Help On PS-CATS Integration

I have a client requirement on CATS - PS integration as below -
1. I am using work center in project activities and i have employees assigned to work center through HR.
I have assigned the concerned employees to the activities in PS. Now once the employee, who is assigned to the activity perform the work and go in time entry sheet in CATS in CAT2 T code -
A. Then in standard SAP, this person can see all the activities to which his work center is assigned But
I want the person/employee so see only activities to which he is assigned so that he can not book time
agaist the other activities or work performed.
I see that this is not the standard functinality and i have also gone through some of the threads in SDN, which says that we can use the user exit in CAT2 T code which will check for this validation during save of CAT2 T code,once emplyee enter the time.
But i want the employee to see his activity when he is entering into the CAT2 T code so that the additional efforts of entering the time can be saved.
Has anybody worked on this. request to share your experiance.
Thanks

Normally it is based on requirement. There are  resouce optimum utilization / over load/ underload  realted report  you can use very well, if you assign the person at workcenter level & control the same via workcneter capacity utilizations. What I  have observed that when you are alwalys running short of resouce at that time it better to assign person at workcenter level for it's optimum utilization. If you your resouce requirement  is mostly not going to be overloaded in that case you go for the person assignmnet at activity level.
Regards
Nitin P.

Similar Messages

  • CProjects PS/CATS integration with Rel 4.7

    Hi,
    we will install cprojects 4.5. on a stand alone system. The ERP-system is still on Rel 4.7. in the next few months. Is it possible to use the accounting integration (creating automatically WBS-elements out of cprojects) and to use the CATS-integration? I have read the installation master guide for cproject, on one page it says Rel >4.6 is required and on another if you want to use CATS integration you need ECC 6.0.
    Can anyone help me? What release do we need for PS and CATs integration?
    Thank's for your help!
    bestr egards
    Christine

    Hi Christine,
    Use this note 1088160  and 1088467 for support package .
    you can find all document for plm by using following link
    https://websmp108.sap-ag.de/plm-inst
    thanks
    sunil
    Edited by: sunil jawalkar on Apr 25, 2008 11:13 AM

  • CProjects Accounting / CATS integration

    Hi
    I am working on cProjects Accounting Integration and CATS integration.
    During same I am getting following messages:
      1. Acct Int.: Single-Obj. Contr. in SAP R/3  DCE458547A88A6F1B3640002A5CD3FB0 does not exist
    2.  Inconsistency between currency type 30 and currency EUR  
    Also, Internal Order is not getting generated.
    It is on ECC6 and cProjects 4.0
    Can anyone help me on the same?????
    If someone has any document to share please send it on [email protected]
    Niraj Sikliogar

    Hi Niraj
    To create the internal order , check the following things
         do the following things,
    .1)     Define company Name
    2)     Define company code, Credit control area, business area, Functional area, FM area.
    )3)     Maintain Controlling area.
    Prerequisite:  Need to define to Company following four things
    a)     Currency type: Defined in Company code
    b)     Currency: Defined in Company code
    c)     charts of account:
    d) Maintain Fiscal variant and assign it to company code.
    4)     Create Cost center
    Prerequisite for cost center:  Need to define 1) Standard Hierarchy 
    5)     Create cost element
    6)     Do the following assignment
    a)     Company code to company
    b)     Company code to credit control area
    c)     Company code to FM area
    d)     Profit center to Company code
    7)     Assignment company code to controlling area
    8)     Create model order: put $$  sign as order type.
    9)     Create the order type
    do the following things ,it will help you.
    any problem put the query
    Reward point if useful
    Regards,.
    nitin

  • CProject-CATS integration

    Hello,
    I want to run cProjects CATS integration scenario. Can somebody share relevent documentation? I am using cProjects 4.5.
    Regards,
    Milind Dumbre

    Hi Milind,
    For Integrating CATS need to make relevant settings in Project type.
    Make settings in Data entry profile.
    If cProjects & CATS (ECC) are on seperate servers ref Note 954860 - Setting up ALE to integrate cProjects with CATS.
    You also need to have account integration & HR integration to use CATS with cProjects.
    Ref the link for furthur details.
    [http://help.sap.com/saphelp_ppm450sp04/helpdata/en/43/054880bbe822f5e10000000a1553f7/frameset.htm]
    Regards
    Sejo

  • Please Help PI Data Dependent Integration Builder Authorizations NOT Workng

    Dear Friends / Experts,
    I had spend many days and explored all Weblog  and links on this website and implemented all the steps required to acheive Data Dependent Integration Builder Security and I am not successful so far. I am just giving up now - Please Help Me ---
    As I said, I already read all the important Forum Links and SAP Web links and Followed Each and Every Step - service.sap.com/instguidesNW04 ® Installation ® SAP XI
    Security Requirement - Data Dependent/Object Level Authorizations in XI / PI
    In distributed teams or in a shared PI environment it might be necessary to limit authorization for a developer or a group of developers to only one Software Component or objects within a Software Component or to specific Configuration Objects.
    Our Environment - PI 7.0 SP 16
    Created a new role in the Integration Builder Design
    u2013Add Object Types of any Software Component and Namespace
    - Enable usage of Integration Builder roles in Exchange Profile
    Integration Builder u2013Integration Builder RepositoryParameter com.sap.aii.util.server.auth.activation to true
    Assign users to the newly created Integration Builder roles
    u2013Create dummy roles in Web AS ABAP, these roles are then available as groups in Web AS Java
    u2013Assign users to these roles
    u2013Assign the Integration Builder roles to the above groups in Web AS Java
    u2013Assign unrestricted roles to Super Users
    Please help - How to validate whether Data Dependent Authorizations are Activated?
    I am working with XI Developers and Basis Team and we did updated all the Required Exchange profile parameters.
    Per this Document - User Authorizations in Integration Builder Tools - Do we need to update the server.lockauth.activation in Exchange Profile. When We updated, It removed Edit Access from all XI Developers in PI
    In both the Integration Repository and the Integration Directory, you can define more detailed authorizations that restrict access to design and configuration objects.
    In both tools, you define such authorizations by choosing Tools ® User Roles from the menu bar. The authorization for this menu option is provided by role SAP_XI_ADMINISTRATOR_J2EE. Of course, this role should only be granted to a very restricted number of administrators. To activate these more detailed authorizations, you must set exchange profile parameter com.sap.aii.ib.server.lockauth.activation to true.
    The access authorizations themselves can be defined at the object-type level only (possibly restricted by a selection path), where you can specify each access action either individually as Create, Modify, or Delete for each object type, or as an overall access granting all three access actions.
    http://help.sap.com/saphelp_nw04/helpdata/en/f7/c2953fc405330ee10000000a114084/frameset.htm
    I was able to control display and maintain access from ABAP Roles, but completely failed to implement Integration Builder Security?
    Are there any ways to check Whether Data Dependent authorization or J2EE Authorizations are activated?
    Thanks a lot
    Satish

    Hello,
    so to give you status of our issue.
    We were able to export missing business component .
    But we also exported some interfaces after that and we had some return code 8, due  to objects still present in change list on quality system (seems after previous failed transports , the change list was not cleared completley...).
    So now we have checked that no objects is present in the change list of quality system and we plan to export again our devs on quality system.
    Hope after that no more return code 8 during imports and all devs transported correctly on quality system.
    Also recommending to read that, which is pretty good.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/7078566c-72e0-2e10-2b8a-e10fcf8e1a3d?overridelayout=t…
    Thanks all,
    S.N

  • HELP! Form-Report integration problem!

    Hi all, I have a problem in integrating report in dev10i. I used to use Dev6i and have no problem in using run_report_object in 6i. I have posted this in Report for few days but haven't got response.
    I got the REP-0503 You did not specify the name of the report and FRM-40738 Argument 1 to builtin Report_Object_Status can not be null. The report run OK in report builder and I create the paper only layout. Also, I save the report as *.rdf and create a report object in form that point to this *.rdf file.
    This is my PL/SQL code:
    PROCEDURE P_PRINT_REPORT_OBJ(vc_reportoj Varchar2, vc_reportserver Varchar2, vc_runformat Varchar2) IS
    v_report_id Report_Object;
    vc_ReportServerJob VARCHAR2(100);
    vc_rep_status VARCHAR2(100);
    vjob_id VARCHAR2(100);
    BEGIN
    v_report_id := FIND_REPORT_OBJECT(vc_reportoj);
    SET_REPORT_OBJECT_PROPERTY(v_report_id, REPORT_COMM_MODE, SYNCHRONOUS);
    SET_REPORT_OBJECT_PROPERTY(v_report_id, REPORT_DESTYPE, CACHE);
    SET_REPORT_OBJECT_PROPERTY(v_report_id, REPORT_DESFORMAT, vc_runformat);
    SET_REPORT_OBJECT_PROPERTY(v_report_id, REPORT_SERVER, vc_reportserver);
    SET_REPORT_OBJECT_PROPERTY(v_report_id, REPORT_OTHER, XXX='||:XXX.XXX||' paramform=no');
    vc_ReportServerJob := RUN_REPORT_OBJECT(v_report_id);
    vjob_id := substr(vc_ReportServerJob,length(vc_reportserver)+2,length(vc_ReportServerJob));
    vc_rep_status := REPORT_OBJECT_STATUS(vc_ReportServerJob);
    IF vc_rep_status = 'FINISHED' THEN
    WEB.SHOW_DOCUMENT('/reports/rwservlet/getjobid'||vjob_id||'?server='||vc_reportserver, '_blank');
    ELSE
    message('Report failed with error message '||vc_rep_status);
    END IF;
    END;
    What gives? Do I miss something here? Do I have to set up other thing??? Also what is the name of report server in Dev10i? I am under impression that this is not needed so I put blank '' when I call this procedure in WHEN-BUTTON-PRESSED trigger like this:
    P_PRINT_REPORT_OBJ('myreportobj','','HTML');

    Hi all, I created simple report from 1 table and save it as *.rdf. I then make a simple form consisting 1 block and a button that have WHEN-BUTTON-PRESSED trigger that call P_PRINT_REPORT_OBJ. I create a report object in the form that point to my *.rdf report file and name the object MYREPORT. This time it gives Rep-0110 Can not open file '%n~<intangible character>' and REP-1170 Error while opening or saving a document. After that other message popup with REP-0110. It seems that FIND_REPORT_OBJECT could not find the file at all/giving the wrong filename as argument. Do I have crooked installation? I have tried it on 2 diff machine running XP2. Is this because of Win XP2? I have admin privilage user account for winXP2. Please help, this is not making a sense at all. I have no problem in Dev6i.
    PROCEDURE P_PRINT_REPORT_OBJ IS
    v_report_id                    Report_Object;
    vc_ReportServerJob               VARCHAR2(100);
    BEGIN
    v_report_id := FIND_REPORT_OBJECT('MYREPORT');
    vc_ReportServerJob := RUN_REPORT_OBJECT(v_report_id);
    END;

  • Need help with Desktop Office Integration (DOI)

    Hi all,
    i need help to read an Excelsheet into an int. table.
    Its the first time, that i use the SAP DOI. I copy different coding into my Report to get connection to an existing Excelsheet.
    Here is my Coding:
    * first get the SAP DOI i_oi_container_control interface
      CALL METHOD c_oi_container_control_creator=>get_container_control
                        IMPORTING control = gr_control
                                  error   = gr_errors.
      APPEND gr_errors.
    * create a control container as defined in dynpro 100
      CREATE OBJECT gr_container
                EXPORTING container_name = 'CONTAINER'.
    * initialize the SAP DOI Container, tell it to run in the container
    * specified above and tell it to run Excel in-place
      CALL METHOD gr_control->init_control
        EXPORTING
          r3_application_name      =    'Data'
          inplace_enabled          = ' '
          inplace_scroll_documents = 'X'
          parent                   = gr_container
          register_on_close_event  = 'X'
          register_on_custom_event = 'X'
          no_flush                 = 'X'
        IMPORTING
          error                    = gr_errors.
    * save error object in collection
      APPEND gr_errors.
    * ask the SAP DOI container for a i_oi_document_proxy for Excel
      CALL METHOD gr_control->get_document_proxy
                           EXPORTING document_type = 'Excel.Sheet'
    *                       EXPORTING document_type = 'Word.Document'
                                    no_flush = 'X'
    *                                REGISTER_CONTAINER = 'X'
                          IMPORTING document_proxy = gr_document
                                    error          = gr_errors.
      APPEND gr_errors.
    Then i open the Document from lokal PC.
    CALL METHOD gr_document->open_document
          EXPORTING
    *      document_title   = ld_filenc
            document_url     = ld_verzc
    *      NO_FLUSH         = ' '
    *      OPEN_INPLACE     = ' '
    *      open_readonly    = ' '
    *      PROTECT_DOCUMENT = ' '
    *      STARTUP_MACRO    = ''
    *      USER_INFO        =
    *      ONSAVE_MACRO     =
          IMPORTING
            error            = gr_errors
    *      RETCODE          =
      APPEND gr_errors.
    Now i start the spreadsheet interface:
    *...check if our document proxy can serve a spreadsheet interface  data:
      DATA: pd_has TYPE i.
      CALL METHOD gr_document->has_spreadsheet_interface
                        EXPORTING no_flush = 'X'
                        IMPORTING is_available = pd_has
                                  error = gr_errors.
      APPEND gr_errors.
      CALL METHOD gr_document->get_spreadsheet_interface
                        EXPORTING no_flush = ' '
                        IMPORTING
                                  sheet_interface = gr_spreadsheet
                                  error = gr_errors.
      APPEND gr_errors.
    * now loop through error collection because
    * Get_spreadsheet_interface flushed and synchronized
    * the automation queue !
      LOOP AT gr_errors.
        CALL METHOD gr_errors->raise_message
                        EXPORTING  type     = 'I'
                        EXCEPTIONS message_raised = 1
                                   OTHERS         = 2.
        IF sy-subrc = 1.
          MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
                  WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
          pd_kz_fehler = 'X'.
          EXIT.
        ENDIF.
      ENDLOOP.
      FREE gr_errors.
    Ok, now i can open a Excelsheet, and i can mark a range in the sheet
    rows is a constant.
    CALL METHOD gr_spreadsheet->set_selection
          EXPORTING
            left     = 1
            top      = 2
            rows     = rows
            columns  = 18
    *    NO_FLUSH = ' '
    *    UPDATING = -1
        IMPORTING
          error    = gr_errors
    *    RETCODE  =
    my first problem: Excel is really open, and the user can see the sheet. I dont want, that excel is visible...is there a way to start excel in no_visible mode?
    second problem: The sheet have makro aktiv...at start from excel, there is a popup, which ask 'makros activate' oder not activate...  i dont want this popup... is there a way, to say it from abap, that makros always active?
    third problem: i see, that the content Table have this components:
    TYPES: BEGIN OF SOI_GENERIC_ITEM,
             ROW(4) TYPE C,
             COLUMN(4) TYPE C,
             VALUE(256) TYPE C,
           END OF SOI_GENERIC_ITEM.
    But my excelsheet have more then 10000 lines....
    forth (and biggest) problem: i need the selected data into an int. tabelle. The table have the components:
    ROW
    COL
    VALUE
    i dont know, how can i do this...
    please help me
    Sorry for my bad english.
    Greetings
    Markus

    Hi,
    May be this link is useful
    /people/thomas.jung3/blog/2005/05/11/using-classic-activex-controls-in-the-abap-control-framework
    Also Check out report SAPRDEMOEXCELINTEGRATION2.
    check the links
    http://www.esnips.com/doc/741a848e-f49a-4436-bec4-e21950f6c94c/desktop-office-integration.pdf
    http://www.esnips.com/doc/2080a9ec-64f9-49c4-bd03-d9f56bc2437c/MSWord--Excel-with-ABAP.pdf
    Regards,
    Raj.

  • Help on FRM-41211 Integration error: SSL failure running another product.

    Am getting the above error, whenever I run my interface form calling a Report module.
    What's baffling though is - this only happens during the initial call to the RUN_PRODUCT built-in. That is, after acknowledging the Form error, the Reports Background Engine is displayed, then everything would seem to be work after that.
    Could this be a bug or is there a run-around to this?
    Thanks a lot for your ideas and help.

    We were getting this error on windows98 machines if someone had opened wordpad or some other unrelated application before running a report after they booted the machine. We solved the problem by forcing the reports backgroup engine to run at startup to prevent this error.
    HOST (
    'start /m RWRBE60.exe ',
    no_screen); -- START BACKGROUND ENGINE TO PREVENT SSL INTEGRATION ERROR

  • Help Required on CATS

    Hello,
    I have activated the CATS BI content in SAP BW. Now we want to develop the reports which
    will show the timesheet entries  processed in CO . Logic used here is to find out the posting date in COBK table
    by matching the document number in CATSDB and reference document number in COBK.
    We want to know the relationship between document number in CATSDB and reference document number in COBK.
    How I can join these two tables?
    Regards,
    Shital

    Hi Hope this will Help you
    Activities
    The user settings for CATS notebook consist of three steps:
    Linking a Personnel Number to a User Name
    Linking a User to a Data Entry Profile
    Assigning Authorization for Data Synchronization
    SAP R/3 contains a range of SAP enhancements for the Cross-Application Time Sheet, which can be used for several user interfaces (CATS notebook, CATS classic, CATS regular, and so on).
    The table below shows the general SAP enhancements that are also relevant for CATS notebook and information about the corresponding offline Java interfaces in CATS notebook.
    General SAP enhancements for the Cross-Application Time Sheet in relation to CATS notebook
    SAP Enhancement
    Meaning
    Java Interface
    CATS0001
    Structure the worklist in SAP R/3 with which you can supply picklists for certain working time attributes in CATS notebook
    Interface IPicklistCustomer
    CATS0002
    Supplement recorded data
    Time data can be supplemented in SAP R/3 only
    CATS0003
    Customer-specific checks for recorded time data
    ITimeSheetChecker interface
    CATS0006
    Validate entire time sheet
    ITimeSheetChecker interface
    CATS0008
    Determine workflow recipients for approval
    Time data is approved in SAP R/3 only
    And also get some information through this path
    http://help.sap.com/saphelp_470/helpdata/en/dc/d66c3cbfac384fe10000000a11408
    http://help.sap.com/saphelp_470/helpdata/en/52/67116a439b11d1896f0000e8322d00/frameset.htm4/frameset.htm
    http://www.timelink.com/sap/CATS_frontend.pdf
    www.timelink.com/sap/cats.pdf
    Reward If helpful
    Regards
    Khaiser

  • Help on PO- BPM Integration!

    Hello people!
            Here I am again needing your knowledge of this suite. Im connecting my NWDS to the PO server and when I login into the server I can see this Iflow going from a legacy to the Integration Engine:
    As you can see the Iflow ends with a SOAP Receiver channel pointing to http://.....:50000/bpm/demosapcom/opco/Start . I think this is the triggering of a BPM right? How is this address determined?
    Then when I go to the Development Infrastructure perspective I see the following SC named ***_BPM with a object named opcont but I dont know how to see if that object is a BPM or what..
    Basically I want to know how to go to the BPM that is called from the SOAP Receiver but going to the Dev Inf perspective doesnt help because i only see that opcont object. I also tried composite designer and process development perspective but they are empty.
    Thanks a lot!

    Thanks for your reply Harald!
    Y saw the link you posted but as it described there, the url inthe reciever channel should be http(s)://<hostname>:<port>/MessagingSystem/receive/JPR/XI, but if you see the printscreen above, the receiver channel points to http(s)://<hostname>:<port>/bpm/demosapcom/opco/Start and I would like to where this url is pointing and how I can see that component.
    In the second printscreen I am connected to the DTR but I only see what is in red. I double click in the opcont component but it does not open a BPM, only some properties and nothing more. How can I see that BPM that someone else has developed in that environment?
    Thanks again!
    Best Regards

  • CATS INTEGRATION WITH PP AND PM MODULE ( TO FIND ACTUAL MANPOWER COSTING THROUGH ACTIVITY TYPE)

    Hi Experts,
    We have a scenario like, Client wants to track the actual manpower costing through activity type ( Ex: How much hours an employee worked on a particular work center to produce an “X” product, So that his actual cost should be loaded on that product.
    We have employee ( 1. Staff 2. Worker 3. Contract labor employee and apprentice from third party roll and staff and worker we plan to go with negative time management and for contract labor and apprentice will go with through cats.
    Since we are not going to run the payroll for contract labor employee and apprentice, we just maintaining the employee data as a group ( Ex: Group A,B,C etc.. Each group consists 20 or 30 employees, According to system each group as one employee and according to us each group consists as 20 or 30 employee.
    The Activity type as well cost center will be created by Co module, the same will be assigned in info type 0315, but still i want more input from experts on the same, since i am new to cross application time sheet configuration, could any one help me out to find the actual manpower costing in a better way.
    Regards,
    Prem

    Hi Experts,
    Can any one please reply on the same.
    How to arrive the exact manpower costing through activity type ?..
    Regards,
    Prem

  • Need Urgent Help on Meeting Place Integration with CUCM 7.1 and AS5400 PSTN Gateway

    Hi,
    This is first time I am on this forum.
    I have already tried going through a lot of docs on docwiki.cisco.com but couldn't find complete configuration help.
    I have to integrate Meeting Place 8.X with an existing CUCM and an E1 gateway (PSTN Gateway) AS5400.
    The CUCM is already part of a Telepresence Environment. I need to create a SIP trunk between AS5400 and CUCM 7.1 and then create a Trunk between AS5400 and Cisco Unified MP 8.X and then between CUMP and CUCM.
    I need help on AS5400 SIP Configs as well as parameters I need to cover on CUCM (Though I have done some basic dial-peer configs but they haven't been of much help).
    Then I also need help on AS5400 SIP configs with CUMP 8.0
    Any docs on Integration between CUMP and TP3000 will be of great help too.
    Rgds,
    Asim

    I can get the Ricoh to register as sip endpoint, it answeres then imediatly disconnects. Doing a monitor with Wireshark looks like it attempts to negotiate t38 but fails. Any idea why this fails?
    |160.260684000|         INVITE SDP (g711U)            |                   |SIP From:
    |         |(5060)   ------------------>  (5060)   |                   |
    |160.338806000|         INVITE SDP (t38)              |                   |SIP Request
    |         |(5060)   <------------------  (63435)  |                   |
    |160.339545000|         491 Request Pending           |                   |SIP Status
    |         |(5060)   ------------------>  (5060)   |                   |
    |160.547894000|         406 Not Acceptable            |                   |SIP Status
    |         |(5060)   <------------------  (63435)  |                   |

  • Help needed with Reader Integrated Key

    Hi,
    I have develop a plug-in and apply for Reader Integrated Key License. This plug-in have been tested with acrobat and reader professional and it is working.
    I follow the advice from the above website and use RIKLATools.zip to created the pair.
    i have just receive the Reader Integrated Key from Adobe,I tried all method but the key  does not work with the plug-in. What is the fool proof way to integrate my Reader Integrated Key with the plug-in to get a digtally signed plug-in?
    Urgent help needed as we are submitting the plug-in to client.
    many Thanks in advance
    Regards
    Jia hao

    Thank you lrosenth, i will email them

  • Help! My cat did something weird!!

    My cat stepped on my key board and made everything huge. I've already tried going to system prefaces and changing the display and it didn't work. My screen moves with the mouse and the most annoying thing is i can't see everything. Help!!! I've already looked up shortcuts and i don't know what she stepped on. it was in the lower left corner with command and option and control but i don't know which ones. Any tips to get my screen back to normal would be awesome!

    Like the last poster said, the cat has most likely caused a zoom in on your mac. The zoom-in works by holding ctrl + two finger scroll upwards on the touch pad. To zoom out, press and hold ctrl + two finger scroll downwards on the touch pad.

  • Help  - How to invoke Integration Builder

    Hello Gurus,
    It's a great forum to know more about XI, scenarios, blogs etc. I have a very simple question as a basic for all the scenarios -
    How to invoke / start integration builder and integration repository. I am getting message "Integration Builder address not maintained" while running the SXMB_IFR.
    Any comments, pointers will be great.
    regards,
    Sm

    Hi Sri,
    1) Were you able to open in exchange profile?
    To findout, try the following URL
    http://<hostname>:<port>/exchangeProfile
    2) Make sure to check connection parameters in Exchange Profile and the following values are set
    com.sap.aii.connect.repository.name
    com.sap.aii.connect.repository.httpport
    3)Make sure your J2EE server is running. You can find out by going to the URL http://hostname:50000.
    Also complete all your post installation activities.
    Also go through these links which will surely help you.....
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1688 [original link is broken] [original link is broken] [original link is broken] [original link is broken] [original link is broken]
    /people/shabarish.vijayakumar/blog/2006/02/13/unable-to-open-iresrid-xipipi-71-updated-for-pi-71-support
    Integration Builder Address not maintained
    Regards,
    Abhy

Maybe you are looking for