONFIRMATIONS =
PO_ITEM_TEXTS =
PO_ITEM_HISTORY =
PO_ITEM_HISTORY_TOTALS =
PO_ITEM_LIMITS =
PO_ITEM_CONTRACT_LIMITS =
PO_ITEM_SERVICES =
PO_ITEM_SRV_ACCASS_VALUES =
RETURN =
PO_SERVICES_TEXTS =
EXTENSIONOUT =
check sy-subrc = 0.
loop at po_items.
write:/ po_items.
endloop.
Check this program too:
RFFMFG_INV_CANC_ALL for BAPi_PO_GET_DETAIL.
Hope it helps you.
Regards,
Anjali -
New sales order and Change sales order in item level or delete at item leve
I got one requirement. Daily i have to display one report on new sales orders created on that day and any sales order item is modified or any item is deleted or any item is added.
How to get the sales order numbers and position numbers which will follow above creteria. I found one function module but it is not giving position numbers and new sales order details.
Is there any BAPI for this requirement.I am using "CHANGEDOCUMENT_READ" function module to get the new sales orders created and changed sales order items on a particular time. This function module is getting data from CDHDR and CDPOS tables. But only change sales orders is coming. New sales orders which is created on that time is not getting.
One of my friend is telling like we have to activate one change pointer to retrive new sales orders also. Which is like there will be one check box.
Is any body having idea on this. Please reply me on briefly with the code to retrive new sales orders and changed sales orders -
Is there a Business Object for Sales Order Create and Change VA01 and VA02
Hi experts -
I am looking for a business object for Sales order create and change VA01 and VA02 respectively?
Thanks,
MarkHi Mark,
I think this question is best answered in [SAP Solutions|/community [original link is broken]; Forums.
- Subhodeep
Edited by: Subhodeep on Aug 29, 2009 11:14 AM -
Sales order as complete and change the delivery status.
Hello All,
We produces an order but then the customer calls and does not want the material so we in turn will scrap the material against the production order using transaction MB1A mvmt type 951 E.
Since the material were scrapped and no material were shipped against the sales order, the sales order u201Coverall statusu201D remains open and the delivery status is u201Cnot deliveredu201D.
To close the order we u201CRejected line itemu201D and moved on.
I would like to know if there is another way we can set the sales order as complete and change the delivery status.
Regards
AmitHello,
you can use the status profile for the same. but a better way would still be to use the rejection reasons . the rejectionr reasons are very well integrated with the document flow as well as transfer of requreiemnts to Production
so a best practise would be to use rejection reason
hope this helps
Thanks
akasha -
Function module which uses both BAPI's for sales order create and change
Please name the function module which uses both BAPI's for sales order create and change.
BAPI_SALESORDER_CREATEFORMDAT2
BAPI_SALESORDERCHANGEYup.
you must write a piece of code for this.
with if else condition.first check if SO is exsist than use second FM to change it else create new SO from first FM.
logic somethig like this.
Amit. -
Change Quotation and sales order creation
Dear All,
I have some requirements from my company that I have to adopt to SAP. My company is a reseller of IT materials.
Our sales people are using an excel file to make the quotation to a customer. This excel file contains a couple of sheets (one for each manufacturer. example IBM, HP, Microsoft etc). Is there any way to make my quotation and sales order look like this?
Also since all the data for the initial creation of the quotation are stored in these files, is there any way to automate the creation of the quotation by transfering all the data from the excel file to the SAP ERP?Hi there,
Try this:
Define a new BAPI which will read all the info in the excel. Internally it will call VA01 & read the information from excel & post it into a quotation.
For this you will need to define the import / table parameters. Each field in the excel is mapped to a field in the import / table.
Excel will have different sheets each with different vendors. But it is not possible in SAP. For each vendor you will need to create different quotation.
Consider that each your vendor supplies 10 products. Enter all that info in an excel sheet.
Then for each different vendor, create a separate quotation giving the details of all products he supplies. Explain the requirement to your ABAPer. He will help you with the BAPI part.
When you create a sales order with reference to a quotation, you may change the quantities. You will retain the products which are required & delete the rest. .
Regards,
Sivanand
Maybe you are looking for
-
Downloaded iPhoto from app store and crashes as soon as I try to open
Please someone help!! I purchased iPhoto and downloaded it from the app store. Haven't been able to use it. It crashes and I get the crash report below. I've looked on all the forums and I deleted the plist or whatever from the library. I tried r
-
Hi, hope someone can help me. When I try to update my NANO,I get a message saying SONGS ON THE IPOD CANNOT BE UPDATED BECAUSE ALL OF THE PLAYLISTS SELECTED FOR UPDATING NO LONGER EXISTS. If I then click OK I get a message saying The IPOD cannot be up
-
Spotlight does NOT find iPhoto keywords
Hi, maybe you guys can help me. Spotlight does not find any of my iPhotos attached with keywords. My System is: Mac OS 10.4.4 and iPhoto 6 (5 did not work either). This is what I have tried so far: - repaired permissions more then once - rebuilt the
-
TP4 ADF BC [BUG] view link are not updated after database synchronization
I have a table with a recursive relationship. By mystake, I created a recursive foreign key for the same attribute (deptid->deptid instead of deptid->parentdeptid). I generated entity, view and application module from this schema. When compiling, err
-
Hi all, when i try to connect to the portal with my ECC6 account user, i can't, i filled UME, Abap tab with connection data. the user mentionnned on the portal is of COM type. created on ECC too Please help