How do I calculate hours?

Hi,
I allow the user to enter a start time of "0200AM" and an end time of "0330AM". How do I calculate the hours? I tried calendar hours, but I wasn't quite sure how it worked.
Thanks

you use the Calendar.set() method to set the specific hour/minutue/am/pm, see the docs for details. then you can do a getTime() which returns a Date object for further manipulation.
thomas

Similar Messages

  • How do I calculate hours in Numbers?

    How do I calculate hours in Numbers? Example: I inserts 7:00 in a cell and 11:30 in another cell. What function do I write to get 4:30?

    Hi Interlaga,
    Enter start time in A2. Enter finish time in B2. They will become Cell > Data Format > Automatic with Date and Time (Date None).
    Formula in C2
    =B2−A2
    That becomes Cell > Data Format  >Automatic
    Refinement is to use 'Date and Time' Format for start and finish, and 'Duration' format for the difference.
    Remember that in Numbers, every Date has a Time attached, and every Time has a Date attached (even if they are not displayed in the cell). So if you enter the times on different days (the 'crossing midnight' problem) the finish time will be 24 hours later .
    It took me a while to understand this, but a Time or a Date is an instant since 1 January 1904.
    Call back for more help.
    Regards,
    Ian.

  • How to calculate hours between two dateTime node in BPEL.

    In my BPEL there's a requirement need calculate hours between two dateTime type..
    I tried 2 solutions, both of them failed:
    1. use xslt calculate duration(xml type, like PT12H) between two dateTime, and then use embedded java code to get the hours.. The problem is : I need to parse the xml duration format...(like this real one: -P80DT17H47M36S....), and to parse it in java , maybe have the same problem with solution 2..
    * [Subtracting 2 dateTime values into a duration using XPath 2.0|http://blogs.oracle.com/rammenon/2007/07/subtracting_2_datetime_values.html]
    2. use embed java code, but it seems we can't use some class in embedded java code:
    my code(input begin, end both dateTime in xml. output: diff, int in xml):
    1 System.out.println("\n\nTimeTestBegin");
    2 String begin=getVariableData("begin").toString();
    3 String end=getVariableData("end").toString();
    4 System.out.println(begin+"-----"+end);
    5 //Class c1=Class.forName("javax.xml.datatype.XMLGregorianCalendar");
    6 //Class c2=Class.forName("javax.xml.datatype.DatatypeFactory");
    7 //System.out.println(c1.getName());
    8 //System.out.println(c2.getName());
    9 javax.xml.datatype.XMLGregorianCalendar beginTime = javax.xml.datatype.DatatypeFactory.newInstance().newXMLGregorianCalendar(begin);
    10 javax.xml.datatype.XMLGregorianCalendar endTime = javax.xml.datatype.DatatypeFactory.newInstance().newXMLGregorianCalendar(end);
    11 long diff=beginTime.toGregorianCalendar().getTimeInMillis()-endTime.toGregorianCalendar().getTimeInMillis();
    12 setVariableData("diff",String.valueOf(diff/1000/3600));
    13 System.out.println("DIFF======"+diff/1000/3600);
    14 System.out.println("TimeTestEnd");
    it's said can't compile java class, but can't find the detail error, I think the problem is how to import java class to embedded java code activity(use full package name like above code don't work), when I remove line 9-13, no compile error..
    BTY: Jdeveloper is a IDE support java, but why the embedded java activity's edit window only have a simple "java code" editor, too simple that it can only edit you code snippet...
    3.There's another sulotion: extend BPEL xpath functions(add a new function), but in my project, modify BPEL server(soa server)'s config file is not allowed..
    Anyone know easy solution to my problem?
    Thanks.

    Hi, All,
    I found the cause. Sorry, it's my mistake..
    below line have a DatatypeConfigurationException:
    javax.xml.datatype.DatatypeFactory.newInstance()
    When I test my java code snippet, I coped the code snippet to one of my java class in eclipse, and put it in a method to check if there's compile error, but I didn't notice there's a "throws Exception"...
    the final java code snippet for test is :
    input: begin dateTime
    input: end dateTime
    output: diff int, how many hours in (begin-end)
    try{
    System.out.println("\n\nTimeTestBegin");
    String begin=getVariableData("begin").toString();
    String end=getVariableData("end").toString();
    System.out.println(begin+"-----"+end);
    javax.xml.datatype.XMLGregorianCalendar beginTime = javax.xml.datatype.DatatypeFactory.newInstance().newXMLGregorianCalendar(begin);
    javax.xml.datatype.XMLGregorianCalendar endTime = javax.xml.datatype.DatatypeFactory.newInstance().newXMLGregorianCalendar(end);
    long diff=beginTime.toGregorianCalendar().getTimeInMillis()-endTime.toGregorianCalendar().getTimeInMillis();
    setVariableData("diff",String.valueOf(diff/1000/3600));
    System.out.println("DIFF======"+diff/1000/3600);
    System.out.println("TimeTestEnd");
    }catch(Exception e){
    e.printStackTrace();
    }

  • How can i calculate overtime hours with PCR?

    hi all,
    i was wandering, can i calculate overtime hours in this case?
    example my DWS for this day is 08.00 - 16.00
    i do early overtime from 06.00 - 08.00, and after my working hours is finished, i do late overtime from 16.00 - 19.00
    (in TIP it is separated in 2 rows)
    how can i calculate my total overtime with pcr? i want to use the total for another calculation..
    06.00 - 08.00 : 2 hours
    16.00 - 19.00 : 3 hours
    +
            total      : 5 hours.
    thx all..

    ZPRN    DVARSTPRSNT
    N      COLOP*
    Y     DOUTTPORIGS
    Y E  HRS=0     HRS=PNUM  ADDDB9066 COLOP*
    Y *  COLOP*
    THE ZPRN PCR WILL GET THE TOTAL NUMBER WORKING HRS IN TIME TYPE 9066
    Now we will write a pcr to get overtime details
          DVARSTDPRCL
    *    DVARSTHOLCL
    * 1  D HRS=D9066  HRS-S HRS?0
    * 1 * ADDDB9067
    * 1 < COLOP*
    0 *
    NOW THIS PCR WILL BRING THE OVERTIME
    BASED ON YOUR DAILY WORK SCHEDULES U NEED TO CHANGE VARSTDPRCL NOW MY RULES WILL WORK FOR ALL THE SHIFTS OTHER THAN WEEKLY OFFS
    REGARDS,
    RAJA SEKHAR.

  • How do I calculate a time such as work hours

    How do I calculate a time such as, a cell may have any time valve pertaining to daily work hours. 8:00 or 7:00 or 10:30. My question is I want another cell to represent any amount over 8:00. Like in a nine hour day you would have 8:00 with 1:00 overtime

    This may help:
    The first row is a header.
    select the three columns and format as  "Duration":
    now enter the formulas as:
    B2=IFERROR(IF(A2>DURATION(0, 0, 8), DURATION(0, 0, 8), DURATION(0, 0, 0)), "")
    C2=IFERROR(A2-B2, "")
    select B2 and C2, then fill down as needed

  • How can i calculate tempsize and logdir size ?

    Hello:
    I have one database on a primary server and its replica on a replica server.
    Since one week to now, Mexican Exchange have had a considerable growth on transactions.
    My database works in line, every night all data is cleaned waiting for new data on next day.
    From last Thursday (29 april 2010) my replicas have had problems on drop all data using delete from.
    I use delete from because those tables are Oracle cache groups defined.
    Looking for error on tterrors logs (yesterday I got this error) I could see that replica was ran out of temporal memory.
    On line database and replica database I have defined same temporal memory size, on this case 512Mb. But primary database did not send any error about this parameter, so if I checked “monitor” columns on database, my temp_in_use size is too less than temp_allocate_size.
    My problem is, how can I calculate temp_allocate_size ?
    So I have had close to 3,000,000 record on a simple table, I mean, I could have 2 or 3 tables with same number of rows.
    If I have this parameter (may be 9,000,000) rows to be deleted, is there any way to calculate temp_allocate_size ?
    But now, I suppose that I need enogh space on “LogDir”, my high_water_mark for permanent memory is 10GB, I have defined 16 gb for LogDir, but if I stopped replication since the operation starts, I had 100% space used at middle of my operation, so 5Gb on real database used, it is using close to 16 gb on LogDir.
    My second doubt … is there any way to calculate LogDir size having the maximum database size ??
    Thanks a lot for your help.
    Regards.

    I think that approaching this from the perspective of increasing temporary space and log space is not the best way.
    Firstly, there are better ways to delete all rows from a table instead of using delete...
    1. For regular tables (ones that are not part of a cache group) you can use TRUNCATE TABLE ... This operation is replicated but the voilume of replicated data is vastly smaller than if you delete all rows individually. Also, it should take a lot less Temp space on both the source and target system.
    2. For cache tables, you could use UNLOAD CACHE GROUP ... This is similar to TRUNCATE but for cache tables. Again, this operation is replicated. Note that if you are using AWT or SWT cache groups and you DELETE in TimesTen then the data is also deleted from Oracle... is that wjhat is desired?
    If you have to use DELETE then it is very important that you delete the rows in small batches rather than as one huge transaction. Trying to replicate a delete of 3M rows will cause huge problems for replication. A much better solution is to delete in smaller batches using some application logic as follows:
    loop:
    commit;
    DELETE FIRST 1000 FROM sometable;
    If rowcount > 0 then goto loop;
    commit;
    This approach has 5 benefits:
    1. Much less Temp space will be needed.
    2. Replication will be able to process the delets as they occur rather than waiting until all 3M rows have been deleted and then trying to tepliate a single transaction of 3M deletes. This will greatly improve replication performance and also prevent excessive log file buildup.
    3. Checkpointing will be able to purge log files as the delete progresses rather than having to wait until all rowsw have been deleted. This will prevent excessive log file buildup.
    4. The overall time required will be much reduced compared to deleting all rows in a single delete.
    You should not stop replication while the delete s are being done as this just causes log file accumulation.
    To answer your original question. it is not possible ot 'calculate' the required temp space pof log space; rather one must use observed data from when the system is running to determine the necessary size. For Temp size, you can look at the Temp high water mark to see the maximum space used and then set TempSize to somewhat more than that value. For log space, you need enough to sustain the maximum amount of log data generated with some contingency. Running our of log space is a very bad idea...
    If you adopt my suggestions above then you can avoid these issues and also complete the cleanup of data in a shorter time.
    Chris

  • How do I calculate the total size of selected folders?

    Hello
    My question is:
    How do I calculate the total size of selected folders?
    Thank you

    It does show the aggregate size.
    Command-Option-I opens the Inspector window. (Or open the File menu and hold the Option key. Get Info turns into Show Inspector.) The Inspector is similar to the Get Info window but it shows aggregate info for multiple selections. It is also dynamic — if you change the selection while the Inspector is open, the info changes to reflect the current selection.

  • How can we calculate no.of leave used by the employee except sunday.

    Dear Friends,
    i have query how can we calculate no.of leave taken by the employee except sunday & government holiday.
    Example: A person take a sick leave From 13/02/2008 to 20/02/2008 with in that period 17th was sunday.
    when we calculate absence day for that person,Total value is 8 days but exact output is 7days only.How can i get exact result,any function module is avilable for this issue .
    Thanks & Regards,
    Rajkumar.A

    Hi,
    you have to consider SL leave as in holiday's So you can check with clinet if client says consider you can otherwise you con't
    its depend client requirement
    and you can go to controlls inSAP and change absence controlls for SL with holidays
    Regards
    Suresh

  • How can we calculate no. of instances in a java program ?

    Hi,
    I want to know that
    How can we calculate no. of instances in a java program ?
    Actually I just want to calculate number of live instances in a program at any time...
    Thanx in Advance
    Vijay

    Been asked a few times in this forum.
    Try having a search.
    One way, in brief, is to instrument your classes so that constructors update a per-type counter, and enqueue a PhantomReference for the instance.
    When you pop from an associated ReferenceQueue, decrement the counter for the no longer reachable type.
    Once you have this, you can query instance counts per type, or globably etc.
    We maintain a model which can be remotely queried - and display results over time using JGraph. Gives a fairly non-intrusive way to spot and narrow down the cause of memory leaks in a large application.

  • How do you calculate the count in before a cue start?

    Here's what I can't figure out.
    I have a quicktime loaded and I need to start a cue at, let's say, 1:05:07:10. I want the tempo to be, oh, 120. I arbitrarily say - this will be measure 41 but it doesn't really matter, I just need my downbeat at that TC and the tempo to be correct.
    So far so good. I have no problem doing this with Tempo operations. I lock the time code, assign it a measure (in this case 41) and have logic calculate a single tempo from 1:00:00:00 (measure 1) to the desired start.
    Now here's my real question. How do I calculate 4 or 8 beats before 1:05:07:10 so I can have a count it at the correct tempo (120)?
    So I'm wonder how some of y'all handle this situation.
    Thanks

    As long as you are in the Fetch call, all other calls to the Scope
    driver will block until Fetch exits.  That's why the Abort doesn't
    do anything.  You have two options:
      1) Use a finite timeout.  Obviously, you are running into
    cases in which the trigger does not arrive, and want to exit
    cleanly.  This is exactly what the timeout is for.
      2) Determine the acquisition state before calling fetch. 
    If this is a finite, single-record acquisition, poll on acquisition
    status and do not call fetch until the status is 1 (acquisition
    complete).  If you're doing a finite, multi-record acquisition,
    poll on the Fetch>>Records Done property and only fetch the
    records that have completed.  If you're doing a continuous
    acquisition, poll on the Fetch>>Points Done or Fetch>>Fetch
    Backlog property and only fetch the number of points that have been
    acquired.
    There's no clean way to break the infinite timeout fetch without forcing LabVIEW to close.

  • How do we calculate Accumulated Depreciation for a Particular Period

    Dear Members,
    How do we calculate the Accumulated Depreciation for a particular asset. It would be great if some body can explain me ,what tables should we use.
    I read that Accumulated Depreciation is nothing but deprn_reserve column in fa_deprn_summary table. I have to make a report which should show the accumulated depreciation for an asset by period name. (eg : For MAY-07 the report should give the accumulated depreciation for that asset).
    Please give your suggestions.
    Thanks
    sandeep

    Hi,
    You can use DEPRN_RESERVE from fa_deprn_summary to get accumulated deprn. Make sure you select the latest row from fa_deprn_summary for a particular period.
    Use FA_DEPRN_PERIODS to join with period_counter if you wnat to use Period Name as criteria.
    Cheers
    Sunil Chawla

  • How i can calculate the backplane speed & throughput of cisco 48 1G 2960S switch?

    How i can calculate the backplane speed & throughput of cisco 48 1G 2960S switch?

    Disclaimer
    The  Author of this posting offers the information contained within this  posting without consideration and with the reader's understanding that  there's no implied or expressed suitability or fitness for any purpose.  Information provided is for informational purposes only and should not  be construed as rendering professional advice of any kind. Usage of this  posting's information is solely at reader's own risk.
    Liability Disclaimer
    In  no event shall Author be liable for any damages whatsoever (including,  without limitation, damages for loss of use, data or profit) arising out  of the use or inability to use the posting's information even if Author  has been advised of the possibility of such damage.
    Posting
    Calculate?  Calculate for wirespeed/line-rate?  If the latter, take all the port bandwidths, and assuming they are duplex, double for necessary fabric bandwidth.  I.e. 48 gig ports would need a 96 Gbps fabric.  Take all your port bandwidths, and allow 1.448 Mpps per gig (for minimum size Ethernet packets), i.e. 48 gig ports would need 69.5 Mpps.  Once you have required fabric bandwidth and PPS, you can compare to vendor's specs.

  • How can I calculate which is the index (x-value) correspondant to a certain value of a signal?

    I just want to calculate the quality of the peak in a FFT, defined as you can see in the attached file.
    For that, I would need to know how can I calculate in Labview the index or indices (x-value) correspondant to a certain amplitude value of the function.
    Kind regards, and thank you for reading,
    Jose
    Solved!
    Go to Solution.
    Attachments:
    quality.jpg ‏6 KB

    If you know the lineshape (e.g. Lorentzian), you can use nonlinear fit. This will give you the most accurate value.
    In the most simple case (insignificant offset and noise, no other peaks) you can apply the following code (if there are other peaks, then take a apropriate array subset before applying the code). To get correct units, just scale with df.
    LabVIEW Champion . Do more with less code and in less time .
    Attachments:
    WidthAtHalfHeight.png ‏52 KB

  • How can I calculate the request time ?

    Hello,
    How can I calculate the total consume time in each request ?
    For example, I want to start calculating the time when I click on a Link or a button and the end time when it completed load the page !
    Eric

    You could use a filter like this one:
    import java.io.*;
    import java.net.*;
    import java.util.*;
    import java.text.*;
    import javax.servlet.*;
    import javax.servlet.http.*;
    import javax.servlet.Filter;
    import javax.servlet.FilterChain;
    import javax.servlet.FilterConfig;
    import javax.servlet.ServletContext;
    import javax.servlet.ServletException;
    import javax.servlet.ServletRequest;
    import javax.servlet.ServletResponse;
    public class TimeFilter implements Filter {
        // The filter configuration object we are associated with.  If
        // this value is null, this filter instance is not currently
        // configured.
        private FilterConfig filterConfig = null;
        private static final boolean debug = false;
        private long start = 0;
        private long end = 0;
        public TimeFilter() {
        private void doBeforeProcessing(ServletRequest request, ServletResponse response)
        throws IOException, ServletException {
            if (debug) log("CalendarFilter:DoBeforeProcessing");
            System.out.print("In Filter  ");
            this.start = System.currentTimeMillis();
            System.out.println((new java.util.Date()).toString() +
                               " start request ");
        private void doAfterProcessing(ServletRequest request, ServletResponse response)
        throws IOException, ServletException {
            if (debug) log("TimeFilter:DoAfterProcessing");
            System.out.println("Completion Time = " + (System.currentTimeMillis() - start));
         * @param request The servlet request we are processing
         * @param result The servlet response we are creating
         * @param chain The filter chain we are processing
         * @exception IOException if an input/output error occurs
         * @exception ServletException if a servlet error occurs
        public void doFilter(ServletRequest request, ServletResponse response,
        FilterChain chain)
        throws IOException, ServletException {
            if (debug) log("TimeFilter:doFilter()");
            doBeforeProcessing(request, response);
            Throwable problem = null;
            try {
                chain.doFilter(request, response);
            catch(Throwable t) {
                problem = t;
                t.printStackTrace();
            doAfterProcessing(request, response);
            // If there was a problem, we want to rethrow it if it is
            // a known type, otherwise log it.
            if (problem != null) {
                if (problem instanceof ServletException) throw (ServletException)problem;
                if (problem instanceof IOException) throw (IOException)problem;
                sendProcessingError(problem, response);
         * Return the filter configuration object for this filter.
        public FilterConfig getFilterConfig() {
            return (this.filterConfig);
         * Set the filter configuration object for this filter.
         * @param filterConfig The filter configuration object
        public void setFilterConfig(FilterConfig filterConfig) {
            this.filterConfig = filterConfig;
         * Destroy method for this filter
        public void destroy() {
         * Init method for this filter
        public void init(FilterConfig filterConfig) {
            this.filterConfig = filterConfig;
            if (filterConfig != null) {
                if (debug) {
                    log("TimeFilter:Initializing filter");
         * Return a String representation of this object.
        public String toString() {
            if (filterConfig == null) return ("TimeFilter()");
            StringBuffer sb = new StringBuffer("TimeFilter(");
            sb.append(filterConfig);
            sb.append(")");
            return (sb.toString());
        private void sendProcessingError(Throwable t, ServletResponse response) {
            String stackTrace = getStackTrace(t);
            if(stackTrace != null && !stackTrace.equals("")) {
                try {
                    response.setContentType("text/html");
                    PrintStream ps = new PrintStream(response.getOutputStream());
                    PrintWriter pw = new PrintWriter(ps);
                    pw.print("<html>\n<head>\n</head>\n<body>\n"); //NOI18N
                    // PENDING! Localize this for next official release
                    pw.print("<h1>The resource did not process correctly</h1>\n<pre>\n");
                    pw.print(stackTrace);
                    pw.print("</pre></body>\n</html>"); //NOI18N
                    pw.close();
                    ps.close();
                    response.getOutputStream().close();;
                catch(Exception ex){ }
            else {
                try {
                    PrintStream ps = new PrintStream(response.getOutputStream());
                    t.printStackTrace(ps);
                    ps.close();
                    response.getOutputStream().close();;
                catch(Exception ex){ }
        public static String getStackTrace(Throwable t) {
            String stackTrace = null;
            try {
                StringWriter sw = new StringWriter();
                PrintWriter pw = new PrintWriter(sw);
                t.printStackTrace(pw);
                pw.close();
                sw.close();
                stackTrace = sw.getBuffer().toString();
            catch(Exception ex) {}
            return stackTrace;
        public void log(String msg) {
            filterConfig.getServletContext().log(msg);
    }and in the web.xml :
       <filter>
            <filter-name>TimeFilter</filter-name>
            <filter-class>
                com.filter.TimeFilter
            </filter>
        <filter-mapping>
            <filter-name>TimeFilter</filter-name>
            <url-pattern>/services/*</url-pattern>
        </filter-mapping > 

  • How can I calculate the value of the cell, which depends on other rows?

    Hi, all!
    I have an application with table. In this table i have calculate some fields, that doesn't exists in data class and depends on other row values, e.g. current row number, or sum of previous rows. How can i calculate this values in TableView?
    The problem is that I have no information about the current row number in the cell value factory.
    Example:
    public class Transaction {
         public String getName();
         public BigInteger getAmount();
    } // There is no getter for "Balance"
    Result table should be something like this:
    Name
    Amount
    Balance
    transaction1
    300
    300
    transaction2
    200
    500
    transaction3
    500
    1000
    Also, after sorting by "Amount", "Balance" should be recalculated:
    Name
    Amount
    Balance
    transaction3
    500
    500
    transaction1
    300
    800
    transaction2
    200
    1000

    Strings can be converted to numbers by various parse methods. For instance Strings can be converted to double via Double.parseDouble(myString).
    That being said, it appears that your textfield will contain numbers and operators, and so these operators will need to be parsed too. I would advise you to search on the terms Java infix postfix.

Maybe you are looking for

  • How can i get a software update for an original ipod

    ????????

  • Windows 8.1 Pro Cannot Connect to Domain Controllers through Wi-Fi

    I have a domain joined Surface 2 Pro running 8.1 Pro Update that is suddenly unable to connect to the domain controllers on the local network. The machine is fully patched. I'm guessing that it is some network level security issue because the wi-fi i

  • Issue in uploading Employee Group and subgroup in LSMW

    Hi Experts,    I`m using LSMW to upload IT 1013 data thru transaction PP01. When i run the LSMW in forground mode , then everything seems to work fine. But when run in background mode, I find that the records are not getting uploaded and its giving m

  • Cannot Install Flash in Firefox 3.6.8

    I am trying to install flash on my machine and can install it in IE 8 but not in FF 3.6.8. I am logged in as admin on this machine with no current AV program running, running Win XP SP3 32 bit. I started having problems with flash and FF 3.6.8 right

  • Mail crashes after upgrade to 10.7.3

    After upgrading to 10.7.3 Mail App quits immediately after starting. Crash report follows: Process:     Mail [1356] Path:        /Applications/Mail.app/Contents/MacOS/Mail Identifier:  com.apple.mail Version:     5.2 (1257) Build Info:  Mail-12570000