Gap analysis for SAP project

I am trained in SAP SD and currently  i am looking out for a job and can any one forward me a gap analysis identified during the requirement gathering phase.
Edited by: tirumala kumandan on Feb 20, 2009 5:10 PM

During the requirement gathering phase of looking for a job you need to look deep inside yourself and say: "Rajesh, what are your requirements?" ...

Similar Messages

  • Function Point Analysis for SAP BW Projects

    Hello All,
    Have been assigned a task to come up with Function Point
    analysis for SAP BW projects.
    Any help will be appreciated.
    Thanks,
    Mainak

    Hi Mainak,
      Function Point Analysis is independent of technology, methodology or platform, so there is no function point analysis specific for sap bw, rather you should familiarize with the fundamentals of FPA.
      And as you might know, FAP is used to determine whether a given a tool, an environment or a language is more productive when compared to others.
      I can send you good links if you can give me your email-id.
    Hope this helps...
    Thanks,
    Raj

  • Template doc regarding Gap analysis of SAP BI -MM

    Hi Gurus,
    Can any one send a template doc regarding Gap analysis of SAP BI -MM

    HI,
    Gap Analysis:
    In simple terms: Gap means small cracks. In SAP world or in Information Technology world, gap analysis is the study of the differences between two different information systems or applications( ex; existing system or legacy system with Client and new is SAP), often for the purpose of determining how to get from one state to a new state. A gap is sometimes spoken of as "the space between where we are and where we want to be."
    Gap Analysis is undertaken as a means of bridging that space. Actual Gap Analysis is time consuming and it plays vital role in Business Blueprintstage.
    A through Gap Analysis will identify the gaps between how the business operates and its needs against what the package can can't do. For each gap there will be one of three outcomes which must be recorded and actioned,
    1. GAP must be closed and customised software can be developed
    2. GAP must be closed but software cannot be written therefore a workaround is required
    3. GAP does not need to be closed.
    A point worth mentioning here is that at time people confuse between user-exits and Gap Analysis. User exits are standard gate ways provided by SAP to exit the standard code and we can write our own code with the help of ABAP workbench, its not new functionality which we are trying to build in sap but its slight enhancement within the same code.
    Gap analysis is start point of Realization and once business Blueprint is finished we have to find the realization of sap system for client requirment and there will be certain gaps when compared to system fit. Those gaps can be closed either by re-engineering of business process to fit with SAP or we have to use USER exits in case of small deviations or complete enhancements with the help of ABAP to fit with the SAP system.
    The Gaps can differ from company to company. Most commonly, however, missing functionality is industry-specific.
    GAP Analysis
    Re: gap analysis
    Re: gap analysis
    Tarak

  • Gap analysis for 9i to 10 g migration

    I am doing a gap analysis for 9i to 10 g migration how this is going to affect the existing back end -application packages procedures ,loss of existing functionality etc .Although i have gone through the 10g migration doc and metalink doc for upgrade could anyone point me to any other white paper that might be there on this task.

    Why not continue your Gap analysis 9i to 10g ?
    Have you read the New Features Guide ?
    Nicolas.

  • How you complete impact analysis for SAP Universe

    hi,
    i want to know that how to how you complete impact analysis for SAP Universe

    EdPC-SCB,
    have you tried enabling auditing?
    - Yes, audit log only shows user's activities which isn't useful for us. Please let us know any audit log that might be helpful .
    For most of the servers listed in the CMC there is an "Audit" tab.  I'd say if you have the disk space in your database for Auditor available, then if in doubt turn it on (at least for a while) to see if it exposes what you are seeking to find out --that'd be the quickest way.  The documentation (xir2_bip_auditor_en.pdf) doesn't offer much in helping you to see a correlation between ticking on an Audit option in a Server and how it will populate in the Auditor DB -- most of us just hunt and peck until we get what we want.  Once you have the good stuff in each of the Servers ticked on you'll be able to track down which report recieves which object.  To help youself out initially, you should run every report that you can find so Auditor will get seeded.
    thanks,
    John

  • Do we have a separate forum for SAP Project Systems?

    hi
    do we have a separate forum for SAP Project Systems?
    regards
    kish

    hi all
    i got the answer
    its the PLM forum ie. product life cycle management
    Expert Forums  » SAP Solutions  » Product Lifecycle Management (PLM)
    cheers
    kish

  • What r the industries suuporting or helping  for SAP project implemetation?

    what r the industries suuporting or helping  for SAP project implemetation

    Hi
    The project team selects the processes that best fit your business from R/3’s functional offering, using the following tools:
    AcceleratedSAP Implementation Assistant
    Question and Answer Database (Q&Adb)
    Business Process Master List (BPML)
    R/3 Structure Modeler
    Business Navigator and external modeling tools
    Regards
    Manoj

  • Results Analysis for Valuated Project stock

    Hi,
    To have transfer prices we have activated material ledger and multiple valuations.
    As material ledger only works with valuated stock, we have moved the Project structure (ETO) from non valuated to valuated.
    Our client requirement was to recognised revenue based on cost. With non valuated project stock, cost is upated as soon as we received the stock for the project and we were able to acheive the RA (revenue recognisition) as per the clients requirement.
    However after changing to valuated, during goods receipt stock is upated and not cost. So we asked the client to consume the purchased material if they have to recognise the revenue.
    Then the question came that if the SFG is received back from the assembly/production order, all of a sudden we will not have cost but revenue & stock. After looking some SAP notes on statistical cost elements, we have created the stock account as a statistical cost element (category 90) and implimented the following SAP notes which helped us to reverse the stock value and update it to P&L (by reading the balance in statistical cost element linked to the Project).
    a) Note 78420 : To activate Function Module EXIT_SAPLKKAG_005 (contains include ZXKAGU05).This Function module takes into account the actual & plan costs of the assigned Production orders & Networks
    b)Note 616869 : Provides source code to be copied to  include ZXKAGU05
    c)Note 616960 : Changes to include ZXKAGU05 to read statistical cost elements in RA
    d)Note 26002 : To activate Function Module EXIT_SAPLKKAG_001 (contains include ZXKAGU01).In this include we can make the necessary modifications to RA calculations. Through this include, stock will be reversed during RA.
    e)Note 785626 : Provides source code to be copied to include ZXKAGU01
    Hower if we have purchased parts which are not consumed, still the RA (FM EXIT_SAPLKKAG_001) reads the value in statistical cost element and posts a debit to RA P&L and reverses the stock. Therefore now i have cost but no revenue (as no consumption).
    As per last paragraph of sap note 785626, if we have purchased parts and we want to exclude them from stock reversal, we have to use a filter with customer enhancement 3 (SAP note 67423). It also says that the goods receipts and issues of purchased parts has to lead to a different valuation class and assigne a different stock accout. Now can any one give some guidance on how a project specific purchased parts (receipts and issues to prod order) can be linked to a seperated valuation class.
    We have same material which is sometimes purchased and sometime produced.
    Regards
    Raghu.

    Hi
    I can say something from theory but not much from sap config. perspective. You have not mentioned actual revenue since POC is calculated from
    R(a)/R(p).How you have considered 100% poc?
    From your data,it looks to me that you have met the target revenue from actual cost which is less than planned one.Inventory indicates that you can generate revenue in next accounting period (unlike WIP).I feel that unlike plant stock,RA is not perfomed on project stock Murli, can ammend my view if it is wrong.
    You can post this problem to Fi/Co.
    Regards
    Adwait

  • Results analysis for a project to be settled to sales order rather than PSG

    Hi Experts
    My client has two company codes.
    CC1 executes project construction for CC2. This is to be mapped as a customer project.
    As far as project settlement is concerned, since PA is not activated, it is proposed to settle to sales order item.
    In this situation, what would be effect of results analysis.
    With out PA, how the postings need to be handled with WIP, Reserves, Inventory and Revenue.
    warm regards
    ramSiva

    Hi,
    I have had this problem earlier, If PA is not abailable you have put in the settlement rule as not to be settled.
    And for the postings have to be managed using the GL accounts that we give in the result analysis configuration.  There is not much flexibility for customization here in this scenario. But you can do as much as possible using the diffrent result analysis categories.
    So for the reserves WIP inventory and revenue use result analysis category to segregate them by GL account
    Thanks
    Naveen

  • Risk Analysis for SAP HR structural authorization

    Hi experts, for those who are familiar with SAP HR structural authorization setup, can you advice what tools out there are able to implement risk based on Structural Authorization as well.
    SAP RAR/CC is not able to do this at the moment, but i am not sure if tools like CSI has the capabilities.
    Appreciate the advice.

    Hi,
    Structural Authorizations "sits" on Standard authorizations. These Structural Authorizations   will need to be defined manually ( as far as I know) depending on the "Evaluation Path".
    Award points if answer was useful.
    Thanks

  • Needed QADB for SAP Project Presales

    Hi guys,
    I am in need of a document which is to prepared just before bidding a new project.
    This means before bidding a new project, what are the details we are expecting from the client.
    The client has to give the relavant doc /answers for the QADB.
    It is general for all modules.
    In short, I require the doc of the presales man.
    Did you guys got any document related to that?
    Regards,
    Anbu

    Hi,
    check this tcode SQADB01 may be helpful to you.
    Regards,
    kishore.

  • Comparing characeristics and Keyfigures in SAP R/3 for Gap analysis

    How to compare characteristics and keyfigures with SAP R/3 tables and fields .
    Is there any standard method is there or standard table is there.We are doing Gap Analysis for comparing this one.Please send anyone.
    Sridhar

    check following blogs if they help you:
    /people/sap.user72/blog/2005/09/05/sap-bw-and-business-content-datasources-in-pursuit-of-the-origins
    /people/swapna.gollakota/blog/2008/01/14/one-stage-stop-to-know-all-about-bw-extractors-part1

  • EXAMPLES OF GAP ANALYSIS & Workaround for the respective GAPs

    PP members:
    I  am looking for couple of <b>GAP Analysis  examples</b> which one might have come across during implementation & support projects and what was the work around for the respective <b>GAPs</b>
    If any one is interested in sharing documents related to AS_IS, TO-BE & GAP Analysis for PP module, I will be thankful
    email id: [email id removed]
    thanks in advance
    Please do not ask for documents to be sent to your email ids.
    Message was edited by:
            Somnath Manna

    Hi Suren,
    AS-IS
    you must interact closely with the super users and process owners for collecting requirements based on the Q&A db to understand their current business process like how they manufacture the parts, what steps they use for planning, production execution etc and what legacy systems or interfaces do they use and try to document all this information in the AS-IS processes either using flowcharts etc and get the sign off from the business process owners this is current business process WITHOUT SAP in place
    TO-BE
    This is what the business client intends to achieve in future WITH SAP implemented, so basically in this analysis, you need to identify what are the business processes that will run using SAP and how SAP will be managing thier day-to day activities and performing SAP Transactions. you also need o document it using either flowcharts and get a sign-off from the process owners as this will be the foundation based on which you will proceed further and develop your blueprint document and also start your realization activities
    GAP
    it is nothing but the difference between the AS-IS AND TO-BE analysis and here you identify the new changes or gaps between the business process without SAP and with SAP in place, it includes what types of configurations changes you need to make and developments and interfaces that will be needed to bridge the gap between the current state and the future state of business with SAP in place.
    Examples of reports not in standard SAP, developments, application of user exits etc.., come under GAP
    based on these three steps you then proceed to prepare your business blueprint document
    Reward if useful and close the thread
    Keerthi

  • What are common error come in gap analysis

    Hi,
    Anyone can tell me, what common error occur in implementation and while how we can over come these error through gap analysis in sap hr.   
    Regards,
    Manker

    GAP  Analysis and common Errors are different
    GAP Analysis -  While Implemention SAP HCM at the Cleint Place if you Find that kind of Scenarios Cannot be done through SAP System those are called GAPS those has to be clarified and find out the solution
    Errors : This will come in the system if the configuratiion is worng
    Please search the forum before raising the ISSUE 
    :check the use of SEARCH  FORUM FEILD 
    thanks

  • SAP Report Gap Analysis Process

    Hi guys,
    We're about to implement SAP ECC to replace the legacy transcation system. Since there are so many report  in ECC I really don't know how to start gap analysis( between ecc standard reports in ECC and required business reports in legacy). These report could cover serval different modules.
    Do you guys have any ideas? Or is there a general way to do it?
    Thanks

    any Requirement specified by the client , which cannot be covered "as -it- is" by standard SAP transaction flow  is  called as a GAP.
    gaps can be resolved either by suggesting work arounds , or  by developments  or  can remain unresolved as accepted gaps.
    for eg: The client wants that system should give a detailed break up of pricing conditions while Quotation comparison.  This is not possible  with standard Quotation comparison sheet,  so we have to go for a Z development.

Maybe you are looking for

  • How to remove SWFs under another SWF?

    Hello! I'm using the following code to link to other pages: var loadPage = new Loader(); function loadBiology(e:MouseEvent):void { addChild(loadPage); loadPage.load(new URLRequest("biology.swf")); Now the code works fine and such, this is more of som

  • Mac didn't go into sleep mode... Now all sorts of messed up

    Gives me a message: says it shut down because of an error. Error report says "panic" as cause. Reset date to Dec 31, 2000, and gave errors about sever safety/validity when opening mail. Wouldn't correct the date/time and had to do it manually. Batter

  • Marketing Calender Query field is not populating

    Hi Experts, I'm using CRM5.0 and EP7.0 . I've a problem with marketing calener. I've added it to portal but I'm not getting data from the backend in the query field(Show label). I'm getting all the views in view field but not the query field. I got s

  • Adobe CS5 unable to update after reinstall on OS X Mavericks

    I installed Adobe CS5 from DVD on a fresh OS X Mavericks, but now I'm unable to update with latest patches: Via Adobe Application Manager: - Application Version 1.0.0.67 - Error validating each downloaded files like:   2014-10-08T09:53:58: UCGetprogr

  • Illustrator CC freezing and un-responsive.

    HELP PLEASE! Ive recently(last november) installed the CC Suite (most programmes). And have been using them fine ever since. However, as of 2 days ago Illustrator has become very un-responsive and freezes when opening files. It will open the file, an