Goods issue for PM Order

Hi:
How can I prevent user from plant 100 from issuing items for a plant maintenance order created for plant 200.

Hi,
There several Objects associated with MIGO to check access for Plant. Please find the list below:
M_MRES_WWA            WERKS      $WERKS
M_MSEG_LGO            WERKS      $WERKS
M_MSEG_WMB            WERKS      $WERKS
M_MSEG_WWA            WERKS      $WERKS
M_MSEG_WWE            WERKS      $WERKS
But for your case, you need to do the following steps:
First find out the roles though which user id is getting access to MIGO. for this you need to go to 
A. SUIM... Role by complex selection criteria ........ unmark composite role.. put the user id in "With User assignment" field ........ put S_TCODE in the authorization object filed and in TCD ..put MIGO.......... then execute... you will get the list of roles providing access to MIGO.
Now do the next steps to check the available "PLANT" value for the user:
1. Go to SUIM
2. Users by complex selection criteria
3. Put the user name and execute
4. Click on Display Details .. the left most selection option in the application toolbar (or press F2)
5. Select the user name and click on "Select/Expand Subtree"
6. Put the mentioned
Download the list and check the value for Plant in those roles... go to those roles and change "Organization Level" Plant if you want to change the existing roles... or you can copy them into new and then provide limited access to Plant as you want which is more convincing. Otherwise other users having having those existing roles will loose their pretended access.
Let me know for more details if required..
Regards,
Dipanjan

Similar Messages

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • Different movement types for Goods Issue for different Order Types

    Hello Experts,
    Can we maintain different movement types for Goods Issue for different Order Types at the time of automatic creation of reservations?
    Thanks and regards,
    Satyajit

    Satyajit,
    Folow the link given,
    Re: How to add new movement types when creating reservation?
    Hope this helps you.
    SmanS

  • BAPI For Create Goods Issue for Sales order with picked quantity

    Hi friends,
            Is there any BAPI available to create Goods issue For sales order with picked quantity...............?
    we hv used BAPI_OUTB_DELIVERY_CREATE_SLS
    with sales order .......its creating delivery order but not doing goods issue with piked quantity........

    pls,reply its argent

  • How to execute 261 goods issue for REM order items other than with MFBF?

    Our users are looking for an easy way to post a 261 goods issue for a single component of a repetitive manufacturing order without using the MFBF transaction where they have to deselect all other components of the order.
    The ideal situation would be to use a transaction similar to MB1C or MB11 to simply enter the planned REM order, component material id, and its respective quantitiy and then post. 
    Any information you can provide will be helpful.

    Strat,
    Thank you for your response but LT01 does not seem to provide the functionality that I am looking for.
    To clarify, our users would like to complete a 261 movement for a single component within a particular repetitive manufacturing, without going into the MFBF transaction and having to deselect all of the unnecessary components just to single out one. 
    So ideally we would like to use the MB1C transaction for a 261 movement. Enter in a REM order, the material id, and the quantity to be issued and simply post a single material.  Currently when we attempt to do this with MB1C we receive the error M7162 that our order, which is a product cost collector, cannot be processed with this transaction.
    Hope this helps clear it up and thanks again for your response.
    - Nick

  • PP-PI sheet through goods issue for Process order

    Hi,
    I want to know how to post goods issue without reference of reservation number against process order through PI sheet.
      I defined one call function 'ENTER CONFIRMATION' through which I can enter into confirmation screen but after saving confirmation of process order ,generally I switched on  to transaction CO54 through which one should sent this PI_CONS message to the desired destination but in that I'm getting an error ,that it is not allowing me to post goods issue excess quantity.(WITHOUT REFERENCE OF RESERVATION NUMBER)
      how to by-pass that reservation number.
    Manually when we do MB1A it will allow us to issue more quantity but that is manually but when it is through PI sheet it is not allowing me to issue excess quantity.
    Regards,
    Amit.

    Hi,
    I want to do GI AND GR  through PI sheet ,I already used PI_CONS AND PI_PROD ,but it is not allowing me to enter quantity excess from bom quantity mentioned .it is not allowing me to override reservation quantity while making gr .
    I'm doing PI sheet with ALV based.
    For to by-pass reservation number I already made zpi_cons and zpi_prod under message category and assigned to instruction category.

  • Trouble with unplanned goods issue for process order

    Hi experts,
    Please help me to solve this problem:
    I have a process order with auto created reservation. Then I do GI against this process order, GI is not done at once for total required material quantity but in several times.
    For one specific material, the quantity is not sufficient in one batch, so I have to insert a new line for additional quantity from another batch.
    Then this issue occurs: In some GI, the additional line is recorded with move type = 1 (planned goods issue); in other GI, it is recorded with move type = 2 (unplanned goods issue) although the (Total withdrawn quantity + Quantity in this GI) is smaller than required quantity in reservation.
    I think this issue has nothing to do with order confirmation as these two steps are independent.
    Can any one explain why this happens? and how to solve it? Because if unplanned goods issue is not recorded in Reservation, then there's an inconsistency between withdrawn quantity in reservation and actual withdrawn quantity in MB51 or COOISPI.
    Thank you very much for your help.

    I assume that you do t-code MIGO with GI to order.  However, the additional line you enter will not be link to reservation, therefore will be record as unplanned goods issue. 
    Two thing you can do; first configure batch determination in MM (OMJJ) and set up batch determination record (MBC1).  You can then click the button stock determ. beside qty.  The system will select the batch based on your requirement.
    Alternatively, you distribute the quantity using another button (it looks like the X sign near the copy content button).  Then you can distribute qty based on the same item.  You can enter the qty, sloc, batch in there. 
    Don't use the New Items function.

  • How movement type 641 E can post goods issue for sales order

    Hi
    One of our sales process need sales goods cross plant, form sales order type OR(the item required special stock E) to create delivery then auto generate PR , form PR create Stock Transprot Order, in vl10b generate delivery type is NL, when PGI this NL delivery, the message said 'Sales order stock 30001057 000010 does not exist' .
    I check the NL delivery movement type is 641 E, normally, 641 would transprot the goods to 'in transfer', but I could not find the reason why it can't create sales order stock  in 'in transport' .
    Any suggestion about that?

    Did you check whether stock is available for the particular material ?
    Is the material extended to the relevent plant, storage location ?

  • Error while doing PGR (post goods issue for sales order return)

    Hello Gurus,
    I'm trying to do PGR for a sales order return. But system shows the following message: "Shortfall below the specified stock level or quantity amounting to 100 UN". (Message number : M7021)
    I've made some searches in SD forum but I didn't fnd appropriate answers.
    What does it mean ? How can I fix it ?
    Thank you,
    Bahia.

    Hi
    "Special Stock E not supported (check your entry)".
    This means your sales order (in your case the returns order ) is created with an item category which is marked with special stock indicator E  in VOV7 and the system is checking for that special stocks and it is not finding that
    When you mark any item category  with special stock indicator it can be E or Q or W ( it can be anything ) system will check for that particular stock category and not the general unrestricted stocks
    For you mistake can be two things
    1. Right now REN or RENN is wrongly marked with special stock indicator E  in VOV7
    If so remove that and try a fresh cycle
    2.The process you are right now doing is returns
    The original sale would have happened with special stock indicator E marked in its item category
    That means it is special stock
    That stock you might be trying to take it into general stocks now
    In that case right now you need to mark REN or RENN with special stock indicator E
    Note whenever you put your hand in VOV7 create a fresh order cycle and test and dont test it with already created order
    Note touching requirement classes are all big things to do in a project and not advisable lot many mistakes we can correct itself if we know order type ,item category and schedule line category
    Regards
    Raja

  • BAPI or FM to get material goods issue for a prod order

    Hi
    I need a FM to get the material goods issue for a prod order. Please let me know.
    Thanks and regards
    Harish

    Hi Harish,
    use FM <b>BAPI_GOODSMVT_CREATE.</b>
    have a look at this thread ..
    FM for good issue for production order
    Regards,
    Santosh

  • Goods Issue on Production Order

    Dear PP Gurus,
    The requirement is,
    while doing Goods issue for Production order of X material, during operation Confirmation ' CO11 & CO12' , System should allow only BOM components of X and restrict or give warning message for goods movement of other materials.
    I tried to use available User Exit for PP Orders but none of them gives desired output.
    Can nybody guide me.
    Thnx in advance.

    In customizing materials management -
    > Inventory Management and Physical Inventory->Goods Issue / Transfer Postings make--> Set Up Dynamic Availability Check
    For 261 movement type set Dynamic Availability Check as "F"
    and then in omcq transaction M7 362 message set "E"
    This customizings prevent good ıssue more than reservation quantity

  • Value of inventory after Goods Issue, before Goods Receipt for open order

    Dear Experts,
    Raw materials R72 and R82 are required to produce Semifinished Product S10.
    Semifinished product S10 is required to produce Fnished product F20
    On 10th August 2011, I created and release a Process Order for material S10 copying component materials R72 and R82.. Goods issue for component materials R72 and R82 were done for this process order using tcode MIGO (mvt type 261).
    It  takes four to five days to properly blend components R72 and R82 to obtain S10.
    It means Goods Receipt for this process order will be done on 14th or 15th August when this blending has been completed.
    Management suddenly issues a directive that stock take should be carried out in the plant on the 12th August 2011, and my process order is still open and cannot be closed ( or goods receipt cannot be done)  because blending is yet to be completed.
    Please how do I take care of this scenario/situation since Goods Issue has been done already?
    How will the Accountants see or get the correct value of inventory?

    When I run WIP Calculation for my Process Order, what will be the effect ? I mean what accouts are updated by WIP Calculation within a period (not across a perion or  at period end)?
    GI values issued to the Process order will come into WIP GL .( Since your client want to know the stock take should be carried out in the plant on the 12th August 2011- we are doing WIP calculation)
    > After  this WIP Calculation is run,  and say about 2days later, Goods Receipt for this process order is to be posted, what steps am I suppose to carry out?
    After GR Made, Run a WIP calculation again for the order so that The WIP from the GL account will get reduced ,now WIP= (GI value + confirmation ) -(GR Value),
    Check in DEV system before doing in PRD,
    On Month end, do the variance calculation and do the settlement

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • Automatic goods issue for outbound delivery, during the transfer order confirmation

    Hello,
    Could you please advise how to realize automatic goods issue for outbound delivery, during the transfer order confirmation in the WMS.
    Now after creation of outbound delivery, i can't post the goods issue. Before i have to make the transfer order and confrim it and only after this i can post the goods issue in the VL02 t-code.
    Could you please advise - what i have to customize that to make automatic GI for outb. delivery (i mean with creation material document) during the TO confrimation.
    Thanks in advance.

    Hi Iiya
    Check the below setting, might be helpful

  • Good issue to Production order - Allows it in back posting date

    Dear all,
    Good issue to Production order ( 261 Movement ), allows us to post the component in back dated eventhough stock is not avaible on that date.
    Example - Component stock on date 10.02.2010 = Zero , I made it Good receipt on date 18.02.2010 and now stock is available on date 18.02.2010.
    Now GI to Production it allows the qty on current and back Posting date also , I want control on date with error message. It should not allowed the GI for back date from 18.02.2010.
    Because of this our MB5B report shows the negetive issue qty if i post in back date.
    Waiting for reply
    Thanks and Regards,
    Saurabh

    Hi SAurabh,
    PLease check whether Negative Stock is allowed for the valuation Area (plant).
    GOTO >> SPRO >> MM>> Invetnroy management and physical inventory >> Goods issue/ Transfer Posting >> Allow Negative stock.
    Untick the Negative stock allowed for your valuation area (PLant)
    Regards,
    Pravin

Maybe you are looking for