How do I go from developer 10.9 preview to OSX Full 10.9

So I am in the Mac App store and I see that the full Mavericks is available for download. Earlier I tried downgrading to 10.8 so I could easily upgrade to 10.9, But the preview version wont allow mw to do so. So anyhow I try to download it in the app store and all I get is the little loading thing in the upper left and nothing else happens. Any advice?

Check your email. Devs participating in the authorized seed should have received instructions.

Similar Messages

  • How to transport requests from development  to production server

    hi gurus
    i am new to SDN
    can u pls give me detailed information how to transport requests from development server to production server?if possible give me screen shot documents
    regards
    surya

    Hi
    Transporting
    There are help pages that discuss creation of transports.
    In simple terms, you: create a transport package
    add objects to the package  export the package, plus optionally any related objects to a predefined folder/directory on the portal server into a file with an extension of .EPA copy the .EPA file to the import folder of your QA system and import it  test the contents on the QA system  copy the .EPA file to the import folder of your production system and import it  Create a transport package file
    Here is the step by step procedure to create a transport package:
    For Export
    1. Go to system administration, and click on transport?export.
    2. In the middle pane, select the folder you want to export and right click on the Transport Package. 3. Fill in the General Properties i.e the name of the package, id and description. 4. And say finish and open the object for editing.
    5. When the object has been opened then right click on the object you want to transport, and say "Add object to the Transport Package".
    6. Check the checkbox of the item u have added and see the properties if it has been added properly. 7. Now click on the save button.
    8. After the object is saved, click on the export button. 9. U will have an option to select where to store the .epa file which will be generated. U can overwrite an existing one by selecting the browse button, or store it with the generated name in the location it automatically generates. 10. Now Click on the Start Export button.
    11. once the export is completed, it shows a report on how much time is taken to generate the .epa file. 12. Here there is an option for downloading the .epa file. Click on the link and download the file. This file is ready to be uploaded into any other EP Server.
    For Import:
    Pre-requisites: You have to copy the .epa file created while export into the local drive. Optionally, you have to manually copy the .epa file generated in the export function into the Import directory of the server ie. chooseFollow the steps below for importing a certain file. 1. Go to System Administration in the portal, and click on Transport?Import. 2. For the source of the package, Click on the radio button Server for the .epa file you have copied lately. Else, click on the radio button on client if you are operating in the client and select the .epa file you have stored on the local drive. 3. Now select the file from the browse option and click on Upload.
    4. Now click on the import button. 5. Once the import process is finished, the report is shown. In the whole process, the par files are not included in the .epa files. For the par files to be included into the .epa files then we have to change the pcdStartup.properties file in the server. The property to be changed is Pcd.TransportApplication.Export.ExcludeObjectTypesAfterRuleProcessing: Keep this property's value as empty for enabling the par files to be uploaded into the .epa. You can check for this property in the portal in the following -System Administration-Support-Portal Content Directory-PCD Configuration.

  • How to export tables from development server to production server

    HI,
    Any body plz let me know how to export tables from development server to production server. what are the user names and password i need to ask my manager to do that. what are the requirements i need to ask him.
    Plz reply me ASAP.
    Thanks in advance.

    hi buddy
    first of all you should let us know the environment of production and development servers
    database versions
    and you need to have userid which has privilege to export tables of other schema. userid(owner) of the tables you want to export.
    Traditional way
    export tables in development server and then ftp to production and then import
    in the above case you should have similar database structure(tablespace etc) to avoid errors...
    if there are few tables only , you can use dblink instead of export and import...

  • Can someone please tell me how to remove norton from my Mac.i am using osx 10.5.8

    Can someone please tell me how to remove norton from my Mac.i am using osx 10.5.8

    Norton Removal Tool (Symantec Uninstaller):
    http://www.symantec.com/business/support/index?page=content&id=TECH103489&locale =en_US

  • How to run workflow from Developer studio ?

    Hi Guys,
    I searched for a work item type in the developer studio and it showed the results, but could not find out how to run it from there.. I know we can run it from there.. There is no run button or options available.
    Do i need to setup some profile options ?
    Any help in this is highly appreciated !!
    Thanks,
    Sathish

    Hi,
    Are you logged in as the Workflow Administrator or a user who has been assigned that responsibility?
    Have a look on the Administration tab and it will show you who is configured as the admin.
    HTH,
    Matt
    WorkflowFAQ.com - the ONLY independent resource for Oracle Workflow development
    Alpha review chapters from my book "Developing With Oracle Workflow" are available via my website http://www.workflowfaq.com
    Have you read the blog at http://www.workflowfaq.com/blog ?
    WorkflowFAQ support forum: http://forum.workflowfaq.com

  • How to selection textu0092s from development  server to prodn does ? if not how

    How to transfer along with code selection text’s from development  server to prodn does ?

    From your ABAP SE38 program, in the menu bar :
    SE38> GOTO>Text Elements>Selection Texts
    press edit button save and activate in the same se38 program.
    Now these selection text become the part of ur request . You can also check the same in your request through se09/se10.
    reward if useful.
    Amit Singla

  • How to transfer menus from development to production instance

    Hi,
    Any suggestion on how to transfer menus between development instance to production instance would be really great.
    Thanks
    --Kumar                                                                                                                                                                                                                                                                                           

    There is also an application which can do it for you without you need to know about the FNDLOAD command. We are using one of them.

  • How to migrate reports from Development QA Production environment

    Hello,
    we have 3 Oracle Discoverer 10.1.2.3 environments and I would like to know what is the correct way to migrate reports from DEV to QA and to PROD.
    I'm researching about this by a couple of days and didn't find anything handy.
    The most likely way that I found was to export the entire EUL from one environment to another with the eulapi with a command line like that:
    exporting:
    eulapi -connect DEVUSER/pass@orcl -eul DEVUSER -export exp_all.eex -all
    importing using [ -import_rename_mode refresh ]:
    eulapi -connect QA_USER/pass@orcl -eul QA_USER -import exp_all.eex -identifier -import_rename_mode refresh -log imp.log
    That would work.
    However if the developer delete some object from the DEV environment and then import in the QA environment the deleted object won't be deleted from the QA environment and after some time the QA and PROD environment would be a mess.
    Another way that I figured out was to drop the eul from the PROD environment and then import all over. That would solve the problem but It has a lot of risks.
    Thanks in Advance,
    Jonas Zanon

    Hi,
    I think the best approach is to export the EUL components (e.g. business areas, folders, hierarchies, workbooks etc) separately from your development environment and hold these in a change management system. You can then import the components into test and prod and know which version of each component you have.
    Often when you make a change you will have to export/import several components. For example, if you add a folder you will need to export the folder, any business areas that hold the folder and if the folder is joined to any detail folders then these as well.
    We don't have scripts to delete components from production. Very rarely do you need to delete anything from production and generally it is not a good idea because reports will stop working because the references in the reports are missing.
    Rod West

  • How to transfer request from Development to Production

    Hi,
      Can anybody tell me Step by Step procedure to transfer request form Dev. to Prod.

    Hi
    It depends how many enviroments you have and the transport routes is defined: anyway I can suppose there are development, quality and production system.
    So:
    - A) U have to release the request in dev system (trx SE09 or SE10): after releasing the request the system will move it to the queue of quality system.
    After the step A u need to use only the trx  STMS in all next enviroments in order to transfer the request to the production.
    - B) It needs to import the request to the quality system:
    - run trx STMS,
    - press the first icon (with a truck);
    - double click on the quality queue
    - refresh the list;
    - place the cursor on the request;
    -  Go to Request->Import
    After importing the requet to the quality, the system will place it in the production queue, so now it needs to repeat the step B, but u have to choose the production queue:
    - C) It needs to import the request to the production system:
    - run trx STMS,
    - press the first icon (with a truck);
    - double click on the production queue
    - refresh the list;
    - place the cursor on the request;
    -  Go to Request->Import
    Sometimes the system is setted not to transfer the request to the next queue after importing it, in this case u need to transfer it by yourself (trx STMS):
    After choosing the right queue go to: Request->Forward->System
    Anyway yuo should consider the steps above should be done by your basis, so perhaps u have no authoriations to run trx STMS.
    Max

  • How to deploy Portal from Development server to Production server ?

    Hi all,
    I am new to OAS Portal. I have a question :
    I am developing the portal in development server, if I want to deploy it into production server, how can I do that ?
    Is there any docs on this ?
    Thank you very much,
    xtanto

    Assuming you are working with Portal 10.1.4, please see the following link for this documentation. It would also help in better planning for your deployment scenarios if you can briefly skim over the two chapters before the one in this link, specially to see what would be your options to lay it out on multiple environments.
    http://download.oracle.com/docs/cd/B14099_19/core.1012/b13995/testprod.htm
    thanks,
    AMN

  • How to download Lion from Developer Center to install in Parallels VM

    I have an iMac and a MacBook Air (MBA) both with OS X 10.8 Mountain Lion. I need to create a Parallels virtual machine with Mac OS X 10.7 Lion as the guest OS to be run on the MBA. I have Parallels installed on the MBA; all I need to do now is to create the VM. But first, I need a Lion install.
    So, I accessed the Developer Center and generated a Redeem Code for OS X Lion which I have successsfully added to my list of purchases in App Store. However, when I try to download OS X Lion the following message is reported.
    Any ideas how I can download Lion to install into my VM?

    Kappy wrote:
    I guess I shouldn't ask why you would want to run Lion in a Parallels' VM.
    I'm a software developer. I have a customer that has expressed a need for me to test the software being developed on Mac OS X Lion as well as OS X Mountain Lion. (I may also need to test on Snow Leopard but that's not definite at the moment.) I have Mountain Lion installed on my development machine (iMac) and test machine (MacBook Air) and I'd like to keep it that way - hence, my desire to install Mountain Lion in a Parallels VM.
    As a registered member of the Apple Developer Program and as I understand it, I have access to past versions of Mac OS X - hence, the redeem code. This appeared to be the easiest way to get the OS X version(s) I need. It turns out, appearances can be deceiving.
    Nothing shifty going on here, I assure you.

  • How do I convert from the try & buy license to the full license?

    Hi, we ordered a new Imq2.0 license after our JmQ2.0 beta license expired. Since it will take a few weeks to get that through the government purchasing process, I downloaded the latest try & buy imq from iplanet so we can continue our development while waiting for the purchasing process to complete. After installing the linux version, software that used to work with the JMS2.0 beta now crashes with the stack trace printed below.
    What does this Bad Portmapper Version Number exception mean and how do I fix
    it? I can't find anything on the Developer Connection about "Bad portmapper"?!??!

    We made some protocol changes between JMQ2.0 Beta and iMQ2.0. My
    guess is your clients are not using the iMQ2.0 jar files. The bottom
    line is you can't mix Beta servers and iMQ2.0 clients (and vice versa).
    This is mentioned in the release notes, although maybe it is not
    explicit enough. It should probably be mentioned in our FAQ too.

  • Connectting from developer 6 to 8.1.6

    I am trying to install developer 2000 version 6 on the same server where oracle 8.1.6 resides. Can anybody help me how to establish connection from developer suite to the database? That will be great help.
    null

    Initialize x in onLoad
    onClipEvent (load) {
    accel1 = 0.8;
    rate1 = 0.1;
    trace(_x);
    _root.xkoord1 = 0;
    x = 0
    Lon Hosford
    www.lonhosford.com
    Flash, Actionscript and Flash Media Server examples:
    http://flashexamples.hosfordusa.com
    May many happy bits flow your way!
    "Euclides" <[email protected]> wrote in
    message
    news:e7unk6$4kg$[email protected]..
    > The next code works fine with Flash Player 6 and Action
    Script 1 but I'm
    > trying
    > to get it work on Flash Player 8 and Action Script 2.
    >
    > Any help, thanks in advance.
    >
    >
    > onClipEvent (load) {
    > accel1 = 0.8;
    > rate1 = 0.1;
    > trace(_x);
    > _root.xkoord1 = 0;
    > }
    > onClipEvent (enterFrame) {
    > x = x*accel1+(_root.xkoord1-_x)*rate1;
    > _x = _x+x;
    > if (Math.abs(_root.xkoord1-_x)<1) {
    > _x = _root.xkoord1;
    > }
    > }
    >

  • OWB propagation from development to production environment

    Our department is in need to implement overall security around our production data warehouse.
    One issue that seems to bother our management is having only one OWB Designer where developers would have to be responsible enough to use snapshots and export mappings to mdl files. Management would like to have development and production OWB Designer Repository where production designer would always be in sync with what is deployed in prd database. Also prd OWB Designer Repository would be like a source safe so we have to always get a mapping from prd designer move it dev designer and when done propagate changes back to prd designer and then deploy to prd database.
    Would this be a good approach?
    Any input on how to handle propagation from development to production environment, and if you are aware of "best practices" when it comes to OWB environment is appreciated.
    Best Regards,
    Vlasta

    Hi,
    Copy whole catalog and rpd from dev to prob.
    If you want to copy specific report go to OracleBIData\web\catalog\samplesales\root\shared\sample+sales(group folder name)
    You can copy reports under folders and dashboards in _portal in Sample sales group folder...both file and .atr file.But you may miss security applied on those dashboards.
    http://www.rittmanmead.com/2008/04/28/migration-obiee-projects-between-dev-and-prod-environments/
    Best practice is to copy whole catalog and rpd (or) Copy shared and system folders and their .atr files from OracleBIData\web\catalog\samplesales\root so that you will not miss security and you will not over ride users folders which may contain some data created by them.
    Thanks,
    Srikanth

  • Hierarchy transport from developement to Quality?

    Dear SDN,
    Hierarchy transport from developement to Quality.
    I have created one balance sheet Hierarchy on 0Account infoobject.
    Could you please tell me how to transport hierarchy from development to Quality.
    Waiting for response.
    Thanks & Regards,
    Kiran

    Hi Kiran,
    Kiran Hierarchy data can be loade from source system, flat file or manually maintained in system.
    since you have done manulally you can do the same in other  systems also, but you need authrizations to maintain manually
    I have manually created my balance sheet hierarchy using RSH1 transaction code.
    you have do the same in quality also, since all required infoobjects are available in quality system, manulally create balance sheet hierarchy using RSH1 transaction code in Quality system.
    check whether you have authorization to manually create in Quality system. you have to do the same procedure in production also i guess.
    Regards
    Daya Sagar

Maybe you are looking for

  • Hide a DataGrid Column in a State?

    In one state, I want to show all columns. In a second state, I want to hide a few columns and made the grid smaller. I have: <mx:State name="detail"> <mx:AddChild relativeTo="{hbox1}" position="lastChild"> <ns:DetailPanel id="detailPanel" /> </mx:Add

  • Not so Smart Folders!

    Hi I have setup a Smart Folder that searches for files that have been modified within the last 3 days, My problem is that this type of search works fine on my home computer but when I try it on my work computer it just freezes the whole system with a

  • DPM 2012 R2 UR4 Console Constantly Crashing

    I have a case open with Microsoft regarding this and despite working on it for a week straight, they haven't been able to figure out the problem.  I'm in the process of escalating it, but in the meantime I thought I'd see if anyone can help point us

  • Issues in Workforce Planning

    Dear Friends, I am facing following isues in workforce planning. 1) I am not able to assign team maintained at WBSE level in assigned activities.Though the manpower maintained at Work Center is easily asigned. 2) The capacity requirement for activity

  • Gimp VS Gimpshop?

    I am learning how to do photo editing and I am not gonna buy photoshop so please do not tell me to buy it but so should I use Gimp or Gimpshop? I have to learn an interface anyway so I figured I should use Gimpshop so that if I needed to I would be a